All hands meeting Pier Oddone, September 21 st , 2011

43
All hands meeting Pier Oddone, September 21 st , 2011

description

All hands meeting Pier Oddone, September 21 st , 2011. Outline. Changes to benefit plans Employee Advisory Group (EAG) State of the FY12 budget Moving forward beyond the Tevatron. 2012 Medical Plan Changes. - PowerPoint PPT Presentation

Transcript of All hands meeting Pier Oddone, September 21 st , 2011

Page 1: All hands meeting Pier Oddone, September 21 st , 2011

All hands meetingPier Oddone, September 21st, 2011

Page 2: All hands meeting Pier Oddone, September 21 st , 2011

Outline

• Changes to benefit plans

• Employee Advisory Group (EAG)

• State of the FY12 budget

• Moving forward beyond the Tevatron

All Hands, September 21st, 20112

Page 3: All hands meeting Pier Oddone, September 21 st , 2011

2012 Medical Plan Changes

• Employees at Fermilab pay a smaller fraction of their health plan costs compared to other institutions

• There are inevitable pressures to come closer to the norm. We are choosing to do that now when we can make certain adjustments to minimize the pain

• All changes will be effective January 1, 2012.

All Hands, September 21st, 20113

Page 4: All hands meeting Pier Oddone, September 21 st , 2011

The employee share increases in 2012

All Hands, September 21st, 20114

Page 5: All hands meeting Pier Oddone, September 21 st , 2011

2012 Medical Plan Changes

All Hands, September 21st, 20115

2011 2012Single Family Single Family

Medical CoverageCigna Open Access Plus $ 80.34 $ 272.77 $ 113.43 $ 385.94 Cigna Network POS $ 81.36 $ 337.08 $ 111.01 $ 460.81 Blue Cross/Blue Shield Blue Advantage $ 68.20 $ 231.85 $ 91.64 $ 311.56

Dental CoverageCigna Dental PPO $ 9.84 $ 50.96 $ 10.07 $ 52.14 Cigna Dental Health HMO $ 11.00 $ 31.30 $ 11.77 $ 33.49

Health Plan Costs – Active Employees -Monthly

Page 6: All hands meeting Pier Oddone, September 21 st , 2011

How do we minimize the pain?

• DOE has frozen salaries for two years. No merit increases are allowed. However, DOE has given some flexibility to the laboratory to make adjustments.

• Within the authority allowed by DOE we will make a one time, permanent increase of $1,000/year

• Full and part-time employees are eligible, amount pro-rated for part-time employees

• The increase is effective Oct. 1, included in first October paycheck

All Hands, September 21st, 20116

Page 7: All hands meeting Pier Oddone, September 21 st , 2011

Other 2012 Medical Plan Changes

• Blue Cross/Blue Shield HMO Illinois plan no longer offered as of Jan. 1, 2012

• Blue/Cross/Blue Shield Blue Advantage will be the only HMO plan

Coverage in Blue Advantage HMO is very similar to HMO Illinois

Most doctors and hospitals in the HMO Illinois network also participate in Blue Advantage

The Blue Advantage plan costs the laboratory and employees significantly less than HMO Illinois

• More information available during Annual Enrollment, which begins November 7.

All Hands, September 21st, 20117

Page 8: All hands meeting Pier Oddone, September 21 st , 2011

Employee Advisory Group

All Hands, September 21st, 20118

http://www.fnal.gov/faw/EAG/

Page 9: All hands meeting Pier Oddone, September 21 st , 2011

Employee Advisory Group

• The EAG consists of 21 employees from throughout the laboratory

• It meets for three hours every month under the guidance of an outside facilitator. It elects its own leadership group to set agendas and prepare meetings

• Meetings attended by senior managers of the laboratory

• Group members come from a variety of employee perspectives, provides input on issues and policies

All Hands, September 21st, 20119

Page 10: All hands meeting Pier Oddone, September 21 st , 2011

Example of recent work…….

• A survey and follow-up analysis regarding satisfaction with the way individuals are managed/supervised within their groups

• Web based survey, anonymous

• Very useful in trying to understand “satisfaction” regarding management and potential correlations

• Invite you to read full survey at

All Hands, September 21st, 201110

http://www.fnal.gov/faw/EAG/presentations/SurveyAnalysis.pptx

Page 11: All hands meeting Pier Oddone, September 21 st , 2011

Congressional actions

• President’s Budget Request for FY 12 had a large increase for Office of Science (BES, BER, ASCR) and flat budgets for HEP

• Both House and Senate have taken the increases out so the Office of Science goes flat from FY11 to FY12. In this day and age, this is considered a good outcome

• The House E&W bill has the President’s request for HEP, but the Senate Committee mark-up took away $17M for Preliminary Engineering Design of LBNE.

All Hands, September 21st, 201111

Page 12: All hands meeting Pier Oddone, September 21 st , 2011

Congressional actions

All Hands, September 21st, 201112

% Change

OHEP FUNDING FY10 * FY11 PBRFY11 CR ** FY12 PBR

FY11 PBR to FY10

FY11 CR to FY10

FY12 PBR to FY11 CR

APPROP / PBR 810.5 829.0 795.4 797.0

SBIR (assumed for FY11) 19.7 20.1 19.3 19.2

ACTUAL AFTER SBIR 790.8 808.9 776.1 777.8 2.3% -1.9% 0.2%

SBIR % 2.4% 2.4% 2.4% 2.4%

* Per Congressional Base Tables on DOE CFO web site

** No Base Table for FY11 CR - SBIR not noted separately. Imputed using FY10 %.

House has the PBR for FY12, Senate $17M less. The numbers will be reconciled in the final bill

Page 13: All hands meeting Pier Oddone, September 21 st , 2011

Further Congressional actions

• The Deficit Reduction Committee has tight time table to produce additional cuts. We expect these to be beyond FY2012. However, any number of things could happen here.

• Next week the Science Committee of the House will visit Fermilab and host a roundtable discussion on the deep underground laboratory and LBNE. Real-time video here in the auditorium Wednesday, 10 am noon

All Hands, September 21st, 201113

Page 14: All hands meeting Pier Oddone, September 21 st , 2011

Life after the Tevatron

• We will shut down the Tevatron down on September 30, 2011; the analysis will continue for several years:

www.fnal.gov/Tevatron

• Next is the exploitation of the LHC. The LHC (accelerator and detectors) has been the largest investment made by the US in the last several decades!!

• Accelerator facilities at Fermilab will move to the Intensity Frontier, first with the existing complex and later with Project X.

All Hands, September 21st, 201114

Page 15: All hands meeting Pier Oddone, September 21 st , 2011

Two aspects to the intensity frontier

• 1) Neutrinos:

“Known unknowns”: the present picture has three generations of neutrinos that have masses and mix. However, we do not know many of the features of this picture: absolute neutrino masses, neutrino spectrum, missing mixing angle 13, matter-antimatter symmetry, Dirac or Majorana

“Unknown unknowns”: is this picture complete or are there additional particles such as sterile neutrinos or anomalous interactions that would make neutrino and anti-neutrino oscillation parameters be different?

All Hands, September 21st, 201115

Page 16: All hands meeting Pier Oddone, September 21 st , 2011

Two aspects to the intensity frontier

• 2) Rare processesIn quarks: studied in colliders such as B-

factories (Japan and Italy) or the Charm Factory (China)

In muons and kaons: studied with intense beams at Fermilab, CERN and KEK

All Hands, September 21st, 201116

LHC

“nothing”

Lots

Intensity Frontier

Only handle on the

next energy scale

Determine/verify

structure

Page 17: All hands meeting Pier Oddone, September 21 st , 2011

Fermilab facilities intensity frontier: neutrinos this decade

SM: Pattern of neutrino masses and mixings Long baseline experiments: MINOS NOvA (LBNE)

Beyond SM: Explore cracks in our understanding: sterile neutrinos? Anomalous interactions?

Short baseline experiments: MiniBooNE MicroBooNE Long baseline experiments: MINOS MINOS+

Neutrino physics measurements as a probe of nuclear structure and support of oscillation experiments

Dedicated experiment: MINERvA

17 All Hands, September 21st, 2011

Page 18: All hands meeting Pier Oddone, September 21 st , 2011

MINOS+ (FY13-14)

All Hands, September 21st, 201118

Sensitivities to new physics

Machado, Nunokawa, Funchal

Kopp, Machado, Parke

0 5 10 15E (GeV)

NOvA

MINOS+

Page 19: All hands meeting Pier Oddone, September 21 st , 2011

NOvA

• Electron appearance and next step in oscillation parameters. Neutrinos vs. antineutrinos?

All Hands, September 21st, 201119

Page 20: All hands meeting Pier Oddone, September 21 st , 2011

MINERvA• Very fine grain

calorimeter with different nuclear targets

• Study nuclear structure with neutrinos

• Provide engineering measurements for oscillation experiments

All Hands, September 21st, 201120

Page 21: All hands meeting Pier Oddone, September 21 st , 2011

MicroBooNE

• Follow excess in present MiniBooNE data. Critical to determine is it electrons or photons?

• Use Liquid Argon TPC: physics + further development of the technology. Successful CD-2-3a review!

All Hands, September 21st, 201121

Page 22: All hands meeting Pier Oddone, September 21 st , 2011

Fermilab facilities intensity frontierrare processes this decade

• Also in the intermediate term, a series of world-class experiments exploiting the present beams:

g-2: anomalous magnetic moment of the muon x20 statistics

Mu2e: direct muon to electron conversion - huge sensitivity to NP

SeaQuest: nuclear physics Drell-Yan process to study the structure of the nucleon in the nuclear environment

All Hands, September 21st, 201122

Page 23: All hands meeting Pier Oddone, September 21 st , 2011

A new (g-2) to uncertainty 0.14*10-11

23 All Hands, September 21st, 2011

Model

UED

LHC

Page 24: All hands meeting Pier Oddone, September 21 st , 2011

Mu2e….

All Hands, September 21st, 201124

Conversion of a muon into an electron in the field of a nucleus: negligible rate in the SM and measurable in almost any extension of the SM

Production Solenoid Detector SolenoidTransport Solenoid

Production TargetTracker

Calorimeter

Page 25: All hands meeting Pier Oddone, September 21 st , 2011

Proton improvement plan

All Hands, September 21st, 201125

Tevatron ends

NOvA

MINERvA

MINOS?

MicroBooNE

g-2 Mu2eMINERvA

MINOS

MiniBooNE

This decade: double the intensity

shutdown for NOvA

Next Decade Project X: 100 times

LBNE

Page 26: All hands meeting Pier Oddone, September 21 st , 2011

Preparing for the next decade• LBNE (0.7MW 2+ MW): the long-base line experiment

Neutrino mass spectrum (mass hierarchy) Matter-antimatter symmetry Neutrino/antineutrino differences Anomalous interactions Bonus: supernova neutrinos, relic neutrinos, proton decay

• Project X: a broad program with megawatts of continuous beam, ideal to lead at the intensity frontier

Neutrino, long/short base-lines, more than 2 MW to LBNE Kaons where the Standard Model backgrounds are minimal and we are

sensitive to many models Rare muon decay with sensitivity to masses 10000 TeV Symmetry violations through electric dipole moments in nuclei Applications to transmutation, spallation targets, ADS

All Hands, September 21st, 201126

Page 27: All hands meeting Pier Oddone, September 21 st , 2011

Long Baseline Neutrino ExperimentCD 0: January 2010

1300 km

Collaboration: 306 members

58 institutions (6 US labs) and 5 countries (India, Italy, Japan, UK, US)

Continue to grow!

Page 28: All hands meeting Pier Oddone, September 21 st , 2011

All Hands, September 21st, 201128

Page 29: All hands meeting Pier Oddone, September 21 st , 2011

Homestake Lab Layout

All Hands, September 21st, 201129

Page 30: All hands meeting Pier Oddone, September 21 st , 2011

Evolution of Neutrino Sensitivities

LBNE NOvA MINOS >2 0.7MW 0.7MW 0.3MW

All Hands, September 21st, 201130

Page 31: All hands meeting Pier Oddone, September 21 st , 2011

Status of Homestake facility• NSF stopped funding the development of the deep

underground laboratory in DUSEL: not appropriate for NSF

• DOE will support the facility through 2012 to allow for re-configuration

• Recent NRC Report strongly supports the scientific objectives: LBNE, DBD, DM

• Marx/Reichtanadter Report supported joint development, but dependent on LBNE

• DOE is supporting design, down-select on technology for LBNE. Final decision depends on costs and budgets……

All Hands, September 21st, 201131

Page 32: All hands meeting Pier Oddone, September 21 st , 2011

Project X Reference Design

All Hands, September 21st, 201132

Page 33: All hands meeting Pier Oddone, September 21 st , 2011

Project X Siting

All Hands, September 21st, 201133

Page 34: All hands meeting Pier Oddone, September 21 st , 2011

Project X

• Unique facility with 3 MW, continuous wave (CW) linac. Multiplies low energy flux of protons at Fermilab by 100 with flexible timing patterns, ideal for rare decays

• Solves “proton economics”. Experiments run simultaneously at 3 GeV, 8 Gev and 60-120 GeV at high power

• Delivers 2+ MW to LBNE

• To be developed consistently to serve as front end of neutrino factory or muon collider

All Hands, September 21st, 201134

Page 35: All hands meeting Pier Oddone, September 21 st , 2011

Project X: new experiments

All Hands, September 21st, 201135

Page 36: All hands meeting Pier Oddone, September 21 st , 2011

Project X: technology innovation

All Hands, September 21st, 201136

Page 37: All hands meeting Pier Oddone, September 21 st , 2011

Project X and the big questions

All Hands, September 21st, 201137

Where does mass come from?

Why is matter dominant?

What are the neutrino masses and what do they say?

Where are the heavy neutrino partners?

Why are there three families of quarks and leptons?

Do the forces unify?

Does nature use supersymmetry or other new symmetries?

Are there extra dimensions of space?

What is dark matter?

What is dark energy?

neutrinos

muons

kaons

Nuclei(EDMs..)

Page 38: All hands meeting Pier Oddone, September 21 st , 2011

Getting ready: IARC

All Hands, September 21st, 201138

Illinois Accelerator Center

Test facilities at NML

IARC jointly funded the State of Illinois and DOE: promotes involvement with industries and universities

Page 39: All hands meeting Pier Oddone, September 21 st , 2011

Getting ready: ARRA - IB-3 Addition

All Hands, September 21st, 201139

Page 40: All hands meeting Pier Oddone, September 21 st , 2011

Getting ready: ARRA- MI-8 Addition

All Hands, September 21st, 201140

Page 41: All hands meeting Pier Oddone, September 21 st , 2011

ARRA-FCC Cooling and Power

All Hands, September 21st, 201141

Page 42: All hands meeting Pier Oddone, September 21 st , 2011

ARRA – WH Generator

All Hands, September 21st, 201142

Page 43: All hands meeting Pier Oddone, September 21 st , 2011

ARRA – CMTF & NML

All Hands, September 21st, 201143