JSC GIAP was founded in 1931;
At present GIAP is included in ALVIGO
Group of Company;
ALVIGO is a group of Design Institutes,
united in a single management complex;
It also includes NIAP LLC and
Khimtekhnologiya, Ltd design institutes;
Activity of ALVIGO is focused on the
production of ammonia, methanol,
ammonium nitrate, nitric acid, acetylene,
acetic acid, and other products of chemical
industry.
27.03.2019
ALVIGO Group of Company
Slide 2
© ALVIGO. All rights reserved
27.03.2019
Ammonium Nitrate Production Experience
Slide 3
АС-50 (4 plants)
АС-60 (26 plants)
АС-67 (7 plants)
АС-72 and АС-72 М (16 plants)
0
2000
4000
6000
8000
10000
12000
Общая мощность агрегатов по производству аммония нитрата Total capacity of ammonium nitrate production plants
GIAP has designed 50+ ammonium nitrate production plants:
Total capacity is more than 11 million tons per year
Ammonium Nitrate Technology
© ALVIGO. All rights reserved
27.03.2019
Prilled Ammonium Nitrate Process Stages
Slide 5
NH3
НNO3
Evaporation
Prills
Cooling
Neutralization Prilling
NH4NO3
Discharge
treatment
To atmosphere
© ALVIGO. All rights reserved
Neutralization Stage
27.03.2019 Слайд 6
Pressure of neutralization
process is atmospheric;
Natural circulation in vessel;
Process is conducted with an
excess of nitric acid;
Local treatment of secondary
steam;
Concentration of solution at outlet
is 89-93% wt.
Secondary Steam
(gas.)
2nd Stage Neutralizer
(gas.)
AN Solution
Neutralizing Heat
Recovery Unit
(Neutralizer)
© ALVIGO. All rights reserved
Evaporation Stage
27.03.2019 Слайд 7
Production of ammonium
nitrate melt is in one stage at
atmospheric pressure;
Residual moisture content in
melt is not more than 0.3 %
wt;
There is no necessity to
locate evaporator unit on the
top of prilling tower.
Scrubber
Evaporator
AN solution
Steam-Air mixture
AN melt
AN melt
Pump
AN solution
AN solution
Steam
Steam Condensate
Air 2nd stage neutralizer
AN melt
(gas.)
© ALVIGO. All rights reserved
Prilling and Cooling Stage
27.03.2019 Слайд 8
Prilling unit is a metallic
tower of rectangular section
Prills cooler is a 3-section
device of “fluidized” bed
High efficiency system of
atmospheric discharge
treatment
To atmosphere To atmosphere
AN melt
AN solution
AN solution
Air
Air
(Liquid)
Air Air Conditioning
Unit
Steam-Air
mixture
Prilling tower
Cooler in “fluidized” bed
Prilled AN
© ALVIGO. All rights reserved
27.03.2019
Quality Parameters of Finished Product
Slide 9
Parameter Name GOST 2-2013
Grade B
(higher grade)
Finished
Product
Mass fraction of nitrogen, %, not less than 34.4 34.5-34.6
Mass fraction of water, %, not more than 0.3 0,2
Grain-size distribution:
Mass fraction of prills:
- from1 to 4 mm, %, not less than
- from 2 to 4 mm, %, not less than
- less than 1 mm, %, not more than
- more than 6 mm, %, not more than
95
80
3
0
98
85±5
1
0
Static strength of prills, calculated as prill,
N/prill (kg/prill), not less
8 (0.8)
12(1.2)
Friability, %, not less than 100 100
© ALVIGO. All rights reserved
27.03.2019
Consumption Indices per 1t of Product
Slide 10
Name Unit Consumption with
operational losses
Raw Material
Gas Ammonia (100% NH3) kg 213
Nitric Acid (100% HNO3) kg 787
Utilities
Saturated Steam Р=1.5 MPa G t 0.3
Circulating Water m3 7
Electrical Energy kWh 25
AC-72 Plants Capacity Increasing
© ALVIGO. All rights reserved
АС-72 Plants Capacities
Slide 12 27.03.2019
After Revamping 2200-2400 tpd
Achieved Capacity 1600 tpd
Design Capacity 1360 tpd
© ALVIGO. All rights reserved
Neutralization
Prilling
(revamping)
Evaporation Neutralization
27.03.2019
Revamping Scheme of АС-72 Plants
Slide 13
NH3 НNO3
Evaporation
NH4NO3
Discharge
treatment
(revamping)
To atmosphere
Additional
treatment of
discharge
Prills cooling
(revamping)
Additional Line of
Neutralization and Evaporation
© ALVIGO. All rights reserved
Air Treatment Scrubber Revamping of АС-72 Plants
Slide 14 27.03.2019
2 stage – filtering treatment
for entrapping of fine
particles and ammonium
nitrate aerosols
1stage – scrubber part with
sieve trays
© ALVIGO. All rights reserved
Main Revamping Parameters of АС-72 Plants
Slide 15 27.03.2019
Parameter
Name
Before
Revamping
After
Revamping
Plant Capacity, tpd 1600 2200-2400
Impurity Content in
Air Discharged, mg/m3:
NH4NO3 > 100 30-50
NH3 > 40 10-15
© ALVIGO. All rights reserved
Track Record of Ammonium Nitrate Plants Revamped
27.03.2019 Слайд 16
Year Customer Services Capacity,
tpd
At
progress KuibyshevAzot,
Togliatti, Russia Ammonium nitrate granulation plant 2300
At
progress KemerovoAzot,
Kemerovo, Russia Revamping of AC-72/1,2 plants with с
capacity increasing
2300
2018 Acron,
Dorogobuzh, Russia Revamping of АС-72/1,2 plants 2300
2017 FosAgro-Cherepovets,
Cherepovets, Russia Revamping of discharge treatment system 1800
2015 UralChem,
Kirovo-Chepetsk,
Russia
Revamping of АС-72 plant with capacity
increasing and reduction of atmospheric
discharge
2100
2007 Neochim,
Dimitrovgrad, Bulgaria Revamping of АС-72 plant with capacity
increasing and reduction of atmospheric
discharge
2150