Alexandrine parrot By Lily-Grace O’Brien 5E 2011 By Lily-Grace O’Brien 5E 2011.
Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002...
-
date post
20-Dec-2015 -
Category
Documents
-
view
214 -
download
2
Transcript of Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002...
Alpha Borough Community Alpha Borough Community Recreation ProjectRecreation Project
Preliminary DesignPreliminary Design
Presented by Group 3
February 28, 2002
From left to right: Pamela Vislocky, Erin O’Brien, Justin Hoffmann, Jon Grabowski, Melissa Stevens
Funding – Grants & LoansFunding – Grants & Loans
Green Acres– $200,000 loan obtained in 1999– Additional grant/loan to cover balance of
outdoor recreational features
Small Cities / Housing & Urban Development (HUD)– Grant of up to $400,000
New Jersey Tree Planting Grant– Up to $25,000
Sources of Revenue Sources of Revenue
Increased pool feesActivities that utilize the rooms in the
recreational facility– Entertainers– Receptions– Dance classes
Proposed Site LayoutProposed Site LayoutAdditions
– Recreation center 2-level access
– Additional baseball field OR tennis courts and soccer field
– Access road and parking lots Total of 89 new parking spaces Crosswalks Fences and guardrail
– Detention facility
Proposed Site LayoutProposed Site LayoutRenovations
– Pool– Basketball courts
w/ lighting– Existing baseball
fields (lighting)
Other– Field house– Playground
Proposed Layout #1Proposed Layout #1
Highlights of layout:
Tennis courts and Soccer field
Building w/ 2-level access
New parking
Sidewalks and jogging path
Proposed Layout #2Proposed Layout #2
Highlights of layout:
New baseball field
Building w/ 2-level access
New parking
Sidewalks and jogging path
Proposed 1Proposed 1stst Floor Plan Floor Plan
– Community room 10,200 s.f. Capacity
100 people Stage Storage space
– Bathrooms– Kitchen– Technology
center– Game room– 2 offices– 1 meeting room
Proposed Basement Floor PlanProposed Basement Floor Plan
– Wrestling room– Weight room– Locker rooms– Mechanical room
5-Phase Plan5-Phase Plan
Improvements to existing fields & basketball courts
New sports fieldsDetention facilityPool and pool buildingCommunity center & associated
improvements
Preliminary Cost EstimatePreliminary Cost EstimatePhase Description Cost Source of Funding
1 Improvements to existing fields & basketball courts $20,000-$100,000 Borough
Lighting for existing basketball courts $10,000-$20,000
Lighting for existing baseball field $80,000-$100,000
Replacement of basketball goals $3,600
2 New sports fields $60,000-$110,000 Green Acres
Baseball field $60,000-$80,000
Two tennis courts $22,000-$30,000
Soccer field $60,000-$70,000
3 Detention facility $25,000-$50,000 Developer, Borough
4 Pool and pool building $270,000 Green Acres
Pool $260,000
Pool building (bathrooms) $10,000
5 Community center & associated improvements $1,000,000-$1,500,000 Small Cities, NJ Tree-Planting Grant, Borough
Build community center $1,000,000
Timber fence around playground $3,500
Access Road
Parking lot
Resurfacing of existing basketball court $6,000
Sidewalks $2,700
Walking/jogging path $5,100
$111,000
Questions / Comments?Questions / Comments?
Group 3 Contact Info:
Erin O’Brien
Phone: (610) 330-4562