ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a...

19
www.pipeline-news.com • October 2017 • Pipeline News 11 in development PLANNEDProjects (Projects added for the current month are highlighted and in bold face type) GAS – The Americas U.S. ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) Project: Alaska Stand Alone Pipeline Type: Project includes construction of a transmission pipeline and lateral Length: 763 miles Diameter: 12 and 36 inches Location: Prudhoe Bay, AK – Nikiski, AK Capacity: 500 MMcf/d Cost: $10 billion Start: 2019 Completion: 2023 Status: Project is awaiting a Supplemental Environmental Impact Statement Comments: Pipeline is part of the proposed Alaska LNG Project ALLIANCE PIPELINE – (5/17) Project: Pacific Alliance Pipeline Expansion Type: Project includes addition of compression facilities Location: Chicago, IL Capacity: 500 MMcf/d Contact: Jason Feit Manager, Asset Optimization and Development (403) 517-6361 Status: Project is undergoing an economics study, with a decision on next steps anticipated by 3Q 2017 Completion: 4Q 2020 AMERICAN MIDSTREAM PARTNERS LP – (REV 6/17) Project: Magnolia Intrastate Extension Type: Project includes extension of pipeline Length: 45 miles Diameter: 24 inches Location: Alabama Capacity: 500 MDth/d Status: Project is in the bid phase Completion:2019 ATMOS ENERGY – (1/17) Type: Project includes construction of two pipelines Length: 18 miles Diameter: 8 inches Location: Lowndes and Oktibbeha counties, MS Start: 2Q 2017 Comments: Pipeline is in the bid phase CABOT OIL & GAS CORP. – (REV 6/17) Owner 2: Williams Partners LP Operator: Constitution Pipeline LLC Project: Constitution Pipeline Type: Project includes construction of pipeline and compression facilities Length: 124 miles Diameter: 30 inches Location: Susquehanna County, PA - Wright County, NY Capacity: 650 MMcf/d Cost: $925 million Docket: CP13-499 Status: New York State blocked the federally approved pipeline in May 2016 and the company is currently challenging the state’s decision CANYON MIDSTREAM PARTNERS – (7/17) Operator: Pomelo Connector LLC Project: Pomelo Connector Pipeline Type: Project includes construction of pipeline and a compressor station Length: 14 miles Diameter: 30 inches Location: Nueces County, TX Capacity: 400 MDth/d Docket: CP17-26 Status: Project is awaiting FERC approval 214-515-5000 www.polyguard.com Innovation based. Employee owned. Expect more. RD-6 Fastest Coating in the West Contractors say there is no faster or trouble free girth weld coating system than Polyguard ® RD-6 ® . On a recent project (12” pipe, FBE mainline coating) a first time crew coated 150 joints on day one after training. On day two, after adding a driver to the 5 man crew, 201 joints were completed. No coating system has less installation problems than Polyguard ® RD-6 ® . Ask someone who has installed it. One of thousands of projects using Polyguard RD-6 non-shielding coating. Our first was in 1988. www.Polyguard.com/pipeline ® Country For more information, visit

Transcript of ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a...

Page 1: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

www.pipeline-news.com • October 2017 • Pipeline News 11

in developmentPLANNEDProjects(Projects added for the current month are highlighted and in bold face type)

GAS – The Americas U.S. ALASKA GASLINE DEVELOPMENT CORP. –(REV 6/17) Project: Alaska Stand Alone Pipeline Type: Project includes construction of a

transmission pipeline and lateral Length: 763 milesDiameter: 12 and 36 inchesLocation: Prudhoe Bay, AK – Nikiski, AKCapacity: 500 MMcf/dCost: $10 billionStart: 2019Completion: 2023Status: Project is awaiting a Supplemental

Environmental Impact StatementComments: Pipeline is part of the proposed Alaska

LNG Project

ALLIANCE PIPELINE – (5/17)Project: Pacific Alliance Pipeline ExpansionType: Project includes addition of compression

facilitiesLocation: Chicago, ILCapacity: 500 MMcf/dContact: Jason Feit Manager, Asset Optimization and

Development (403) 517-6361Status: Project is undergoing an economics

study, with a decision on next steps anticipated by 3Q 2017

Completion: 4Q 2020

AMERICAN MIDSTREAM PARTNERS LP – (REV 6/17)Project: Magnolia Intrastate ExtensionType: Project includes extension of pipelineLength: 45 milesDiameter: 24 inchesLocation: AlabamaCapacity: 500 MDth/dStatus: Project is in the bid phaseCompletion:2019

ATMOS ENERGY – (1/17)Type: Project includes construction of two

pipelinesLength: 18 milesDiameter: 8 inchesLocation: Lowndes and Oktibbeha counties, MSStart: 2Q 2017 Comments: Pipeline is in the bid phase

CABOT OIL & GAS CORP. – (REV 6/17)Owner 2: Williams Partners LPOperator: Constitution Pipeline LLCProject: Constitution PipelineType: Project includes construction of pipeline

and compression facilitiesLength: 124 milesDiameter: 30 inchesLocation: Susquehanna County, PA -

Wright County, NYCapacity: 650 MMcf/dCost: $925 million

Docket: CP13-499Status: New York State blocked the federally

approved pipeline in May 2016 and the company is currently challenging the state’s decision

CANYON MIDSTREAM PARTNERS – (7/17)Operator: Pomelo Connector LLCProject: Pomelo Connector Pipeline

Type: Project includes construction of pipeline and a compressor station

Length: 14 milesDiameter: 30 inchesLocation: Nueces County, TXCapacity: 400 MDth/dDocket: CP17-26Status: Project is awaiting FERC approval

214-515-5000 • www.polyguard.com

Innovat ion based. Employee owned. Expect more.

RD-6 Fastest Coatingin the West

Contractors say there is no faster or trouble free girth weld coating system than Polyguard® RD-6®. On a recent project (12” pipe, FBE

mainline coating) a first time crew coated 150 joints on day one after training. On day two, after adding a driver to the 5 man crew, 201 joints were completed. No coating system has less installation problems than

Polyguard® RD-6®. Ask someone who has installed it.

One of thousands of projects using Polyguard RD-6 non-shielding coating. Our first was in 1988.

www.Polyguard.com/pipeline

®

Country

For more information, visit

Page 2: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

PLANNEDProjects in development

12 Pipeline News October 2017 • www.pipeline-news.com

DOMINION ENERGY – (REV 9/17)Owner 2: Duke EnergyOwner 3: Piedmont Natural Gas Owner 4: Southern Company GasOperator: Atlantic Coast Pipeline LLCProject: Atlantic Coast PipelineType: Project includes construction of pipelineLength: 600 milesDiameter: 20, 36 and 42 inchesLocation: Harrison County, WV – Chesapeake, VACapacity: 1.5 Bcf/dCost: $5.1 billionDocket: CP15-554Status: Project has received a Final Environmental

Impact StatementStart: 4Q 2017Comments: Project has awarded construction

contracts to Spring Ridge Constructors LLC, U.S. Pipeline Inc., SMPC LLC and Rockford Corp.

Project: Supply Header ProjectType: Project includes pipeline construction and

facility modificationsLength: 38 milesDiameter: 30 inchesLocation: Westmoreland County, PA; Wetzel County,

WVCapacity: 1.5 MMDth/dCost: $500 millionDocket: CP15-555Status: Project has received a Final Environmental

Impact StatementStart: 4Q 2018Completion: 4Q 2019Comments: Project will move Marcellus Shale gas

from Ohio, West Virginia and Pennsylvania into the Atlantic Coast Pipeline for further delivery to Virginia and North Carolina

Project: Sweden Valley ProjectType: Project includes pipeline construction,

compressor station modifications and new metering and regulation facilities

Capacity: 120 MDth/dCost: $48 millionStatus: Project is preparing to file an application

for a Certificate of Public Convenience and Necessity with FERC

Completion: 4Q 2019Comments: Project will help meet growing demand

for natural gas to serve Midwest markets

Project: Line A Abandonment ProjectOperator: Dominion Energy Carolina Gas

Transmission LLCType: Project includes pipeline abandonment

to be done in three phasesLength: 60 milesDiameter: 10 inchesLocation: York County, SCDocket: CP17-3Status: Project has received a favorable

Environmental Assessment

DRIFTWOOD LNG PIPELINE LLC – (8/16)Project: Driftwood LNG PipelineType: Project involves dual lay of pipelineLength: 96 milesDiameter: 36 and 42 inchesLocation: Calcasieu Parish, LA - Evangeline Parish,

LACapacity: 4 Bcf/d

Docket: CP17-118Status: Project has submitted a formal application

with FERCStart: 2018Completion: 2022Comments: Pipeline is part of the proposed Driftwood

LNG Project

DTE ENERGY – (8/17)Operator: Birdsboro Power LLCProject: Birdsboro PipelineType: Project includes construction of pipelineLength: 14 milesDiameter: 24 or 30 inchesLocation: Oley Township, PACapacity: 79 MDth/dContact: Kenneth Magyar VP, Project Development & Business

Development (724) 416-7263Docket: PF17-1Status: Project is awaiting an Environmental

Assessment Start: 2Q 2018

Owner 2: Spectra Energy Partners LPOperator: NEXUS Gas Transmission SystemProject: NEXUS ProjectType: Project includes pipeline construction and

four compressor stationsLength: 255 milesDiameter: 42 inchesLocation: Ohio, Michigan and OntarioCapacity: 1.5 Bcf/dCost: $2 billionDocket: CP16-22Status: Project is awaiting FERC approval

Contractor: FluorType: front-end engineering and design

Contractor: Michels Corp.Type: Pipeline constructionLocation: Ohio and Michigan

Contractor: Latex ConstructionType: Pipeline constructionLocation: Ohio

Contractor: M.G. Dyess Inc.Type: Pipeline constructionLocation: Ohio

DUKE ENERGY – (6/17)Project: Central Corridor Pipeline ExtensionType: Project includes expansion of existing

pipelineLength: 12 milesDiameter: 20 inchesLocation: Raleigh, NCStart: 3Q 2018Completion: 2019

Type: Project includes construction of pipelineLength: 13 milesDiameter: 20 inchesLocation: Cincinnati, OHStatus: Project is undergoing public hearings. If

built, pipeline will increase the reliability of natural gas delivery in central Cincinnati

CENTERPOINT ENERGY – (4/17)Type: Project includes construction of pipelineLength: 12 milesDiameter: 12 inchesLocation: Lafayette and Yalobusha counties, MSStatus: Project is in the early stagesStart: 4Q 2017

CHENIERE ENERGY INC. – (REV 7/17)Operator: Midship Pipeline Co. LLCProject: Midship ProjectType: Project includes construction of pipeline,

several laterals, compressor stations and interconnects

Length: 200 milesDiameter: 36 inchesLocation: Grady, OK – Bryan, TXCapacity: 1.4 MMDth/dDocket: CP17-458Status: Project is awaiting an Environmental

Impact StatementCompletion: 1Q 2019

CHESAPEAKE UTILITIES CORP. – (11/16)Operator: Eastern Shore Natural GasProject: 2017 Expansion ProjectType: Project includes pipeline looping,

upgrades to existing metering facilities and installation of a compressor unit

Length: 33 milesLocation: Pennsylvania, Maryland, DelawareCapacity: 86 MDth/dCost: $99 millionDocket: PF16-7Status: Project is currently awaiting a pre-filing

review

CRESTWOOD EQUITY – (7/17)Owner: Crestwood EquityProject: DELTA PipelineType: Project includes construction of pipeline Length: 200 milesDiameter: 20 inchesLocation: Reeves County, TX - Orla, TXCapacity: 200 Mcf/dContact: Russ Kovin Senior Vice President, Commercial

Operations, Central US [email protected] (832) 519-2260Status: Project is seeking shipper commitmentsCompletion: 3Q 2018

Operator: Arrow Field Services Type: Project includes construction of pipelineLength: 5 milesDiameter: 8 and 10 inchesLocation: McKenzie County, NDCost: $6.3 million Status: The North Dakota Public Service

Commission held a public hearing and is reviewing the project

DENBURY RESOURCES – (7/16)Owner: Denbury ResourcesType: Project includes construction of pipelineLength: 110 milesDiameter: 20 inchesLocation: Glendive, MTStart: 2018

Page 3: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

www.pipeline-news.com • October 2017 • Pipeline News 13

PLANNEDProjects in development

ENABLE MIDSTREAM PARTNERS – (2/17)Operator: Oklahoma Gas and Electric (OG&E) Project: Muskogee PipelineType: Project includes construction of pipeline

and associated metering facilitiesLength: 77 milesDiameter: 20 inchesLocation: OklahomaCapacity: 228 Mcf/dCost: $70 millionStart: 2018Comments: The 20-year contract will support OG&E’s

planned conversion of two 500 megawatt coal-fired generating units to natural gas

EQT CORP. – (REV 8/17)Owner 2: NextEra US Gas Assets LLCOperator: Mountain Valley Pipeline LLCProject: Mountain Valley PipelineType: Project includes construction of pipeline

and three compressor stationsLength: 301 milesDiameter: 42 inchesLocation: Wetzel County, WV - Pittsylvania County,

VACapacity: 2 MMDth/dCost: $3.5 billionDocket: CP16-10Status: Project has received a positive Final

Environmental Impact StatementStart: 4Q 2017Completion: 4Q 2018

EQT MIDSTREAM PARTNERS LP – (REV 6/17)Project: Equitrans Expansion ProjectType: Project includes construction of pipeline

and expansion of existing compressor stations

Length: 8 milesDiameter: 6 and 30 inchesLocation: Greene, Allegheny and Washington

counties, PA; Wetzel County, WVCapacity: 600 MDth/dCost: $172 millionDocket: CP16-13Status: FERC has delayed the release of its final

Environmental Impact StatementStart: 4Q 2017Completion: 4Q 2018

FAIRBANKS PIPELINE CO. – (REV 8/15)Project: Arctic Fox PipelineType: Project includes construction of pipeline

and a secondary transmission networkLength: 514 milesDiameter: 4 and 12 inchesLocation: Prudhoe Bay - North Pole, AKCapacity: 19 Bcf/yCost: $1 billionStatus: Project is delayed

FLORIDA GAS TRANSMISSION – (REV 7/17)Project: East-West ProjectType: Project includes construction of two

laterals and facility modificationsLength: 20 milesDiameter: 12 inchesLocation: Matagorda and Wharton counties, TX;

Acadia Parish, LACapacity: 275 MMDth/dCost: $68.9 millionDocket: CP17-8Status: Project is awaiting an Environmental

Assessment

FORTISBC – (REV 9/17)Operator: Woodfibre Natural Gas Ltd.Project: Eagle Mountain – Woodfibre Gas PipelineType: Project includes pipeline construction and

compressor station upgradesLength: 29 miles Diameter: 24 inchesLocation: Coquitlam to Squamish, B.C.Capacity: .23 Bcf/dCost: $350 millionStatus: Project is in the pre-application phaseComments: Project will expand a portion of the

existing natural gas transmission system and is associated with the proposed Woodfibre LNG Facility

Contractor: Hedberg & Associates Consulting Ltd.Type: Project includes access planning,

permitting and LiDAR design for pipeline routing

Cost: $250 million

GULF SOUTH PIPELINE LP – (REV 12/16)Project: St. Charles Parish Expansion ProjectType: Project includes construction of pipeline

and a new compressor stationLength: 1.25 milesDiameter: 16 inchesLocation: Montz, LACapacity: 133 Mcf/d

FASTER. SAFER. SMARTER.

BIG DIAMETER OR ODD-SIZED JOBS ARE

NO PROBLEMVacuworx Vacuum Lifting Systems can handle any size material, with standard lift capacities up to 25 tonne. Pads are available to buy or rent, with or without a lifter—so you can get an entire system or just the pad you need to work with the equipment you already have. And our pads are engineered to maximize safety, so you can be confident in every lift, every time.

BIG DIAMETER OR ODD-SIZED JOBS ARE

FASTER. SAFER. SMARTER. VACUWORx.COM

Page 4: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

PLANNEDProjects in development

14 Pipeline News October 2017 • www.pipeline-news.com

Cost: $30 millionDocket: CP16-47Status: FERC has issued an Environmental

Assessment for the projectStart: 3Q 2017

IROQUOIS GAS TRANSMISSION SYSTEM LP– (6/17)Project: Wright Interconnect ProjectType: Project includes construction of

a compression facility and facility modifications

Location: Wright, NYCapacity: 650 MDth/dDocket: CP13-502Completion: 2Q 2018Comments: Project is being developed in conjunction

with the proposed Constitution Pipeline

KINDER MORGAN INC. – (REV 8/17)Owner 2: Southern Co.Operator: Southern Natural Gas Co. LLCProject: Fairburn Expansion Project Type: Project includes construction of a pipeline

lateral, pipeline looping and a compressor station

Length: 7 milesDiameter: 30 inchesLocation: Atlanta, GACapacity: 343 MDth/dCost: $240 millionDocket: CP17-46Status: Project is awaiting FERC approvalCompletion:2018

Operator: Tennessee Gas Pipeline Co. LLC Project: Lone Star ProjectType: Project includes construction of two

compressor stationsCapacity: 300 MDth/dCost: $132 millionLocation: Jackson and San Patricio counties, TXDocket: CP16-496Status: FERC has issued an Environmental

Assessment for the project

Project: SK PipelineType: Project includes construction of pipeline

and additional compressor facilitiesLength: 40 milesDiameter: 30 inchesLocation: West Columbia, TX - Stratton Ridge, TXCapacity: 320 MDth/d Cost: $150 millionStart: 4Q 2017Completion:3Q 2019 Comments: Project will support Train III export

capacity as part of the Freeport LNG Export Project

Operator: Kinder Morgan Texas Pipeline LLCProject: Gulf Coast Express Pipeline ProjectType: Project includes construction of pipelineLength: 430 milesDiameter: 42 inchesLocation: Waha, TX - Agua Dulce, TXCapacity: 1.7 MMDth/dStatus: Project is undergoing an open seasonCompletion:2Q 2019

Operator: Kinder Morgan Louisiana Pipeline LLC Project: Sabine Pass Expansion ProjectType: Project includes construction of a tap

and lateral; modification of three existing delivery interconnects; construction of additional compression; construction of header pipelines; and the abandonment and replacement of a meter station

Length: 1.6 milesLocation: Cameron Parish, LACapacity: 600 MDth/dDocket: CP17-22Status: Project is awaiting FERC approvalStart: 2Q 2018Completion:2Q 2019Comments: Modifications will enable bidirectional flow

Operator: Kinder Morgan Louisiana Pipeline LLCProject: Lake Charles Expansion ProjectType: Project includes installation of new

compression facilities and header pipelines

Length: 1.5 milesDiameter: 24 and 26 inchesLocation: Evangeline Parish, LACapacity: 1.4 MMDth/dDocket: CP14-511 Status: Project is awaiting FERC approvalCompletion: 2018Comments: Project includes reconfiguration of an

existing pipeline system to accommodate natural gas service at the proposed Magnolia LNG terminal

Operator: Tennessee Gas Pipeline Co. LLCProject: ACR ProjectType: Project includes abandonment of

certain natural gas pipeline facilities and modifications of existing pipeline facilities and compressor stations

Length: 14 milesDiameter: 2 , 16, 30 and 36 inchesLocation: Louisiana - New York City- Boston Docket: CP15-88Status: FERC has issued an Environmental

Assessment for the project

MDU RESOURCES GROUP INC. – (8/17)Operator: WBI Energy Inc.Project: Line Section 27 ExpansionType: Project includes pipeline construction and

associated facilitiesLength: 13 milesDiameter: 24 inchesLocation: North DakotaCapacity: 600 MDth/dCost: $30 millionCompletion: 4Q 2018

MILLENNIUM PIPELINE CO. – (REV 5/17)Project: Eastern System UpgradeType: Project includes construction of looped

pipeline, new compression capabilities and upgrades to existing stations

Length: 10 milesDiameter: 36 inchesLocation: Rockland County, NYCapacity: 200 MDth/dCost: $275 millionDocket: CP16-486 Status: Project has received a favorable

Environmental AssessmentStart: 4Q 2017Completion: 4Q 2018

Project: Valley Lateral Project

Type: Project includes installation of a pipeline lateral

Length: 7.8 milesDiameter: 16 inchesLocation: Orange County, NYCapacity: 130 MDth/dCost: $39 millionStatus: Project is awaiting water permits

MOUNTAINEER GAS CO. – (9/17)Operator: Mountaineer Gas Co.Project: Mountaineer Gas Pipeline Phase IType: Project includes pipeline constructionLength: 27.5 milesDiameter: 10 inchesLocation: Berkley, VA - Martinsburg, WVCost: $45 millionDocket: 15-1256-G-390PCompletion: 2Q 2019

Project: Mountaineer Gas Pipeline Phase IISegment: Charlestown LoopLength: 24.5 milesStatus: Project is awaiting WV PSC approval

Project: Mountaineer Gas Pipeline Phase IIILength: 4.4 milesStatus: Project is awaiting WV PSC approval

NAMERICO ENERGY HOLDINGS LLC – (5/17)Operator: Pecos Trail Pipeline Co.Project: Pecos Trail PipelineType: Project includes construction of pipelineLength: 468 milesDiameter: 42 inchesLocation: West Texas – Corpus Christi, TXCapacity: 1.85 Bcf/dStatus: Project is seeking sufficient shipper

commitmentsCompletion: 4Q 2019

NATIONAL FUEL GAS SUPPLY CORP. – (REV-6/17)Project: Northern Access 2016 ProjectType: Project includes construction of pipeline,

installation of additional compression, and a new compressor station and gas dehydration facility

Length: 97 milesDiameter: 24 inchesLocation: McKean County, PA - Erie County, NYCapacity: 300 MDth/dCost: $455 millionDocket: CP15-115Status: New York DEC denied the project’s permit,

so the project is on hold

Project: Line QP Project Type: Project includes construction of

pipeline and a regulator stationLength: 5 milesDiameter: 4 inchesLocation: Warren County, PA Docket: CP16-28Status: Project has received a favorable

Environmental AssessmentComments: Project includes the abandonment of

the Line Q Project and Queen Storage assets

NEW JERSEY NATURAL GAS – (REV 8/17)Project: Southern Reliability LinkType: Project includes construction of a pipeline

Page 5: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

www.pipeline-news.com • October 2017 • Pipeline News 15

PLANNEDProjects in development

Docket: CP17-471Status: Project is awaiting an Environmental

AssessmentComments: Project is an expansion of the existing

Carson and South Tahoe laterals

NYSEG – (REV 6/17)Project: DeRuyter Pipeline ReplacementType: Project includes take up and relay of

existing pipelineLength: 25 milesDiameter: 10 inchesLocation: Norwich, NY - Oneonta, NYStart: 2019Completion: 2020

and compressor stationLength: 30 milesDiameter: 30 inchesLocation: Ocean, Burlington and Monmouth

counties, NJCost: $130 millionStatus: Project is awaiting approval from the New

Jersey Pinelands Commission

NEXTDECADE LLC – (REV 6/17)Operator: Rio Bravo Pipeline LLCProject: Rio Bravo PipelineType: Project includes construction of two

parallel pipelines and three compressor stations

Length: 137 milesDiameter: 42 inchesLocation: Brownsville, TX - Kingsville, TXCapacity: 4.5 Bcf/dDocket: CP16-455Status: Project is awaiting an Environmental

AssessmentStart: 2Q 2018Completion: 1Q 2022Comments: Pipeline is part of the Rio Grande LNG

Project

NEXTERA ENERGY INC. – (10/17) Operator: Florida Southeast Connection LLCProject: Okeechobee Lateral ProjectType: Project includes construction of a

pipeline lateral, receiver and launcher and other associated facilities

Length: 5.2 milesDiameter: 24 inches Location: Okeechobee County, FLCost: $30 millionDocket: CP17-463Status: FSC has engaged in discussions with

property owners along the pipeline route regarding the acquisition of an easement across the portion of their properties needed for pipeline construction and operations

Start: 3Q 2018Completion:1Q 2019Comments: Project will transport natural gas from

the main, 126-mile FSC pipeline in central Florida to a new Florida Power & Light Co. power plant currently under construction

NORTHWEST PIPELINE – (REV 9/17)Project: Pacific Connector ProjectType: Project includes construction of pipelineLength: 232 milesDiameter: 16 inchesLocation: Malin, OR – Coos Bay, ORCapacity: 1.2 MMDth/dDocket: PF17-4Status: Project is undergoing an open seasonComments: Project will connect to the proposed

Jordan Cove LNG Terminal

PAIUTE PIPELINE CO. – (10/17) Project: 2018 Expansion Project Type: Project includes pipeline replacement

and pipeline loopingLength: 8.4 milesDiameter: 12 and 20 inchesLocation: Douglas and Lyon counties, NECapacity: 4.6 MDth/d Cost: $17.9 million

PENNEAST PIPELINE CO. LLC – (REV 8/17)Project: PennEast PipelineType: Project includes construction of an

underground pipelineLength: 120 milesDiameter: 36 inchesLocation: Luzerne County, PA – Mercer, NJCapacity: 1 Bcf/dCost: $1 billionDocket: CP15-558Status: The New Jersey Department of

Environmental Protection has closed the project’s application over deficiencies

Start: 2Q 2018

PIPE RAMMING PROS DEPEND ON HAMMERHEAD®

SUPPORT.EXPERTISE.

EQUIPMENT.

DESMOND BLAKEProject engineerDrill Tech Drilling & Shoring Inc.Antioch and Corona CA; Dallas/Fort Worth, TX

HammerHead Equipment products and expertise take the guesswork out of pipe ramming. And legendary factory support puts even the toughest pipe ramming jobs within your reach.

Find your local dealer at hammerheadtrenchless.com or call 800-331-6653

MOLING | RAMMING | BURSTING | HDD ASSIST | WINCHES | CIPPA Charles Machine Works Company ©2017 Earth Tool Company, LLC

We had a very challenging pipe ramming project to do in an extremely sensitive area with a number of critical requirements—one of them being the pipe’s 108-inch diameter. While we

had plenty of experience with pipe jacking, we had limited experience ramming a pipe with this large a diameter before, and there was no time to experiment. It was definitely the outstanding communication and cooperation between the HammerHead and Drill Tech engineering departments that set us up for a successful ram. We also had one of their field engineers on site with their 34-inch hammer through the whole project. We will definitely be working with HammerHead again.”

Page 6: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

16 Pipeline News October 2017 • www.pipeline-news.com

PLANNEDProjects in development

PUBLIC SERVICE ELECTRIC AND GAS CO. – (9/17)Project: Gas System Modernization Program Phase

IIType: Project includes replacement of aging

cast-iron and unprotected steel gas pipesLength: 1,250 milesLocation: New JerseyCost: $2.7 billionStatus: Project is preparing to file with the New

Jersey BPUCompletion: 4Q 2022Comments: The upgrades will take place across

PSE&G’s service territory in 11 counties, concentrating on urban areas established in the early 1900s, where much of the utility’s cast-iron and unprotected steel gas pipes are located

SEMCO ENERGY GAS CO. – (3/17)Project: Marquette Connector Pipeline ProjectType: Project includes construction of pipelineLength: 42 milesDiameter: 10 and 20 inchesLocation: Arnold, MI - Negaunee Township, MICapacity: 144 MMcf/dCost: $135 millionStatus: Project has filed for regulatory approval

(Act 9) Start: 2020

SEMPRA ENERGY – (REV 10/17)Operator: Southern California Gas Co.Project: Pipeline Safety & Reliability Project - Line

3602Type: Project includes partial replacement of

Line 1600, which entered service in 1949Length: 43 milesDiameter: 36 inchesLocation: San Diego, CACost: $600 millionStatus: Project is in the planning stages

Operator: Port Arthur LNG Pipeline LLCProject: Port Arthur Pipeline - Texas ConnectorType: Project includes construction of

pipelineLength: 34 milesDiameter: 42 inchesLocation: Jefferson and Orange counties, TX;

Cameron Parish, LACapacity: 2 Bcf/dDocket: CP17-21Contact: JD Morris Director, Permitting & Compliance [email protected] (718) 298-5479Status: Sempra LNG & Midstream LLC and

Woodside Energy Inc. have signed a memorandum of understanding (MOU) with Korea Gas Corp. regarding key aspects of the Port Arthur LNG Project, including engineering and construction works, operations and maintenance activities, feed gas sourcing, offtake of LNG and KOGAS as a potential purchaser of LNG from, and equity participant in, the project

Start: 3Q 2021Completion: 3Q 2022Comments: Pipeline is part of the Port Arthur

Liquefaction Project

SOUTHERN CO. – (9/17)Operator: Virginia Natural GasProject: Southside Connector Distribution ProjectLength: 9 milesDiameter: 24 inchesLocation: Norfolk, VA - Chesapeake, VAStart: 4Q 2017Completion: 3Q 2018Contact: Les Flora Project Manager (757) 616-7543 [email protected]: Project will provide a more reliable

connection between the Hampton Roads region’s two main gas supply lines

SOUTHERN STAR CENTRAL CORP. – (3/17)Owner 2: NextEra US Gas Assets LLCProject: Sooner Trails Pipeline ProjectType: Project includes construction of pipelineLength: 250 milesDiameter: 36 inchesLocation: Bryan County, OK - Lamar County, TXCapacity: 1.2 MMDth/dStatus: Project is awaiting a pre-filing review

SPECTRA ENERGY – (8/17)Owner 2: ConocoPhillipsProject: TEMAX ProjectType: Project includes construction of pipeline,

looping and replacement of compressor stations

Length: 33 milesDiameter: 24 inchesLocation: Clarington, OH - Delta, PACapacity: 395 MMcf/dCost: $500 millionStatus: Project is preparing to pre-file with FERCComments: Project is an expansion of the Texas

Eastern Transmission Pipeline System

Owner 2: Eversource EnergyOwner 3: National GridOperator: Algonquin Gas Transmission LLCProject: Access Northeast ProjectType: Project includes replacement of existing

pipeline, looping extensions, installation of new pipeline, compressor station modifications and construction of pig launcher and receiver facilities

Length: 96 milesDiameter: 6 to 12 inchesLocation: New York; Connecticut; MassachusettsCapacity: 925 MDth/d Docket: PF16-1Status: Project has been delayed indefinitely

Operator: Algonquin Gas Transmission LLCProject: Access Northeast ProjectSegment: West Boylston LateralType: Project includes construction of a pipeline

lateralLength: 27 milesDiameter: 16 inchesLocation: Milford, Upton, Grafton, Sutton,

Shrewsbury, Boylston and West Boylston, MA

Operator: Texas Eastern TransmissionProject: Stratton Ridge ProjectType: Project includes modifications of three

mainline compressor stations and the installation of two new compressor stations

Location: Brazoria County, TXCapacity: 322 MDth/dCost: $94 millionDocket: CP17-57Status: Project is awaiting an Environmental

AssessmentCompletion: 2Q 2019

Project: Greater Philadelphia Expansion ProjectType: Project includes replacement of existing

pipeline with a larger diameter pipe and adding new pipeline looping

Length: 35 milesLocation: Philadelphia, PACapacity: 475 MDth/dStatus: Project is in the evaluation stageCompletion: 2019

Operator: Valley Crossing Pipeline LLCProject: Border Crossing ProjectType: Project includes pipeline construction Length: .2 milesDiameter: 42 inchesLocation: Texas state waters east of Brownsville, TXCapacity: 2.6 Bcf/dDocket: CP17-19Status: Project has received an Environmental

AssessmentComments: Project will connect the Valley Crossing

System with the Mexican Marina Pipeline

Project: Renaissance Gas Transmission ProjectType: Project includes construction of pipelineLength: 230 milesDiameter: 24, 30 and 36 inchesLocation: Mount Pleasant, TN - Lawrenceville, GACapacity: 1.25 Bcf/dStatus: Project is on hold

SPIRE – (REV 8/17)Project: Spire STL PipelineType: Project includes installation of steel

pipeline and minor modifications to line 880

Length: 70 milesDiameter: 24 inchesLocation: St. Louis, MOCapacity: 400 MDth/dDocket: CP17-40Status: Project is awaiting a FERC final order

Contractor: T.G. Mercer Consulting Services Inc.Type: Project includes offloading of pipeLength: 43 milesDiameter: 24 inchesLocation: Polk County, MNContact: Michael Magee Superintendent

SPRING RIDGE CONSTRUCTORS LLC – (3/17)Contractor: Rockford Corp.Type: Project includes construction of pipelineLength: 177 milesDiameter: 20, 36 and 42 inchesLocation: Virginia and North CarolinaCost: $680 millionStart: 2018Completion:2020

Page 7: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

www.pipeline-news.com • October 2017 • Pipeline News 17

Our name says it all.

PLANNEDProjects in development

SUMMIT MIDSTREAM PARTNERS LP – (8/17)Operator: XTO Energy Inc.Project: Summit Midstream Gathering SystemType: Project includes gathering and processing

system constructionLength: 161 milesDiameter: 48 inchesLocation: Eddy and Lea counties, NMCapacity: 60 MMcf/dCost: $110 millionStatus: Project is seeking shipper commitmentsCompletion: 3Q 2018

TALEN ENERGY CORP. – (10/17)Project: Montour LateralType: Project includes construction of a

pipeline lateralLength: 15 milesDiameter: 30 inchesLocation: Montour County, PACost: $70 millionStatus: Project is in the early stagesStart: 2Q 2018Comments: Project will supply natural gas to the

Montour Plant

TALLGRASS ENERGY – (REV 4/17)Owner 2: AGL Resources Inc.Project: Prairie State PipelineType: Project includes construction of pipelineLength: 140 milesLocation: Douglas County, IL - Chicago Market

CentreCapacity: 1.2 Bcf/dCost: $1 billionStatus: Project is in the planning stage

TELLURIAN INC. – (REV 8/17)Operator: Downeast Pipeline LLCProject: Downeast PipelineType: Project includes construction of pipelineLength: 30 milesDiameter: 30 inches Location: Robbinston, MECapacity: 300 MMcf/d Docket: CP07-52Status: Project has currently been deniedComments: Pipeline is part of the proposed Downeast

LNG Project

TEXAS EASTERN TRANSMISSION LP – (10/17)Project: Idle Line 1 Abandonment ProjectType: Project includes abandonment and

removal of existing pipeline, metering and regulating facilities, and other related aboveground facilities

Length: 165 milesDiameter: 24 inchesLocation: Fayette County, OH - Greene County, PADocket: CP17-6Status: Project has received a favorable

Environmental Assessment

TRANSCANADA CORP. – (REV 9/17)Operator: Columbia Pipeline Group Inc. Project: Eastern Panhandle ExpansionType: Project includes pipeline constructionLength: 4 milesDiameter: 8 inchesLocation: Martinsburg, WVCapacity: 47 MDth/d

Docket: CP17-80Status: Project is undergoing an Environmental

AssessmentStart: 2Q 2018Comments: Project will provide firm transportation

service to markets in West Virginia through Mountaineer Gas Co.’s gathering system

Project: Continent to Coast Expansion ProjectType: Project includes meter station upgradesLocation: Westbrook, MNCapacity: 300 MMcf/dContact: Cynthia L. Armstrong Director of Marketing and Business

Development (603) 559-5527 [email protected]: CP96-248Status: Project is currently in the planning stageComments: Project is an expansion of the Portland

Natural Gas Transmission System and will transport gas into the Maritimes & Northeast Pipeline

Operator: Columbia Pipeline GroupProject: Buckeye Xpress ProjectType: Project includes pipeline looping and

additional compressionCapacity: 700 MMcf/dStatus: Project is undergoing an open seasonCompletion: 1Q 2020

Operator: Columbia Pipeline GroupProject: Central Virginia Connector Project

Page 8: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

PLANNEDProjects in development

18 Pipeline News October 2017 • www.pipeline-news.com

Type: Project includes replacement and upgrade of three compressor units, installation of pipe and valve modifications, and installation of other appurtenant facilities

Length: .10 milesLocation: Greater Richmond, VACapacity: 45 MMDth/dCost: $6.3 millionDocket: CP16-493Status: Project is awaiting an Environmental

Assessment

Operator: Columbia Pipeline GroupProject: Mountaineer XPress ProjectType: Project includes construction of various

diameter pipeline and loopingLength: 165 milesDiameter: 24, 36 and 42 inchesLocation: Marshall and Cabell counties, WV Capacity: 2.7 Bcf/dCost: $2.7 billionDocket: CP16-357Status: Project has received a favorable

Environmental AssessmentStart: 4Q 2017Completion: 4Q 2018Comments: Project is associated with the Gulf Xpress

Project

Operator: Columbia Pipeline GroupProject: Gulf Xpress Project Type: Project includes construction of three

compressor stations, modifications to three existing compressor stations and one regulating station

Location: Marshall and Cabell counties, WV Capacity: 2.7 Bcf/dCost: $2.7 billionDocket: CP16-361Status: Project has received a favorable

Environmental AssessmentStart: 4Q 2017Completion: 4Q 2018Comments: Project is associated with the Mountaineer

XPress Project

Contractor: Welded Construction LP Sub: ProFoam LLCType: Project includes providing foam breakers

on pipelineLength: 25 milesDiameter: 36 inchesLocation: Marshall County, WV and Greene County,

PAContact: Kevin Smith Superintendent

Operator: Columbia Pipeline GroupProject: WB Xpress ProjectType: Project includes replacement of pipeline

and the construction of two new compressor stations

Length: 30 milesDiameter: 12, 26 and 36 inchesLocation: Randolph and Pendleton counties, WV;

Kanawha County, WV; Fairfax County, VACapacity: 1.3 Bcf/dCost: $850 millionDocket: CP16-38Status: Project received a favorable

Environmental Assessment and awards are currently pending

Start: 4Q 2017

Completion:3Q 2018Operator: Columbia Pipeline GroupProject: Columbia Gas Transmission System

Modernization ProgramSegment: B-System ProjectType: Project includes construction of pipeline,

replacement of existing pipeline and upgrades to equipment and facilities

Length: 20.8 milesDiameter: 20 inchesLocation: Fairfield and Franklin counties, OHDocket: CP16-498Status: Project is awaiting an Environmental

AssessmentStart: 2017Completion: 2018Comments: Project is part of Columbia’s ongoing

Modernization Program to replace aging infrastructure, upgrade natural gas compression systems and increase pipeline reliability

VENTURE GLOBAL LNG – (REV 8/17)Operator: TransCameron Pipeline LLCProject: TransCameron East LateralType: Project includes construction of pipelineLength: 24 milesDiameter: 42 inchesLocation: Grand Chenier, LA and Johnson’s Bayou,

LACapacity: 2 MMDth/dCost: $344.5 millionContact: Fory Musser Senior Vice President, Corporate

Development [email protected]: CP15-550Status: Project filed with FERC and is currently

awaiting approvalCompletion: 1Q 2019

Operator: Venture Global Gator Express LLCProject: Gator Express Pipeline SystemType: Project includes construction of pipeline,

looping and appurtenant facilitiesLength: 27 milesDiameter: 42 inchesLocation: Plaquemines Parish, LA Capacity: 1.9 MMDth/dCost: $284 millionDocket: CP17-67Status: Project is awaiting an Environmental

Impact Statement

WBI ENERGY INC. – (REV 8/17)Project: Valley Expansion Pipeline ProjectType: Project includes construction of pipeline,

interconnect facilities, an electric compressor station, replacement of two existing town border stations and the construction a regulator station

Length: 38 milesDiameter: 16 milesLocation: Clay County MN; Cass, Burleigh, Stutsman

and Barnes counties, NDCapacity: 40 MMcf/dCost: $60 millionDocket: PF16-10Start: 2018

WILLIAMS PARTNERS LP – (REV 9/17)Operator: Northwest Pipeline LLCProject: North Seattle Lateral Upgrade ProjectType: Project includes pipeline removal and

replacement and facility upgradesLength: 7 milesDiameter: 8 inchesLocation: Snohomish County, WADocket: CP17-441Status: Project has filed with FERCStart: 2Q 2019Completion: 4Q 2019Comments: Project has executed firm agreements

with Puget Sound Energy to expand delivery capabilities of the existing lateral, which serves PSE customers

Operator: Northwest Pipeline LLCProject: North Fork Nooksack Line Lowering

ProjectType: Project includes pipeline removal and

replacementLength: .7 milesDiameter: 30 inchesLocation: Whatcom County, WADocket: CP17-133Status: Project is awaiting an Environmental

Assessment

Operator: Steelhead LNG Corp.Project: Island Gas ConnectorType: Project includes construction of pipeline,

meter stations and compressor stationsLength: 80 milesDiameter: 36 inchesLocation: Sumas, WA - Vancouver Island, B.C.Completion: 4 Q2020Status: Project is preparing to start the pre-filing

process with FERC

Operator: Transcontinental Gas Pipe Line Co. LLCProject: Rivervale South to Market ProjectType: Project includes pipeline looping,

upgrades and existing facility modifications

Length: 11 milesLocation: New JerseyCapacity: 190 MDth/dCost: $127 millionDocket: CP17-490Status: Project submitted an application with

FERC for authorization of the project, and has executed precedent agreements with Direct Energy Business Marketing LLC and UGI Energy Services LLC for firm transportation service

Start: 4Q 2018Completion: 4Q 2019Comments: Project will help meet the growing

heating and power generation demand for northeastern consumers, primarily in New Jersey and New York

Operator: Transcontinental Gas Pipe Line Co. LLCProject: St. James Supply LateralType: Project includes construction of pipeline,

compressor stations and a pig receiver siteLength: .7 milesDiameter: 20 inchesLocation: St. James Parish, LACapacity: 161.5 MDth/dDocket: CP17-58

Page 9: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

www.pipeline-news.com • October 2017 • Pipeline News 19

PLANNEDProjects in development

Status: Project is awaiting an Environmental Assessment

Completion: 2020

Operator: Transcontinental Gas Pipe Line Co. LLCProject: Northeast Supply EnhancementType: Project includes construction of pipelineLength: 35 milesDiameter: 26 and 42 inchesLocation: New York Bay; Lancaster County, PA;

Middlesex County, NJCapacity: 400 MMcf/dCost: $926.5 millionDocket: CP17-101Status: Project is in the planning stageStart: 2Q 2018Completion: 4Q 2019

Operator: Transcontinental Gas Pipe Line Co. LLCProject: Gulf Connector Expansion ProjectType: Project includes increasing compression

on the existing pipelineLocation: Texas – LouisianaCapacity: 475 MDth/dCost: $167.4 millionDocket: CP16-494Status: Project submitted an application

with FERC for a Certificate of Public Convenience and Necessity

Start: 4Q 2017Completion: 1Q 2019

Operator: Williams Northwest Pipeline LLCProject: Washington Expansion Project

Type: Project includes construction of pipeline looping and compression stations

Length: 140 milesDiameter: 36 inchesLocation: Whatcom County, WA - Woodland, WACapacity: 750 MDth/dDocket: CP13-507 Completion: 4Q 2018

WISCONSIN GAS – (2/17)Project: Dovre Lateral Natural Gas PipelineType: Project includes construction of pipelineLength: 9.5 milesDiameter: 12 inchesLocation: Barron County, WI

XCEL ENERGY – (8/17)Project: Lancaster to Fort Lupton Pipeline Type: Project includes construction of pipelineLength: 4.1 milesDiameter: 24 inchesLocation: Weld County, COStatus: Project is in the development stageStart: 3Q 2017Completion: 1Q 2018

Project: Tungsten to Bobtail Pipeline Type: Project includes construction of pipelineLength: 15 milesLocation: Boulder County, CO - Black Hawk, COStatus: Project is in the planning stagesStart: 2Q 2019Completion: 3Q 2020

CanadaCHEVRON CANADA LIMITED – (REV 2/17)Owner 2: Apache CanadaOperator: Pacific Trail Pipelines Ltd. PartnershipProject: Pacific Trail PipelineType: Project includes construction of pipeline

and a compressor stationLength: 298 milesDiameter: 42 inchesLocation: Prince George - Kitimat, B.C.Capacity: 1 Bcf/dCost: $1 billionFiling: A31037Status: Project is conducting pre-construction

activitiesComments: Project is associated with the proposed

Kitimat LNG Facility

IMPERIAL OIL RESOURCES – (REV 7/17)Owner 2: ConocoPhillips CanadaOwner 3: Shell CanadaOwner 4: ExxonMobil CanadaProject: Mackenzie Gas ProjectType: Project includes construction of a

gathering system and transmission pipeline

Length: 1,056 milesDiameter: 10 and 30 inchesLocation: Mackenzie Valley - Fort Simpson - AlbertaCapacity: 1.2 Bcf/d Cost: $16 billionStatus: NEB is giving the consortium until the end

of 2022 to start building the long-delayed project

Precision Welding & Fabrication

• ASME Pressure Vessels• Pipe Fabrication• Stainless And Alloy Fabrication• Structural Steel Fabrication• Cross- Overs, Platforms And

Caged Ladders• Hydro-Testing• Field Measuring• Plate Rolling

Buy Direct from the Fabricator and save on your Pipe Clamps and Supports.

Send your quotes to [email protected] or call today at 281-252-0151Visit us at www.weweld.com

Precision Welding & Fabrication10002 Sweetwater Lane, Houston, TX 77037Phone: 281.252.0151 Toll Free: 877.252.0152 Fax: 281.252.8151 [email protected] n www.weweld.com

Page 10: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

20 Pipeline News October 2017 • www.pipeline-news.com

PLANNEDProjects in development

SPECTRA ENERGY CORP. – (REV 5/17)Project: Westcoast Connector Gas Transmission

ProjectType: Project includes construction of two

adjacent pipelinesLength: 528 milesDiameter: 42 and 48 inchesLocation: Cypress, B.C. - Prince Rupert, B.C.Capacity: 4.2 Bcf/dCost: $7.5 billionStatus: Project is on hold

Contractor: FLUORType: Project includes engineering,

procurement and construction of the pipeline

TRANSCANADA CORP. (REV 10/17)Project: Eastern Mainline ProjectType: Project includes construction of four

sections of new natural gas transmission pipeline and the installation of nine new 11MW compressor units at five existing compressor stations

Location: City of Markham - Township of Edwardsburgh/Cardinal

Length: 173 milesDiameter: 36 inchesCapacity: 80 MMcf/dCost: $160 millionFiling: A69340Status: Project is preparing to file with the

NEB and undergoing an expanded assessment

Start: 2018Completion: 2020Comments: Project will increase capacity of the

existing Canadian Mainline System. Project will provide businesses, homes, schools and hospitals in Ontario and Quebec with access to a safe and diverse source of natural gas

Operator: NOVA Gas Transmission Ltd.Project: Peace River Mainline AbandonmentType: Project includes abandonment of a loop

on the existing mainline and the removal of associated above ground facilities

Length: 165 milesLocation: Northwest AlbertaContact: Marie McKenney Process Advisor [email protected]: A82534Status: The NEB will hold a public hearing to

consider an application for the projectCompletion: 2Q 2018

Operator: NOVA Gas Transmission Ltd.Project: Merrick Mainline ProjectType: Project includes construction of pipeline,

a meter station, mainline valve sites, launcher and receiver facilities, cathodic protection facilities and miscellaneous work

Length: 161 milesDiameter: 48 inchesLocation: Summit Lake, BC – Peace River, BCCapacity: 2 Bcf/dCost: $1.9 billionFiling: A60778Status: Project has applied with the NEB and is

currently on hold

Operator: NOVA Gas Transmission Ltd.Project: 2019 NGTL ExpansionType: Project includes construction of pipeline,

compression enhancements at five compressor stations, new meter stations and other associated facilities

Length: 171 milesDiameter: 48 inchesLocation: Alberta and British ColumbiaCapacity: 3 Bcf/dCost: $2 billion Status: Applications will be filed with the NEB in

4Q 2017Start: 1Q 2019Completion: 2Q 2021Comments: Project is in addition to the current $5.1

billion near-term capital program for the NGTL System

Operator: NOVA Gas Transmission Ltd.Project: 2018 NGTL ExpansionType: Project includes construction of pipeline,

one new compressor, new and expanded meter stations, and other associated facilities

Length: 55 milesDiameter: 20 to 48 inchesLocation: Alberta and British ColumbiaCapacity: 2.7 Bcf/dCost: $570 million

Project: North Montney ProjectType: Project includes construction of pipeline,

associated metering facilities, valve sites and compression facilities

Length: 190 milesDiameter: 42 inchesLocation: Peace River, ABCapacity: 2.4 Bcf/dCost: $1.7 billionFiling: A69520Status: Project has received NEB approval and an

Environmental CertificateCompletion: 2Q 2019

Operator: Prince Rupert Gas Transmission Ltd.Project: Prince Rupert Gas Transmission PipelineType: Project includes construction of pipelineLength: 560 milesDiameter: 36 and 48 inchesLocation: Hudson’s Hope, B.C. - Lelu IslandCapacity: 2 Bcf/dCost: $5 billionStatus: Project has received regulatory

approval and is currently awaiting a final investment decision

Operator: Coastal GasLink Pipeline Ltd.Project: Coastal GasLink PipelineType: Project includes construction of pipeline

and compressor stationsLength: 416 milesDiameter: 48 inchesLocation: Dawson Creek - Kitimat, B.C.Capacity: 2.1 Bcf/dCost: $4.8 billionStatus: Project has received regulatory approval

and is currently considering an alternate route

SPECTRA ENERGY – (REV 7/17)Operator: Westcoast Energy Inc. Project: Wyndwood Pipeline Expansion ProjectType: Project includes construction of pipeline

looping and associated facilitiesLength: 17 milesDiameter: 36 inchesLocation: Chetwynd, B.C.Capacity: 50 MMcf/dCost: $170 millionFiling: A80172 Status: Project is awaiting NEB approval

MexicoENGIE – (8/17)Project: Energia Mayakan Pipeline ExtensionType: Project includes construction of pipelineLength: 99 milesDiameter: 16 to 24 inchesLocation: Valladolid, Yucatan - Quintana RooCost: $300 million Status: Project is in the planning stageCompletion: 1Q 2020

Caribbean/South & Central AmericaROYAL DUTCH SHELL – (5/17)Project: Dragon – Hibiscus PipelineType: Project includes construction of pipelineLength: 11 milesLocation: Venezuela (Dragon – Hibiscus)Capacity: 300 MMcf/dCost: $100 millionStatus: Project is in the development stage

NGL - The AmericasU.S. ENERGY TRANSFER PARTNERS LP – (4/17)Project: Fractionator VType: Project includes construction of a fifth

natural gas liquids fractionation facility and associated product infrastructure

Location: Mont Belvieu, TXCapacity: 120 MbpdCompletion: 2018

ENTERPRISE PRODUCTS PARTNERS LP — (6/17)Project: Lou-Tex NGL Pipeline ConversionType: Pipeline conversionLength: 263 milesLocation: Sorrento, LA - Mont Belvieu, TX Completion: 1Q 2020Comments: Pipeline will be converted from CPG to

PGP service

PERMICO ENERGIA LLC – (10/17) Project: Permico’s Texas NGL ProjectSegment: Companero PipelineType: Project includes bi-directional pipeline

constructionLength: 510 milesDiameter: 24 inchesLocation: Monahans, TX – Corpus Christi, TXCapacity: 300 MbpdStatus: Project funding has been secured

through long-term commitments from Korean pension fund institutions

Page 11: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

www.pipeline-news.com • October 2017 • Pipeline News 21

PLANNEDProjects in development

Start: 2Q 2018Completion: 4Q 2020Comments: Project will include the Markham

Storage Facility and El Centro Fractionator

Segment: Mont Belvieu PipelineType: Project includes bi-directional pipeline

constructionLength: 230 milesDiameter: 20 inchesLocation: El Centro Fractionator - Mont BelvieuCapacity: 250 Mbpd

Segment: Markham PipelineType: Project includes bi-directional pipeline

constructionLength: 116 milesDiameter: 16 inchesLocation: El Centro Fractionator - Markham

StorageCapacity: 175 Mbpd

TARGA RESOURCES CORP. – (7/17)Project: Grand Prix PipelineType: Project includes construction of pipelineLocation: West Texas - Mont Belvieu, TXCapacity: 550 MbpdCost: $1.3 billionStatus: Project is in the planning stageCompletion: 2Q 2019

WILLIAMS PARTNERS LP – (6/17)Project: Promesa PipelineType: Project includes construction of pipeline

and utilization of existing pipelineLength: 3 milesDiameter: 4 to 10 inchesLocation: Mont Belvieu, TX - Houston Ship ChannelStatus: Project is in the planning stage

LNG - The AmericasU.S. DOWNEAST LNG INC. – (2/17)Project: Downeast LNG ProjectType: Project includes construction of a long

pier, two full-containment LNG storage tanks, LNG vaporization and processing equipment and other support facilities

Location: Robbinston, MECapacity: 3 MMtpaCost: $1.3 billionDocket: CP07-53Status: Project has currently been denied

FERUS NATURAL GAS FUELS LP – (REV 4/17)Operator: Eagle LNG PartnersProject: Jacksonville LNG ProjectType: Project includes construction of three

liquefaction trainsLocation: Jacksonville, FLCapacity: 1 MMtpaCost: $100 millionDocket: CP17-41Status: Project has submitted a formal application

with FERC

FREEPORT LNG DEVELOPMENT LP – (9/17)Operator: FLNG Liquefaction 4 LLCProject: Freeport LNG Quintana Regas Terminal

ExpansionSegment: Train 4 ProjectType: Project includes construction of a fourth

liquefication trainLocation: Quintana Island, TXCapacity: 5 MtpaDocket: CP17-47Status: Project is awaiting approvalCompletion: 2019Comments: Train 4 will use electric motors with

variable frequency drive for the cooling and liquefac-tion compression power, resulting in negligible incremental emissions. Train 4 will be constructed adjacent to the first three trains on Quintana Island

KINDER MORGAN INC. – (6/17)Operator: Gulf LNG Liquefaction Co. LLCProject: Gulf LNG Liquefaction ProjectType: Project includes installation of natural gas

pre-treatment, liquefaction, and export facilities at the existing Gulf LNG Terminal

Location: Jackson County, MSCapacity: 11.5 MMtpaCost: $5 billionDocket: CP15-521Status: Project is awaiting an Environmental

Impact StatementCompletion: 2020

Page 12: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

22 Pipeline News October 2017 • www.pipeline-news.com

PLANNEDProjects in development

Contractor: KBRType: Project includes a front-end engineering

and design report for FERC pre-filing services

NEXTDECADE LLC – (REV 6/17)Operator: Rio Grande LNG LLCProject: Rio Grande LNG ProjectType: Project includes construction of six

liquefaction trains, pre-treatment facilities, four full-containment LNG storage tanks and truck loading facilities

Location: Brownsville, TXCapacity: 27 MMtpaCost: $20 billionDocket: CP16-454Status: Project is awaiting an Environmental

AssessmentStart: 2Q 2018Completion: 1Q 2022

Contractor: GE Oil & GasType: Project includes supply of gas turbine and

compressor equipment

SEMPRA LNG & MIDSTREAM – (7/17)Operator: Port Arthur LNG LLCProject: Port Arthur Liquefaction ProjectType: Project includes construction of two

liquefaction trains, LNG storage tanks, marine facilities, NGLs and refrigerant storage, feed gas pre-treatment and combustion turbine generators

Location: Jefferson County, TXCapacity: 13.5 MMtpaDocket: CP17-20Contact: JD Morris Director, Permitting & Compliance [email protected] (718) 298-5479Status: Project is awaiting FERC reviewStart: 3Q 2021Completion: 3Q 2022

TELLURIAN INC. – (REV 8/17)Operator: Driftwood LNG LLCProject: Driftwood LNG ProjectType: Project includes construction of five LNG

plants, three LNG storage tanks, marine facilities and associated infrastructure and support facilities

Location: Calcasieu Parish, LACapacity: 26 MMtpaCost: $14 billionDocket: CP17-117Status: Project has submitted a formal application

with FERCStart: 2018Completion: 2022

OIL - The AmericasU.S. BAKKENLINK PIPELINE LLC – (REV 3/15)Project: Dry Creek to Beaver Lodge ProjectType: Project includes construction of pipeline Length: 37 milesDiameter: 16 inchesLocation: Johnson’s Corner, ND - Tioga, NDCapacity: 100 Mbpd

BLUEKNIGHT ENERGY PARTNERS LP – (REV 11/16)Operator: Knight Warrior LLCProject: Knight Warrior PipelineType: Project includes construction of pipelineLength: 160 milesDiameter: 16 inchesLocation: Madison, Walker, Grimes, Montgomery

and Harris counties, TXCapacity: 100 MbpdCost: $300 millionStatus: Project is delayed

Contractor: Hatch Mott MacDonald LLCType: Project includes engineering and design

for the project

Contractor: Contract Land Staff LLCType: Project includes land management for the

project

Contractor: Apex TITAN Inc. Type: Project includes environmental services

for the project

BOE PIPELINE LLC– (7/16)Project: Bakken Oil Express II Pipeline Type: Project includes construction of pipelineLength: 42 milesDiameter: 16 inchesLocation: Dunn County, ND and McKenzie County,

NDCapacity: 165 MbpdCost: $55 millionStatus: Project has received approval from the

NDPSC and BLM

BUCKEYE PARTNERS LP – (5/17)Project: South Texas Gateway PipelineType: Project includes construction of a

distribution system and a long-haul pipeline

Diameter: 24 inchesLocation: Wink, TX – Corpus Christi, TXCapacity: 400 MbpdCompletion: 2019Status: Project is undergoing an open season

ENBRIDGE INC. – (7/17)Project: Line 5 Pipeline Replacement Type: Project includes replacement of pipeline

via HDDLength: .6 milesDiameter: 30 inchesLocation: Little Rock, ARStatus: The Michigan Pipeline Safety Advisory

Board is expected to release two studies on risks from the aging pipeline built in 1953

Operator: Enbridge Pipelines LLCProject: Enbridge Ozark Pipeline ExpansionType: Project includes increasing horsepower at

pump stations and adding drag reducing agents to the crude petroleum

Location: Cushing, OK - Wood River, ILStatus: Project is seeking shipper commitmentsCompletion: 2Q 2018

ELK PETROLEUM INC. – (5/17)Operator: Grieve Pipeline LLCProject: Grieve PipelineType: Project includes construction of pipeline

Length: 32 milesDiameter: 8 inchesLocation: Mountain View, WYCapacity: 12 MbpdContact: Scott Hornafius CEO, Elk Petroleum Inc. 720-744-4884 [email protected]: Project is undergoing an open seasonCompletion: 1Q 2018

ENBRIDGE PIPELINES INC. – (REV 10/17)Project: Line 67 ExpansionType: Project includes installation of

new pump stations and associated station piping, including valves and appurtenances at four existing facilities

Location: Donaldson, Plummer, Cass Lake, and Floodwood, MN

Capacity: 120 MbpdCost: $199.2 millionDocket: PL-9/CN-12-590Status: Project has received a final EISComments: Project will add compression to a

segment of the existing Alberta Clipper Pipeline

ENERGY TRANSFER PARTNERS LP – (REV 9/17)Operator: Permian Express Terminal LLCProject: Permian Express 3Type: Project includes construction of a

gathering systemLocation: Nederland, TXCapacity: 100 MbpdContact: Chris Martin Senior Director, Business Development (281) 637-6548 [email protected]: Project is undergoing an open

season Completion: 4Q 2017

Contractor: American Electric Technologies Inc. (M&I Electric)

Type: Project includes M&I’s turnkey power delivery solutions, conventional switchgear, motor control centers and installation of frequency drives

Cost: $4 million

GEL PIPELINE TEXAS LLC – (4/17)Type: Project includes construction of pipelineLength: 23 milesLocation: Texas City, TXComments: The company has launched an open

season for the proposed project

MAGELLAN MIDSTREAM PARTNERS LP – (7/17)Owner 2: Plains All American Pipeline LPOperator: BridgeTex Pipeline Co. LLCProject: BridgeTex Pipeline ExpansionType: Project includes expansion of the

BridgeTex Pipeline via enhancements of existing pumps and related equipment

Diameter: 20 inches Location: Bryan, TXCapacity: 100 MbpdDocket: OR16-19

Page 13: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

www.pipeline-news.com • October 2017 • Pipeline News 23

PLANNEDProjects in development

MINNESOTA PIPE LINE CO. LLC – (REV 1/17)Operator: Koch Pipeline Co.Project: Minnesota Pipe Line Reliability ProjectType: Project includes adding six pump stations

to MPL Line 4 and upgrading existing stations

Location: Howard County, TX - Glasscock County, TX

Capacity: 185 MbpdDocket: PL5/CN-14-320Cost: $125 million

ONEOK BAKKEN PIPELINE LLC – (REV 3/17)Project: Bakken Expansion II Loop ProjectType: Project includes construction of pipelineLength: 58 milesDiameter: 16 inchesLocation: Alexander, ND and Ft. Laramie, FLCapacity: 160 MbpdStatus: Project has been delayed

PHILLIPS 66 – (5/17)Project: Reeves-Odessa Origination (Rodeo)

ProjectType: Project includes construction of pipeline

and associated lateralsLength: 130 milesLocation: Reeves, TX – Odessa, TXCapacity: 130 MbpdContact: Scott Hutson Director, Business Development [email protected]: Project is undergoing an open seasonCompletion: 2Q 2018

PILGRIM PIPELINE HOLDINGS LLC – (REV 3/17)Project: Pilgrim PipelineType: Project includes construction of parallel

pipelinesLength: 356 milesDiameter: 24 inchesLocation: Port of Albany, NY – Linden, NJCapacity: 400 MbpdCost: $900 millionStatus: Project is finalizing the route

PLAINS ALL AMERICAN PIPELINE LP – (9/17)Project: Sunrise Pipeline System ExpansionType: Project includes construction of pipeline

and utilization of existing pipelineLength: 180 milesDiameter: 24 inchesLocation: Colorado City, TX – Wichita Falls, TXCapacity: 120 MbpdStatus: Project is in the planning phaseCompletion: 2Q 2019Comments: Project includes capacity expansions to

the existing Delaware Basin system of up to 200 Mbpd

Project: Permian Basin to Cushing PipelineType: Project includes construction of pipeline

and utilization of existing pipelineLocation: Midland, TX - Cushing, OKCapcity: 350 MbpdStatus: Project is undergoing an open seasonCompletion: 2Q 2019

SHELL PIPELINE COMPANY LP (REV 2/17)Operator: Zydeco Pipeline Co. LLCOwner 2: Shell Midstream Partners LPProject: Houma - St. James PipelineType: Project includes construction and

replacement of large diameter pipelineLength: 40 milesDiameter: 24 inchesLocation: Houma - St. JamesStart: 2Q 2018Status: Project is in the planning stagesComments: Project will replace a segment of the

existing Zydeco Houma – St. James line TALLGRASS PONY EXPRESS PIPELINE LLC – (REV 9/17)Project: Platteville ExtensionType: Project includes construction of facilities

to connect Holly Frontier’s refinery complex

Location: Platteville, COCapacity: 100 MbpdStatus: Project is undergoing a second open

seasonCompletion: 2Q 2018

Project: Tallgrass Grasslands TerminalType: Project includes construction of a terminalLocation: Platteville, COStatus: Project is awaiting the conclusion of the

Platteville Extension’s recently announced open season

Completion: 2Q 2018Comments: Project will serve as a new pipeline origin

for the Pony Express Platteville Extension

Call Jim Filipowicz today! (800)334-5964 or (406)761-4848Steel Etc. • 1408 52nd St. N • Great Falls, MT

Flume PipeNew & Used STD & Heavy Wall PipeUsed Railroad Flat Cars & Tank Cars

Get your product where you need it, when you need it!

Material delivered to job sites ON TIME in the Continental US & Canada

Featurin

g:

Coal Slag Blast Abrasive

Grit Sizes8-20 Course • 16-40 Medium

20-40 Med Fine • 30-60 Fine • 40-60 Extra Fine

Environmentally friendly NO heavy metal<.2% Free silica

Consistent, hard angular particlesFast cleaning

Blastox blending® availableCARB & QPL approved

Page 14: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

24 Pipeline News October 2017 • www.pipeline-news.com

PLANNEDProjects in development

TEXSTAR MIDSTREAM LOGISTICS – (5/17)Owner 2: Castleton Commodities InternationalOwner 3: Ironwood Midstream Energy PartnersOperator: Epic Pipeline Co. LLCProject: EPIC PipelineType: Project includes construction of pipelineLength: 730 milesDiameter: 16, 20, 24 and 30 inchesLocation: Orla, Pecos, Crane and Midland counties,

TX - Corpus Christi, TX Capacity: 440 MbpdStatus: Project is undergoing an open seasonCompletion: 1Q 2019

Project: Karnes PipelineType: Project includes pipeline constructionLength: 15 milesDiameter: 10 and 12 inchesLocation: Karnes, TXComments: Associated with EPIC Pipeline

TRANSCANADA CORP. – (REV 8/17)Operator: Upland Pipeline LLCProject: Upland Pipeline ProjectType: Project includes construction of pipeline

and related facilities, including valve sites, tanks and new pump stations

Length: 240 milesDiameter: 20 inchesLocation: Williston, ND - Manitoba-Saskatchewan

borderCapacity: 300 MbpdCost: $600 millionDocket: 2015-18866Status: Company has requested the U.S. State

Department to pause review of the project

CanadaENBRIDGE PIPELINES INC. – (7/17)Project: Line 21 Pipeline (Norman Wells Pipeline)Type: Project includes installation and

decommissioning of pipelineLength: 1.5 milesDiameter: 12 inchesLocation: Fort Simpson, Northwest TerritoriesFiling: A85153Status: Project is awaiting NEB approval

Project: Northern Gateway PipelineType: Project includes construction of two

pipelines and a marine terminalLength: 731 milesDiameter: 20 and 36 inchesLocation: Bruderheim, AB - Kitimat, B.C.Capacity: 718 MbpdCost: $6.5 billionDocket: A43714Status: The Federal Government has directed the

NEB to dismiss the project’s application

TRANSCANADA CORP. – (REV 9/17)Project: Keystone XL ProjectType: Project includes construction of pipelineLength: 1,179 milesDiameter: 36 inchesLocation: Hardisty, AB - Steele City, NECapacity: 830 MbpdCost: $7 billionFiling: A21262Status: Project has launched an open season

Project: Energy East PipelineType: Project includes pipeline conversion and

construction Length: 870 milesDiameter: 42 inchesLocation: Hardisty, AB - St. John, N.B.Capacity: 1.1 MMbpdCost: $15.7 millionFiling: A84515Status: Project has filed comments on NEB’s

Draft Lists of Issues, Draft Factors and Draft Scope of the Factors for the Environmental Assessments

Start: 2Q 2018Completion: 4Q 2020

Contractor: CH2M HILL Inc.Type: Project includes front-end engineering

and design for the project

Contractor: ABBType: Project includes delivering electrical

houses for pump stations

PRODUCTS - The AmericasU.S.CENEX PIPELINE LLC – (10/17)Owner: CHS Inc.Project: Cenex Pipeline ReplacementType: Project includes 8-inch pipeline

replacementLength: 182 milesDiameter: 10 inchesLocation: Sidney, MT – Minot, NDStatus: CHS recently finished contacting

landowners and conducting environmental resource surveys. The next step is to work with tribal leadership, state and federal agencies to complete the approval and permitting process

Start: 4Q 2017Completion: 2Q 2019Comments: The pipeline will follow a new route for

the majority of the 182 miles and will utilize existing easements for the rest of its length

FORMOSA PLASTICS GROUP – (7/17)Contractor: Strike LLCProject: Formosa Expansion ProjectType: Project includes construction of pipelineLength: 186 milesDiameter: 8, 10 and 16 inchesLocation: Point Comfort, TXCapacity: 46 Mbpd

HOWARD ENERGY PARTNERS LP – (REV 6/17)Operator: Dos Águilas Pipeline LLC Project: Dos Aguilas ProjectSegment 1: Laredo Express PipelineSegment 2: Borrego PipelineSegment 3: Poliducto Frontera PipelineSegment 4: Poliducto del Norte PipelineType: Project includes construction of pipelineLength: 287 milesDiameter: 12 inchesLocation: Corpus Christi, TX - Monterrey, Nuevo

LeonCapacity: 72 Mbpd

Cost: $500 millionStatus: Project is awaiting approvalStart: 4Q 2018

Operator: GT Pipeline LLCProject: Sabine Bayou Line ProjectType: Project includes construction of pipelineLength: 6 milesDiameter: 16 and 20 inchesLocation: Port Arthur, TXCapacity: 308 MbpdStatus: Project is undergoing an open season

KINDER MORGAN INC. – (REV 7/17)Operator: Palmetto Products Pipe Line LLCProject: Palmetto PipelineType: Project includes construction of pipeline,

tanks and pump stationsLength: 360 milesDiameter: 16 and 20 inchesLocation: South Carolina - FloridaCapacity: 167 MbpdCost: $1.1 billionDocket: OR15-13Status: Project is delayed

MAGELLAN MIDSTREAM PARTNERS LP – (10/17)

Owner 2: Valero Energy Corp.Project: Texas Refined Petroleum Products

Pipeline SystemType: Work scope includes the expansion and

reversal of an existing refined petroleum products pipeline system

Length: 135 milesDiameter: 16 inchesLocation: Houston, TX - Hearne, TXCapacity: 85 MbpdCost: $375 million (Magellan’s share)Status: Project is awaiting necessary permits

and regulatory approvalCompletion: 2Q 2019Comments: Project will provide the ability to deliver

additional product north to Temple, Waco and Dallas as well as Magellan’s Midcontinent markets, including Little Rock, AR. If warranted by additional customer demand, pipeline capacity originating in the Houston area could be further increased

MexicoMONTERRA ENERGY – (REV 5/17)Operator: Monterra Energy S. de R.L. de C.V.Project: Monterra del Centro PipelineType: Project includes construction of pipelineLength: 167 milesDiameter: 18 inchesLocation: Tuxpan, Veracruz - Tula, HidalgoCapacity: 100 MbpdStatus: Project is in the development stageCompletion: 3Q 2018

Page 15: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

www.pipeline-news.com • October 2017 • Pipeline News 25

PLANNEDProjects in development

OFFSHORE - The AmericasU.S. WILLIAMS COMPANIES INC. – (8/17)Operator: Transcontinental Gas Pipe Line Co. LLCProject: Central Texas Gathering System FacilitiesType: Project includes pipeline abandonment

and constructionLength: 40 milesDiameter: 20 inchesLocation: offshore Texas (Brazos Block A-133A to

Brazos Block 538)Capacity: 2.6 Bcf/dCost: $2.9 millionDocket: CP17-450Status: Project filed an application with FERC

OTHER - The AmericasU.S. DENBURY RESOURCES – (9/16)Project: Cedar Creek Anticline ProjectType: Project includes construction of pipelineLength: 120 milesDiameter: 20 inchesLocation: Eastern MontanaCost: $225 millionStart: 2Q 2018

GAS – InternationalAsia PacificALCAN GOVE PTY LTD. – (8/14)Project: Katherine to Gove Gas Pipeline Type: Project includes the construction and

operation of new pipelineLength: 373 milesLocation: Katherine - GoveComments: Project is currently undergoing a feasibility

study

BANGLADESH PETROLEUM CORP. – (9/17)Project: Dhaka to Chittagong PipelineType: Project includes pipeline constructionLength: 155 milesDiameter: 16 inchesLocation: Dhaka – ChittagongCapacity: 3 MMtpaStatus: Project is securing land acquisition

Contractor: Engineers India Ltd.Type: Project includes route surveying

Contractor: Bangladesh ArmyType: Project includes engineering,

procurement and construction

CHINA PETROCHEMICAL CORP. (SINOPEC) – (9/17)Project: Erdos-Anping-Cangzhou PipelineType: Project includes construction of a trunk

and five trunk lines

Length: 1,424 milesLocation: Xiongan New Area, Beijing – Cangzhou,

Hebei provinceCapacity: 30 Bcm/yCost: $5.1 billionStatus: Project has been approved by the National

Development and Reform CommissionStart: 2019Comments: Project is designed to connect major LNG

storage with Xiongan New Area, China’s new economic zone near capital Beijing and is part of Sinopec’s clean heating program on the northern region

INDIAN OIL CORP. LTD. – (1/13)Project: Sanganer-Bijwasan Naphtha PipelineType: Project includes the construction of new

pipelineLength: 183 milesLocation: Sanganer - Bijwasan NaphthaComments: Project is currently awaiting development

decisions

Project: Patna to Motihari and Baitalpur PipelineType: Project includes the construction of new

pipelineLength: 167 milesLocation: Patna to MotihariComments: Project is currently awaiting development

decisions

Project: Cauvery Basin-Trichy Pipeline Type: Project includes the construction of new

pipeline

1209 Hardy StreetHouston, TX 77020Tel: (713) 222-0146Tel: (800) 231-7205Fax: (713) 222-7403

Copyright 2015Knapp Polly Pig, Inc.All rights reserved

E-mail: [email protected]

By-pass ports::Gauging plates::Transmitter cavities::Medium or heavy density foam

Available options:

Single piece bodyBi-Directional

Condensate removalParaffin scrapingDewateringCommissioning

Quality-built in Houston, Texasfor over 25 years

FOAM DISC PIGThe Original Manufacturer of the

Steel wire brush

Rounded nose Extended-Length

Plastic brush

Page 16: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

VaculiftsShearsHammersBuckets

WHEEL LOADERSAll machines 21/2 to 9 yrds.All current Kawasaki models available with couplers, forks or buckets.

EXCAVATORSAll machines from 17,000 to 111,000 lbs. All current Kobelcomodels available.

OFF ROADDUMP TRUCKSBell Truck models, Cat and other makes available, from 25 to 50 ton.

MOTOR GRADERSMany models to choosefrom: 140H, 140M & 14H. Joystick or lever controls, scarifiers & rippers, Accugrade ready.

CRANESCrawlers, rough terrain and carrydeck models available. From 30 to 100 ton.

COMPRESSORSIngersoll Rand, Atlas Copco, Doosan, Sullair. 100 to 125 psi. Tier 3 or 4 diesel available.

LIGHT PLANTSAvailable with 90 hr. runtime, 6.0kW single phase generators,auto start / stop.

PIPELAYERS& SIDEBOOMSMidwestern booms with 20,000 to 40,000 lbs. max lift. Many makes and models to choose from.

WATER TRUCKSOn and off road trucks available. From 2,000 to 8,000 gallons.

ON HIGHWAYDUMP TRUCKSWestern Star, International, Mack, F450’s, F750’s and more!

DOZERSA variety of models to choose from. Cat D3K’s to D8T’s available with winches, rippers and angle blades.

Morooka MST1500 Personnel Carriers

Morooka MST1500 Fuel Tankers

LICENSED AND INSURED TRANSPORTATION SERVICES AVAILABLE

Crane Mat Grapples

Morooka MST1500 Vacuums

ATTACHMENTS

Morooka MST1500 Flatbeds

Morooka MST1500 Sandblasters

Morooka MST1500 Dumpers

Morooka MST2200 Dumpers

320 Briscoe Drive Morris, Illinois 60450 www.iltruck.com [email protected]

One Call Rents It All! 815-941-1900

RUBBER TRACK CARRIERS New models available: 800’s, 1500’s and 2200’s. Dumpers, Flatbeds, Personnel Carriers, Mounted Vacuums, Fuel Tanks, Welders, Compressors, Sandblasters and Conveyors. • Custom configurations are available upon request, call one of our sales or rental representatives to inquire.

Page 17: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

VaculiftsShearsHammersBuckets

WHEEL LOADERSAll machines 21/2 to 9 yrds.All current Kawasaki models available with couplers, forks or buckets.

EXCAVATORSAll machines from 17,000 to 111,000 lbs. All current Kobelcomodels available.

OFF ROADDUMP TRUCKSBell Truck models, Cat and other makes available, from 25 to 50 ton.

MOTOR GRADERSMany models to choosefrom: 140H, 140M & 14H. Joystick or lever controls, scarifiers & rippers, Accugrade ready.

CRANESCrawlers, rough terrain and carrydeck models available. From 30 to 100 ton.

COMPRESSORSIngersoll Rand, Atlas Copco, Doosan, Sullair. 100 to 125 psi. Tier 3 or 4 diesel available.

LIGHT PLANTSAvailable with 90 hr. runtime, 6.0kW single phase generators,auto start / stop.

PIPELAYERS& SIDEBOOMSMidwestern booms with 20,000 to 40,000 lbs. max lift. Many makes and models to choose from.

WATER TRUCKSOn and off road trucks available. From 2,000 to 8,000 gallons.

ON HIGHWAYDUMP TRUCKSWestern Star, International, Mack, F450’s, F750’s and more!

DOZERSA variety of models to choose from. Cat D3K’s to D8T’s available with winches, rippers and angle blades.

Morooka MST1500 Personnel Carriers

Morooka MST1500 Fuel Tankers

LICENSED AND INSURED TRANSPORTATION SERVICES AVAILABLE

Crane Mat Grapples

Morooka MST1500 Vacuums

ATTACHMENTS

Morooka MST1500 Flatbeds

Morooka MST1500 Sandblasters

Morooka MST1500 Dumpers

Morooka MST2200 Dumpers

320 Briscoe Drive Morris, Illinois 60450 www.iltruck.com [email protected]

One Call Rents It All! 815-941-1900

RUBBER TRACK CARRIERS New models available: 800’s, 1500’s and 2200’s. Dumpers, Flatbeds, Personnel Carriers, Mounted Vacuums, Fuel Tanks, Welders, Compressors, Sandblasters and Conveyors. • Custom configurations are available upon request, call one of our sales or rental representatives to inquire.

Page 18: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

28 Pipeline News October 2017 • www.pipeline-news.com

PLANNEDProjects in development

Length: 74 milesLocation: Cauvery Basin refinery - TrichyComments: Project is currently awaiting development

decisions

Project: Ennore-Trichy-Puducherry LPG PipelineType: Project includes the construction of new

pipelineLength: 248 milesLocation: Ennore – Trichy - PuducherryComments: Project is currently awaiting development

decisions

PHILIPPINE NATIONAL OIL CO. – (REV 12/16)Project: Batangas-Manila PipelineType: Project includes the construction of new

pipelineLength: 65 milesLocation: Batangas - ManilaStart: Delayed

RELIANCE INDUSTRIES – (REV 7/13)Project: Kakinada-Basudebpur-Howrah Pipeline Type: Project includes the construction of new

pipelineLength: 680 milesLocation: Kakinada-Basudebpur-HowrahComments: According to the New Indian Express,

land owners opposed the project due to inadequate compensation and safety concerns with past pipeline leakage

SINOPEC – (11/13)Project: Zhundong Coal-to-Gas Plant Type: Project includes the construction of new

gas pipelinesLength: 4,970 milesLocation: Zhundong, ChinaCompletion: 2021Comments: Project will be the largest coal-to-gas

plant in China and will help increase domestic energy efficiency and cut reliance on oil and gas imports

FSU Eastern EuropeAZERBAIJAN/TURKMENISTAN/GOV. OF UK – (REV 8/16)Project: Trans Caspian Gas Pipeline Type: Project includes the construction of new

pipeline, including a subsea portionLength: 186 milesLocation: Türkmenbaşy – Caspian Sea - Sangachal

Terminal, BakuComments: Project will have a capacity of 30 Bcm

GAZPROM – (REV 12/16)Project: Yamal – Europe-2 Pipeline Type: Project includes the construction of new

pipelineLength: 250 milesLocation: Poland - Slovakia - Hungary Completion: 2019Comments: Project will have an annual throughput of

no less than 15 Bcm of gas

GAZ-SYSTEM S.A. – (REV 1/13)Project: Poland-Slovakia PipelineType: Project includes the construction of new

pipelineLength: 158 milesLocation: Poland - Slovakia Start: 2018

Comments: Project will connect the natural gas transmission systems of the two countries and expansion of the Poland-Czech Republic Pipeline

Project: Zdzieszowice-Wrocław PipelineType: Project includes the construction of new

pipelineLength: 80 milesLocation: Zdzieszowice - WrocławComments: Project is currently awaiting development

decisions

Project: Skoczów-Oświęcim PipelineType: Project includes the construction of new

pipelineLength: 31 milesLocation: Skoczów - OświęcimComments: Project is currently awaiting development

decisions

Project: Szczecin-Lwówek PipelineType: Project includes the construction of new

pipelineLength: 116 milesLocation: Szczecin - LwówekComments: Project is currently awaiting development

decisions

Project: Rembelszczyzna–Gustorzyn PipelineType: Project includes the construction of new

pipelineLength: 109 milesLocation: Rembelszczyzna – GustorzynComments: Project is currently awaiting development

decisions

Project: Szczecin-Gdańsk PipelineType: Project includes the construction of new

pipelineLength: 164 milesLocation: Szczecin - GdańskComments: Project is currently awaiting development

decisions

Project: Gustorzyn - Odolanów PipelineType: Project includes the construction of new

pipelineLength: 104 milesLocation: Gustorzyn - OdolanówComments: Project is currently awaiting development

decisions

Project: Polkowice-Żary PipelineType: Project includes the construction of new

pipelineLength: 41 milesLocation: Polkowice - ŻaryComments: Project is currently awaiting development

decisionsProject: Strachocina-Pogórska Wola PipelineType: Project includes the construction of new

pipelineLength: 60 milesLocation: Strachocina - Pogórska WolaComments: Project is currently awaiting development

decisions

MALTA/SICILY – (7/17)Project: Malta to Sicily PipelineType: Project includes the construction of a

22-inch pipelineLength: 98 miles (21 miles onshore and 77 miles

offshore)Location: Gela, Sicily – Delimara, Malta

Capacity: 2 Bcm/yCost: $360 millionStatus: Malta and Sicily have signed a letter of

intent that will allow for progress to be made regarding the construction of the project

Completion: 2024

POLAND/DENMARK – (6/16)Type: Project will link Poland to gas from

Norway and increase the security of its energy supplies

Location: Poland - NorwayStart Date: 2017Comments: A feasibility plan should be ready by the

end of 2016

POLAND/LITHUANIA – (REV 8/14)Project: Gas Interconnection Poland–LithuaniaType: Project includes the construction of new

pipelineLength: 445 milesLocation: Lithuania - Poland Completion: 2019Comments: Pipeline is a part of the Baltic Energy

Market Interconnection Plan project and will have a capacity of up to 2.3 Bcm/year

Middle EastGOV. OF IRAN – (3/16) Project: Iran-Iraq-Syria PipelineType: Project includes the construction of a

56-inch pipelineLength: 3,500 milesLocation: Iran – Iraq - SyriaComments: Pipeline will have a daily capacity of as

much as 110 MMcm

KOREA GAS CORP. – (4/16)Type: Project includes construction of one

onshore lateral from Rudan to Mobarak Mount, and one offshore lateral from Mobarak Mount to Sohar Port in Oman

Length: 250 milesLocation: Iran - OmanStart Date: 2017Comments: Feasibility studies for the offshore section

of the pipeline are expected to be complete by mid-2016

AfricaEAST AFRICAN COMMUNITY – (REV 12/16)Project: Dar es Salaam-Tanga-Mombasa PipelineType: Project includes the construction of new

pipeline and gas skid supply terminalsLength: 329 milesLocation: Tanzania - MombasaComments: Project is currently undergoing a feasibility

study

OIL - InternationalAfricaGOV. OF UGANDA – (REV 2/13) Project: Eldoret - Kampala PipelineType: Project includes the extension and

reversal of existing pipeline, including mainline pumps, intermediate pump stations and road/rail loading facilities

Length: 497 miles

Page 19: ALASKA GASLINE DEVELOPMENT CORP. – (REV 6/17) CANYON ...€¦ · Status: Project has received a Final Environmental Impact Statement Start: 4Q 2018 Completion:4Q 2019 Comments:

www.pipeline-news.com • October 2017 • Pipeline News 29

PLANNEDProjects in development

Location: Eldoret – KampalaStart: 2017

MALAWI GOVERNMENT – (REV 7/16)Project: Moz-Malawi-Zambia-Congo PipelineType: Project includes the construction of new

pipeline, pumping stations and storage tanks

Length: 504 milesLocation: Moz – Malawi – Zambia - CongoComments: Pipeline will have 500 cm/month of

capacity

SOUTH SUDAN – (REV 12/16)Project: Juba-Lamu oil pipelineType: Project includes the construction of new

pipelineLength: 1,242 milesLocation: Juba - LamuComments: Project is currently in the feasibility

stages and, when complete, will transport between 700M to one million barrels of crude oil from South Sudan to other countries via the proposed Lamu Port, as an alternative route to Port Sudan

TOYOTA TSHUSHO – (REV 4/12)Type: Project includes the construction of new

pipeline, pumping stations and storage tanks

Length: 870 milesLocation: Jabu, South Sudan - Kenya’s Lamu portComments: Pipeline has an estimated capacity of 450

Mbpd

FSU Eastern EuropeROSNEFT/TRANSNEFT – (11/13)Project: Skovorodino-Mohe Pipeline ExpansionType: Project includes the expansion of tank

farm pumping stationsLocation: Skovorodino - MoheComments: Pipeline capacity is expected to reach 30

million tons per year beginning in January 2018

Middle EastMINISTRY OF OIL OF IRAQ – (8/17)Operator: State Company for Oil Projects Project: Basra-Aqaba PipelineType: Project includes construction of dual oil

and gas pipelinesLength: 440Location: Basra, Iraq - Aqaba, JordanCapacity: 2.25 Mbpd 500 Mcf/dCost: $18 billionStart: 4Q 2018Complete: 4Q 2020Status: Project is in the tender process

Contractor: SNC LavalinType: Project includes engineering,

procurement and design

OFFSHORE – InternationalAsia PacificASIA CONSORTIUM ENGR./DOSB – (3/16)Project: Trans Oriental Gas PipelineType: Project includes the construction of a

subsea pipelineLength: 2,485 milesCompletion: 2022Location: Malaysia - South KoreaComments: An MoU for the project has been signed

FSU Eastern EuropeGOV. OF RUSSIA/GOV. OF JAPAN – (6/12)Project: Sakhalin - Japan PipelineType: Project includes the construction of new

pipelineLength: 807 milesLocation: Sakhalin - JapanComments: Project will transfer about 25 Bcm/year of

gas

Middle EastTRADE BANK OF IRAQ – (7/16)Project: Basra - Aqaba PipelineType: Project includes the construction of new

pipelineLength: 1,044 milesLocation: Basra - AqabaStart: 2017Comments: An MoU was signed in November 2015

and, when built, the project will have a capacity of 4.5 MMbpd

Western Europe & EU CountriesSTATOIL – (12/13)Project: Skrugard Field DevelopmentType: Project includes the construction of new

pipelineLength: 174 milesLocation: Skrugard - VeidnesCompletion: 2018Comments: Production is estimated at almost 200

Mbpd of oil

WOOD GROUP – (11/16)Project: Utgard Gas FieldType: Project consists of a 13-mile long pipe-

in-pipe production pipeline from the 4-slot template at Utgard to the Sleipner T platform and an integrated service umbilical (ISU) from the Sleipner A

Length: 13 milesLocation: North SeaStart: 2017Completion: 2019

Southeast Connections, LLC2720 Dogwood Dr. SE

Conyers, GA 30013404-659-1422

www.seconnections.com

• New Pipeline Construction • Pipeline Maintenance and Integrity Management • Pipeline Relocation “Providing expert options for today’s ever-changing utility installation requirements”

Southeast Connections, LLC

1-17_SE_Connections_Ad2.indd 1 1/12/2017 8:58:52 PM