AMBER alignment and calibration issues RM, Manoa Aug.29,2011idlab/taskAndSchedule/... · AMBER...
Transcript of AMBER alignment and calibration issues RM, Manoa Aug.29,2011idlab/taskAndSchedule/... · AMBER...
![Page 1: AMBER alignment and calibration issues RM, Manoa Aug.29,2011idlab/taskAndSchedule/... · AMBER orientation East 19.12 North AMBER near calibration stand H = 3 m Ricardo Perez was](https://reader033.fdocuments.in/reader033/viewer/2022041606/5e344269b1e16320e21e89b4/html5/thumbnails/1.jpg)
AMBER alignment and calibration issues
RM, Manoa Aug.29,2011
![Page 2: AMBER alignment and calibration issues RM, Manoa Aug.29,2011idlab/taskAndSchedule/... · AMBER orientation East 19.12 North AMBER near calibration stand H = 3 m Ricardo Perez was](https://reader033.fdocuments.in/reader033/viewer/2022041606/5e344269b1e16320e21e89b4/html5/thumbnails/2.jpg)
AMBER calibration goals, timelines
Short term (by november 15): ● AMBER-SD synchronization
Long term (april?may?)● AMBER calibration with shaped pulses
![Page 3: AMBER alignment and calibration issues RM, Manoa Aug.29,2011idlab/taskAndSchedule/... · AMBER orientation East 19.12 North AMBER near calibration stand H = 3 m Ricardo Perez was](https://reader033.fdocuments.in/reader033/viewer/2022041606/5e344269b1e16320e21e89b4/html5/thumbnails/3.jpg)
HEATLET and AMIGA
![Page 4: AMBER alignment and calibration issues RM, Manoa Aug.29,2011idlab/taskAndSchedule/... · AMBER orientation East 19.12 North AMBER near calibration stand H = 3 m Ricardo Perez was](https://reader033.fdocuments.in/reader033/viewer/2022041606/5e344269b1e16320e21e89b4/html5/thumbnails/4.jpg)
HEATLET zoomed view
octocopter
airplane
![Page 5: AMBER alignment and calibration issues RM, Manoa Aug.29,2011idlab/taskAndSchedule/... · AMBER orientation East 19.12 North AMBER near calibration stand H = 3 m Ricardo Perez was](https://reader033.fdocuments.in/reader033/viewer/2022041606/5e344269b1e16320e21e89b4/html5/thumbnails/5.jpg)
AMBER orientation
East
19.12
North
AMBER near calibration stand
H=3m
Ricardo Perez was contacted to prepare a wooden scaffold to place the source (on a 1.5 m tripod) in front of AMBER parabula
![Page 6: AMBER alignment and calibration issues RM, Manoa Aug.29,2011idlab/taskAndSchedule/... · AMBER orientation East 19.12 North AMBER near calibration stand H = 3 m Ricardo Perez was](https://reader033.fdocuments.in/reader033/viewer/2022041606/5e344269b1e16320e21e89b4/html5/thumbnails/6.jpg)
Coihueco in GoogleEarthHEAT/Amber Coordinates:● E=445672 N=6114174(my file?)
● Lat=35°06'48.85” (GE)● Long=69°35 52.62” (GE)●FD Coordinates:● E=445358 N=6114135● Lat=35°06'50.90”● Long=69°35 58.68”
175 m175 m
170 m
![Page 7: AMBER alignment and calibration issues RM, Manoa Aug.29,2011idlab/taskAndSchedule/... · AMBER orientation East 19.12 North AMBER near calibration stand H = 3 m Ricardo Perez was](https://reader033.fdocuments.in/reader033/viewer/2022041606/5e344269b1e16320e21e89b4/html5/thumbnails/7.jpg)
HEAT/AMBER should be visible from the closest tank (Nancy) but we'll send Riki to check
FD HEAT
Coihueco in GoogleEarth
![Page 8: AMBER alignment and calibration issues RM, Manoa Aug.29,2011idlab/taskAndSchedule/... · AMBER orientation East 19.12 North AMBER near calibration stand H = 3 m Ricardo Perez was](https://reader033.fdocuments.in/reader033/viewer/2022041606/5e344269b1e16320e21e89b4/html5/thumbnails/8.jpg)
Coihueco in GoogleEarth:Airplane View from 2.4km altitude in AMBER FoV cone HEAT/AMBER
HEATLET-1HEATLET-1
HEATLET-2HEATLET-2
![Page 9: AMBER alignment and calibration issues RM, Manoa Aug.29,2011idlab/taskAndSchedule/... · AMBER orientation East 19.12 North AMBER near calibration stand H = 3 m Ricardo Perez was](https://reader033.fdocuments.in/reader033/viewer/2022041606/5e344269b1e16320e21e89b4/html5/thumbnails/9.jpg)
HEATLET-1HEATLET-1 HEATLET-2HEATLET-2
HEATLET-3HEATLET-3
Distance=1.27 kmHeight=0.73 km
T in FoV= 3.7 sec
1.4 km (3D)
1.6 km (3D)
Distance=3.1 kmHeight=1.75 kmT in FoV=9 sec
2 km (3D)
1
2
Coihueco in GoogleEarth:Calibration points in AMBER FoV
![Page 10: AMBER alignment and calibration issues RM, Manoa Aug.29,2011idlab/taskAndSchedule/... · AMBER orientation East 19.12 North AMBER near calibration stand H = 3 m Ricardo Perez was](https://reader033.fdocuments.in/reader033/viewer/2022041606/5e344269b1e16320e21e89b4/html5/thumbnails/10.jpg)
Aircraft option 1: Piper P-28 Arrow 2
Can take up to 4 peopleCost: ~900 AR$/hr=210US$/hr (fuel+pilot)Cruising speed ~ 137 knots = 254 km/h No problem to fly at about 200 kmh = 55m/s, or at lower speed, flaps on.
![Page 11: AMBER alignment and calibration issues RM, Manoa Aug.29,2011idlab/taskAndSchedule/... · AMBER orientation East 19.12 North AMBER near calibration stand H = 3 m Ricardo Perez was](https://reader033.fdocuments.in/reader033/viewer/2022041606/5e344269b1e16320e21e89b4/html5/thumbnails/11.jpg)
Aircraft option 2: Cessna 182E
Can take up to 4 peopleCost: 1.3X Piper? (fuel+pilot)Cruising speed ~ 138 knots = 256 km/h
![Page 12: AMBER alignment and calibration issues RM, Manoa Aug.29,2011idlab/taskAndSchedule/... · AMBER orientation East 19.12 North AMBER near calibration stand H = 3 m Ricardo Perez was](https://reader033.fdocuments.in/reader033/viewer/2022041606/5e344269b1e16320e21e89b4/html5/thumbnails/12.jpg)
30º
Optical Axis
![Page 13: AMBER alignment and calibration issues RM, Manoa Aug.29,2011idlab/taskAndSchedule/... · AMBER orientation East 19.12 North AMBER near calibration stand H = 3 m Ricardo Perez was](https://reader033.fdocuments.in/reader033/viewer/2022041606/5e344269b1e16320e21e89b4/html5/thumbnails/13.jpg)
NO 6 5 4 3 2
3 2 1
Careful: CO grid to be shifted 3.3 degrees to the left
![Page 14: AMBER alignment and calibration issues RM, Manoa Aug.29,2011idlab/taskAndSchedule/... · AMBER orientation East 19.12 North AMBER near calibration stand H = 3 m Ricardo Perez was](https://reader033.fdocuments.in/reader033/viewer/2022041606/5e344269b1e16320e21e89b4/html5/thumbnails/14.jpg)
Octocopter Option:- flying altitude range: 500-600 m (max 1000 m)
- about 20 mins autonomy (2,3 sets of batteries?)
- no way to have one ready by november : fully in the hands of Germans, who are preparing for a test around nov. meeting: GPS+GHz source+LED source (Ghz equipment tested on CROME). Test on HEAT at nightime, on AMBER at daytime?- we need: - Ghz receiver to trigger tanks