SERVICES AVAILABLE
Company Profile Al-Jeel Al-Thalith Contracting Company Ltd.
ELECTRICAL
Transmission lines, Distribution Lines, Services Connections, Un-derground Substations, Cathodic Protection Systems. MECHANICAL
Equipment, Structures, Pipelines, Fencing.
COMMUNICATIONS
Fiber Optics Cables, Copper Ca-bles, Communication Equipments
CIVIL
Building, Land Development, Road, Water & Sewage System, Renova-tions.
TRANSPORTATION
Aggregates, Fuel, Sweet & Raw Water, General Cargo.
NO JOB OR NO TASK IS MORE IMPORTANT THAN
WORKER HEALTH AND SAFETY.
Our vision is to be the pre-eminent
institution in the Kingdom of Saudi
Arabia and achieve market recog-
nition both in quality and delivery of
service as well as the range of
services offering.
We believe that no job or no task
is more important than worker
health and safety. If a job repre-
sents a potential safety or health
threat, every effort will be made to
plan a safe way to do the task.
Every procedure must be a safe
procedure. Shortcuts in safe pro-
cedures by either foremen or
workers will not be tolerated.
[email protected] P.O Box 30158, Al-Khobar 31952, Kingdom of Saudi Arabia. Tel +966-3-8994747 Fax +966-3-8994949 +966-3-8653802
Contents
DOCUMENT TITLE
Company Profile COMPILED BY
Adnan Akhtar CONTACT
T. +966-3-8994747 F. +966-3-8994949 [email protected]
Al-Jeel Al-Thalith Introduction……………………………………………………….……………03
Services…………………………………………………………………………………………………………..04
Corporate Information…………………………………………………………………………………07
Health & Safety Policy………………………………………………………………………………….11
Quality Assurance & Quality Control…………………………………………………………15
Facilities…………………………………………………………………………………………………………..17
Manpower Details…………………………………………………………………………………………19
Equipment Details…………………………………………………………………………………………23
Completed Projects……………………………………………………………………………………...27
Ongoing Projects…………………………………………………………………………………………..39
Glimpses of Projects…………………………………………………………………………………….43
Legal Documents……………………………………………………………………………….…………64
Company Profile
Introduction
Al-Jeel Al-Thalith Contracting Co. Ltd. formerly known as Mohammad Mana
Al-Sagri & Partners Trading & Contracting Company is a 100% Saudi collective com-
pany established in the year 1996 and is located in Al-Khobar, Saudi Arabia.
Al-Jeel Al-Thalith is well represented in the Kingdom and has participated in
some of the SEC and Saudi ARAMCO construction and services projects as well as
other agencies. We are proud to say that “successful projects completion” has always
received our highest priority.
Our relative success as a construction and services contractor has been due to
our ability to maintain a stable and skilled workforce, including management and our
ability to introduce the latest technology related to our work.
All of our projects coordinate closely in order to achieve a coordinated effort and
therefore, can offer full-service within the stipulated time anywhere in the Kingdom.
Page No.3
Page No.4
We are providing comprehensive services in the fields of construction, operation
& maintenance of Civil, Electrical, Mechanical, Communication and Transportation Sec-
tors since 1996. This includes but is not limited to the following:
Electrical Department
· Transmission Lines design & erection
· Distribution Lines
· Services Connections
· Cathodic Protection Systems
· Grounding system design, supply, installation, testing & commissioning
· Package & unit substations installation, testing and commissioning
· 13.8 kV Switchgears (EPC)
· Transformers installation, testing and commissioning.
· MV/LV cable laying, testing and Termination
· Installation, testing and commissioning of backup generators.
· Installation, testing and commissioning of UPS systems.
· Design, supply and installation of cable Trays and raceaways.
· Conceptual design, installation and Testing of HV, MV and
LV protection relays.
· Old switchgear modification & retrofitting
· DC power supply system
· DC battery banks design, installation, testing and commissioning.
Services
Company Profile
Page No.5
Instrumentation & Control Department
· Fiber Optics and Structure Cabling
· Control Cabling
· Communication Equipments
- Low Density and Medium density Multiplexers
- SDH
- PABX System
- Wireless Connection.
· Instrumentation, conceptual design, installation testing and commissioning
· Installation, testing & commissioning of:
- RTUs / SCADA System
- CCTV & Access Control Systems
- Control & instrumentation cabinets, assembling & wiring.
· Old instrumentation and controls upgrading and retrofitting.
· Distribution Lines
· Services Connections
· Cathodic Protection Systems
· BMS (Building Management System)
· Fire Detection System.
· Industrial Gas Monitoring System installation, testing and commissioning.
Services
Page No.6
Mechanical Department · HVAC Division
· Industrial Fabrication
· Pipelines (BS, GS, SS, PVC, HDPE, GRP, VCP, DI)
· Fencing
· Pumping Stations
· Sewerage lifting stations
· Fire Protection System
Civil & Construction Department · Building
· Land Development (Earth Moving)
· Road, Water & Sewage System
· Renovations
· Underground non-invasive surveying for buried utilities.
· Trenching
· PEB design and erection
· Switchgear rooms.
· Foundation pads.
Transportation · Aggregates
· Fuel
· Sweet & raw water.
· Molten Sulpher
Services
Company Profile
Corporate Information
Page No.7
Management
Saleh Mana Al-Sagri Managing Director Fayez Mana Al-Sagri Asst. Managing Director & Finance Manager
Auditors
Tariq M. Al-Shabbani Certified Accountants License No.388
Banks
National Commercial Bank Thoqbah Branch, Al-Khobar Riyadh Bank, King Abdul Aziz Street, Al-Khobar. Saudi Al-Fransi Bank, Thoqbah Branch, Al-Khobar
Head Office
Prince Mumdouh Street, Cross No.22, Al-Khobar 31952, Saudi Arabia. Tel: +966-3-8994747, 8653884, 8653802 Fax: +966-3-8994949 E-mail: [email protected]
Vendor Registration Numbers
Saudi Aramco: 10006416 Saudi Electricity Company: 1000644 Royal Commission (MARAFIQ): 1676 Saline Water Conversion Corp: Registered
Health & Safety Policy
Page No.10
Company Profile
Health & Safety Policy
Page No.11
Al-Jeel Al-Thalith Contracting Company Limited believes that NO JOB
OR NO TASK IS MORE IMPORTANT THAN WORKER HEALTH AND SAFETY. If a job
represents a potential safety or health threat, every effort will be made to plan a safe
way to do the task. Every procedure must be a safe procedure. Shortcuts in safe proce-
dures by either foremen or workers will not be tolerated.
If a worker observes any unprotected job, which may pose a potential threat to
their health or safety, he or she must inform management and management must take
adequate precautions.
The Company’s Management is responsible for en-
suring that there is effective governance of health and
safety matters through the provision of approved and ap-
propriate organizational arrangements and policies that are
effectively implemented in practice. This is exercised directly
by the management itself in certain ways e.g., through the
annual report, but also through the Employees Committee
(EC) which has a specific remit in this respect. An employee
member of the Board also attends the regular meetings
of the Project Managers (PMS) when quarterly health and
safety reports are considered, so as to informally observe
that appropriate matters are being reported on, discussed
and considered and, where appropriate, acted on.
The PMS are collectively responsible for considering recommendations,
from professional advisers and others, for how the governance and
management arrangements are effectively implemented and made operational and for
giving/gaining approval to changes from time to time. Arrangements for overall health
and safety management, policy development and auditing largely fall within the remit of
the Executive Director – Human Resources.
Our futures are only
built through our people.
We aim to protect
them.
No Job or no task is
more important than
workers’ health and
safety.
Page No.12
All heads of organizational operating units are personally responsible for imple-
mentation of approved health and safety policies and procedures within their areas of
responsibility and for safe working practices. They have the support and professional
advice of health and safety and professionals, and access to specialist internal and exter-
nal advice where this is needed. Depending on particular. Health and safety coordinators
also operate to support implementation within the company.
Health & Safety Policy
Quality Assurance & Quality Control
Page No.14
Company Profile
Page No.15
Quality Assurance & Quality Control
Quality Assurance
Al-Jeel Al-Thalith Contracting Company Ltd. recognizes the requirement for
Quality Assurance within all business areas in which it operates and has therefore com-
mitted itself to the establishment of an effective Quality Management System which can
be implemented as required on any project, study or proposal it undertakes. The aim of
the system is to ensure that client’s objectives are met with minimum wastage, rework
or concessions and thus achieving a reliable cost system of management.
Al-Jeel Al-Thalith Contracting Company Ltd. considers satisfying client require-
ments and achieving the prime project objectives as an essential quality issue. J.T. oper-
ates a total quality management system, fully supported by the management and staff. A
commitment to quality is required from all employees and the “think quality” philosophy is
encouraged in all aspects of J.T. operations.
To ensure the achievement of these objectives, J.T. has appointed a Quality As-
surance Manager, who is responsible for the introduction, documentation, implementa-
tion and maintenance of the Quality System. The Quality Assurance Manager has a di-
rect reporting link to the Managing Director on all Quality Matters in order to ensure
independence.
J.T. Quality Assurance procedures and Quality Manual have been developed to
meet the requirements of the International Standard Organization ISO 9002. Our policy
statements have been developed in line with these standards.
Quality Control
The Quality Control department is an integral part of the contractors overall
organization, and the contractor’s organizational chart should clearly define its place
with in.
The Quality Control Officer reports directly to the project manager and coordi-
nate the Quality Control function with the Project Superintendent on site. The Quality
Control Officer will coordinate technicians and site engineers as required to assist in
managing and administering the contractor’s quality control program set forth in this
document.
Page No.16
Warehousing Facilities
There are two warehouses located in Dammam and Rafha consisting of open
storage and covered storage area for storing materials and equipments, which are re-
quired for work. These warehouses are controlled by storekeeper for material tracking
and scheduling.
Camps and Accommodation Facilities
The company operates and maintains its own labor camps and accommodation facilities
in the following locations:
Facilities
Camp Location Capacity
Al-Khobar Camp Al-Khobar 20
Hafr ul Batin Camp Al-Olaiya 20
Rafha Camp Rafha 66
Manpower Details
Page No.18
Company Profile
Manpower Details
Page No.19
Description Nationality Number
Management Saudi 3
Field & Technical Staff
Civil Engineer Filipino, Egyptian. 7
Electrical Engineer Egyptian, Pakistani. 5
Electronics Engineer Pakistani 1
Surveyor Egyptian 2
Foreman Egyptian, Filipino, Pakistani. 3
Fiber Optic Splicer/Power Cable Filipino, Indian. 3
Electrician Egyptian, Indian, Filipino 8
Telecommunications Technician Filipino. 4
HE Operator Filipino, Sri Lankan, Indian. 7
Lineman Filipino, Pakistani 15
Steel Fixer & Welder Indian, Pakistani 2
Transportation & Mechanic Staff.
Chief Mechanic Pakistani. 1
Mechanics Filipino, Indian, Pakistani 5
Drivers Indian, Sri Lankan. 7
Auto Electrician Indian. 1
Page No.20
Manpower Details
Description Nationality Number
A.C Technician Filipino, Indian 2
Tyre man Sri Lankan. 1
Finance & Admin Staff.
Accountant Egyptian, Indian, Pakistani. 4
Office Assistants. Pakistani. 2
Govt. Relation Saudi. 1
Civil Works & Others.
Carpenter Filipino, Indian. 04
Shuttering Carpenter Pakistani 8
Mason Filipino, Indian, Pakistani 14
Tile Fixer Pakistani. 8
Plumber Indian, Pakistani. 02
Labour Nepali, Indian, Filipino, Pakistani 25
Equipments Details
Page No.22
Company Profile
Equipments Details
Page No.23
Description MFG/Model Quantity
Trailer 50/30 Ton Low Bed 5
Trailer 20 Ton Flat Bed 10
Trailer Wire Rack 3
Trailer Water & Fuel Tanker 2
Cabin Tractor 2 x 4Merc/IVECO 24
Dump Truck 4 x 4 IVECO / 4 x 6 Merc. 3
Winch Truck 2 x 4 CAT/Merc. 5 Ton 2
Water Truck 2 x 4 GMC 1
Bucket Truck GMC/Merc. 12
Backhoe Volvo/CAT 420/Case 428 4
Front Loader John Deer/CAT 920/CAT 966 3
Rock Breaker CAT Poclain 2
Rock Drill Robbin 1
Bulldozer CAT D6/D8 2
Grader CAT G14 1
Forklift CAT Clark 2
Loader CAT 2
Mobile Crane Grove 25 Ton 1
Page No.24
Equipments Details
Description MFG/Model Quantity
Rough-Terrain Crane Grove 40 Ton 1
Vibro Hammer 40 Ton 1
Pickup Ford F-150/F-350/Nissan 12
Jeep Toyota Land Cruiser 10
Passenger Car Suburban/KIA Car 2
Others KIA Mini Truck 1
Hydraulic Cable Puller Tema Italy/Timberland USA 4
Air Compressor Ingersoll Rand/Sulair 2
Hydraulic Pump Tema Italy 2
Generator 400 Watts Robbin 8
Electrical & Mechanical Tools Assorted Lot
Civil Works Tools Assorted Lot
Safety Equipments Assorted Lot
Lineman Safety Tools Assorted Lot
Scaffoldings Assorted Lot Lot
Fiber Optics Splicing Equipment Ericson 2
OTDR Exfo 1
Light Source Exfo 1
Power Meter Exfo 1
Company Profile
Equipments Details
Description Quantity
Welding machine 13
Jack trolley (2 Ton) 5
Boom jack trolley (2.5 Ton) 3
Lifting A frame 4
Lifting Chain block (5 Ton) 2
Lifting Chain Block (3 Ton) 5
Lifting Chain Block (2 Ton) 6
Lifting Chain Block ( 1 Ton) 4
Makita cutter 16” 4
Grinder 9” 12
Grinder 4” 10
Drill machine 7
Drill hammer machine 5
Jack Hammer 4
Generator welding machine 1
Diesel Generator 1
Air compressor 4
Flash Light 12
Hand Lamp 10
Magnate Drill 1
Oxygen Gas Cylinder sets 8
Lathe Machine 1
Electric cable drum 12
Electric lifting crane (2 Ton) 2
Tool trolley 6
Spanner all size Lot
Completed Projects
Page No.28
Company Profile
Completed Projects
Page No.29
Contract No. & Client
Type of Contract Value in SR Duration Status
33005/06 Main Contract SEC-EOA
Electrical 356,842.39
26th Nov 2005 to
24th May 2006
Completed
Washing of 380KV Overhead Transmission Lines by climbing in the Eastern Operating Area. Ghunan-Ghazlan A&B Transmission Lines, Qurayah-Shedgum A&B, Ghazlan-Fadilih A&B and Ghazlan-Fadilih C&D
Contract No. & Client
Type of Contract Value in SR Duration Status
32003/44 Civil & Electrical 386,986.00 17th Sep 2005
to 10th Mar 2006
Completed
Construction and installation of street lighting system at Berri Power Plant as per scope of work.
Contract No. & Client
Type of Contract Value in SR Duration Status
Private Main Contract Transportation 300,000.00
Unit rate
04th Mar 1999 to
07th Mar 2003
Completed
E.A. JUFALI, Dammam Transportation of household supplies from Mina Store, Dammam to various location in Saudi Arabia.
Contract No. & Client
Type of Contract Value in SR Duration Status
546/2 Amanatul Dammam Main Contract
Civil Works
1,376,084.20
29th May 2004 to
28th May 2005
Completed
Construction of hallow block perimeter fence around cemeteries for Qurayat, Al-Olayah, Al-Shait and Al-Redaifha Villages.
Page No.30
Completed Projects
Contract No. & Client
Type of Contract Value in SR Duration Status
SCECO-South Sub-Contract (Private) NEC Saudi Arabia.
Communication 15,120.00 25th Sep 2004
to 25th Dec 2004
Completed
Under NEC Saudi Arabia Ltd. Splicing & Testing of Single Mode (SM) Fiber Optics Pigtail connection for Juaymah DOC 48 cores and Rastanura 230 KV S/S # 8024 cores.
Contract No. & Client
Type of Contract Value in SR Duration Status
546/2 Amanatul Dammam Main Contract Qurayat-Al-Olaiya
Civil & Electrical 1,992,720.00 01st Jan 2002
to 31st Dec 2002
Completed
Supply and Installation of street lights including cable trenching, laying, erection of poles, testing and commissioning, asphalting of roadways, concreting of sidewalks and gutters.
Contract No. & Client
Type of Contract Value in SR Duration Status
SAUDI ARAMCO Contract # 6600007908 Sub-contract (Manpower & Equipment Supply To Nasser Manea Wabran)
Civil and Communication 1,800,000.00
26th Aug 2003 to
09th Dec 2003
Completed
Installation, testing and commissioning including excavation of cable trench, fiber optics cable laying, installation of optical pedestal, terra tape, backfilling, 4-4” diameter PVC duck bank concreting, splicing and cable terminations at pump station # 2. Underground copper cable installation for telecommunication and pedestal at pump station # 3 in Khurais.
Company Profile
Completed Projects
Page No.31
Contract No. & Client
Type of Contract Value in SR Duration Status
Nil Private Main Contract
Transportation 29,250.00 Unit rate
12th Jan 2000 to
11th Jan 2001
Completed
GULF STEEL COATING INDUSTRIES, DAMMAM. Transportation of steel from Jubail factory to various locations in Saudi Arabia & GCC.
Contract No. & Client
Type of Contract Value in SR Duration Status
47275/00 SAUDI ARAMCO Sub-Contract
Civil & Electrical 243,000.00 02nd Jan 2000
to 01st Jun 2001
Completed
Cathodic protection & 13.8 KV overhead power lines for Shaybah Wells.
Contract No. & Client
Type of Contract Value in SR Duration Status
SH-N/004/19 SEC-SOUTH Sub-Contract
Civil, Electrical & Mechanical 1,404,500.00
10th Jun 2000 to
31st Mar 2001
Completed
Stringing, clipping & jumper of 102 Km, 33 KV 3Ph overhead HT line and 168 Km LT line and erection, testing and commissioning of 309 Nos. 100,200 and 500 KVA H-pole transformer in feeder noose. 1 & 2 in Al-Habil Area.
Contract No. & Client
Type of Contract Value in SR Duration Status
84198/00 SEC-ERB Main Contract
Electrical 6,987,126.00 07th Jul 2001
to 06th Jul 2004
Completed
Expansion, reinforcement, maintenance of electrical network & provide power supply to the customers in Sakaka, Domat-Al-Jandal, Tabarjal, Qurayyat, Turaif, Awaiquila.
Page No.32
Completed Projects
Contract No. & Client
Type of Contract Value in SR Duration Status
152/4 Amanatul Dammam Main Contract Qurayat, Al-Olaiya
Civil 1,376,084.20 29th May 2004
to 28th May 2005
Completed
Construction of Hallow block fencing around the cemeteries of Qurayat, Al-Olaiya...
Contract No. & Client
Type of Contract Value in SR Duration Status
835064/84 SEC-ERB Main Contract
Electrical 97,656.00 13th Jan 2001
to 17th Mar 2001
Completed
Replacement of 36 Nos. outdoor focus lights at Qateef office complex. Works includes all Civil Works, installation of lighting fixtures and testing and commissioning
Contract No. & Client
Type of Contract Value in SR Duration Status
MODA SEC-ERB Sub-Contract
Fiber Optics 68,200.00 30th Aug 2000
to 25th Apr 2001
Completed
Fiber Optics cable splicing, testing and commissioning.
Contract No. & Client
Type of Contract Value in SR Duration Status
SHT/04/A/20 SEC-SOUTH Sub-Contract
Electrical
774,600.00
01st Nov 2001 to
01st May 2001
Completed
Supply and installation of all electrical network 22 KV with SEC South Branch for Asir Villages.
Company Profile
Completed Projects
Page No.33
Contract No. & Client
Type of Contract Value in SR Duration Status
82569/00 SEC-EAST Main Contract.
Communication
850,000.00
01st Feb 1999 to
31st Oct 1999
Completed
Fiber Optics splicing, testing and commissioning of 115 KV transmission line from Nari-yah BSP to Nariyah S/S # 2. Nariyah BSP to Qaryat Al-Ulyah, Safaniyah to Khafji S/S # 3.
Contract No. & Client
Type of Contract Value in SR Duration Status
85041/65 SEC-EAST Main Contract
Civil
46,699.00
22nd Nov 1999 to
15th Feb 1999
Completed
Repair and repainting of the control room of Salwa power plant flooring and repair and waterproofing of the control room roofing. Activities include polishing, smoothing of floor concrete surface with sealant/putty, scraping and filling roof cracks with sealant and polyurethane foam.
Contract No. & Client
Type of Contract Value in SR Duration Status
Nil Private Main Contract.
Civil
2,660,000.00
14th Jun 1999 to
14th Dec 2001
Completed
Complete construction and finishing works including structural, finishing, painting, plumb-ing, electrical, carpentry, steel fabrication, interior decoration etc. on a turnkey basis for four villas located in Al-Khobar.
Contract No. & Client
Type of Contract Value in SR Duration Status
Nil Private Main Contract.
Equipment Sup-
ply.
2,002,950.00
10th Aug 1998 to
28th Feb 1998
Completed
SALIM W. AL-YAMI CO. & PART. Supply of heavy equipment and trucks with operators / drivers within the Eastern Re-gion of Saudi Arabia on rental basis.
Page No.34
Completed Projects
Contract No. & Client
Type of Contract Value in SR Duration Status
85064/51 SEC-EAST Main Contract
Civil 61,900.00 10th Aug 1999
to 08th Sep 1999
Completed
Modification of two toilet rooms in building No.16, SEC, Dammam. Activities include demolition, replacement of the existing walls and flooring with new ceramics tiles and glazed marbles, installation of corian solid, western closets water heaters, marble parti-tions, plumbing works, painting and restoration
Contract No. & Client
Type of Contract Value in SR Duration Status
83140/00 SEC-EAST Main Contract.
Civil & Electrical 832,543.00 15th Dec 1998
to 14th Dec 2000
Completed
Installation, testing, commissioning of 97 Nos. grounds, replacement of shield wire jump-ers and replacement of 121 Nos. defective aerial warning lights on Khursaniyah-Nariyah-Qaisumah 230 KV transmission lines.
Contract No. & Client
Type of Contract Value in SR Duration Status
Nil Private Main Contract.
Transportation 300,000.00 14th Feb 1998
to 13th Apr 1998
Completed
NASSIR MANEA WABRAN CO. & PART. Providing construction equipment, material and fuel transportation, flat and low bed tankers and trailers.
Contract No. & Client
Type of Contract Value in SR Duration Status
72375/00 SAUDI ARAMCO Sub-Contract
Civil Equipment & Mechanical 1,120,260.00
10th Aug 1998 to
28th Feb 1999 Completed
Complete assembly, erection and conductor installation for the 50 structures of 34.5 KV DC transmission line. Supply and installation of portal cable risers, installation of sub-station equipment and the related tie-in overhead and underground substation modifica-tion works.
Company Profile
Completed Projects
Page No.35
Contract No. & Client
Type of Con-tract Value in SR Duration Status
82569/01 SEC-EAST Sub-Contract
Communication
100,000.00
15th Jul 1998 to
14th Oct 1998
Completed
Splicing, testing, commissioning of OPGW on Berri Ghazalan 230 KV transmission line, approx. 4.1 km.
Contract No. & Client
Type of Con-tract Value in SR Duration Status
400477/033 SAUDI ARAMCO Sub-Contract
Civil, Electrical
and Mechanical
436,427.00
13th Sep 1997 to
25th Feb 1997
Completed
Upgrade SASREF Metering Control Building in Jubail Industrial City. Activities include ex-pansion and renovation, extension, construction, relocating, supplying, installation, dis-connection, re-routing, caging, verifying, sealing etc.
Contract No. & Client
Type of Con-tract Value in SR Duration Status
72375/00 SAUDI ARAMCO Sub-Contract
Civil Equipment & Manpower Sup-
ply
1,100,000.00
03rd Oct 1998 to
28th Feb 1999
Completed
Complete foundation works for 34.5 KV DC direct impeded steel poles transmission lines from Rabigh refinery to Rabigh community, approximately 24 km, including equip-ment and manpower supply.
Contract No. & Client
Type of Con-tract Value in SR Duration Status
Nil SAUDI ARAMCO Main Contract
Transportation
460,000.00
01st Jan 1998 to
31st Dec 1998
Completed
Transportation services to Salim Al-Yami Co. for Rabigh jobsite under SAUDI ARAMCO Contract # 723375/00 (Power supply to Rabigh Community).
Page No.36
Completed Projects
Contract No. & Client
Type of Contract Value in SR Duration Status
Nil Private Main Contract
Civil & Man-power Supply 55,000.00
22nd Dec 1996 to
21st Jan 1997 Completed
Mr. Ahmed Nassir Al-Wabran Renovation services for a private villa in Al-Khobar.
Contract No. & Client
Type of Contract Value in SR Duration Status
Nil Private Main Contract.
Supply of Const. Equipments 350,000.00
01st Dec 1996 to
30th Jan 1997 Completed
M/S Al-Salem Est. Supply of construction equipments at Dhahran Airport on rental basis.
Contract No. & Client
Type of Contract Value in SR Duration Status
82792/00 SEC-EAST Sub-Contract
Civil & Electrical 1,377,419.44 01st Jan 1997
to 17th Jun 1998
Completed
Installation, testing, commissioning of approximately 800 Nos. steel tower grounding on Khursaniyah-Nariyah-Quisumah 230V transmission lines.
Contract No. & Client
Type of Contract Value in SR Duration Status
30542158/00 SEC-ERB Meter Reading 2,801,400.00
27th Dec 2005 to
26th Dec 2008 Completed
Meter reading and distribution of energy consumption invoice EOA.
Contract No. & Client
Type of Contract Value in SR Duration Status
109/B—Main Contract Ministry of Municipality Affairs
Civil 2,999,350.00 01st Apr 2005
to 30th May 2008
Completed
Construction of Qaryatul Olaiya Municipality Building.
Contract No. & Client
Sub Contract SAUDI ARAMCO
Supply, installation, Testing & Commissioning of Helipad Lighting System at Aramco Site in Manifa.
Type of Contract Value in SR Duration Status
Aviation 1 Million 01st Oct 2009 to 01st Jan 2010 Completed
Company Profile
Completed Projects
Page No.37
Contract No. & Client
Type of Con-tract Value in SR Duration Status
956 Ministry of Finance
Electrical 4,862,174 16th Feb 2008
to 15 Dec 2009
Completed.
Completion of 13.8 KV overhead distribution line for provision of electricity to three fuel stations, housing facility of Ministry and airstrip situated at Batha border.
Contract No. & Client
Type of Con-tract Value in SR Duration Status
10541048/00 SEC-EOA Main Contract
Civil & Electrical 18,713.883.00 approx
15th April 2005 to
30th May 2008 Completed
Install, remove, replace and modify overhead distribution facilities for operating voltage up to and including 35 KV, Central Operating Area (including Riyadh City, Riyadh Rural Area, Qassim, Dawadmi, Kharj and Hail)
Contract No. & Client
Type of Con-tract Value in SR Duration Status
Nil King Faisal University
Time & Atten-dance System
1,368,659 One year. Completed
Installation of Time & Attendance System in different campuses of King Faisal University located in Dammam, Khafji, Nariya, Qatif, Hafr Al Batin and Jubail.
Contract No. & Client
Type of Con-tract Value in SR Duration Status
DT-KFSH-E09 King Fahad Specialist Hospital, Dammam. (Sub Contract)
Electrical 4 million One year. Completed
Up-gradation of HVAC Equipment at King Fahd Specialist Hospital, Dammam.
Page No.38
Completed Projects Contract No. &
Client Type of
Contract Value in SR Duration Status
13/96 King Faisal University
Electrical SR 998,142 11 months Completed
Replacement of Sub Stations from Building No.27 of the University.
Contract No. & Client
Type of Contract Value in SR Duration Status
King Faisal University Teaching Hospital
Electrical 480,000 02 months Completed
Supply & Installation of New Switchgear and dismantling of existing switchgear.
Contract No. & Client
Type of Contract Value in SR Duration Status
King Fahd Specialist Hospital, Dammam
Electrical 248,000 01 month Completed
Installation of Electrical Panels, Cables, Cables Trays and associated work.
Contract No. & Client
Type of Contract Value in SR Duration Status
Sub Contract Al-Bilad Compound
Electrical SR 33,000 02 weeks Completed
Removal of existing transformers and installation, testing & commissioning of new trans-formers.
Contract No. & Client
Type of Contract Value in SR Duration Status
Sub Contract U.S Embassy, Riyadh
Electrical 21,184 02 weeks Completed
Supply of surge protectors to American Embassy.
Ongoing Projects
Page No.40
Company Profile
Ongoing Projects
Page No.41
Contract No. & Client
Type of Contract Value in SR Duration Status
30841036/00 SEC Electrical Unit Rate 3 years Ongoing
Contract for maintenance of Overhead and Underground Distribution Networks up to 36 KV.
Contract No. & Client
Type of Contract Value in SR Duration Status
732/51 Ministry of Education.
Construction 4595136.70 22 months Ongoing
Construction of Abada Bin Al Samit Primary School in Hafr-ul-Batin.
Contract No. & Client
Type of Contract Value in SR Duration Status
733/51 Ministry of Education
Construction 4559088.00 22 months Ongoing
Construction of Al-Moghira Bin Shoba Secondary School in Hafr-ul-Batin.
Contract No. & Client
Type of Contract Value in SR Duration Status
Kuwait International Aircraft Leasing Company.
Transportation Unit Rate - Ongoing
Kuwait International Aircraft Leasing Company. Supply and transportation of Jet A1 fuel from Dhahran to Khafji.
Page No.42
Ongoing Projects
Contract No. & Client
Type of Contract Value in SR Duration Status
Sub Contract Al Noor Specialist Hospital, Makkah.
Electrical & Control 11000000 01 year Ongoing
Electrical & BMS controls system Works.
Glimpses of Projects
Page No.44
Company Profile
Glimpses of Projects
Page No.45
Well prepared OPGW Joint Box with accessories.
Page No.46
Glimpses of Projects
OPGW Joint Box Preparation
Company Profile
Glimpses of Projects
Page No.47
Stringing Equipment
Page No.48
Glimpses of Projects
Cable Puller
Company Profile
Glimpses of Projects
Page No.49
Digger Equipment
Page No.50
Glimpses of Projects
Digger Equipment
Company Profile
Glimpses of Projects
Page No.51
Rebar for Pole Foundation
Page No.52
Glimpses of Projects
Casing Vibrator
Company Profile
Glimpses of Projects
Page No.53
Construction of Municipality Building in
Qaryat-ul-Olaiya.
Page No.54
Glimpses of Projects
Construction of Municipality Building in
Qaryat-ul-Olaiya.
Company Profile
Glimpses of Projects
Page No.55
Construction of Municipality Building in
Qaryat-ul-Olaiya.
Page No.56
Glimpses of Projects
Installation of Street lighting including cable trenching, laying, erection of
poles, testing and commissioning in Qaryat-ul-Olaiya.
Company Profile
Glimpses of Projects
Page No.57
Supply, installation, Testing & Commissioning of Helipad Lighting & Control System at Aramco Site in Manifa.
Page No.58
Glimpses of Projects
Supply, installation, Testing & Commissioning of Helipad Lighting System at Aramco Site in Manifa.
Company Profile
Glimpses of Projects
Page No.59
Up gradation of HVAC Equipment at King Fahd Specialist Hospital, Dammam.
(Construction of Switchgear Room)
Page No.60
Glimpses of Projects
Up gradation of HVAC Equipment at King Fahd Specialist Hospital, Dammam.
(Construction of Switchgear Room)
Company Profile
Glimpses of Projects
Page No.61
Up gradation of HVAC Equipment at King Fahd Specialist Hospital, Dammam.
(Construction of Switchgear Room)
Page No.62
Glimpses of Projects
Up gradation of HVAC Equipment at King Fahd Specialist Hospital, Dammam.
(Construction of Switchgear Room)
Legal Documents
Page No.64
HEAD OFFICE Prince Mumduh Street, Cross No.22, Madinatul Ummal, Al-Khobar 31952, Kingdom of Saudi Arabia. T. +966-3-8994747 / 8653884 F. +966-3-8994949 [email protected]