    Good PracticesGood Practicesin ICT Procurementin ICT Procurement

    under RA 9184under RA 9184

    rogelio vicente juan o. morales

    [email protected]

  • 8/4/2019 Alt Methods Part 2 Distrib

    2/52

  • 8/4/2019 Alt Methods Part 2 Distrib

    3/52

    Public perception: Computerization slows down

    work processes.

    Govt ICT Procurements

    DFA

    LTO

    LRA

    POEA

    GSIS

    COMELEC

  • 8/4/2019 Alt Methods Part 2 Distrib

    4/52

    ICT Hardware Items

    Description

    1. Computing DevicesDesktop PCs/Laptops/TabletsServers

    2. Networking DevicesWired routers and switchesWireless routers and switches

    3. Duplicating machines, Printer/Fax/Scanner

    4. Telephony Equipment (IP phones, etc.)

    5. Data Network (copper, fiber)

    6. AVR and UPS, Genset

  • 8/4/2019 Alt Methods Part 2 Distrib

    5/52

    ICT Software Items

    Description

    1. Operating Systems

    2. Office Productivity (i.e., MS Office)3. Specialized Software

    GIS, CAD, MultimediaEnterprise/Supply Chain/CR Mgt Sys

    4. Databases5. Systems & Network Mgt

  • 8/4/2019 Alt Methods Part 2 Distrib

    6/52

    ICT Supply Items

    Description

    1. Paper, Inkjet/Toner

    2. DVD-R, CD-R, Floppy disks

    3. Flash drives

    4. Network cable, patch cable/plugs

    5. Other consumables

  • 8/4/2019 Alt Methods Part 2 Distrib

    7/52

    ICT-related ServicesDescription

    1. Anti-virus subscriptionEnd-point (various)

    Device specific (e.g., routers)2. Tech Support & Preventive Maint

    Hardware: PCs, printers, network

    3. Tech Support & Preventive MaintS/W Licenses: OS, DB, incl. patches(related to an existing product)

    4. Internet Connectivity

    5. Web/Server Hosting, Data Conversion

    6. Training (end-user, IT staff)

    7. Application Svc/Subscriptions

  • 8/4/2019 Alt Methods Part 2 Distrib

    8/52

    4 Trends in ICT & Govt

    1. ICT cost/power ratio israpidly going down.

    2. Demand for qualityservices increasing butthe number of people todeliver them remainsthe same.

  • 8/4/2019 Alt Methods Part 2 Distrib

    9/52

    4 Trends in ICT & Govt

    3. ICT personnel in govt arebecoming a very scarce

    resource.4. Imperative for GOs to

    deliver the services yetoperate in a sustainablemanner

  • 8/4/2019 Alt Methods Part 2 Distrib

    10/52

    ICT ProcurementGood Practices

    Why not best

    practices?Why good practices?

    Situations change

    Systems change

    13

    13

  • 8/4/2019 Alt Methods Part 2 Distrib

    11/52

    ICT ProcurementGood Practices

    Technical capability: dont

    build it, buy it.Techs change so fast.

    Instead, build Project Mgtand leadership/supervisoryskills.

    11

  • 8/4/2019 Alt Methods Part 2 Distrib

    12/52

    ICT ProcurementGood Practices

    Introducing a

    paradigm shift forthe ICT unit: From ICT Specialists

    to ICT Project Managers

    Certified:

    LEAN but MEANLEAN but MEANICT unit

  • 8/4/2019 Alt Methods Part 2 Distrib

    13/52

    Keep in mind

    The more a firm strivesfor self-sufficiency, thelarger it becomes. Task of mgt increasing in

    complexity and diversity.

    Brings back the issue of strategicintent

  • 8/4/2019 Alt Methods Part 2 Distrib

    14/52

    IS Devt Strategy:

    "Build or Buy" Rule of

    thumb: Create a minimum, acceptable set of

    functions.

    Shop for OTS solutions. If at least 80%match, then consider a buy.

    For the unmet functions, weigh the cost ofcustomizing. If more than the OTS cost,

    build.

  • 8/4/2019 Alt Methods Part 2 Distrib

    15/52

    Test: Goods or Services?

    Anti-virus software

    Operating systems

    PC & printer maintenance contract

    ERP software

    RDBMS software

  • 8/4/2019 Alt Methods Part 2 Distrib

    16/52

    ICT ProcurementGood Practices

    Make ICT proc plansharmonize with APP. Why we have ISPs

    ICT is cross-cutting in all functions ofthe organization.

    One or more project may share thesame ICT resource/infra

    22

  • 8/4/2019 Alt Methods Part 2 Distrib

    17/52

    ICT ProcurementGood Practices

    As the ICT unit, build a rosterof reliable suppliers. Rate

    them periodically Feedback to Purchasing

    Not just Purchasings job, its the ICT

    units too.

    33

  • 8/4/2019 Alt Methods Part 2 Distrib

    18/52

    ICT ProcurementGood Practices

    Procurement of ICTs:include the ICT unit in the

    process Let the ICT unit review purchases;

    advise the BAC; inspect the items

    (work with purchasing & propertyunits)

    44

  • 8/4/2019 Alt Methods Part 2 Distrib

    19/52

    ICT ProcurementGood Practices

    Equipmentpurchases: include site prep, installation,

    testing & comm,training, tech supportand maintenance.

    Good project packagingand specs design

    55

  • 8/4/2019 Alt Methods Part 2 Distrib

    20/52

    ICT ProcurementGood Practices

    Equipmentpurchases: include site prep, installation,

    testing & comm,training, tech supportand maintenance.

    Good project packagingand specs design

    55

    Have a holistic viewof the procurement.

  • 8/4/2019 Alt Methods Part 2 Distrib

    21/52

    ICT ProcurementGood Practices

    Feasibility studies are aseparate procurementactivity Serves to inform decision-making

    Example: solution design selection This process is variable

    66

  • 8/4/2019 Alt Methods Part 2 Distrib

    22/52

    ICT ProcurementGood Practices

    Repeat order: should beexception, not practiceCase: each functional unit in the

    agency makes its own purchases.ICT unit should assert function

    Indicates lack of planning

    77

  • 8/4/2019 Alt Methods Part 2 Distrib

    23/52

    ICT ProcurementGood Practices

    Plan bulk purchases of PCs There is strength in numbers

    Trust branded PCs

    88

  • 8/4/2019 Alt Methods Part 2 Distrib

    24/52

    Branded vs. Clone?

    1. Product Warranty

    2. Manufacturer Source

    3. Service Availability

    4. Product Reliability

    5. Maintainability (by Tech Support) If you must buy clone make sure a

    supplier can closely match the warrantyof a branded

  • 8/4/2019 Alt Methods Part 2 Distrib

    25/52

    ICT ProcurementGood Practices

    PCs procured centrally butfor distribution to different

    regions.Ensure local tech support.

    99

  • 8/4/2019 Alt Methods Part 2 Distrib

    26/52

    ICT ProcurementGood Practices

    AMAP, limit diversity among

    printers. Replenishmentcosts will be lower.

    1010

  • 8/4/2019 Alt Methods Part 2 Distrib

    27/52

    Case of Printer Inks

    Relationship between

    Procurement ProcessAND Printer Ink type

    Inks for small users(small quantities of different

    types) could cause most ofPurchasing Depts time

  • 8/4/2019 Alt Methods Part 2 Distrib

    28/52

    Pareto Principle

    The 80/20 Principle: inbuilt imbalance betweencauses and results, inputs andoutputs, and effort and

    reward.

  • 8/4/2019 Alt Methods Part 2 Distrib

    29/52

    Pareto Examples

    80% computers time spentexecuting 20% of code

    80% of world wealth ownedby 20% of richest

    80% of profits come from20% of products sold

  • 8/4/2019 Alt Methods Part 2 Distrib

    30/52

    ICT ProcurementGood Practices

    ICT unit should provide

    guidance in PC specs. Purpose of use should dictate specs.Standard specs can be developed andupdated periodically.

    1111

  • 8/4/2019 Alt Methods Part 2 Distrib

    31/52

    ICT ProcurementGood Practices

    Keep this in mind:

    The higher the complexityof the procurementpackage, the higher the

    risk for failure.

    1212

  • 8/4/2019 Alt Methods Part 2 Distrib

    32/52

    What to do?

    Do a reality check

    Stricter penalty clause

    Well-defined SLAs But ensure enforcement!!!

    Limit bid to a minimum number ofqualified suppliers

  • 8/4/2019 Alt Methods Part 2 Distrib

    33/52

    ICT ProcurementGood Practices

    Lastly

    RA 9184 is not just BACsbusiness, its everybodysbusiness. Not just IT and purchasing, ALSO property,

    finance, accounting, etc.

    Procurement is a process that cuts acrossdifferent functions in the organization.

    1313

  • 8/4/2019 Alt Methods Part 2 Distrib

    34/52

    SARO-related issues

    Waiting game a cause ofproject implem delays

    SARO near-expiry

  • 8/4/2019 Alt Methods Part 2 Distrib

    35/52

  • 8/4/2019 Alt Methods Part 2 Distrib

    36/52

  • 8/4/2019 Alt Methods Part 2 Distrib

    37/52

    Consider Total Cost ofOwnership

    Real cost of product is not just its purchaseprice.

    TCO: total acquisition cost and operating

    costs. Infrastructure (floor space) Electricity (for equipment, cooling, backup

    power) Downtime, outage and failure expenses Backup and recovery process, technology

    training Diminished performance (i.e. users having to

    wait, diminished money-making ability) Security (including breaches, loss of reputation,

    recovery and prevention)

  • 8/4/2019 Alt Methods Part 2 Distrib

    38/52

    Example 1

    Procurement of outsourced networkmanagement service which includes

    the delivery/installation of a networkmanagement system and server on-site.

  • 8/4/2019 Alt Methods Part 2 Distrib

    39/52

    Example 2

    Procurement of a turnkey solutionusing the services of a Systems

    Integrator

  • 8/4/2019 Alt Methods Part 2 Distrib

    40/52

    Example 3

    Procurement of a web-basedapplication with servers, network

    infrastructure and PC workstations.

  • 8/4/2019 Alt Methods Part 2 Distrib

    41/52

    Tech Specs for Goods

    (Servers) Consider, if possible: Intended use and application

    Minimum memory Minimum disk storage

    Connectivity

    Backup Performance (fault tolerance,

    availability, proc speed, expansioncapability

    Packa in

  • 8/4/2019 Alt Methods Part 2 Distrib

    42/52

    Tech Specs for Goods

    (Software) usually provide the ff: Mode of operation/gen system archi

    Functional requirements, preferably detailedenough to the point of identifying all inputsand outputs

    Intended number of users

    Est. number of transactions to be handled Interfacing and interoperability requirements

    Compatibility, security and auditabilityrequirements

  • 8/4/2019 Alt Methods Part 2 Distrib

    43/52

    Consulting TOR

    Required expertise and minimumavailability of expertise

    Expected outputs preferably withtimetable

    TOR would normally contain: Background

    Objectives, Scope of Services, Training (when appropriate)

    Reports & Time Scheulde

    Data, Local Services, Personnel, and Facilitiesto be provided by procuring entity

  • 8/4/2019 Alt Methods Part 2 Distrib

    44/52

    SLAs forOutsourced Svcs

    Availability of the service to the user

    Minimum acceptable performance of

    the components to the service Measurement and reporting

    mechanisms that allow monitoring

    of the service Cost of the service or additional

    services (where applicable)

  • 8/4/2019 Alt Methods Part 2 Distrib

    45/52

    f

  • 8/4/2019 Alt Methods Part 2 Distrib

    46/52

    SLAs forData Conversion

    Possible service levels wouldinvolve:

    Accuracy Turnaround time

    Security/confidentiality of information

    f

  • 8/4/2019 Alt Methods Part 2 Distrib

    47/52

    SLAs forRepair & Maint

    Typical service level metrics include: Availability

    Location (on-site/walk-in) Response times of tech support

    Service/repair times,

    Service escalation clauses which mayinclude provision of service units and/orreplacements

  • 8/4/2019 Alt Methods Part 2 Distrib

    48/52

    GPRA Principles

    Technology neutralitycompetitiveness by extending equal

    opportunity to enable privatecontracting parties who are eligible andqualified to participate in publicbidding.

    Procurement based on objectivestandards

  • 8/4/2019 Alt Methods Part 2 Distrib

    49/52

    GPRA Principles

    Brand names Sec 3: the procurement process shall

    be made simple and made adaptable toadvances in modern technology inorder to ensure an effective andefficient method.

    4 justifications by way of strictexception.

  • 8/4/2019 Alt Methods Part 2 Distrib

    50/52

    Strict Exemptions

    May specify brand, product, orstandard names provided that it

    allows for functional equivalentsthru addition of the words: or substantially equivalent

    Wherein it means operationally andfunctionally interchangeable.

  • 8/4/2019 Alt Methods Part 2 Distrib

    51/52

    Successful ICT Proc

    Well-written TOR is aSMART TORScope and Deliverables

    Timetables

    CostQuality

  • 8/4/2019 Alt Methods Part 2 Distrib

    52/52