Air-Cooled Chillers Efficiency, Affordability and Life Cycle
Cost Advantages for Healthcare

Air-Cooled Chillers Efficiency, Affordability and Life Cycle Cost Advantages for Healthcare
“This isn't your Father’s
air-cooled chiller”
Presented by: David N. Schurk DES., CEM., LEED-AP., CDSM., CWEP., SFP., CIAQM., HCCC., National Healthcare Strategic Account Manager, Carrier Corporation

Air-Cooled Chillers Heating/Piping/Air-Conditioning
Engineering Magazine May, 2014 (with 2017 update)
100,000 ft(2) 385-Tons

Air-Cooled Chillers What's Changed?
Chillers Full Load IPLV Improvements
Past 9.75EER 1.23kW/Ton
12.24EER 0.98kW/Ton
+13% Full Load
Todays A/C Chillers
+11 EER 1.09kW/Ton
+21 EER 0.57kW/Ton
+42% Part Load
1970 Z-28 Camaro 2018 Dodge Challenger SRT
“More miles
per-gallon ”

Air-Cooled Chillers What's Changed?

Air-Cooled Chillers
Compression Technology
Screw Compressor Reciprocating Compressor
What's Changed?
“Leaner & meaner
engine”
Scroll Compressor

Air-Cooled Chillers
Compressor VFD Fan VFD
What's Changed?

Air-Cooled Chillers
Low-Noise Aeroacoustic Condenser Fan Traditional Condenser Fan
What's Changed?
Aerodynamics Technology
Same air flow through condenser coils at 25% lower speed 850 vs. 1140 rpm
Slower speed means better reliability Increased motor and bearing life
Cycle time (25% less) Bearing Loads (45% less)
.75 3 = 42%hp
“Its all about the clean lines”

Air-Cooled Chillers
Heat Exchange Technology
Microchannel Copper Tube/Alum Fin
What's Changed?
“More bang for the buck”

Air-Cooled Chillers
Refrigerant Economizer
What's Changed? “Turbo-charged
Compression”

Air-Cooled Chillers
BAS Interface & Energy Management
What's Changed?
“Easier- handling around
the curves”

Air-Cooled Chillers The Life-Cycle Story
Many small to medium chiller plants use air cooled chillers with air-cooled screw chillers being common in the 165 to 565-ton range.
Positive displacement compression, no surge Avoid cooling towers Avoid condenser pumps & piping Avoid water costs Avoid chemical costs In a natural disaster there are no water issues Avoid high maintenance costs Saves mechanical room space Very good FL, ILPV & NPLVs Easier to control (no bypass) and operate (no
tower freezing) in cold climates Excellent choice for applications where
maintenance may be lacking Compressor work tracks drybulb not wet bulb Lower first cost
*Tip: Air cooled chillers do not require mechanical room space. To estimate the savings use $50/ft².

Air-Cooled Chillers The Life-Cycle Story
Design Performance rated at AHRI Condenser Relief: Traditional C.S Centrifugal
Evap Cond
Capacity
(ton)
Input
(kW)
Performance
(kW/ton)
RLA
(A)
NPLV
(kW/ton)
75% Load
(kW/ton)
50% Load
(kW/ton)
25 % Load
(kW/ton)
EWT
(°F)
LWT
(°F)
385.4 211.0 0.554 296 0.524 0.491 0.519 0.696 53.9 94.0
Traditional Constant-Speed (CS) WC centrifugal
Design Performance rated at AHRI Condenser Relief: Traditional VFD Centrifugal
Evap Cond
Capacity
(ton)
Input
(kW)
Performance
(kW/ton)
RLA
(A)
IPLV
(kW/ton)
75% Load
(kW/ton)
50% Load
(kW/ton)
25 % Load
(kW/ton)
EWT
(°F)
LWT
(°F)
385.4 223.4 0.580 312 0.377 0.427 0.330 0.418 54.0 94.1
Traditional Variable-Speed (VFD) WC centrifugal
“Hybrid” Variable-Speed (VFD) WC chiller Design Performance rated at AHRI Condenser Relief: “Hybrid” VFD Centrifugal
Operating Evap Cond
Capacity
(ton)
Input
(kW)
Performance
(kW/ton)
RLA
(A)
IPLV
(kW/ton)
75% Load
(kW/ton)
50% Load
(kW/ton)
25 % Load
(kW/ton)
EWT
(°F)
EWT
(°F)
385.4 230.8 0.599 314 0.329 0.424 0.287 0.259 54.0 94.3

Air-Cooled Chillers The Life-Cycle Story
Chiller Type
NPLV kW/Ton
Past A/C 0.980
Todays A/C 0.625
CS WC Centrifugal
0.587
VFD WC Centrifugal
0.480
“Hybrid” VFD WC Chiller
0.405
Chiller-only “Efficiency” Comparison
Full load tons = 385 W.C. includes tower fan & condenser pump energy cost
#1
#2
#3
#4
#5
Tower & Pump FL = 0.08kW/ton Tower & Pump PL = 0.06kW/ton

Air-Cooled Chillers The Life-Cycle Story
Chiller Type
NPLV kW/Ton
Chiller Op-Cost
$/yr
Op-Cost Improvement
%
Past A/C 0.980 $158,916 BASE
Todays A/C 0.625 $102,485 +35.6%
CS WC Centrifugal
0.587 $89,659 +43.6%
VFD WC Centrifugal
0.480 $75,934 +52.2%
“Hybrid” VDF WC
Chiller
0.405 $66,683 +58.0%
Chiller-only “Op-Cost”
Comparison
Full load tons = 385 Electrical rate = $0.08/kWh
W.C. includes tower fan & condenser pump energy cost
#1
#2
#3
#4
#5
Tower & Pump FL = 0.08kW/ton Tower & Pump PL = 0.06kW/ton

Air-Cooled Chillers The Life-Cycle Story
Utility rates have been increasing higher than inflation and GDP growth.

Air-Cooled Chillers The Life-Cycle Story
City of Houston Water Rates

Air-Cooled Chillers The Life-Cycle Story
A) HVAC Water Chillers & Cooling Towers: Fundamentals, Application & Operation, Herbert W. Stanford, Stanford White Associates, Consulting Engineers.
Total make-up water includes: • Evaporation • Drift • Blowdown…….0.0145/gpm (A)
Houston city water rates = $3.74/1000 gal
Total cost of water: $19,097 / year
FL GPM % Load % Run Time Hour/Year Gal/Yr
16.75 100% 1.00% 8760 88038
16.75 75% 42.00% 8760 2773197
16.75 50% 45.00% 8760 1980855
16.75 25% 12.00% 8760 264114
GAL/YR 5106204
385 Tons X 3 gpm/ton = 1155 gpm X .0145 = 16.75gpm
Tower Water Consumption 8-10 CC
Cooling Tower Make-up Water
Does NOT include sewer charges or additional maintenance associated with total cost of tower ownership
Chemical treatment cost = $3.00/1000 gallons
Total cost of chemicals: = $15,312 / year
Total cost of water & Chemicals: $34,409 / year

Air-Cooled Chillers The Life-Cycle Story
Chiller Type
NPLV kW/ton
Energy Cost $/yr
Water/ Chemicals $
Op-Cost $/yr
Op-Cost Improvement
Past A/C 0.980 $158,916 $NA $158,916 BASE
Todays A/C 0.625 $102,485 $NA $102,485 +35.6%
CS WC Centrifugal
0.587 $89,659 $34,409 $124,068 +21.9%
VFD WC Centrifugal
0.480 $75,934 $34,409 $110,343 +30.5%
“Hybrid” VFD WC Chiller
0.405 $66,683 $34,409 $101,092 +36.4%
Full Load Tons = 385.4 Electrical Rate = $0.08/kWh
#1
#3
#4
#2
#5
Chiller, tower, condenser pump, water & chemical op-cost comparison
Chiller “System” Op-Cost

Air-Cooled Chillers The Life-Cycle Story
Individual Item Contractor Sell Price
Todays Air-Cooled Chiller $227,487 ($591/ton)
Traditional CS WC Centrifugal Chiller $174,142 ($452/ton)
Traditional VFD WC Centrifugal Chiller $199,920 ($519/ton)
“Hybrid” VFD WC Chiller $244,174 ($634/ton)
Cooling Tower $40,000 ($103/ton)
Condenser Pump $3500
Condenser Piping $21,000
Water Treatment Equipment $4400
Additional Controls $4000
Refrigerant Monitor/Ventilation $4600
Mechanical Room Space $15,000
Total Tower/Pump Add $92,400 ($240/ton)
Chiller “Cost”
(Less Installation)
#4
#3
#2
#1
Add

Air-Cooled Chillers The Life-Cycle Story
Item Contractor Sell Price % Premium
Todays Air-Cooled Chiller $227,487 ($591/ton) Base Price
Traditional CS WC Cent Chiller + Tower
$266,542 ($692/ton) +17%
Traditional VFD WC Cent Chiller + Tower
$292,320 ($759/ton) +28%
“Hybrid” VFD WC Chiller Chiller + Tower
$336,574 ($874/ton) +47%
Note: Installation & Labor NOT Included
#1
#2
#3
#4
First Cost Only Important:
Nothing we’ve looked at so far tells the whole story…..
Equipment “Cost”
Less Installation

Air-Cooled Chillers The Life-Cycle Story
Item Contractor Sell $
15-Year Op-Cost $
Total LCC $
Best Lifetime Cost of Ownership
Todays Air-Cooled
Chiller
$227,487 $1,772,316 $1,999,803 BASE
CS WC Centrifugal
Chiller
$266,542 $2,412,102 $2,678,644 +$678,841
VFD WC Centrifugal
Chiller
$292,320 $2,200,528 $2,492,848 +$493,045
“Hybrid” VFD WC Chiller
$336,547 $1,748,226 $2,084,773 +$84,970
15-year savings include 2% per year utility escalation rate Op-cost does not include maintenance or upkeep
#1
#2
#3
#4
First Cost + Energy Cost

Air-Cooled Chillers The Life-Cycle Story
Item Op-Cost First-Cost Cost to Own
Todays Air-Cooled Chiller
#2 #1 #1
CS WC Centrifugal Chiller
#4 #2 #4
VFD WC Centrifugal Chiller
#3 #3 #3
“Hybrid” VFD WC Chiller
#1 #4 #2
Life-Cycle Cost Does not include maintenance or upkeep

Air-Cooled Chillers The Life-Cycle Story
• “Screw chillers usually require less maintenance than centrifugal chillers…”
• “Water-cooled systems always cost more to maintain due to the constant water treatment requirements and the need for regular tube cleaning… but generally last longer”.
• “…a reasonable estimate of the annual maintenance cost savings is $1000 to $2000 per year for the first 5-10 years (plus the cost of cooling tower maintenance, water and chemicals”.
*ASHRAE Fundamentals of Design and Control of Central Chilled-Water Plants, Steven T. Taylor, PE
Maintenance AC vs. WC

Air-Cooled Chillers The Life-Cycle Story