Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated...

31
Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS www.gsi.de/eurons

Transcript of Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated...

Page 1: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

The Integrated Infrastructure Initiative (I3) EURONS

www.gsi.de/eurons

Page 2: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

The I3 project EURONS : Goals of an I3

• Improvement of existing infrastructures*(Joint research activities, JRA)

• Increase access to existing infrastructures*(Transnational access, TNA)

• Foster networking and integrating activities(Networks)

* Large-scale facilities, laboratories with unique instrumentation, collections and museums, data bases, communication networks, etc.

Page 3: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

The I3 project EURONS: Budgets for Access, Networks, and JRAs

• Access to infrastructures: 6.590 k€

• Networking and integrating activities: 1.456 k€

• Joint research activities: 6.010 k€

total:14.056 k€

• 45 institutions in 22 countries

• Work packages:8 Transnational Access Activities8 Networking Activities11 Joint Research Activities

• January 2005 to December 2008

• Project Coordinator: Alex C. Mueller (Orsay) (Assistant to the Coordinator: Christoph Scheidenberger, GSI)

Page 4: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

General AssemblyOne representative of each laboratory feedback from and to community, monitor progress

Project Coordination CommitteeAll project leaders and the managing teamSupport of Coordinator in all management issues, surveys the overall coherence of the activities

ManagementAdministrative personsKeep track of financial situation, control „cash flow“

The I3 project EURONS: Management structure

Page 5: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

The Activities : Networks

 No.  Network Activity Responsible Person

 N1  MANET - Management Network Alex C. Mueller (CNRS-IN2P3) and C. Scheidenberger (GSI)

 N2 CARINA - Challenges and Advanced Research in Nuclear Astrophysics

C. Angulo (UCL)K. Sonnabend (IKP TUD)

 N3 GAMMAPOOL - Coordination of the resources for -ray spectroscopy in Europe

S. Lenzi (INFN Padova)

 N4 EWON - East-West-Outreach - European Nuclear Physics Network

S. Harissopulos (NCSR Demokritos) and R. Broda (U-Warsaw)

 N5  NuPECC - NuPECC Mapping Studies S. Körner (NuPECC)

 N6 PANSI3 - Network for Enhanced Dissemination of Information on Nuclear Research within EURONS

H. Leeb (AIAU)

 N7 SHE - Transfermium element synthesis, properties and reactions

A. Villari (GANIL)

 N8 TNET - Network to coordinate the Nuclear Structure and Reaction Theory work

I.Thompson (U-Surrey)J. Tostevin (U-Surrey)

Page 6: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

No.                    ProjectResponsible Person(s)

 JRA1ACTAR - Active Target Detectors for the Study of Extremely Exotic Nuclei using Direct Reactions

H. Savajols / P. Roussel-Chomaz (GANIL) 

 JRA2AGATA - Advanced Gamma Tracking Array

W. Korten (CEA)

 JRA3Charge Breeding - Advanced charge breeding of radioactive ions

O. Kester (GSI)

 JRA4DLEP - Detection of Low Energy Particles from Exotic β-decays

O. Tengblad (CSIC)

 JRA5EXL - Exotic nuclei studied with Light hadronic probes

N. Kalantar (RUG-KVI)

The Activities : Joint Research Activities

Page 7: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

No.                    Project   Responsible Person(s)

 JRA6INTAG - Instrumentation for Tagging

P. Butler (U-Liverpool)

 JRA7ISIBHI - Ion Sources for Intense Beams of Heavy Ions

G. Ciavola (INFN-LNS)

 JRA8LASER - Laser techniques for Exotic nuclei Research

P. Van Duppen (U-Leuven)

 JRA9RHIB - Reactions with High-Intensity Beams of exotic nuclei

T. Aumann (GSI)

 JRA10

SAFERIB - European Joint Research Activity on Radiation Protection Issues related to Radioactive Ion Beam Facilities

P. Thirolf (LMU)

 JRA11

TRAPSPEC - Improvements and developments of ion traps, spectrometers and detectors for low-energy nuclear physics experiments

N. Severijns (U-Leuven)

The Activities : Joint Research Activities

• see details here: www.gsi.de/eurons

Page 8: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

I. TNA activities

EURONS backbone:8 facilities

~ 1900 users ~ 18700 person-

days> 350 user projects~ new user groups

Page 9: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

The "theory access facility" of EURONS

• International workshopseries and collaboration meetings

• Doctoral Training Programme

• Postdoctoral Programme• Theory of strongly-int. particles:

– nuclear structure– QCD– hadron physics

• matter under extreme conditions

• nuclear astrophysics • condensed matter physics• quantum physics of small

systems

Page 10: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

II. JRA and networking

In 2002/3, when preparing the EURONS project, the nuclear-structure community in Europe had identified the following needs of high priority:

• Beams• Detectors and instruments• Reaction setups• Safety

• Co-ordination (synergies, strategies)• Mapping studies• Outreach

JRAs

Networks

Page 11: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

BeamsISIBHI: intense primary beams efficient charged-particle

generation for accelerators study and optimize the charge

breeding process improve the beam quality and

purity

Charge Breeding: intense secondary beams

optimization of breeding efficiency narrow the charge state distribution optimize the purification

from rest gas contamination optimize the transverse and longitudinal emittance of the extracted beams

LASER: efficient use of ISOL beams new exotic and isomeric RIBs optimization of RIB time structure injection into ion traps or post-accelerators,

reduction of background in collinear spectroscopy,...)

New beamsIntensityQuality (purity, phase space)

Complementary developments, all facilities benefit

Page 12: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

Safety - Impact on Research Facilities

SAFERIB project results:SAFERIB project results: improvement of research facilities:improvement of research facilities:calculations and measurements of secondary radiation/activation from fast beams in thick targets

development of high-intensity fission source

development of cryotrap to localize volatile radioactivity from intense fission source

development of remote-controlled target handling system

study of impact on the environment: - soil and ground water activation - activity transport in ground water - spent ISOL targets: inventory, handling, release risks

GSI: improvement of target shielding of Super-FRS

EURISOL: concept for safe, intense fission source

GANIL: improvement of radiopro- tection concept for SPIRAL-2

INFN-LNL: prerequisite for operation of SPES fission target

CERN: improvement of radioactive waste handling and disposal

any RIB facility licensing procedure

Saferib

Page 13: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

AGATA DLEP

INTAG TRAPSPEC

SensitivitySelectivity

Count-rate capab.New opportun.

Detectors and instrumentsDevelopment of semi-conductor charged-particle detectors with pulse shape analysis

Detector array + electronics builtISOLDE: evidence of a new state in 11Be observed in 11Li beta decay

Implementation of new equipment for trap-assisted spectroscopy for nuclear structure and fundamental physicsApplied at ISOLDE, GANIL, GSI, JYFL: masses, decay schemes, recoil spectra, neutron decay

Gamma-ray spectroscopy of unpre-cedented selectivity and efficiency, demonstrator ready end of 2008

AGATA demonstrator currently under construction in Legnaro

Application at LNL, GANIL, GSI

Extend the method from -decay tagging to - tagging using focal plane detectors and prompt radiation spectrometers

Now in use at GANIL, GSI, ISOLDE, JYFL, LNL

universally applicable to improve the performance of the facilities.

Page 14: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

Pooling of resources - GAMMAPOOLPooling of existing, not site-specific g-ray instrumentation in order to use it Europe-wide in a coordinated manner among 20 participanting institutes from 6 countries:

– Resources and campaigns: clusters, clovers, single-crystal Ge, electronics and other equipment forRISING @ GSI/FRS CLARA @ LNL/PRISMAJUROGAM @ JYFL/RITU

– New collaborations:Newgan @ GANIL, ORGAM @ ALTO, Euclides @ LNLAGATA: characterization of detectors

– Workshops: 3 workshops with >200 participants and ~120 contributions

....a good example, how one can achieve a high value with good co-ordination and rather little money

stopped beam, isomer and β-decay stud. neutron rich nuclei, reaction mechanism proton-rich very heavy nuclei

Page 15: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

Identification and definition of needs and strategies - CARINA, TNET, SHE

e.g. CARINA: co-ordinate activities, research efforts and efficient use of existing experimental facilities for nuclear astrophysics

4 working groups established:• Astrophysics and nuclear models• Instrumentation• Link to EURONS large scale facilities• Link to European small scale facilities

2 workshops3 new collaborations established (JINA, EURISOL, ECOS)

.... a new degree of interaction for increased efficiency in nuclear astrophysics has been established

Page 16: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

Mapping studies - NuPECC, EWON

• The mapping of the community at large, performed under the auspices of NuPECC are subject of two dedicated networks

• EWON has specifically addressed the eastern-European nuclear physics research potential with an emphasis on the candidate countries

• Enhanced involvement of more than 500 scientists• Look for actions necessary to improve the existing infrastructures • Exploit and promote the research

potential of “local machines”• Promote the high-level of expertise

of EWON scientists• Come up with ideas to be included

in future I3 => EWIRA• Interact intensively with NuPECC

Page 17: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

Enhanced dissemination - PANSI3

A dedicated outreach activity • to reach the layman• to raise public awareness of

nuclear science in Europe• to disseminate EURONS results

......realized with a concerted networking effort

......published recently

Page 18: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

....reaching the general public

Page 19: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

EURONS Deliverables 2005 - 2009

0

20

40

60

80

100

120

140

160

180

0 12 24 36 48Project Month

Nu

mb

er o

f D

eliv

erab

les Sum Deliverables

DueSum DeliverablesAccomplished

EURONS monitoring: deliverables

Page 20: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

EURONS monitoring: milestones

EURONS Milestones 2005 - 2009

0

50

100

150

200

250

300

350

0 12 24 36 48Project Month

Nu

mb

er o

f M

iles

ton

es

Sum MilestonesDue

Sum MilestonesAccomplished

Page 21: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

EURONS Financial Flow and EC-contribution

0

2

4

6

8

10

12

14

16

0 6 12 18 24 30 36 42 48

Month of the Project

Fin

anci

al F

low

(in

M€)

* number taken from Forms C section 5: requested EC-contribution to the eligible costs of the concerned contractor depending on the cost model

70% EC pre-financing first 36 months:reached month 19

80% of EURONS budget

100% of EURONS budget

Request* for months 1-48

EURONS monitoring: financial overview

Page 22: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

Impact and future

• Applicationsdata, basic knowledge and techniques for spin-offs in– health, medicine– safety, security– producing and evaluating nuclear data and techniques for

applications, e.g. nuclear energy

• Society– outreach activities have prompted public awareness and have

attracted large interest (e.g. open-house days at various EURONS facilities)

– integral part of the EURONS activities: education of next-generation nuclear scientists, a great value for the society as a whole

• Future– all EURONS activities will continue in one or another way, ENSAR?– integration of east-European scientists from candidate countries– several long-term projects (NUSTAR@FAIR, SPIRAL-II, Eurisol...)

and many "small" laboratories increase future opportunities

Page 23: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

Applications for the society

Health, medicineSafety, securityTrace analysisHigh-power X-ray imagingPolonium detection

on-line PET imaging using pulse shape analysis

Page 24: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

Conclusions

EURONS activities have lead to an ... efficient use of existing resources... improvement of its facilities... increase of access in quantity and quality

EURONS has fulfilled its mission

EURONS has largely disseminated its achievements, more publications to come

EURONS is a managerial and scientific success, for the benefit of the facilities, the user community, and the public

As a pan-European project, EURONS has very successfully contributed to structuring the field, coordinating ongoing activities, promoting the most needed R&D, defining future needs of the nuclear-structure community in Europe

This community must be kept together by a successor project

Page 25: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

Intense primary beams

High B-field (~3T), operated at 28 GHz

• compact source, permanent magnets Bmax=3T, Brad~1.7...2.2T highest field of a permanent- magnet trap

• commissioning has begun at the end of 2007, completion within next months• multi-purpose super-conducting ECRIS (MS-ECRIS)

• largest adjustable magnetic field ever achieved: Bmax=4T, Brad=2.7T, large ECR zone

• all components built, but magnets have not yet achieved the requested performances.

Simulations and tests at Grenoble, Groningen, Frankfurt, Catania to optimize E-field:• uniform field: ions weakly scattered,

strongly improved beam quality• non-uniform E-field: ions strongly scattered

Page 26: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

6-

1+

New opportunities with laser ion sources

Increased selectivity New beams

For the first time laser ionization of polonium:development of two new laser ionization schemes

Post-accelerated isomeric Cu beams at ISOLDE: 68m,gCu, 2.86 MeV/u, 3E5 pps, 74% pure

68gCu

68mCu

Page 27: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

6-

1+

New opportunities with laser ion sources

Increased selectivity New beams

For the first time laser ionization of polonium:development of two new laser ionization schemes

68Cu 6- (+1+)

120Sn2+-0+

Energy (keV)

68Cu 1+

Post-accelerated isomeric Cu beams at ISOLDE: 68m,gCu, 2.86 MeV/u, 3E5 pps, 74% pure

68gCu

68mCu

Page 28: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

Charge breeders survey

Injection of molecules: 13C16O 13C4+ 0.5% 139LO+ 139L23+ 2.5 %

Tests in the afterglow mode: 86K13+ 86K13+ 1%132Xe18+ 132Xe18+ 2.2%85Rb1+ 85Rb15+ 2.5 %

Trapping and breeding of daughter nuclides:61Mn (T1/2=0.7s) 61Fe (T1/2=359s): qual.

res.Simulations with CBSIM: ionization, charge exchange, RR, collisions, electron- ion-heating, ion-ion cooling, space-charge neutralis.,...

84Kr15+LPSC

120Sn22+LPSC

EBIS ECRIS

Page 29: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

Reaction setups for relativistic beams

Exclusive measurement of all interesting reaction channels

- knockout plus decay of residual system

- inelastic excitation plus proton decay (nuclear, electromagnetic)

- quasi-free scattering: (p,2p) (p,pn) (p,p)

new: proton tracking

behind magnet with drift chambers

new: proton tracking around the target with Si-strip detectors

new: beam tracking with Diamond detectors

New user groups from nuclear astrophysics attracted !

RHIB

Page 30: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

New schemes for reaction experiments

Feasibility study (p,p) at ESR with 350 MeV/u 136Xe ions

Reconstruction of full kinematics for

elastic and inelastic scatteringtransfer reactionsbreak-up and knock-out

GSI - high energy: storage ring + internal target

GANIL - low energy: active target

EXL

Page 31: Alex C. Mueller, MANETNuPECC Meeting 2009, Vienna, March 13th - 14th, 2009 The Integrated Infrastructure Initiative (I3) EURONS .

Alex C. Mueller, MANET NuPECC Meeting 2009, Vienna, March 13th - 14th, 2009

SAMURAI TPC, RIKEN

An example for synergies

R3B TPC, GSI/FAIR

AT/TPC, MSU

TACTIC, TRIUMF

TPC BORDEAUX

ACTAR, GANIL

ACTIVE TARGET, SPIRAL2 + FAIR

AFTER (ASIC)

ACTAR