www.pipeline-news.com • October 2017 • Pipeline News 11
in developmentPLANNEDProjects(Projects added for the current month are highlighted and in bold face type)
GAS – The Americas U.S. ALASKA GASLINE DEVELOPMENT CORP. –(REV 6/17) Project: Alaska Stand Alone Pipeline Type: Project includes construction of a
transmission pipeline and lateral Length: 763 milesDiameter: 12 and 36 inchesLocation: Prudhoe Bay, AK – Nikiski, AKCapacity: 500 MMcf/dCost: $10 billionStart: 2019Completion: 2023Status: Project is awaiting a Supplemental
Environmental Impact StatementComments: Pipeline is part of the proposed Alaska
LNG Project
ALLIANCE PIPELINE – (5/17)Project: Pacific Alliance Pipeline ExpansionType: Project includes addition of compression
facilitiesLocation: Chicago, ILCapacity: 500 MMcf/dContact: Jason Feit Manager, Asset Optimization and
Development (403) 517-6361Status: Project is undergoing an economics
study, with a decision on next steps anticipated by 3Q 2017
Completion: 4Q 2020
AMERICAN MIDSTREAM PARTNERS LP – (REV 6/17)Project: Magnolia Intrastate ExtensionType: Project includes extension of pipelineLength: 45 milesDiameter: 24 inchesLocation: AlabamaCapacity: 500 MDth/dStatus: Project is in the bid phaseCompletion:2019
ATMOS ENERGY – (1/17)Type: Project includes construction of two
pipelinesLength: 18 milesDiameter: 8 inchesLocation: Lowndes and Oktibbeha counties, MSStart: 2Q 2017 Comments: Pipeline is in the bid phase
CABOT OIL & GAS CORP. – (REV 6/17)Owner 2: Williams Partners LPOperator: Constitution Pipeline LLCProject: Constitution PipelineType: Project includes construction of pipeline
and compression facilitiesLength: 124 milesDiameter: 30 inchesLocation: Susquehanna County, PA -
Wright County, NYCapacity: 650 MMcf/dCost: $925 million
Docket: CP13-499Status: New York State blocked the federally
approved pipeline in May 2016 and the company is currently challenging the state’s decision
CANYON MIDSTREAM PARTNERS – (7/17)Operator: Pomelo Connector LLCProject: Pomelo Connector Pipeline
Type: Project includes construction of pipeline and a compressor station
Length: 14 milesDiameter: 30 inchesLocation: Nueces County, TXCapacity: 400 MDth/dDocket: CP17-26Status: Project is awaiting FERC approval
214-515-5000 • www.polyguard.com
Innovat ion based. Employee owned. Expect more.
RD-6 Fastest Coatingin the West
Contractors say there is no faster or trouble free girth weld coating system than Polyguard® RD-6®. On a recent project (12” pipe, FBE
mainline coating) a first time crew coated 150 joints on day one after training. On day two, after adding a driver to the 5 man crew, 201 joints were completed. No coating system has less installation problems than
Polyguard® RD-6®. Ask someone who has installed it.
One of thousands of projects using Polyguard RD-6 non-shielding coating. Our first was in 1988.
www.Polyguard.com/pipeline
®
Country
For more information, visit
PLANNEDProjects in development
12 Pipeline News October 2017 • www.pipeline-news.com
DOMINION ENERGY – (REV 9/17)Owner 2: Duke EnergyOwner 3: Piedmont Natural Gas Owner 4: Southern Company GasOperator: Atlantic Coast Pipeline LLCProject: Atlantic Coast PipelineType: Project includes construction of pipelineLength: 600 milesDiameter: 20, 36 and 42 inchesLocation: Harrison County, WV – Chesapeake, VACapacity: 1.5 Bcf/dCost: $5.1 billionDocket: CP15-554Status: Project has received a Final Environmental
Impact StatementStart: 4Q 2017Comments: Project has awarded construction
contracts to Spring Ridge Constructors LLC, U.S. Pipeline Inc., SMPC LLC and Rockford Corp.
Project: Supply Header ProjectType: Project includes pipeline construction and
facility modificationsLength: 38 milesDiameter: 30 inchesLocation: Westmoreland County, PA; Wetzel County,
WVCapacity: 1.5 MMDth/dCost: $500 millionDocket: CP15-555Status: Project has received a Final Environmental
Impact StatementStart: 4Q 2018Completion: 4Q 2019Comments: Project will move Marcellus Shale gas
from Ohio, West Virginia and Pennsylvania into the Atlantic Coast Pipeline for further delivery to Virginia and North Carolina
Project: Sweden Valley ProjectType: Project includes pipeline construction,
compressor station modifications and new metering and regulation facilities
Capacity: 120 MDth/dCost: $48 millionStatus: Project is preparing to file an application
for a Certificate of Public Convenience and Necessity with FERC
Completion: 4Q 2019Comments: Project will help meet growing demand
for natural gas to serve Midwest markets
Project: Line A Abandonment ProjectOperator: Dominion Energy Carolina Gas
Transmission LLCType: Project includes pipeline abandonment
to be done in three phasesLength: 60 milesDiameter: 10 inchesLocation: York County, SCDocket: CP17-3Status: Project has received a favorable
Environmental Assessment
DRIFTWOOD LNG PIPELINE LLC – (8/16)Project: Driftwood LNG PipelineType: Project involves dual lay of pipelineLength: 96 milesDiameter: 36 and 42 inchesLocation: Calcasieu Parish, LA - Evangeline Parish,
LACapacity: 4 Bcf/d
Docket: CP17-118Status: Project has submitted a formal application
with FERCStart: 2018Completion: 2022Comments: Pipeline is part of the proposed Driftwood
LNG Project
DTE ENERGY – (8/17)Operator: Birdsboro Power LLCProject: Birdsboro PipelineType: Project includes construction of pipelineLength: 14 milesDiameter: 24 or 30 inchesLocation: Oley Township, PACapacity: 79 MDth/dContact: Kenneth Magyar VP, Project Development & Business
Development (724) 416-7263Docket: PF17-1Status: Project is awaiting an Environmental
Assessment Start: 2Q 2018
Owner 2: Spectra Energy Partners LPOperator: NEXUS Gas Transmission SystemProject: NEXUS ProjectType: Project includes pipeline construction and
four compressor stationsLength: 255 milesDiameter: 42 inchesLocation: Ohio, Michigan and OntarioCapacity: 1.5 Bcf/dCost: $2 billionDocket: CP16-22Status: Project is awaiting FERC approval
Contractor: FluorType: front-end engineering and design
Contractor: Michels Corp.Type: Pipeline constructionLocation: Ohio and Michigan
Contractor: Latex ConstructionType: Pipeline constructionLocation: Ohio
Contractor: M.G. Dyess Inc.Type: Pipeline constructionLocation: Ohio
DUKE ENERGY – (6/17)Project: Central Corridor Pipeline ExtensionType: Project includes expansion of existing
pipelineLength: 12 milesDiameter: 20 inchesLocation: Raleigh, NCStart: 3Q 2018Completion: 2019
Type: Project includes construction of pipelineLength: 13 milesDiameter: 20 inchesLocation: Cincinnati, OHStatus: Project is undergoing public hearings. If
built, pipeline will increase the reliability of natural gas delivery in central Cincinnati
CENTERPOINT ENERGY – (4/17)Type: Project includes construction of pipelineLength: 12 milesDiameter: 12 inchesLocation: Lafayette and Yalobusha counties, MSStatus: Project is in the early stagesStart: 4Q 2017
CHENIERE ENERGY INC. – (REV 7/17)Operator: Midship Pipeline Co. LLCProject: Midship ProjectType: Project includes construction of pipeline,
several laterals, compressor stations and interconnects
Length: 200 milesDiameter: 36 inchesLocation: Grady, OK – Bryan, TXCapacity: 1.4 MMDth/dDocket: CP17-458Status: Project is awaiting an Environmental
Impact StatementCompletion: 1Q 2019
CHESAPEAKE UTILITIES CORP. – (11/16)Operator: Eastern Shore Natural GasProject: 2017 Expansion ProjectType: Project includes pipeline looping,
upgrades to existing metering facilities and installation of a compressor unit
Length: 33 milesLocation: Pennsylvania, Maryland, DelawareCapacity: 86 MDth/dCost: $99 millionDocket: PF16-7Status: Project is currently awaiting a pre-filing
review
CRESTWOOD EQUITY – (7/17)Owner: Crestwood EquityProject: DELTA PipelineType: Project includes construction of pipeline Length: 200 milesDiameter: 20 inchesLocation: Reeves County, TX - Orla, TXCapacity: 200 Mcf/dContact: Russ Kovin Senior Vice President, Commercial
Operations, Central US [email protected] (832) 519-2260Status: Project is seeking shipper commitmentsCompletion: 3Q 2018
Operator: Arrow Field Services Type: Project includes construction of pipelineLength: 5 milesDiameter: 8 and 10 inchesLocation: McKenzie County, NDCost: $6.3 million Status: The North Dakota Public Service
Commission held a public hearing and is reviewing the project
DENBURY RESOURCES – (7/16)Owner: Denbury ResourcesType: Project includes construction of pipelineLength: 110 milesDiameter: 20 inchesLocation: Glendive, MTStart: 2018
www.pipeline-news.com • October 2017 • Pipeline News 13
PLANNEDProjects in development
ENABLE MIDSTREAM PARTNERS – (2/17)Operator: Oklahoma Gas and Electric (OG&E) Project: Muskogee PipelineType: Project includes construction of pipeline
and associated metering facilitiesLength: 77 milesDiameter: 20 inchesLocation: OklahomaCapacity: 228 Mcf/dCost: $70 millionStart: 2018Comments: The 20-year contract will support OG&E’s
planned conversion of two 500 megawatt coal-fired generating units to natural gas
EQT CORP. – (REV 8/17)Owner 2: NextEra US Gas Assets LLCOperator: Mountain Valley Pipeline LLCProject: Mountain Valley PipelineType: Project includes construction of pipeline
and three compressor stationsLength: 301 milesDiameter: 42 inchesLocation: Wetzel County, WV - Pittsylvania County,
VACapacity: 2 MMDth/dCost: $3.5 billionDocket: CP16-10Status: Project has received a positive Final
Environmental Impact StatementStart: 4Q 2017Completion: 4Q 2018
EQT MIDSTREAM PARTNERS LP – (REV 6/17)Project: Equitrans Expansion ProjectType: Project includes construction of pipeline
and expansion of existing compressor stations
Length: 8 milesDiameter: 6 and 30 inchesLocation: Greene, Allegheny and Washington
counties, PA; Wetzel County, WVCapacity: 600 MDth/dCost: $172 millionDocket: CP16-13Status: FERC has delayed the release of its final
Environmental Impact StatementStart: 4Q 2017Completion: 4Q 2018
FAIRBANKS PIPELINE CO. – (REV 8/15)Project: Arctic Fox PipelineType: Project includes construction of pipeline
and a secondary transmission networkLength: 514 milesDiameter: 4 and 12 inchesLocation: Prudhoe Bay - North Pole, AKCapacity: 19 Bcf/yCost: $1 billionStatus: Project is delayed
FLORIDA GAS TRANSMISSION – (REV 7/17)Project: East-West ProjectType: Project includes construction of two
laterals and facility modificationsLength: 20 milesDiameter: 12 inchesLocation: Matagorda and Wharton counties, TX;
Acadia Parish, LACapacity: 275 MMDth/dCost: $68.9 millionDocket: CP17-8Status: Project is awaiting an Environmental
Assessment
FORTISBC – (REV 9/17)Operator: Woodfibre Natural Gas Ltd.Project: Eagle Mountain – Woodfibre Gas PipelineType: Project includes pipeline construction and
compressor station upgradesLength: 29 miles Diameter: 24 inchesLocation: Coquitlam to Squamish, B.C.Capacity: .23 Bcf/dCost: $350 millionStatus: Project is in the pre-application phaseComments: Project will expand a portion of the
existing natural gas transmission system and is associated with the proposed Woodfibre LNG Facility
Contractor: Hedberg & Associates Consulting Ltd.Type: Project includes access planning,
permitting and LiDAR design for pipeline routing
Cost: $250 million
GULF SOUTH PIPELINE LP – (REV 12/16)Project: St. Charles Parish Expansion ProjectType: Project includes construction of pipeline
and a new compressor stationLength: 1.25 milesDiameter: 16 inchesLocation: Montz, LACapacity: 133 Mcf/d
FASTER. SAFER. SMARTER.
BIG DIAMETER OR ODD-SIZED JOBS ARE
NO PROBLEMVacuworx Vacuum Lifting Systems can handle any size material, with standard lift capacities up to 25 tonne. Pads are available to buy or rent, with or without a lifter—so you can get an entire system or just the pad you need to work with the equipment you already have. And our pads are engineered to maximize safety, so you can be confident in every lift, every time.
BIG DIAMETER OR ODD-SIZED JOBS ARE
FASTER. SAFER. SMARTER. VACUWORx.COM
PLANNEDProjects in development
14 Pipeline News October 2017 • www.pipeline-news.com
Cost: $30 millionDocket: CP16-47Status: FERC has issued an Environmental
Assessment for the projectStart: 3Q 2017
IROQUOIS GAS TRANSMISSION SYSTEM LP– (6/17)Project: Wright Interconnect ProjectType: Project includes construction of
a compression facility and facility modifications
Location: Wright, NYCapacity: 650 MDth/dDocket: CP13-502Completion: 2Q 2018Comments: Project is being developed in conjunction
with the proposed Constitution Pipeline
KINDER MORGAN INC. – (REV 8/17)Owner 2: Southern Co.Operator: Southern Natural Gas Co. LLCProject: Fairburn Expansion Project Type: Project includes construction of a pipeline
lateral, pipeline looping and a compressor station
Length: 7 milesDiameter: 30 inchesLocation: Atlanta, GACapacity: 343 MDth/dCost: $240 millionDocket: CP17-46Status: Project is awaiting FERC approvalCompletion:2018
Operator: Tennessee Gas Pipeline Co. LLC Project: Lone Star ProjectType: Project includes construction of two
compressor stationsCapacity: 300 MDth/dCost: $132 millionLocation: Jackson and San Patricio counties, TXDocket: CP16-496Status: FERC has issued an Environmental
Assessment for the project
Project: SK PipelineType: Project includes construction of pipeline
and additional compressor facilitiesLength: 40 milesDiameter: 30 inchesLocation: West Columbia, TX - Stratton Ridge, TXCapacity: 320 MDth/d Cost: $150 millionStart: 4Q 2017Completion:3Q 2019 Comments: Project will support Train III export
capacity as part of the Freeport LNG Export Project
Operator: Kinder Morgan Texas Pipeline LLCProject: Gulf Coast Express Pipeline ProjectType: Project includes construction of pipelineLength: 430 milesDiameter: 42 inchesLocation: Waha, TX - Agua Dulce, TXCapacity: 1.7 MMDth/dStatus: Project is undergoing an open seasonCompletion:2Q 2019
Operator: Kinder Morgan Louisiana Pipeline LLC Project: Sabine Pass Expansion ProjectType: Project includes construction of a tap
and lateral; modification of three existing delivery interconnects; construction of additional compression; construction of header pipelines; and the abandonment and replacement of a meter station
Length: 1.6 milesLocation: Cameron Parish, LACapacity: 600 MDth/dDocket: CP17-22Status: Project is awaiting FERC approvalStart: 2Q 2018Completion:2Q 2019Comments: Modifications will enable bidirectional flow
Operator: Kinder Morgan Louisiana Pipeline LLCProject: Lake Charles Expansion ProjectType: Project includes installation of new
compression facilities and header pipelines
Length: 1.5 milesDiameter: 24 and 26 inchesLocation: Evangeline Parish, LACapacity: 1.4 MMDth/dDocket: CP14-511 Status: Project is awaiting FERC approvalCompletion: 2018Comments: Project includes reconfiguration of an
existing pipeline system to accommodate natural gas service at the proposed Magnolia LNG terminal
Operator: Tennessee Gas Pipeline Co. LLCProject: ACR ProjectType: Project includes abandonment of
certain natural gas pipeline facilities and modifications of existing pipeline facilities and compressor stations
Length: 14 milesDiameter: 2 , 16, 30 and 36 inchesLocation: Louisiana - New York City- Boston Docket: CP15-88Status: FERC has issued an Environmental
Assessment for the project
MDU RESOURCES GROUP INC. – (8/17)Operator: WBI Energy Inc.Project: Line Section 27 ExpansionType: Project includes pipeline construction and
associated facilitiesLength: 13 milesDiameter: 24 inchesLocation: North DakotaCapacity: 600 MDth/dCost: $30 millionCompletion: 4Q 2018
MILLENNIUM PIPELINE CO. – (REV 5/17)Project: Eastern System UpgradeType: Project includes construction of looped
pipeline, new compression capabilities and upgrades to existing stations
Length: 10 milesDiameter: 36 inchesLocation: Rockland County, NYCapacity: 200 MDth/dCost: $275 millionDocket: CP16-486 Status: Project has received a favorable
Environmental AssessmentStart: 4Q 2017Completion: 4Q 2018
Project: Valley Lateral Project
Type: Project includes installation of a pipeline lateral
Length: 7.8 milesDiameter: 16 inchesLocation: Orange County, NYCapacity: 130 MDth/dCost: $39 millionStatus: Project is awaiting water permits
MOUNTAINEER GAS CO. – (9/17)Operator: Mountaineer Gas Co.Project: Mountaineer Gas Pipeline Phase IType: Project includes pipeline constructionLength: 27.5 milesDiameter: 10 inchesLocation: Berkley, VA - Martinsburg, WVCost: $45 millionDocket: 15-1256-G-390PCompletion: 2Q 2019
Project: Mountaineer Gas Pipeline Phase IISegment: Charlestown LoopLength: 24.5 milesStatus: Project is awaiting WV PSC approval
Project: Mountaineer Gas Pipeline Phase IIILength: 4.4 milesStatus: Project is awaiting WV PSC approval
NAMERICO ENERGY HOLDINGS LLC – (5/17)Operator: Pecos Trail Pipeline Co.Project: Pecos Trail PipelineType: Project includes construction of pipelineLength: 468 milesDiameter: 42 inchesLocation: West Texas – Corpus Christi, TXCapacity: 1.85 Bcf/dStatus: Project is seeking sufficient shipper
commitmentsCompletion: 4Q 2019
NATIONAL FUEL GAS SUPPLY CORP. – (REV-6/17)Project: Northern Access 2016 ProjectType: Project includes construction of pipeline,
installation of additional compression, and a new compressor station and gas dehydration facility
Length: 97 milesDiameter: 24 inchesLocation: McKean County, PA - Erie County, NYCapacity: 300 MDth/dCost: $455 millionDocket: CP15-115Status: New York DEC denied the project’s permit,
so the project is on hold
Project: Line QP Project Type: Project includes construction of
pipeline and a regulator stationLength: 5 milesDiameter: 4 inchesLocation: Warren County, PA Docket: CP16-28Status: Project has received a favorable
Environmental AssessmentComments: Project includes the abandonment of
the Line Q Project and Queen Storage assets
NEW JERSEY NATURAL GAS – (REV 8/17)Project: Southern Reliability LinkType: Project includes construction of a pipeline
www.pipeline-news.com • October 2017 • Pipeline News 15
PLANNEDProjects in development
Docket: CP17-471Status: Project is awaiting an Environmental
AssessmentComments: Project is an expansion of the existing
Carson and South Tahoe laterals
NYSEG – (REV 6/17)Project: DeRuyter Pipeline ReplacementType: Project includes take up and relay of
existing pipelineLength: 25 milesDiameter: 10 inchesLocation: Norwich, NY - Oneonta, NYStart: 2019Completion: 2020
and compressor stationLength: 30 milesDiameter: 30 inchesLocation: Ocean, Burlington and Monmouth
counties, NJCost: $130 millionStatus: Project is awaiting approval from the New
Jersey Pinelands Commission
NEXTDECADE LLC – (REV 6/17)Operator: Rio Bravo Pipeline LLCProject: Rio Bravo PipelineType: Project includes construction of two
parallel pipelines and three compressor stations
Length: 137 milesDiameter: 42 inchesLocation: Brownsville, TX - Kingsville, TXCapacity: 4.5 Bcf/dDocket: CP16-455Status: Project is awaiting an Environmental
AssessmentStart: 2Q 2018Completion: 1Q 2022Comments: Pipeline is part of the Rio Grande LNG
Project
NEXTERA ENERGY INC. – (10/17) Operator: Florida Southeast Connection LLCProject: Okeechobee Lateral ProjectType: Project includes construction of a
pipeline lateral, receiver and launcher and other associated facilities
Length: 5.2 milesDiameter: 24 inches Location: Okeechobee County, FLCost: $30 millionDocket: CP17-463Status: FSC has engaged in discussions with
property owners along the pipeline route regarding the acquisition of an easement across the portion of their properties needed for pipeline construction and operations
Start: 3Q 2018Completion:1Q 2019Comments: Project will transport natural gas from
the main, 126-mile FSC pipeline in central Florida to a new Florida Power & Light Co. power plant currently under construction
NORTHWEST PIPELINE – (REV 9/17)Project: Pacific Connector ProjectType: Project includes construction of pipelineLength: 232 milesDiameter: 16 inchesLocation: Malin, OR – Coos Bay, ORCapacity: 1.2 MMDth/dDocket: PF17-4Status: Project is undergoing an open seasonComments: Project will connect to the proposed
Jordan Cove LNG Terminal
PAIUTE PIPELINE CO. – (10/17) Project: 2018 Expansion Project Type: Project includes pipeline replacement
and pipeline loopingLength: 8.4 milesDiameter: 12 and 20 inchesLocation: Douglas and Lyon counties, NECapacity: 4.6 MDth/d Cost: $17.9 million
PENNEAST PIPELINE CO. LLC – (REV 8/17)Project: PennEast PipelineType: Project includes construction of an
underground pipelineLength: 120 milesDiameter: 36 inchesLocation: Luzerne County, PA – Mercer, NJCapacity: 1 Bcf/dCost: $1 billionDocket: CP15-558Status: The New Jersey Department of
Environmental Protection has closed the project’s application over deficiencies
Start: 2Q 2018
PIPE RAMMING PROS DEPEND ON HAMMERHEAD®
SUPPORT.EXPERTISE.
EQUIPMENT.
DESMOND BLAKEProject engineerDrill Tech Drilling & Shoring Inc.Antioch and Corona CA; Dallas/Fort Worth, TX
HammerHead Equipment products and expertise take the guesswork out of pipe ramming. And legendary factory support puts even the toughest pipe ramming jobs within your reach.
Find your local dealer at hammerheadtrenchless.com or call 800-331-6653
MOLING | RAMMING | BURSTING | HDD ASSIST | WINCHES | CIPPA Charles Machine Works Company ©2017 Earth Tool Company, LLC
We had a very challenging pipe ramming project to do in an extremely sensitive area with a number of critical requirements—one of them being the pipe’s 108-inch diameter. While we
had plenty of experience with pipe jacking, we had limited experience ramming a pipe with this large a diameter before, and there was no time to experiment. It was definitely the outstanding communication and cooperation between the HammerHead and Drill Tech engineering departments that set us up for a successful ram. We also had one of their field engineers on site with their 34-inch hammer through the whole project. We will definitely be working with HammerHead again.”
“
16 Pipeline News October 2017 • www.pipeline-news.com
PLANNEDProjects in development
PUBLIC SERVICE ELECTRIC AND GAS CO. – (9/17)Project: Gas System Modernization Program Phase
IIType: Project includes replacement of aging
cast-iron and unprotected steel gas pipesLength: 1,250 milesLocation: New JerseyCost: $2.7 billionStatus: Project is preparing to file with the New
Jersey BPUCompletion: 4Q 2022Comments: The upgrades will take place across
PSE&G’s service territory in 11 counties, concentrating on urban areas established in the early 1900s, where much of the utility’s cast-iron and unprotected steel gas pipes are located
SEMCO ENERGY GAS CO. – (3/17)Project: Marquette Connector Pipeline ProjectType: Project includes construction of pipelineLength: 42 milesDiameter: 10 and 20 inchesLocation: Arnold, MI - Negaunee Township, MICapacity: 144 MMcf/dCost: $135 millionStatus: Project has filed for regulatory approval
(Act 9) Start: 2020
SEMPRA ENERGY – (REV 10/17)Operator: Southern California Gas Co.Project: Pipeline Safety & Reliability Project - Line
3602Type: Project includes partial replacement of
Line 1600, which entered service in 1949Length: 43 milesDiameter: 36 inchesLocation: San Diego, CACost: $600 millionStatus: Project is in the planning stages
Operator: Port Arthur LNG Pipeline LLCProject: Port Arthur Pipeline - Texas ConnectorType: Project includes construction of
pipelineLength: 34 milesDiameter: 42 inchesLocation: Jefferson and Orange counties, TX;
Cameron Parish, LACapacity: 2 Bcf/dDocket: CP17-21Contact: JD Morris Director, Permitting & Compliance [email protected] (718) 298-5479Status: Sempra LNG & Midstream LLC and
Woodside Energy Inc. have signed a memorandum of understanding (MOU) with Korea Gas Corp. regarding key aspects of the Port Arthur LNG Project, including engineering and construction works, operations and maintenance activities, feed gas sourcing, offtake of LNG and KOGAS as a potential purchaser of LNG from, and equity participant in, the project
Start: 3Q 2021Completion: 3Q 2022Comments: Pipeline is part of the Port Arthur
Liquefaction Project
SOUTHERN CO. – (9/17)Operator: Virginia Natural GasProject: Southside Connector Distribution ProjectLength: 9 milesDiameter: 24 inchesLocation: Norfolk, VA - Chesapeake, VAStart: 4Q 2017Completion: 3Q 2018Contact: Les Flora Project Manager (757) 616-7543 [email protected]: Project will provide a more reliable
connection between the Hampton Roads region’s two main gas supply lines
SOUTHERN STAR CENTRAL CORP. – (3/17)Owner 2: NextEra US Gas Assets LLCProject: Sooner Trails Pipeline ProjectType: Project includes construction of pipelineLength: 250 milesDiameter: 36 inchesLocation: Bryan County, OK - Lamar County, TXCapacity: 1.2 MMDth/dStatus: Project is awaiting a pre-filing review
SPECTRA ENERGY – (8/17)Owner 2: ConocoPhillipsProject: TEMAX ProjectType: Project includes construction of pipeline,
looping and replacement of compressor stations
Length: 33 milesDiameter: 24 inchesLocation: Clarington, OH - Delta, PACapacity: 395 MMcf/dCost: $500 millionStatus: Project is preparing to pre-file with FERCComments: Project is an expansion of the Texas
Eastern Transmission Pipeline System
Owner 2: Eversource EnergyOwner 3: National GridOperator: Algonquin Gas Transmission LLCProject: Access Northeast ProjectType: Project includes replacement of existing
pipeline, looping extensions, installation of new pipeline, compressor station modifications and construction of pig launcher and receiver facilities
Length: 96 milesDiameter: 6 to 12 inchesLocation: New York; Connecticut; MassachusettsCapacity: 925 MDth/d Docket: PF16-1Status: Project has been delayed indefinitely
Operator: Algonquin Gas Transmission LLCProject: Access Northeast ProjectSegment: West Boylston LateralType: Project includes construction of a pipeline
lateralLength: 27 milesDiameter: 16 inchesLocation: Milford, Upton, Grafton, Sutton,
Shrewsbury, Boylston and West Boylston, MA
Operator: Texas Eastern TransmissionProject: Stratton Ridge ProjectType: Project includes modifications of three
mainline compressor stations and the installation of two new compressor stations
Location: Brazoria County, TXCapacity: 322 MDth/dCost: $94 millionDocket: CP17-57Status: Project is awaiting an Environmental
AssessmentCompletion: 2Q 2019
Project: Greater Philadelphia Expansion ProjectType: Project includes replacement of existing
pipeline with a larger diameter pipe and adding new pipeline looping
Length: 35 milesLocation: Philadelphia, PACapacity: 475 MDth/dStatus: Project is in the evaluation stageCompletion: 2019
Operator: Valley Crossing Pipeline LLCProject: Border Crossing ProjectType: Project includes pipeline construction Length: .2 milesDiameter: 42 inchesLocation: Texas state waters east of Brownsville, TXCapacity: 2.6 Bcf/dDocket: CP17-19Status: Project has received an Environmental
AssessmentComments: Project will connect the Valley Crossing
System with the Mexican Marina Pipeline
Project: Renaissance Gas Transmission ProjectType: Project includes construction of pipelineLength: 230 milesDiameter: 24, 30 and 36 inchesLocation: Mount Pleasant, TN - Lawrenceville, GACapacity: 1.25 Bcf/dStatus: Project is on hold
SPIRE – (REV 8/17)Project: Spire STL PipelineType: Project includes installation of steel
pipeline and minor modifications to line 880
Length: 70 milesDiameter: 24 inchesLocation: St. Louis, MOCapacity: 400 MDth/dDocket: CP17-40Status: Project is awaiting a FERC final order
Contractor: T.G. Mercer Consulting Services Inc.Type: Project includes offloading of pipeLength: 43 milesDiameter: 24 inchesLocation: Polk County, MNContact: Michael Magee Superintendent
SPRING RIDGE CONSTRUCTORS LLC – (3/17)Contractor: Rockford Corp.Type: Project includes construction of pipelineLength: 177 milesDiameter: 20, 36 and 42 inchesLocation: Virginia and North CarolinaCost: $680 millionStart: 2018Completion:2020
www.pipeline-news.com • October 2017 • Pipeline News 17
Our name says it all.
PLANNEDProjects in development
SUMMIT MIDSTREAM PARTNERS LP – (8/17)Operator: XTO Energy Inc.Project: Summit Midstream Gathering SystemType: Project includes gathering and processing
system constructionLength: 161 milesDiameter: 48 inchesLocation: Eddy and Lea counties, NMCapacity: 60 MMcf/dCost: $110 millionStatus: Project is seeking shipper commitmentsCompletion: 3Q 2018
TALEN ENERGY CORP. – (10/17)Project: Montour LateralType: Project includes construction of a
pipeline lateralLength: 15 milesDiameter: 30 inchesLocation: Montour County, PACost: $70 millionStatus: Project is in the early stagesStart: 2Q 2018Comments: Project will supply natural gas to the
Montour Plant
TALLGRASS ENERGY – (REV 4/17)Owner 2: AGL Resources Inc.Project: Prairie State PipelineType: Project includes construction of pipelineLength: 140 milesLocation: Douglas County, IL - Chicago Market
CentreCapacity: 1.2 Bcf/dCost: $1 billionStatus: Project is in the planning stage
TELLURIAN INC. – (REV 8/17)Operator: Downeast Pipeline LLCProject: Downeast PipelineType: Project includes construction of pipelineLength: 30 milesDiameter: 30 inches Location: Robbinston, MECapacity: 300 MMcf/d Docket: CP07-52Status: Project has currently been deniedComments: Pipeline is part of the proposed Downeast
LNG Project
TEXAS EASTERN TRANSMISSION LP – (10/17)Project: Idle Line 1 Abandonment ProjectType: Project includes abandonment and
removal of existing pipeline, metering and regulating facilities, and other related aboveground facilities
Length: 165 milesDiameter: 24 inchesLocation: Fayette County, OH - Greene County, PADocket: CP17-6Status: Project has received a favorable
Environmental Assessment
TRANSCANADA CORP. – (REV 9/17)Operator: Columbia Pipeline Group Inc. Project: Eastern Panhandle ExpansionType: Project includes pipeline constructionLength: 4 milesDiameter: 8 inchesLocation: Martinsburg, WVCapacity: 47 MDth/d
Docket: CP17-80Status: Project is undergoing an Environmental
AssessmentStart: 2Q 2018Comments: Project will provide firm transportation
service to markets in West Virginia through Mountaineer Gas Co.’s gathering system
Project: Continent to Coast Expansion ProjectType: Project includes meter station upgradesLocation: Westbrook, MNCapacity: 300 MMcf/dContact: Cynthia L. Armstrong Director of Marketing and Business
Development (603) 559-5527 [email protected]: CP96-248Status: Project is currently in the planning stageComments: Project is an expansion of the Portland
Natural Gas Transmission System and will transport gas into the Maritimes & Northeast Pipeline
Operator: Columbia Pipeline GroupProject: Buckeye Xpress ProjectType: Project includes pipeline looping and
additional compressionCapacity: 700 MMcf/dStatus: Project is undergoing an open seasonCompletion: 1Q 2020
Operator: Columbia Pipeline GroupProject: Central Virginia Connector Project
PLANNEDProjects in development
18 Pipeline News October 2017 • www.pipeline-news.com
Type: Project includes replacement and upgrade of three compressor units, installation of pipe and valve modifications, and installation of other appurtenant facilities
Length: .10 milesLocation: Greater Richmond, VACapacity: 45 MMDth/dCost: $6.3 millionDocket: CP16-493Status: Project is awaiting an Environmental
Assessment
Operator: Columbia Pipeline GroupProject: Mountaineer XPress ProjectType: Project includes construction of various
diameter pipeline and loopingLength: 165 milesDiameter: 24, 36 and 42 inchesLocation: Marshall and Cabell counties, WV Capacity: 2.7 Bcf/dCost: $2.7 billionDocket: CP16-357Status: Project has received a favorable
Environmental AssessmentStart: 4Q 2017Completion: 4Q 2018Comments: Project is associated with the Gulf Xpress
Project
Operator: Columbia Pipeline GroupProject: Gulf Xpress Project Type: Project includes construction of three
compressor stations, modifications to three existing compressor stations and one regulating station
Location: Marshall and Cabell counties, WV Capacity: 2.7 Bcf/dCost: $2.7 billionDocket: CP16-361Status: Project has received a favorable
Environmental AssessmentStart: 4Q 2017Completion: 4Q 2018Comments: Project is associated with the Mountaineer
XPress Project
Contractor: Welded Construction LP Sub: ProFoam LLCType: Project includes providing foam breakers
on pipelineLength: 25 milesDiameter: 36 inchesLocation: Marshall County, WV and Greene County,
PAContact: Kevin Smith Superintendent
Operator: Columbia Pipeline GroupProject: WB Xpress ProjectType: Project includes replacement of pipeline
and the construction of two new compressor stations
Length: 30 milesDiameter: 12, 26 and 36 inchesLocation: Randolph and Pendleton counties, WV;
Kanawha County, WV; Fairfax County, VACapacity: 1.3 Bcf/dCost: $850 millionDocket: CP16-38Status: Project received a favorable
Environmental Assessment and awards are currently pending
Start: 4Q 2017
Completion:3Q 2018Operator: Columbia Pipeline GroupProject: Columbia Gas Transmission System
Modernization ProgramSegment: B-System ProjectType: Project includes construction of pipeline,
replacement of existing pipeline and upgrades to equipment and facilities
Length: 20.8 milesDiameter: 20 inchesLocation: Fairfield and Franklin counties, OHDocket: CP16-498Status: Project is awaiting an Environmental
AssessmentStart: 2017Completion: 2018Comments: Project is part of Columbia’s ongoing
Modernization Program to replace aging infrastructure, upgrade natural gas compression systems and increase pipeline reliability
VENTURE GLOBAL LNG – (REV 8/17)Operator: TransCameron Pipeline LLCProject: TransCameron East LateralType: Project includes construction of pipelineLength: 24 milesDiameter: 42 inchesLocation: Grand Chenier, LA and Johnson’s Bayou,
LACapacity: 2 MMDth/dCost: $344.5 millionContact: Fory Musser Senior Vice President, Corporate
Development [email protected]: CP15-550Status: Project filed with FERC and is currently
awaiting approvalCompletion: 1Q 2019
Operator: Venture Global Gator Express LLCProject: Gator Express Pipeline SystemType: Project includes construction of pipeline,
looping and appurtenant facilitiesLength: 27 milesDiameter: 42 inchesLocation: Plaquemines Parish, LA Capacity: 1.9 MMDth/dCost: $284 millionDocket: CP17-67Status: Project is awaiting an Environmental
Impact Statement
WBI ENERGY INC. – (REV 8/17)Project: Valley Expansion Pipeline ProjectType: Project includes construction of pipeline,
interconnect facilities, an electric compressor station, replacement of two existing town border stations and the construction a regulator station
Length: 38 milesDiameter: 16 milesLocation: Clay County MN; Cass, Burleigh, Stutsman
and Barnes counties, NDCapacity: 40 MMcf/dCost: $60 millionDocket: PF16-10Start: 2018
WILLIAMS PARTNERS LP – (REV 9/17)Operator: Northwest Pipeline LLCProject: North Seattle Lateral Upgrade ProjectType: Project includes pipeline removal and
replacement and facility upgradesLength: 7 milesDiameter: 8 inchesLocation: Snohomish County, WADocket: CP17-441Status: Project has filed with FERCStart: 2Q 2019Completion: 4Q 2019Comments: Project has executed firm agreements
with Puget Sound Energy to expand delivery capabilities of the existing lateral, which serves PSE customers
Operator: Northwest Pipeline LLCProject: North Fork Nooksack Line Lowering
ProjectType: Project includes pipeline removal and
replacementLength: .7 milesDiameter: 30 inchesLocation: Whatcom County, WADocket: CP17-133Status: Project is awaiting an Environmental
Assessment
Operator: Steelhead LNG Corp.Project: Island Gas ConnectorType: Project includes construction of pipeline,
meter stations and compressor stationsLength: 80 milesDiameter: 36 inchesLocation: Sumas, WA - Vancouver Island, B.C.Completion: 4 Q2020Status: Project is preparing to start the pre-filing
process with FERC
Operator: Transcontinental Gas Pipe Line Co. LLCProject: Rivervale South to Market ProjectType: Project includes pipeline looping,
upgrades and existing facility modifications
Length: 11 milesLocation: New JerseyCapacity: 190 MDth/dCost: $127 millionDocket: CP17-490Status: Project submitted an application with
FERC for authorization of the project, and has executed precedent agreements with Direct Energy Business Marketing LLC and UGI Energy Services LLC for firm transportation service
Start: 4Q 2018Completion: 4Q 2019Comments: Project will help meet the growing
heating and power generation demand for northeastern consumers, primarily in New Jersey and New York
Operator: Transcontinental Gas Pipe Line Co. LLCProject: St. James Supply LateralType: Project includes construction of pipeline,
compressor stations and a pig receiver siteLength: .7 milesDiameter: 20 inchesLocation: St. James Parish, LACapacity: 161.5 MDth/dDocket: CP17-58
www.pipeline-news.com • October 2017 • Pipeline News 19
PLANNEDProjects in development
Status: Project is awaiting an Environmental Assessment
Completion: 2020
Operator: Transcontinental Gas Pipe Line Co. LLCProject: Northeast Supply EnhancementType: Project includes construction of pipelineLength: 35 milesDiameter: 26 and 42 inchesLocation: New York Bay; Lancaster County, PA;
Middlesex County, NJCapacity: 400 MMcf/dCost: $926.5 millionDocket: CP17-101Status: Project is in the planning stageStart: 2Q 2018Completion: 4Q 2019
Operator: Transcontinental Gas Pipe Line Co. LLCProject: Gulf Connector Expansion ProjectType: Project includes increasing compression
on the existing pipelineLocation: Texas – LouisianaCapacity: 475 MDth/dCost: $167.4 millionDocket: CP16-494Status: Project submitted an application
with FERC for a Certificate of Public Convenience and Necessity
Start: 4Q 2017Completion: 1Q 2019
Operator: Williams Northwest Pipeline LLCProject: Washington Expansion Project
Type: Project includes construction of pipeline looping and compression stations
Length: 140 milesDiameter: 36 inchesLocation: Whatcom County, WA - Woodland, WACapacity: 750 MDth/dDocket: CP13-507 Completion: 4Q 2018
WISCONSIN GAS – (2/17)Project: Dovre Lateral Natural Gas PipelineType: Project includes construction of pipelineLength: 9.5 milesDiameter: 12 inchesLocation: Barron County, WI
XCEL ENERGY – (8/17)Project: Lancaster to Fort Lupton Pipeline Type: Project includes construction of pipelineLength: 4.1 milesDiameter: 24 inchesLocation: Weld County, COStatus: Project is in the development stageStart: 3Q 2017Completion: 1Q 2018
Project: Tungsten to Bobtail Pipeline Type: Project includes construction of pipelineLength: 15 milesLocation: Boulder County, CO - Black Hawk, COStatus: Project is in the planning stagesStart: 2Q 2019Completion: 3Q 2020
CanadaCHEVRON CANADA LIMITED – (REV 2/17)Owner 2: Apache CanadaOperator: Pacific Trail Pipelines Ltd. PartnershipProject: Pacific Trail PipelineType: Project includes construction of pipeline
and a compressor stationLength: 298 milesDiameter: 42 inchesLocation: Prince George - Kitimat, B.C.Capacity: 1 Bcf/dCost: $1 billionFiling: A31037Status: Project is conducting pre-construction
activitiesComments: Project is associated with the proposed
Kitimat LNG Facility
IMPERIAL OIL RESOURCES – (REV 7/17)Owner 2: ConocoPhillips CanadaOwner 3: Shell CanadaOwner 4: ExxonMobil CanadaProject: Mackenzie Gas ProjectType: Project includes construction of a
gathering system and transmission pipeline
Length: 1,056 milesDiameter: 10 and 30 inchesLocation: Mackenzie Valley - Fort Simpson - AlbertaCapacity: 1.2 Bcf/d Cost: $16 billionStatus: NEB is giving the consortium until the end
of 2022 to start building the long-delayed project
Precision Welding & Fabrication
• ASME Pressure Vessels• Pipe Fabrication• Stainless And Alloy Fabrication• Structural Steel Fabrication• Cross- Overs, Platforms And
Caged Ladders• Hydro-Testing• Field Measuring• Plate Rolling
Buy Direct from the Fabricator and save on your Pipe Clamps and Supports.
Send your quotes to [email protected] or call today at 281-252-0151Visit us at www.weweld.com
Precision Welding & Fabrication10002 Sweetwater Lane, Houston, TX 77037Phone: 281.252.0151 Toll Free: 877.252.0152 Fax: 281.252.8151 [email protected] n www.weweld.com
20 Pipeline News October 2017 • www.pipeline-news.com
PLANNEDProjects in development
SPECTRA ENERGY CORP. – (REV 5/17)Project: Westcoast Connector Gas Transmission
ProjectType: Project includes construction of two
adjacent pipelinesLength: 528 milesDiameter: 42 and 48 inchesLocation: Cypress, B.C. - Prince Rupert, B.C.Capacity: 4.2 Bcf/dCost: $7.5 billionStatus: Project is on hold
Contractor: FLUORType: Project includes engineering,
procurement and construction of the pipeline
TRANSCANADA CORP. (REV 10/17)Project: Eastern Mainline ProjectType: Project includes construction of four
sections of new natural gas transmission pipeline and the installation of nine new 11MW compressor units at five existing compressor stations
Location: City of Markham - Township of Edwardsburgh/Cardinal
Length: 173 milesDiameter: 36 inchesCapacity: 80 MMcf/dCost: $160 millionFiling: A69340Status: Project is preparing to file with the
NEB and undergoing an expanded assessment
Start: 2018Completion: 2020Comments: Project will increase capacity of the
existing Canadian Mainline System. Project will provide businesses, homes, schools and hospitals in Ontario and Quebec with access to a safe and diverse source of natural gas
Operator: NOVA Gas Transmission Ltd.Project: Peace River Mainline AbandonmentType: Project includes abandonment of a loop
on the existing mainline and the removal of associated above ground facilities
Length: 165 milesLocation: Northwest AlbertaContact: Marie McKenney Process Advisor [email protected]: A82534Status: The NEB will hold a public hearing to
consider an application for the projectCompletion: 2Q 2018
Operator: NOVA Gas Transmission Ltd.Project: Merrick Mainline ProjectType: Project includes construction of pipeline,
a meter station, mainline valve sites, launcher and receiver facilities, cathodic protection facilities and miscellaneous work
Length: 161 milesDiameter: 48 inchesLocation: Summit Lake, BC – Peace River, BCCapacity: 2 Bcf/dCost: $1.9 billionFiling: A60778Status: Project has applied with the NEB and is
currently on hold
Operator: NOVA Gas Transmission Ltd.Project: 2019 NGTL ExpansionType: Project includes construction of pipeline,
compression enhancements at five compressor stations, new meter stations and other associated facilities
Length: 171 milesDiameter: 48 inchesLocation: Alberta and British ColumbiaCapacity: 3 Bcf/dCost: $2 billion Status: Applications will be filed with the NEB in
4Q 2017Start: 1Q 2019Completion: 2Q 2021Comments: Project is in addition to the current $5.1
billion near-term capital program for the NGTL System
Operator: NOVA Gas Transmission Ltd.Project: 2018 NGTL ExpansionType: Project includes construction of pipeline,
one new compressor, new and expanded meter stations, and other associated facilities
Length: 55 milesDiameter: 20 to 48 inchesLocation: Alberta and British ColumbiaCapacity: 2.7 Bcf/dCost: $570 million
Project: North Montney ProjectType: Project includes construction of pipeline,
associated metering facilities, valve sites and compression facilities
Length: 190 milesDiameter: 42 inchesLocation: Peace River, ABCapacity: 2.4 Bcf/dCost: $1.7 billionFiling: A69520Status: Project has received NEB approval and an
Environmental CertificateCompletion: 2Q 2019
Operator: Prince Rupert Gas Transmission Ltd.Project: Prince Rupert Gas Transmission PipelineType: Project includes construction of pipelineLength: 560 milesDiameter: 36 and 48 inchesLocation: Hudson’s Hope, B.C. - Lelu IslandCapacity: 2 Bcf/dCost: $5 billionStatus: Project has received regulatory
approval and is currently awaiting a final investment decision
Operator: Coastal GasLink Pipeline Ltd.Project: Coastal GasLink PipelineType: Project includes construction of pipeline
and compressor stationsLength: 416 milesDiameter: 48 inchesLocation: Dawson Creek - Kitimat, B.C.Capacity: 2.1 Bcf/dCost: $4.8 billionStatus: Project has received regulatory approval
and is currently considering an alternate route
SPECTRA ENERGY – (REV 7/17)Operator: Westcoast Energy Inc. Project: Wyndwood Pipeline Expansion ProjectType: Project includes construction of pipeline
looping and associated facilitiesLength: 17 milesDiameter: 36 inchesLocation: Chetwynd, B.C.Capacity: 50 MMcf/dCost: $170 millionFiling: A80172 Status: Project is awaiting NEB approval
MexicoENGIE – (8/17)Project: Energia Mayakan Pipeline ExtensionType: Project includes construction of pipelineLength: 99 milesDiameter: 16 to 24 inchesLocation: Valladolid, Yucatan - Quintana RooCost: $300 million Status: Project is in the planning stageCompletion: 1Q 2020
Caribbean/South & Central AmericaROYAL DUTCH SHELL – (5/17)Project: Dragon – Hibiscus PipelineType: Project includes construction of pipelineLength: 11 milesLocation: Venezuela (Dragon – Hibiscus)Capacity: 300 MMcf/dCost: $100 millionStatus: Project is in the development stage
NGL - The AmericasU.S. ENERGY TRANSFER PARTNERS LP – (4/17)Project: Fractionator VType: Project includes construction of a fifth
natural gas liquids fractionation facility and associated product infrastructure
Location: Mont Belvieu, TXCapacity: 120 MbpdCompletion: 2018
ENTERPRISE PRODUCTS PARTNERS LP — (6/17)Project: Lou-Tex NGL Pipeline ConversionType: Pipeline conversionLength: 263 milesLocation: Sorrento, LA - Mont Belvieu, TX Completion: 1Q 2020Comments: Pipeline will be converted from CPG to
PGP service
PERMICO ENERGIA LLC – (10/17) Project: Permico’s Texas NGL ProjectSegment: Companero PipelineType: Project includes bi-directional pipeline
constructionLength: 510 milesDiameter: 24 inchesLocation: Monahans, TX – Corpus Christi, TXCapacity: 300 MbpdStatus: Project funding has been secured
through long-term commitments from Korean pension fund institutions
www.pipeline-news.com • October 2017 • Pipeline News 21
PLANNEDProjects in development
Start: 2Q 2018Completion: 4Q 2020Comments: Project will include the Markham
Storage Facility and El Centro Fractionator
Segment: Mont Belvieu PipelineType: Project includes bi-directional pipeline
constructionLength: 230 milesDiameter: 20 inchesLocation: El Centro Fractionator - Mont BelvieuCapacity: 250 Mbpd
Segment: Markham PipelineType: Project includes bi-directional pipeline
constructionLength: 116 milesDiameter: 16 inchesLocation: El Centro Fractionator - Markham
StorageCapacity: 175 Mbpd
TARGA RESOURCES CORP. – (7/17)Project: Grand Prix PipelineType: Project includes construction of pipelineLocation: West Texas - Mont Belvieu, TXCapacity: 550 MbpdCost: $1.3 billionStatus: Project is in the planning stageCompletion: 2Q 2019
WILLIAMS PARTNERS LP – (6/17)Project: Promesa PipelineType: Project includes construction of pipeline
and utilization of existing pipelineLength: 3 milesDiameter: 4 to 10 inchesLocation: Mont Belvieu, TX - Houston Ship ChannelStatus: Project is in the planning stage
LNG - The AmericasU.S. DOWNEAST LNG INC. – (2/17)Project: Downeast LNG ProjectType: Project includes construction of a long
pier, two full-containment LNG storage tanks, LNG vaporization and processing equipment and other support facilities
Location: Robbinston, MECapacity: 3 MMtpaCost: $1.3 billionDocket: CP07-53Status: Project has currently been denied
FERUS NATURAL GAS FUELS LP – (REV 4/17)Operator: Eagle LNG PartnersProject: Jacksonville LNG ProjectType: Project includes construction of three
liquefaction trainsLocation: Jacksonville, FLCapacity: 1 MMtpaCost: $100 millionDocket: CP17-41Status: Project has submitted a formal application
with FERC
FREEPORT LNG DEVELOPMENT LP – (9/17)Operator: FLNG Liquefaction 4 LLCProject: Freeport LNG Quintana Regas Terminal
ExpansionSegment: Train 4 ProjectType: Project includes construction of a fourth
liquefication trainLocation: Quintana Island, TXCapacity: 5 MtpaDocket: CP17-47Status: Project is awaiting approvalCompletion: 2019Comments: Train 4 will use electric motors with
variable frequency drive for the cooling and liquefac-tion compression power, resulting in negligible incremental emissions. Train 4 will be constructed adjacent to the first three trains on Quintana Island
KINDER MORGAN INC. – (6/17)Operator: Gulf LNG Liquefaction Co. LLCProject: Gulf LNG Liquefaction ProjectType: Project includes installation of natural gas
pre-treatment, liquefaction, and export facilities at the existing Gulf LNG Terminal
Location: Jackson County, MSCapacity: 11.5 MMtpaCost: $5 billionDocket: CP15-521Status: Project is awaiting an Environmental
Impact StatementCompletion: 2020
22 Pipeline News October 2017 • www.pipeline-news.com
PLANNEDProjects in development
Contractor: KBRType: Project includes a front-end engineering
and design report for FERC pre-filing services
NEXTDECADE LLC – (REV 6/17)Operator: Rio Grande LNG LLCProject: Rio Grande LNG ProjectType: Project includes construction of six
liquefaction trains, pre-treatment facilities, four full-containment LNG storage tanks and truck loading facilities
Location: Brownsville, TXCapacity: 27 MMtpaCost: $20 billionDocket: CP16-454Status: Project is awaiting an Environmental
AssessmentStart: 2Q 2018Completion: 1Q 2022
Contractor: GE Oil & GasType: Project includes supply of gas turbine and
compressor equipment
SEMPRA LNG & MIDSTREAM – (7/17)Operator: Port Arthur LNG LLCProject: Port Arthur Liquefaction ProjectType: Project includes construction of two
liquefaction trains, LNG storage tanks, marine facilities, NGLs and refrigerant storage, feed gas pre-treatment and combustion turbine generators
Location: Jefferson County, TXCapacity: 13.5 MMtpaDocket: CP17-20Contact: JD Morris Director, Permitting & Compliance [email protected] (718) 298-5479Status: Project is awaiting FERC reviewStart: 3Q 2021Completion: 3Q 2022
TELLURIAN INC. – (REV 8/17)Operator: Driftwood LNG LLCProject: Driftwood LNG ProjectType: Project includes construction of five LNG
plants, three LNG storage tanks, marine facilities and associated infrastructure and support facilities
Location: Calcasieu Parish, LACapacity: 26 MMtpaCost: $14 billionDocket: CP17-117Status: Project has submitted a formal application
with FERCStart: 2018Completion: 2022
OIL - The AmericasU.S. BAKKENLINK PIPELINE LLC – (REV 3/15)Project: Dry Creek to Beaver Lodge ProjectType: Project includes construction of pipeline Length: 37 milesDiameter: 16 inchesLocation: Johnson’s Corner, ND - Tioga, NDCapacity: 100 Mbpd
BLUEKNIGHT ENERGY PARTNERS LP – (REV 11/16)Operator: Knight Warrior LLCProject: Knight Warrior PipelineType: Project includes construction of pipelineLength: 160 milesDiameter: 16 inchesLocation: Madison, Walker, Grimes, Montgomery
and Harris counties, TXCapacity: 100 MbpdCost: $300 millionStatus: Project is delayed
Contractor: Hatch Mott MacDonald LLCType: Project includes engineering and design
for the project
Contractor: Contract Land Staff LLCType: Project includes land management for the
project
Contractor: Apex TITAN Inc. Type: Project includes environmental services
for the project
BOE PIPELINE LLC– (7/16)Project: Bakken Oil Express II Pipeline Type: Project includes construction of pipelineLength: 42 milesDiameter: 16 inchesLocation: Dunn County, ND and McKenzie County,
NDCapacity: 165 MbpdCost: $55 millionStatus: Project has received approval from the
NDPSC and BLM
BUCKEYE PARTNERS LP – (5/17)Project: South Texas Gateway PipelineType: Project includes construction of a
distribution system and a long-haul pipeline
Diameter: 24 inchesLocation: Wink, TX – Corpus Christi, TXCapacity: 400 MbpdCompletion: 2019Status: Project is undergoing an open season
ENBRIDGE INC. – (7/17)Project: Line 5 Pipeline Replacement Type: Project includes replacement of pipeline
via HDDLength: .6 milesDiameter: 30 inchesLocation: Little Rock, ARStatus: The Michigan Pipeline Safety Advisory
Board is expected to release two studies on risks from the aging pipeline built in 1953
Operator: Enbridge Pipelines LLCProject: Enbridge Ozark Pipeline ExpansionType: Project includes increasing horsepower at
pump stations and adding drag reducing agents to the crude petroleum
Location: Cushing, OK - Wood River, ILStatus: Project is seeking shipper commitmentsCompletion: 2Q 2018
ELK PETROLEUM INC. – (5/17)Operator: Grieve Pipeline LLCProject: Grieve PipelineType: Project includes construction of pipeline
Length: 32 milesDiameter: 8 inchesLocation: Mountain View, WYCapacity: 12 MbpdContact: Scott Hornafius CEO, Elk Petroleum Inc. 720-744-4884 [email protected]: Project is undergoing an open seasonCompletion: 1Q 2018
ENBRIDGE PIPELINES INC. – (REV 10/17)Project: Line 67 ExpansionType: Project includes installation of
new pump stations and associated station piping, including valves and appurtenances at four existing facilities
Location: Donaldson, Plummer, Cass Lake, and Floodwood, MN
Capacity: 120 MbpdCost: $199.2 millionDocket: PL-9/CN-12-590Status: Project has received a final EISComments: Project will add compression to a
segment of the existing Alberta Clipper Pipeline
ENERGY TRANSFER PARTNERS LP – (REV 9/17)Operator: Permian Express Terminal LLCProject: Permian Express 3Type: Project includes construction of a
gathering systemLocation: Nederland, TXCapacity: 100 MbpdContact: Chris Martin Senior Director, Business Development (281) 637-6548 [email protected]: Project is undergoing an open
season Completion: 4Q 2017
Contractor: American Electric Technologies Inc. (M&I Electric)
Type: Project includes M&I’s turnkey power delivery solutions, conventional switchgear, motor control centers and installation of frequency drives
Cost: $4 million
GEL PIPELINE TEXAS LLC – (4/17)Type: Project includes construction of pipelineLength: 23 milesLocation: Texas City, TXComments: The company has launched an open
season for the proposed project
MAGELLAN MIDSTREAM PARTNERS LP – (7/17)Owner 2: Plains All American Pipeline LPOperator: BridgeTex Pipeline Co. LLCProject: BridgeTex Pipeline ExpansionType: Project includes expansion of the
BridgeTex Pipeline via enhancements of existing pumps and related equipment
Diameter: 20 inches Location: Bryan, TXCapacity: 100 MbpdDocket: OR16-19
www.pipeline-news.com • October 2017 • Pipeline News 23
PLANNEDProjects in development
MINNESOTA PIPE LINE CO. LLC – (REV 1/17)Operator: Koch Pipeline Co.Project: Minnesota Pipe Line Reliability ProjectType: Project includes adding six pump stations
to MPL Line 4 and upgrading existing stations
Location: Howard County, TX - Glasscock County, TX
Capacity: 185 MbpdDocket: PL5/CN-14-320Cost: $125 million
ONEOK BAKKEN PIPELINE LLC – (REV 3/17)Project: Bakken Expansion II Loop ProjectType: Project includes construction of pipelineLength: 58 milesDiameter: 16 inchesLocation: Alexander, ND and Ft. Laramie, FLCapacity: 160 MbpdStatus: Project has been delayed
PHILLIPS 66 – (5/17)Project: Reeves-Odessa Origination (Rodeo)
ProjectType: Project includes construction of pipeline
and associated lateralsLength: 130 milesLocation: Reeves, TX – Odessa, TXCapacity: 130 MbpdContact: Scott Hutson Director, Business Development [email protected]: Project is undergoing an open seasonCompletion: 2Q 2018
PILGRIM PIPELINE HOLDINGS LLC – (REV 3/17)Project: Pilgrim PipelineType: Project includes construction of parallel
pipelinesLength: 356 milesDiameter: 24 inchesLocation: Port of Albany, NY – Linden, NJCapacity: 400 MbpdCost: $900 millionStatus: Project is finalizing the route
PLAINS ALL AMERICAN PIPELINE LP – (9/17)Project: Sunrise Pipeline System ExpansionType: Project includes construction of pipeline
and utilization of existing pipelineLength: 180 milesDiameter: 24 inchesLocation: Colorado City, TX – Wichita Falls, TXCapacity: 120 MbpdStatus: Project is in the planning phaseCompletion: 2Q 2019Comments: Project includes capacity expansions to
the existing Delaware Basin system of up to 200 Mbpd
Project: Permian Basin to Cushing PipelineType: Project includes construction of pipeline
and utilization of existing pipelineLocation: Midland, TX - Cushing, OKCapcity: 350 MbpdStatus: Project is undergoing an open seasonCompletion: 2Q 2019
SHELL PIPELINE COMPANY LP (REV 2/17)Operator: Zydeco Pipeline Co. LLCOwner 2: Shell Midstream Partners LPProject: Houma - St. James PipelineType: Project includes construction and
replacement of large diameter pipelineLength: 40 milesDiameter: 24 inchesLocation: Houma - St. JamesStart: 2Q 2018Status: Project is in the planning stagesComments: Project will replace a segment of the
existing Zydeco Houma – St. James line TALLGRASS PONY EXPRESS PIPELINE LLC – (REV 9/17)Project: Platteville ExtensionType: Project includes construction of facilities
to connect Holly Frontier’s refinery complex
Location: Platteville, COCapacity: 100 MbpdStatus: Project is undergoing a second open
seasonCompletion: 2Q 2018
Project: Tallgrass Grasslands TerminalType: Project includes construction of a terminalLocation: Platteville, COStatus: Project is awaiting the conclusion of the
Platteville Extension’s recently announced open season
Completion: 2Q 2018Comments: Project will serve as a new pipeline origin
for the Pony Express Platteville Extension
Call Jim Filipowicz today! (800)334-5964 or (406)761-4848Steel Etc. • 1408 52nd St. N • Great Falls, MT
Flume PipeNew & Used STD & Heavy Wall PipeUsed Railroad Flat Cars & Tank Cars
Get your product where you need it, when you need it!
Material delivered to job sites ON TIME in the Continental US & Canada
Featurin
g:
Coal Slag Blast Abrasive
Grit Sizes8-20 Course • 16-40 Medium
20-40 Med Fine • 30-60 Fine • 40-60 Extra Fine
Environmentally friendly NO heavy metal<.2% Free silica
Consistent, hard angular particlesFast cleaning
Blastox blending® availableCARB & QPL approved
24 Pipeline News October 2017 • www.pipeline-news.com
PLANNEDProjects in development
TEXSTAR MIDSTREAM LOGISTICS – (5/17)Owner 2: Castleton Commodities InternationalOwner 3: Ironwood Midstream Energy PartnersOperator: Epic Pipeline Co. LLCProject: EPIC PipelineType: Project includes construction of pipelineLength: 730 milesDiameter: 16, 20, 24 and 30 inchesLocation: Orla, Pecos, Crane and Midland counties,
TX - Corpus Christi, TX Capacity: 440 MbpdStatus: Project is undergoing an open seasonCompletion: 1Q 2019
Project: Karnes PipelineType: Project includes pipeline constructionLength: 15 milesDiameter: 10 and 12 inchesLocation: Karnes, TXComments: Associated with EPIC Pipeline
TRANSCANADA CORP. – (REV 8/17)Operator: Upland Pipeline LLCProject: Upland Pipeline ProjectType: Project includes construction of pipeline
and related facilities, including valve sites, tanks and new pump stations
Length: 240 milesDiameter: 20 inchesLocation: Williston, ND - Manitoba-Saskatchewan
borderCapacity: 300 MbpdCost: $600 millionDocket: 2015-18866Status: Company has requested the U.S. State
Department to pause review of the project
CanadaENBRIDGE PIPELINES INC. – (7/17)Project: Line 21 Pipeline (Norman Wells Pipeline)Type: Project includes installation and
decommissioning of pipelineLength: 1.5 milesDiameter: 12 inchesLocation: Fort Simpson, Northwest TerritoriesFiling: A85153Status: Project is awaiting NEB approval
Project: Northern Gateway PipelineType: Project includes construction of two
pipelines and a marine terminalLength: 731 milesDiameter: 20 and 36 inchesLocation: Bruderheim, AB - Kitimat, B.C.Capacity: 718 MbpdCost: $6.5 billionDocket: A43714Status: The Federal Government has directed the
NEB to dismiss the project’s application
TRANSCANADA CORP. – (REV 9/17)Project: Keystone XL ProjectType: Project includes construction of pipelineLength: 1,179 milesDiameter: 36 inchesLocation: Hardisty, AB - Steele City, NECapacity: 830 MbpdCost: $7 billionFiling: A21262Status: Project has launched an open season
Project: Energy East PipelineType: Project includes pipeline conversion and
construction Length: 870 milesDiameter: 42 inchesLocation: Hardisty, AB - St. John, N.B.Capacity: 1.1 MMbpdCost: $15.7 millionFiling: A84515Status: Project has filed comments on NEB’s
Draft Lists of Issues, Draft Factors and Draft Scope of the Factors for the Environmental Assessments
Start: 2Q 2018Completion: 4Q 2020
Contractor: CH2M HILL Inc.Type: Project includes front-end engineering
and design for the project
Contractor: ABBType: Project includes delivering electrical
houses for pump stations
PRODUCTS - The AmericasU.S.CENEX PIPELINE LLC – (10/17)Owner: CHS Inc.Project: Cenex Pipeline ReplacementType: Project includes 8-inch pipeline
replacementLength: 182 milesDiameter: 10 inchesLocation: Sidney, MT – Minot, NDStatus: CHS recently finished contacting
landowners and conducting environmental resource surveys. The next step is to work with tribal leadership, state and federal agencies to complete the approval and permitting process
Start: 4Q 2017Completion: 2Q 2019Comments: The pipeline will follow a new route for
the majority of the 182 miles and will utilize existing easements for the rest of its length
FORMOSA PLASTICS GROUP – (7/17)Contractor: Strike LLCProject: Formosa Expansion ProjectType: Project includes construction of pipelineLength: 186 milesDiameter: 8, 10 and 16 inchesLocation: Point Comfort, TXCapacity: 46 Mbpd
HOWARD ENERGY PARTNERS LP – (REV 6/17)Operator: Dos Águilas Pipeline LLC Project: Dos Aguilas ProjectSegment 1: Laredo Express PipelineSegment 2: Borrego PipelineSegment 3: Poliducto Frontera PipelineSegment 4: Poliducto del Norte PipelineType: Project includes construction of pipelineLength: 287 milesDiameter: 12 inchesLocation: Corpus Christi, TX - Monterrey, Nuevo
LeonCapacity: 72 Mbpd
Cost: $500 millionStatus: Project is awaiting approvalStart: 4Q 2018
Operator: GT Pipeline LLCProject: Sabine Bayou Line ProjectType: Project includes construction of pipelineLength: 6 milesDiameter: 16 and 20 inchesLocation: Port Arthur, TXCapacity: 308 MbpdStatus: Project is undergoing an open season
KINDER MORGAN INC. – (REV 7/17)Operator: Palmetto Products Pipe Line LLCProject: Palmetto PipelineType: Project includes construction of pipeline,
tanks and pump stationsLength: 360 milesDiameter: 16 and 20 inchesLocation: South Carolina - FloridaCapacity: 167 MbpdCost: $1.1 billionDocket: OR15-13Status: Project is delayed
MAGELLAN MIDSTREAM PARTNERS LP – (10/17)
Owner 2: Valero Energy Corp.Project: Texas Refined Petroleum Products
Pipeline SystemType: Work scope includes the expansion and
reversal of an existing refined petroleum products pipeline system
Length: 135 milesDiameter: 16 inchesLocation: Houston, TX - Hearne, TXCapacity: 85 MbpdCost: $375 million (Magellan’s share)Status: Project is awaiting necessary permits
and regulatory approvalCompletion: 2Q 2019Comments: Project will provide the ability to deliver
additional product north to Temple, Waco and Dallas as well as Magellan’s Midcontinent markets, including Little Rock, AR. If warranted by additional customer demand, pipeline capacity originating in the Houston area could be further increased
MexicoMONTERRA ENERGY – (REV 5/17)Operator: Monterra Energy S. de R.L. de C.V.Project: Monterra del Centro PipelineType: Project includes construction of pipelineLength: 167 milesDiameter: 18 inchesLocation: Tuxpan, Veracruz - Tula, HidalgoCapacity: 100 MbpdStatus: Project is in the development stageCompletion: 3Q 2018
www.pipeline-news.com • October 2017 • Pipeline News 25
PLANNEDProjects in development
OFFSHORE - The AmericasU.S. WILLIAMS COMPANIES INC. – (8/17)Operator: Transcontinental Gas Pipe Line Co. LLCProject: Central Texas Gathering System FacilitiesType: Project includes pipeline abandonment
and constructionLength: 40 milesDiameter: 20 inchesLocation: offshore Texas (Brazos Block A-133A to
Brazos Block 538)Capacity: 2.6 Bcf/dCost: $2.9 millionDocket: CP17-450Status: Project filed an application with FERC
OTHER - The AmericasU.S. DENBURY RESOURCES – (9/16)Project: Cedar Creek Anticline ProjectType: Project includes construction of pipelineLength: 120 milesDiameter: 20 inchesLocation: Eastern MontanaCost: $225 millionStart: 2Q 2018
GAS – InternationalAsia PacificALCAN GOVE PTY LTD. – (8/14)Project: Katherine to Gove Gas Pipeline Type: Project includes the construction and
operation of new pipelineLength: 373 milesLocation: Katherine - GoveComments: Project is currently undergoing a feasibility
study
BANGLADESH PETROLEUM CORP. – (9/17)Project: Dhaka to Chittagong PipelineType: Project includes pipeline constructionLength: 155 milesDiameter: 16 inchesLocation: Dhaka – ChittagongCapacity: 3 MMtpaStatus: Project is securing land acquisition
Contractor: Engineers India Ltd.Type: Project includes route surveying
Contractor: Bangladesh ArmyType: Project includes engineering,
procurement and construction
CHINA PETROCHEMICAL CORP. (SINOPEC) – (9/17)Project: Erdos-Anping-Cangzhou PipelineType: Project includes construction of a trunk
and five trunk lines
Length: 1,424 milesLocation: Xiongan New Area, Beijing – Cangzhou,
Hebei provinceCapacity: 30 Bcm/yCost: $5.1 billionStatus: Project has been approved by the National
Development and Reform CommissionStart: 2019Comments: Project is designed to connect major LNG
storage with Xiongan New Area, China’s new economic zone near capital Beijing and is part of Sinopec’s clean heating program on the northern region
INDIAN OIL CORP. LTD. – (1/13)Project: Sanganer-Bijwasan Naphtha PipelineType: Project includes the construction of new
pipelineLength: 183 milesLocation: Sanganer - Bijwasan NaphthaComments: Project is currently awaiting development
decisions
Project: Patna to Motihari and Baitalpur PipelineType: Project includes the construction of new
pipelineLength: 167 milesLocation: Patna to MotihariComments: Project is currently awaiting development
decisions
Project: Cauvery Basin-Trichy Pipeline Type: Project includes the construction of new
pipeline
1209 Hardy StreetHouston, TX 77020Tel: (713) 222-0146Tel: (800) 231-7205Fax: (713) 222-7403
Copyright 2015Knapp Polly Pig, Inc.All rights reserved
E-mail: [email protected]
By-pass ports::Gauging plates::Transmitter cavities::Medium or heavy density foam
Available options:
Single piece bodyBi-Directional
Condensate removalParaffin scrapingDewateringCommissioning
Quality-built in Houston, Texasfor over 25 years
FOAM DISC PIGThe Original Manufacturer of the
Steel wire brush
Rounded nose Extended-Length
Plastic brush
VaculiftsShearsHammersBuckets
WHEEL LOADERSAll machines 21/2 to 9 yrds.All current Kawasaki models available with couplers, forks or buckets.
EXCAVATORSAll machines from 17,000 to 111,000 lbs. All current Kobelcomodels available.
OFF ROADDUMP TRUCKSBell Truck models, Cat and other makes available, from 25 to 50 ton.
MOTOR GRADERSMany models to choosefrom: 140H, 140M & 14H. Joystick or lever controls, scarifiers & rippers, Accugrade ready.
CRANESCrawlers, rough terrain and carrydeck models available. From 30 to 100 ton.
COMPRESSORSIngersoll Rand, Atlas Copco, Doosan, Sullair. 100 to 125 psi. Tier 3 or 4 diesel available.
LIGHT PLANTSAvailable with 90 hr. runtime, 6.0kW single phase generators,auto start / stop.
PIPELAYERS& SIDEBOOMSMidwestern booms with 20,000 to 40,000 lbs. max lift. Many makes and models to choose from.
WATER TRUCKSOn and off road trucks available. From 2,000 to 8,000 gallons.
ON HIGHWAYDUMP TRUCKSWestern Star, International, Mack, F450’s, F750’s and more!
DOZERSA variety of models to choose from. Cat D3K’s to D8T’s available with winches, rippers and angle blades.
Morooka MST1500 Personnel Carriers
Morooka MST1500 Fuel Tankers
LICENSED AND INSURED TRANSPORTATION SERVICES AVAILABLE
Crane Mat Grapples
Morooka MST1500 Vacuums
ATTACHMENTS
Morooka MST1500 Flatbeds
Morooka MST1500 Sandblasters
Morooka MST1500 Dumpers
Morooka MST2200 Dumpers
320 Briscoe Drive Morris, Illinois 60450 www.iltruck.com [email protected]
One Call Rents It All! 815-941-1900
RUBBER TRACK CARRIERS New models available: 800’s, 1500’s and 2200’s. Dumpers, Flatbeds, Personnel Carriers, Mounted Vacuums, Fuel Tanks, Welders, Compressors, Sandblasters and Conveyors. • Custom configurations are available upon request, call one of our sales or rental representatives to inquire.
VaculiftsShearsHammersBuckets
WHEEL LOADERSAll machines 21/2 to 9 yrds.All current Kawasaki models available with couplers, forks or buckets.
EXCAVATORSAll machines from 17,000 to 111,000 lbs. All current Kobelcomodels available.
OFF ROADDUMP TRUCKSBell Truck models, Cat and other makes available, from 25 to 50 ton.
MOTOR GRADERSMany models to choosefrom: 140H, 140M & 14H. Joystick or lever controls, scarifiers & rippers, Accugrade ready.
CRANESCrawlers, rough terrain and carrydeck models available. From 30 to 100 ton.
COMPRESSORSIngersoll Rand, Atlas Copco, Doosan, Sullair. 100 to 125 psi. Tier 3 or 4 diesel available.
LIGHT PLANTSAvailable with 90 hr. runtime, 6.0kW single phase generators,auto start / stop.
PIPELAYERS& SIDEBOOMSMidwestern booms with 20,000 to 40,000 lbs. max lift. Many makes and models to choose from.
WATER TRUCKSOn and off road trucks available. From 2,000 to 8,000 gallons.
ON HIGHWAYDUMP TRUCKSWestern Star, International, Mack, F450’s, F750’s and more!
DOZERSA variety of models to choose from. Cat D3K’s to D8T’s available with winches, rippers and angle blades.
Morooka MST1500 Personnel Carriers
Morooka MST1500 Fuel Tankers
LICENSED AND INSURED TRANSPORTATION SERVICES AVAILABLE
Crane Mat Grapples
Morooka MST1500 Vacuums
ATTACHMENTS
Morooka MST1500 Flatbeds
Morooka MST1500 Sandblasters
Morooka MST1500 Dumpers
Morooka MST2200 Dumpers
320 Briscoe Drive Morris, Illinois 60450 www.iltruck.com [email protected]
One Call Rents It All! 815-941-1900
RUBBER TRACK CARRIERS New models available: 800’s, 1500’s and 2200’s. Dumpers, Flatbeds, Personnel Carriers, Mounted Vacuums, Fuel Tanks, Welders, Compressors, Sandblasters and Conveyors. • Custom configurations are available upon request, call one of our sales or rental representatives to inquire.
28 Pipeline News October 2017 • www.pipeline-news.com
PLANNEDProjects in development
Length: 74 milesLocation: Cauvery Basin refinery - TrichyComments: Project is currently awaiting development
decisions
Project: Ennore-Trichy-Puducherry LPG PipelineType: Project includes the construction of new
pipelineLength: 248 milesLocation: Ennore – Trichy - PuducherryComments: Project is currently awaiting development
decisions
PHILIPPINE NATIONAL OIL CO. – (REV 12/16)Project: Batangas-Manila PipelineType: Project includes the construction of new
pipelineLength: 65 milesLocation: Batangas - ManilaStart: Delayed
RELIANCE INDUSTRIES – (REV 7/13)Project: Kakinada-Basudebpur-Howrah Pipeline Type: Project includes the construction of new
pipelineLength: 680 milesLocation: Kakinada-Basudebpur-HowrahComments: According to the New Indian Express,
land owners opposed the project due to inadequate compensation and safety concerns with past pipeline leakage
SINOPEC – (11/13)Project: Zhundong Coal-to-Gas Plant Type: Project includes the construction of new
gas pipelinesLength: 4,970 milesLocation: Zhundong, ChinaCompletion: 2021Comments: Project will be the largest coal-to-gas
plant in China and will help increase domestic energy efficiency and cut reliance on oil and gas imports
FSU Eastern EuropeAZERBAIJAN/TURKMENISTAN/GOV. OF UK – (REV 8/16)Project: Trans Caspian Gas Pipeline Type: Project includes the construction of new
pipeline, including a subsea portionLength: 186 milesLocation: Türkmenbaşy – Caspian Sea - Sangachal
Terminal, BakuComments: Project will have a capacity of 30 Bcm
GAZPROM – (REV 12/16)Project: Yamal – Europe-2 Pipeline Type: Project includes the construction of new
pipelineLength: 250 milesLocation: Poland - Slovakia - Hungary Completion: 2019Comments: Project will have an annual throughput of
no less than 15 Bcm of gas
GAZ-SYSTEM S.A. – (REV 1/13)Project: Poland-Slovakia PipelineType: Project includes the construction of new
pipelineLength: 158 milesLocation: Poland - Slovakia Start: 2018
Comments: Project will connect the natural gas transmission systems of the two countries and expansion of the Poland-Czech Republic Pipeline
Project: Zdzieszowice-Wrocław PipelineType: Project includes the construction of new
pipelineLength: 80 milesLocation: Zdzieszowice - WrocławComments: Project is currently awaiting development
decisions
Project: Skoczów-Oświęcim PipelineType: Project includes the construction of new
pipelineLength: 31 milesLocation: Skoczów - OświęcimComments: Project is currently awaiting development
decisions
Project: Szczecin-Lwówek PipelineType: Project includes the construction of new
pipelineLength: 116 milesLocation: Szczecin - LwówekComments: Project is currently awaiting development
decisions
Project: Rembelszczyzna–Gustorzyn PipelineType: Project includes the construction of new
pipelineLength: 109 milesLocation: Rembelszczyzna – GustorzynComments: Project is currently awaiting development
decisions
Project: Szczecin-Gdańsk PipelineType: Project includes the construction of new
pipelineLength: 164 milesLocation: Szczecin - GdańskComments: Project is currently awaiting development
decisions
Project: Gustorzyn - Odolanów PipelineType: Project includes the construction of new
pipelineLength: 104 milesLocation: Gustorzyn - OdolanówComments: Project is currently awaiting development
decisions
Project: Polkowice-Żary PipelineType: Project includes the construction of new
pipelineLength: 41 milesLocation: Polkowice - ŻaryComments: Project is currently awaiting development
decisionsProject: Strachocina-Pogórska Wola PipelineType: Project includes the construction of new
pipelineLength: 60 milesLocation: Strachocina - Pogórska WolaComments: Project is currently awaiting development
decisions
MALTA/SICILY – (7/17)Project: Malta to Sicily PipelineType: Project includes the construction of a
22-inch pipelineLength: 98 miles (21 miles onshore and 77 miles
offshore)Location: Gela, Sicily – Delimara, Malta
Capacity: 2 Bcm/yCost: $360 millionStatus: Malta and Sicily have signed a letter of
intent that will allow for progress to be made regarding the construction of the project
Completion: 2024
POLAND/DENMARK – (6/16)Type: Project will link Poland to gas from
Norway and increase the security of its energy supplies
Location: Poland - NorwayStart Date: 2017Comments: A feasibility plan should be ready by the
end of 2016
POLAND/LITHUANIA – (REV 8/14)Project: Gas Interconnection Poland–LithuaniaType: Project includes the construction of new
pipelineLength: 445 milesLocation: Lithuania - Poland Completion: 2019Comments: Pipeline is a part of the Baltic Energy
Market Interconnection Plan project and will have a capacity of up to 2.3 Bcm/year
Middle EastGOV. OF IRAN – (3/16) Project: Iran-Iraq-Syria PipelineType: Project includes the construction of a
56-inch pipelineLength: 3,500 milesLocation: Iran – Iraq - SyriaComments: Pipeline will have a daily capacity of as
much as 110 MMcm
KOREA GAS CORP. – (4/16)Type: Project includes construction of one
onshore lateral from Rudan to Mobarak Mount, and one offshore lateral from Mobarak Mount to Sohar Port in Oman
Length: 250 milesLocation: Iran - OmanStart Date: 2017Comments: Feasibility studies for the offshore section
of the pipeline are expected to be complete by mid-2016
AfricaEAST AFRICAN COMMUNITY – (REV 12/16)Project: Dar es Salaam-Tanga-Mombasa PipelineType: Project includes the construction of new
pipeline and gas skid supply terminalsLength: 329 milesLocation: Tanzania - MombasaComments: Project is currently undergoing a feasibility
study
OIL - InternationalAfricaGOV. OF UGANDA – (REV 2/13) Project: Eldoret - Kampala PipelineType: Project includes the extension and
reversal of existing pipeline, including mainline pumps, intermediate pump stations and road/rail loading facilities
Length: 497 miles
www.pipeline-news.com • October 2017 • Pipeline News 29
PLANNEDProjects in development
Location: Eldoret – KampalaStart: 2017
MALAWI GOVERNMENT – (REV 7/16)Project: Moz-Malawi-Zambia-Congo PipelineType: Project includes the construction of new
pipeline, pumping stations and storage tanks
Length: 504 milesLocation: Moz – Malawi – Zambia - CongoComments: Pipeline will have 500 cm/month of
capacity
SOUTH SUDAN – (REV 12/16)Project: Juba-Lamu oil pipelineType: Project includes the construction of new
pipelineLength: 1,242 milesLocation: Juba - LamuComments: Project is currently in the feasibility
stages and, when complete, will transport between 700M to one million barrels of crude oil from South Sudan to other countries via the proposed Lamu Port, as an alternative route to Port Sudan
TOYOTA TSHUSHO – (REV 4/12)Type: Project includes the construction of new
pipeline, pumping stations and storage tanks
Length: 870 milesLocation: Jabu, South Sudan - Kenya’s Lamu portComments: Pipeline has an estimated capacity of 450
Mbpd
FSU Eastern EuropeROSNEFT/TRANSNEFT – (11/13)Project: Skovorodino-Mohe Pipeline ExpansionType: Project includes the expansion of tank
farm pumping stationsLocation: Skovorodino - MoheComments: Pipeline capacity is expected to reach 30
million tons per year beginning in January 2018
Middle EastMINISTRY OF OIL OF IRAQ – (8/17)Operator: State Company for Oil Projects Project: Basra-Aqaba PipelineType: Project includes construction of dual oil
and gas pipelinesLength: 440Location: Basra, Iraq - Aqaba, JordanCapacity: 2.25 Mbpd 500 Mcf/dCost: $18 billionStart: 4Q 2018Complete: 4Q 2020Status: Project is in the tender process
Contractor: SNC LavalinType: Project includes engineering,
procurement and design
OFFSHORE – InternationalAsia PacificASIA CONSORTIUM ENGR./DOSB – (3/16)Project: Trans Oriental Gas PipelineType: Project includes the construction of a
subsea pipelineLength: 2,485 milesCompletion: 2022Location: Malaysia - South KoreaComments: An MoU for the project has been signed
FSU Eastern EuropeGOV. OF RUSSIA/GOV. OF JAPAN – (6/12)Project: Sakhalin - Japan PipelineType: Project includes the construction of new
pipelineLength: 807 milesLocation: Sakhalin - JapanComments: Project will transfer about 25 Bcm/year of
gas
Middle EastTRADE BANK OF IRAQ – (7/16)Project: Basra - Aqaba PipelineType: Project includes the construction of new
pipelineLength: 1,044 milesLocation: Basra - AqabaStart: 2017Comments: An MoU was signed in November 2015
and, when built, the project will have a capacity of 4.5 MMbpd
Western Europe & EU CountriesSTATOIL – (12/13)Project: Skrugard Field DevelopmentType: Project includes the construction of new
pipelineLength: 174 milesLocation: Skrugard - VeidnesCompletion: 2018Comments: Production is estimated at almost 200
Mbpd of oil
WOOD GROUP – (11/16)Project: Utgard Gas FieldType: Project consists of a 13-mile long pipe-
in-pipe production pipeline from the 4-slot template at Utgard to the Sleipner T platform and an integrated service umbilical (ISU) from the Sleipner A
Length: 13 milesLocation: North SeaStart: 2017Completion: 2019
Southeast Connections, LLC2720 Dogwood Dr. SE
Conyers, GA 30013404-659-1422
www.seconnections.com
• New Pipeline Construction • Pipeline Maintenance and Integrity Management • Pipeline Relocation “Providing expert options for today’s ever-changing utility installation requirements”
Southeast Connections, LLC
1-17_SE_Connections_Ad2.indd 1 1/12/2017 8:58:52 PM