    ALPTRANSIT GOTTHARD

  • Titel PPT Seite 2

    PUBLIC TRANSPORT SYSTEM IN SWITZERLAND TODAY:

    ZEB

    AlpTransit

    HGV

    Ordinary budget 2007-2010

    Infrastructure fund

    Munich Paris Germany, NL, Scandinavia

    • The „blue“ Banana • 150 Mio. people

    Italy

  • Titel PPT Seite 3

    PUBLIC TRANSPORT SYSTEM IN SWITZERLAND TODAY

    Regional train to A

    Regional train to B

    Voralpen-Express from E Voralpen-Express from B

    Regional train from C Regional train from D

    Regional train from A

    Regional train from B

    Regional train to C Regional train to D Voralpen-Express to E Voralpen-Express to B

    34

    30

  • Titel PPT Seite 4

    Freight transportation: example with UKV 1300 tons with travel time gain

    The Gotthard Project; Comparison of Energy Consumption Existing Line

    Base Line

    198 km 0 km

    161 km 0 km

    100% Traction power

    via mountain track

    43…52%

    FREIGHT TRANSPORTATION: EXAMPLE WITH 1300 TONS WITH TRAVEL TIME GAIN / ENERGY CONSUMPTION

    Traction Power via base line

    All trains per day: 2000 MWh mountain 1250 MW tunnel

    Zurich-Milan: Now: 4 h 03 min New: 2 h 55 min Gain: 43 min freight 68 min pax

  • Titel PPT Seite 5

    Traffic volums: 300 trains/day 40 Mio net tons/year

    • 2 x 57 km long single track tunnel tubes (2x35 ml) • 2 x Multifunctional Places • 178 Cross passages every 325 mts • In total 157 kms of tunnel systems (98 ml) • Exterior track length: 40 km (24 ml)

    OVERALL VIEW GOTTHARD-BASE TUNNEL

  • Titel PPT Seite 6

    Rail track • 114 km slab track (in tunnel sections) • Concrete works with concrete train • 40 km ballast track (outside the tunnel sections) • 30 switches and crossings

    Power supply 50 Hz / Ventilation

    Cable installations / Mechanical

    • More than 5800 km of cables (MV- LV-

    and Control cables)

    • Control cabinets, 2000 pcs.

    • Local Control-and Supervision Systems 50Hz

    Traction Power 16.7 Hz

    • 114 km catenary in tunnel sections

    • 40 km catenary in the open track areas

    • Earthing systems

    • Switchgears

    • Monitoring- and Control Systems 16.7 Hz

    Telecommunication and Signalling

    • Interlocking, ETCS Level 2

    • Railway control systems

    • Tunnel radio network

    • Tunnel control system / IT-Systems

    60% 40 %

    Transtec Gotthard – Permanent Installations

    Overall Tasks / Project Management

    Temporary Installations

    TRANSTEC GOTTHARD – PERMANENT INSTALLATIONS

    • One global supplier

    • 1.9 Billion CHF

    • 9 8 years

  • Titel PPT Seite 7

    Earth W. 2 x 150 mm2 Cu

    Feeder 4 x 95 mm2

    Earth W. 1 x 150 mm2 Cu

    C.W. 120mm2 RIS / 17 kN

    M.W. 70mm2 Bz / 15 kN

    OCS: RE 250 OPTIMIERT 2009; TUNNEL

    • OCS in tunnel: 114 km/70 ml

    • OCS exterior: 40 km/24 ml

    • Cantilevers tunnel: 2860 pc.

    • Cantilevers on poles: 560 pc.

    • Feeder conoles: 3200 pc

    • Feeder wires: 2 x 114 km / 70 ml

    • Switches in tunnel: 39 pc.

  • Titel PPT Seite 8

    OCS: RE 250 OPTIMIERT 2009; OPEN TRACK

  • Titel PPT Seite 9

    OCS: RE 250 OPTIMIERT 2009; LONGITUDINAL LAYOUT

    Tunnel

    Exterior

  • Titel PPT Seite 10

    COMMISSIONING (SPEED/UPLIFT/SHORT CIRC./IMPEDANCE/VAR.)

    Speed Speed and uplift

  • Titel PPT Seite 11

    INSTALLATION WORKS ON OPEN TRACKS

  • Titel PPT Seite 12

    «Thank you for your attention.» Kummler+Matter AG Hohlstrasse 188 CH-8004 Zürich T +41 44 247 47 47 F +41 44 247 47 77 www.kuma.ch [email protected]

    ALPTRANSIT GOTTHARD

    Alptransit GotthardPublic Transport System in Switzerland Today:Public Transport System in Switzerland TodayFreight transportation: example with 1300 tons with travel time gain / energy consumptionOverall View Gotthard-Base TunnelTranstec Gotthard – Permanent InstallationsOcs: re 250 optimiert 2009; tunnelOcs: re 250 optimiert 2009; open trackOcs: re 250 optimiert 2009; Longitudinal layoutCommissioning (Speed/Uplift/short circ./Impedance/Var.)Installation works on open tracksAlptransit Gotthard