Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 1 Air-Ground Data Link - DFS Strategy ATN’99 -...

17
Air-Ground Data Link - DFS Strategy 23-Sep-99 Chart 1 Air-Ground Data Link - DFS Strategy ATN’99 - An International Conference on the Implementation of Aeronautical Datalink 23 September 1999 Speaker: Thomas Belitz, DFS Telecommunications ([email protected]) FOR PRINTOUTS OF THIS PRESENTATION PLEASE USE THE „PRINT>WITH NOTES“-FEATURE OF MS POWERPOINT.

Transcript of Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 1 Air-Ground Data Link - DFS Strategy ATN’99 -...

  • Slide 1

Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 1 Air-Ground Data Link - DFS Strategy ATN99 - An International Conference on the Implementation of Aeronautical Datalink 23 September 1999 Speaker: Thomas Belitz, DFS Telecommunications ([email protected]) FOR PRINTOUTS OF THIS PRESENTATION PLEASE USE THE PRINT>WITH NOTES-FEATURE OF MS POWERPOINT. Slide 2 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 2 1.Todays Shortcomings 2.Environment 3.Operational Requirements 4.Air-Ground Data Link Media 5.DFS-ATM-Systems/ Processes 6.Implementation Scenario Phase 1 (from 2005) 7.Implementation Scenario Phase 2 (from 2007) 8.Benefits according to Implementation Phases 9.Cost-Benefit Considerations 10.Summary 11.Conclusions Air-Ground Data Link - DFS Strategy Contents Slide 3 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 3 increasing number of aircraft results in reaching capacity limits on voice frequencies/ frequency shortage overload of executive controllers increasing challenge to ensure the safety of flight Todays Shortcomings voice communication implies potential of misunderstandings no automated exchange of information between data processing systems in the Air and on the Ground Airline requirements regarding data link are not satisfied Slide 4 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 4 Strategies, approved by DFS ATM 2000+ EATMS-OCD EATCHIP-Communications Strategy Important Programs FAA- NEXCOM- Program LINK 2000+ PIT - PETAL Integration Team Military Aviation There was no specific military requirement for ATS-Data Link Services identified yet. Environment Relevant Strategies and Programs Slide 5 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 5 Environment EATCHIP Communications Strategy (dated July 98) Mobile Network Services Deployment Slide 6 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 6 Environment EATCHIP Communications Strategy (dated July 98) Slide 7 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 7 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 year D-FIS CPDLC ADAP others Operational Requirements Data Link Services - specific to DFS D-ATIS (INDAL) DCL, CIC, ACM, (COTRAC) D-OTIS, D-RVR, D-SIGMET CAP, SAP PPD, (ADS) FLIPCY others D-DCL (INDAL) Slide 8 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 8 Air-Ground Data Link Media Assumption of Availabilities Alternative Media Slide 9 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 9 DFS-ATM-Systems/Processes Potential in Performance-Enhancements resulting from the introduction of Data Link Services Slide 10 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 10 Alternative Media (Selection of complementary media by 2001) Implementation Scenario Phase 1 (from 2005) Non-Time Critical Services ATM- Systems A/G-Mediea DL-Services VDL M2 primary datalink System adaptations Mode S Com SATCOM, complementary datalink ACARS INDAL (D-ATIS, D-DCL) 2000 2001 2002 2003 2004 2005 2006 year CPDLC (DCL, CIC- none time critical) ADAP (CAP, SAP) DFIS (D-OTIS, D-SIGMET) FLIPCY Slide 11 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 11 A/G-Link Media DL-Services 2007 2008 2009 2010 2011 2012 year Alternative Media (Selection by 2001) Alternative Media (Selection by 2002) VDL M3 CPDLC(CIC-time critical), ADAP(PPD, ADS), DFIS(D-RVR), others VDL M2 primary link (non-time critical services only) Mode S Com, complementary link SATCOM, complementary link Implementation Scenario Phase 2 (from 2007) Time Critical Services ACARS ATM- Systems System adaptations VDL M4 Slide 12 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 12 Benefits according to implementation phases Slide 13 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 13 Data Link Introduction Do Nothing-Alternative Traffic Growth Cost-Benefit Considerations Requirement driven Capacity Plan EAM 04 P1 Program RVSM VAFORIT 1 Mode S ES Slide 14 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 14 DFS is a contributor to the ongoing Link 2000+ CBA. The objective is to conduct a European-wide analysis. The uncertainty* of early conducted cost estimations with particular focus to DFS was very high. Therefore, the introduction of Data Link Services** could not be justified by economic reasons only. * At the moment of already conducted estimations there were very few reliable sources of monetary information regarding costs and benefits. ** There was no individual investigation particular to singular data link services. Cost-Benefit Consideration still in progress Slide 15 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 15 The cost/ benefit-ratio could not be finally calculated. There are a lot of currently unknown factors in the equation. This leaves the risk, that the figure will not justify the need. The introduction of Air-Ground Data Link Services could not only be justified by a cost/ benefit-analysis. Summary (1) The continued use of today's operational environment will result in further frequency shortages. Future ATM-concepts depend on Air-Ground Data Link Services. Air- Ground data communications is a major component of the ATM Strategy for 2000+. The benefits of Air-Ground Data Link Services were demonstrated in the framework of PHARE and during the PETAL Life Trials. Slide 16 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 16 The migration from ACARS to VDL M2 as the next generation AOC- Data Link media seems to be decided by the Airlines and the Service Providers (SITA/ ARINC). Service Providers already decided on installation and operation of VDL M2 Ground- Infrastructure. Summary (2) Airspace capacity shortages are expected when Data Link Services are not introduced before 2006. DFS customers are requesting Data Link Services today, in order to receive enhanced and improved overall quality of ATC Services. Slide 17 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 17 There is a strategic requirement to introduce Air- Ground Data Link services within DFS controlled airspace. Conclusions (1) Data Link Services Therefore DFS introduces Air-Ground Data Link Services in a phased approach: Phase 0(starting 1999): Initial Data Link Applications (Result of the Projects INDAL- DATIS and -DDCL) Phase 1(starting 2005): non- time critical Data Link Services depending on operational requirements: Phase 2(starting 2007): time critical Data Link Services Slide 18 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 18 Data Link Services (main categories only) Conclusions (2) Data Link Services Phase 1 (starting 2005): non- time critical Services CPDLC (DCL, CIC- non time critical) ADAP (CAP, SAP) D-FIS (D-OTIS, D-SIGMET) other Services (e.g. FLIPCY) additional Phase 2 Services (optional starting 2007): time critical Services CPDLC (CIC-time critical) ADAP (PPD, ADS) D-FIS (D-RVR) other Services. Slide 19 Air-Ground Data Link - DFS Strategy 23-Sep-99Chart 19 Non- time critical ATS Data Link- messages will use VDL M2 (medium timeframe, starting 2005) Conclusion (3) Air-Ground Data Link Media The need for and the type of a complementary Data- Link Media (in addition to VDL M2) needs to be investigated and decided till 2001. In the light of the DFS- decision on Mode S Enhanced Surveillance, SSR Mode S communications will get special attention. The operational requirement for the use of time critical ATS- Data Link- messages - and if so the type of the media - needs to be defined till 2002.