Page 1: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically

AH

ME

DA

BA

D

S.P.Ring Road

Sarkhej-Gandhinagar Hwy

NH-8A

N

WE

S

Pro

jec

t Site

Page 2: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 3: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 4: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 5: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 6: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 7: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 8: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 9: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 10: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 11: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 12: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 13: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 14: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 15: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 16: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 17: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 18: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 19: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 20: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 21: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 22: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 23: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 24: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 25: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 26: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 27: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 28: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 29: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 30: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 31: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 32: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 33: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 34: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically
Page 35: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically

Vra

j Villa

Bu

ng

low

Va

nsh

ree

Bu

ng

low

Pu

sh

pB

un

glo

w

Vik

ram

na

ga

r

Ma

ruti

Ce

led

ron

Ko

tak

Ho

use

Se

a P

arl

Ap

pa

rtme

nt

Ash

ok

Vatik

aB

un

glo

w

Isc

on

Ma

ll

Ra

jpa

thS

oc

iety

Ash

ok

Vatik

a

La

nd

ma

rkH

ote

l

Ma

ule

sh

wa

rF

arm

Ch

an

dra

S

an

idh

ya

Ho

usin

g C

olo

ny

Arc

hit

Bu

ng

low

Aa

dira

jB

un

glo

w

Ch

iripal

Bu

ng

low

Ja

intila

lP

ark

Sh

asw

at

Sa

nk

alp

Gra

ce

-2

Aa

rnav

Bu

ng

low

Sp

ring

Ve

lly

Ga

llop

sM

all

Isc

on

Te

mp

le

Sh

iva

likS

hilp

Esse

mH

ouse

Ch

ok

hi

Dh

an

i

Ra

md

evn

aga

r

Am

bli R

oad

Sarkhej-Gandhinagar Hwy

PR

OJ

EC

T S

ITE

N

WE

S

Page 36: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically

1

CO

LOU

R N

OTE:-

BLO

CK

:-A+B

AREA TABLE :-

R.C.C. COLUMN FOOTING SECTION

L X B

AS PER STRUCTURAL DESIGN

B.B.C.C

DE PTH UP TO GOOD SOIL

GR.LVL.

(1) HYDRANT SYSTEM :ON/OFF SW

ITCHES LOCATED NEAR THE HOSE REEL HOSE OR HYDRANT OUTLET, AT EACH FLOOR FOR THE MAINFIRE-PUMP AT UNDERGROUND W

ATER TANK WITH A CAPACITY TO DISCHARGE 900 LITERS PER MINUTE AT 3 BAR

PRESSURE AS MEASURED AT THE TERRACE LEVEL SHOULD BE INSTALLED.

THE RISER FOR THE BUILDINGS EXCEEDING 18 MITERS HEIGHT SHOULD NOT BE OF LESS THAN 100 MM.INTERNAL DIAM

ETER. THE RISER SHOULD BE CONNECTED TO THE BOTTOM OF THE TERRACE TANK WITH A STOP

VALVE AND A NRV TO ACT A DOWN-COM

ER. ONE RISER IS REQUIRED FOR EVERY 1000 SQ. METERS FLOORAREA AND IF THE BUILDING IS DIVIDED INTO, TW

O OR MORE PARTS THEN EACH PART SHOULD HAVE ASEPARATE RISER W

ITH ALL THE FITTINGS AT EACH FLOOR LEVEL. EACH FLOOR SHOULD HAVE ONE HYDRANT OUTLET W

ITH A COUPLING FOR ATTACHING A 63 MM. DIA . HOSE .25 MM

. BORE HOSE- REEL HOSE WITH 8 MM

. SHUT- OFF NOZZLE AT EACH FLOOR LANDING. THE LENGTH OF THEHOSE SHOULD BE ENOUGH TO REACH THE FARTHEST CORNER OR THE FLOOR. HOSE-BOX W

ITH 15 METERSLONG 63 M

M. DIA. HOSE AND 12.5 MM. BORE NOZZLE AT ALTERNATE FLOORS. THE HOSE-REEL HOSE SHOULD BE

COUPLED TO THE RISER. FIRE - SERVICE INLET SHOULD BE INSTALLED AT A POINT NEAR THE ENTRY TO THE PERMISES W

HERE AFIRE SERVICE VEHICLE CAN APPROACH EASILY. A PERMANENT HYDRANT POINT COM

PRISING OF 63 MM DIA SIZE 2 NOS OF HYDRANT VALVES SHOULD BE

INSTALLED AT THE TERRACE LEVEL. OVERHEAD TANK REFILLING BYPASS CONNECTION SHOULD BE DONE AT THE TERRACE LEVEL. THE OVERHEAD TANK SHALL BE OF A CAPACITY OF NOT LESS THAN 20,000 LITERS. THE UNDERGROUNDTANK SHALL BE OF NOT LESS THAN 1,00,000 LITERS.(2) FIRE LIFT : THE FIRE-LIFT AND ALL LIFTS SHOULD HAVE A PROVISION TO GROUND TO AUTOMATICALLY IN CASE OFELECTRICITY FAILURE . EACH BUILDING SHOULD HAVE AT LEAST ONE LIFT AS A FIRE -LIFT AND IF THE BUILDINGIS DIVIDED INTO A M

ORE PARTS THEN EACH PART SHOULD HAVE A FIRE-LIFT. LIFT-WELL SHOULD HAVE

BLOWERS TO PRESSURIZE THE LIFT -W

ELL SO CONNECTED THAT IT WILL AUTOMATICALLY OPERATE W

HENALARM

CALL POINT IS OPERATE, SO THAT IF PREVENTS THE LIFT WELL GETTING SMOKE LOGGED.

(3)FIRE ALARM:

FIRE ALARM CALL POINT TO BE INSTALLED AT EACH FLOOR W

ITH SOUNDERS CAPABLE OF BEING HEARD ALLTHROUGHOUT THE BUILDING .(4)

FIRE EXTINGUISHERS : ONE CARBON DIOXIDE (CO

2 ) TYPE EXTINGUISHER OF 4.5 KG. WITH ISI M

ARK. AND ONE EXTINGUISHER OF 5 KG.DRY CHEMICAL POW

DER (DCP) TYPE EXTINGUISHER WITH ISI MARK TO INSTALLED ON EACH FLOOR IN CASE OF

COMMERCIAL BUILDING .

ONE CARBON DIOXIDE (CO2 ) TYPE EXTINGUISHER OF 4.5 KG. W

ITH ISI MARK. OR TW

O CARBON DIOXIDE (CO2 )

TYPE EXTINGUISHER OF 2 KG. CAPACITY ON EACH FLOOR AND 5 KG. DRY CHEMICAL POWDER (DCP) W

ITH ISIM

ARK TYPE EXTINGUISHER ON ALTERNATE FLOOR IN CASE OF RESIDENTIAL BUILDINGS. IF THE BUILDING IS DIVIDED INTO TW

O OR MORE PARTS THEN EACH PART SHOULD HAVE THESE

EXTINGUISHERS INSTALLED.

(5)STAIRCASE :

THE STAIRCASE HAS TO BE OPEN FROM AT LEAST ONE OR TW

O SIDES BUT IF THE STAIRCASE IS IN THECENTRE CORE OF THE BUILDING IT HAS TO BE PRESSURIZED TO PREVENT IT FROM

GETTING SMOKE LOGGED. THE RISER / DOW

N - COMER SHOULD BE LOCATED IN THE STAIRCASE OR CLOSE TO IN TO MAKE IT EASILY

APPROACHABLE IN CASE OF FIRE FROM THE FLOOR BELOW

OR ABOVE.

(6)BASEM

ENT : THE BASEMENT OF 200 SQ. METERS OR MORE SHOULD BE PROTECTED W

ITH AUTOMATIC SPRINKLER SYSTEM

WITH AT LEAST ONE SPRINKLE HEAD FOR ACTUAL CAR PARKING SPACE .

ADDITIONALLY BE PROTECTED BY A HYDRANT OUTLET AND TWO 25 MM

.BORE HOSE- REEL HOSES WITH 8MM .

BORE NOZZLES AT EACH BASEMENT LEVEL.

(7)LIGHTENING ARRESTER :

A LIGHTENING ARRESTER SHOULD ALSO BE INSTALLED AND BE PROPERLY EARTHED TO PREVENT DAMAGE TOTHE BUILDING W

HEN THE LIGHTENING STRIKES.(8)

PHOTO LUMINESCENT ( AUTO GLOW

) SIGNAGE'S:IF THE BUILDING FALLS IN A CONFINED AREA OR IF IT HAS AN ENCLOSED STAIRCASE OR IS NOT W

ELL LIT-UP ONTHE INSIDE, THEN ADEQUATE PHOTO LUM

INESCENT ( AUTO GLOW ) SIGNAGE'S SHOULD BE DISPLAYED AT EACH

FLOOR / LANDING / PATHWY / DEAD-END AND ALONG ALL EXIT ROUTES LANDING TO THE GROUND LEVEL. THE

SIGNAGE SHOULD INDICATE FIRE FIGHTING, FIRE SAFETY, FIRST-AID AND OTHER SAFETY EQUIPEMENT PRESENTON THE RESPECTIVE FLOOR / LANDING / PATHW

AY / DEAD - END AND ALONG ALL EXIT ROUTES LEADING TO THEGROUND LEVEL.(9)

ELECTRIC POWER SUPPLY TO THE ENTIRE FIRE - SAFETY SYSTEM

ELECTRICITY SUPPLY TO THE FIRE PUMP, FIRE ALARM SYSTEM, STAIRCASE PRESSURIZATION SYSTEM AND FIRE

LIFT SHOULD BE MADE AVAILABLE FROM THE MAIN ELECTRICAL SUPPLY. ( I.E. FROM ELECTRICAL POWER

SUPPLY OF THE COMPANY ) THIS IS TO ENSURE AVAILABILITY OF POW

ER SUPPLY TO THE FIRE PROTECTION &SAFETY SYSTEM

EVEN AFTER THE MAIN ELECTRICAL SUPPLY TO THE BUILDING IS SWITCHED OFF THE TIME OF

FIRE.(10)

IMPORTANT INSTRUCTIONS :AFTER INSPECTION OF A LOW

-RISE BUILDING BY THE FIRE SERVICES AUTHORITY , IF THE FIRE OFFICERCONCERNED FEELS THE NEED FOR ADDITIONAL FIRE PREVENTION / PROTECTION / VENTILATION SYSTEMREQUIRED OR EQUIPEM

ENT ( I.E. PASSIVE SYSTEM / SPRIKLER / DRENCHER ETC. ) AS PER FIRE LOAD / FIRE RISK/ PUBLIC GETHERING. POTENTIAL / OCCUPANCY / CONFINED AREA, THOSE ADDITIONAL MEASURES /EQUIPEM

ENT HAVE TO BE IMPLEMENTED / INSTALLED.

D = UP TO UNDER GROUND II ND RIVER(AQUIFER)

PER

CO

LATIO

N W

ELL

G.L.

PE

RFO

RA

TED R.C.C.

SLAB

10.00 M. G.L.

200 MM

DIA. STA

INER

PIPE

125 MM

DIA. GRAVEL

PAC

KING

STA

INER

450 MM

DIA. BORE

150 MM

DIA. P.V

.C. PIPE

CA

TCH

PIT W

ITHFILTR

ATIO

N MEDIA

SIZE-2.00 X

2.00 X 2.50

AIR

VENT

FOR

BUILD

ING

UNIT 1500.00 S

Q. M

T. OR

MO

RE AN

D UP TO

4000.00 SQ. M

T. AND

PART TH

ERE O

F IT.

DR

AIN

AG

E SEC

TION

STA

IR D

ETAILS:-

SC

HE

DU

LE OF O

PENIN

G

BU

ILT UP A

REA

TABLE

SITE PLAN

40.00M WIDE T.P.S. ROAD

9.00M WIDE T.P.S. ROAD

9.00

M W

IDE

T.P.

S. R

OAD

20.65M.

6.93M.

6.93M.74.61M.

95.51M.

22.41

M.

6.22M.

6.22

M.

ADJ. F.P. NO: 64 / 4

51.677.50M WIDE APROCH ROADLENGTH = 51.67 M.

29.75

13.83

22.416.00

6.00

8.97

8.52

8.52

8.52

8.52

8.52

8.52

8.52

8.97

9.02

9.00

8.75

8.00

8.00

8.75

4.50M WIDE OPEN SPACE

FOR PUBLIC DOMAIN

13.0111.68

2.1532

.81

6.40

12.54

SPACE FOR D TO DPICK UP

5.50

11.58

10.86

6.12

5.04 10.38

5.50

11.58

PLAN SH

OW

ING

PRO

POSED

RESID

ENTIAL BU

ILDIN

G O

N

SUR

. NO

: 378/4, ( OLD

SUR

. NO

:1051+1055 / 5 - VEJALPUR

)

DR

AFT T.P.S. NO

: 51 - ( BOD

AKDEV - M

AKRBA - VEJALPU

R )

O.P. N

O: 64 / 5, F.P. N

O: 64 / 5, TAL.: VEJALPU

R, D

IST: A,BAD.

MO

JE: JOD

HAPU

R,

4.50

4.50

4.20

4.20

4.20

3.50

4.20

ELE. SUBSTATIO

N

4.18

DNUP

2.05

2.03 2.03.30

DNUP

2.05

2.03.30

5.07M WIDE RAMP (SLOPE=1:7)

TOTAL LENGTH OF RAMP = 26.60M.

RAMP DN

PLATFORM5.90X4.50

PLATFORM5.90X4.50

RAMP DN

4.55M WIDE RAMP (SLOPE=1:7)

TOTAL LENGTH OF RAMP = 26.60M.

13.23

66.76

2.03

Page 37: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically

Annexure 5: Water balance Construction phase:

S. No. Purpose

Water Requirement Wastewater Generation

Quantity (kld) Remarks Quantity

(kld) Remarks

1. Domestic water for labour

6.75

45 lpcd for 150 workers

Arrangement for domestic water requirement will

be met by contractor

5.73 Wastewater will be disposed into septic tank

2. Dust suppression 5 - - Losses

3. Use in

construction, curing etc

10 - - Losses

Total 21.75 5.73 Operation phase:

S. No. Purpose

Water Requirement Wastewater Generation

Quantity (kld) Remarks Quantity (kld) Remarks

1. Domestic water for residential flats 40.5

150 lpcd for 270

Occupants 32.4 @ 80% of water

consumption Discharged into sewer

line 2. Visitors 0.75 @ 15 lpcd

for 50 visitors

0.6

3. Green belt development 1.3

@4.0 lit/Sq. meter of

total green area

(334.33m2)

0

Total 42.55 33

Page 38: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically

Water balance diagram operation phase

Fresh water 42.55kld

Domestic Water requirement

40.5 kld

Horticulture 1.3 kld

To Sewer Line 33 kld

Visitors 0.75 kld

Page 39: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically

Annexure 6: Storm water management Storm Water Drainage System The rainwater will be collected through piped drains and conveyed into rainwater harvesting system for filtration. All storm water drains have been designed for adequate size and slope such that there shall not be any flooding in the site. It shall be ensured that no wastewater shall enter into storm water drainage system. Rainwater Harvesting Plan Adequate rainwater harvesting pits will be provided in the project premises. The rainwater collected from the project area will be conveyed into the rainwater harvesting system consisting of Desilting-cum-Filter Chamber, Oil & Grease Separators and finally shall be conveyed into recharge pits and balance if any will be disposed municipal storm water line. Details of maximum storm water generated Description Area in sq m Maximum rainfall

intensity In m/h

Runoff coefficient

Total storm water In cum/h

Roof area 719.65 0.045 0.8 25.90 Paved area 1698.02 0.045 0.5 38.20 Green area 334.33 0.045 0.2 3.0 Total 2752 67.1 1 No of Percolation Well required Annual recharge of ground water Description Area in sq m Maximum rainfall

intensity In m/Annual

Runoff coefficient

Total storm water In cum/annual

Roof area 719.65 0.762 0.8 438.69 Paved area 1698.02 0.762 0.5 646.94 Green area 334.33 0.762 0.2 50.95 Total 2752 1136.58 Annual recharge of ground water ~ 1000 m3

Page 40: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically

Rain water harvesting scheme

Page 41: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically

Annexure 7: Fire and Safety Proposed building height is 67.5 m from ground level. All fire protection facilities will be designed as per the latest National Building Code given in 2005,

Residential Flats is in Group A, sub Group A-4 Fire Zone No.1 (clause 3.2.2.2)

Following component/item will be provided: Under the clauses (4.18.2, 6.1.2, 6.2.3, 6.3.2, 6.4.3, 6.5.2, 6.5.2.1, 6.5.2.2, 6.5.2.3, 6.5.2.4, 6.5.2.5, 6.6.2, 6.7.2, 6.8.2 and 6.9.2) following are minimum requirements for fire fighting installations.

Fire Extinguishers Hose Reel Wet riser Automatic sprinkler system Manually Operated Electric Fire Alarm System Terrace Tank -10,000 liter (Two Number) Underground Tank -1,50,000 liter (One Number) One electric and one diesel pump of capacity 1620 liter/min and one electric

pump of capacity 180 liter/min at terrace tank level with minimum pressure of 2 kg/cm2 - 900 l/min

Based upon the Occupancy (Clause 4.3, Table 20, NBC):

Residential group Unit Value Occupant load m2/person 12.5

Occupants per unit exit width

Number of occupants Stairways-25 Ramps-50 Doors -75

Travel distance form occupancy

m 30

Page 42: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically

Annexure 8: Environmental Management Plan 1.0 Structure of EMP

Environmental Management Plan (EMP) is the key to ensure a safe and clean environment. The desired results from the environmental mitigation measures proposed in the project may not be obtained without a management plan to assure its proper implementation & function. The EMP envisages the plans for the proper implementation of mitigation measures to reduce the adverse impacts arising out of the project activities. EMP has been prepared addressing the issues like:

• Pollution control/mitigation measures for abatement of the undesirable impacts caused during the

construction and operation stage • Details of management plans (Landscape plan, Solid waste management plan etc.) • Institutional set up identified/recommended for implementation of the EMP • Post project environmental monitoring programme to be undertaken • Expenditures for environmental protection measures and budget for EMP

2.0 Proposed Environmental Mitigation Measures

The major impacts due to different project activities were identified during the EIA study. The mitigation measures proposed for the impacts constitute the part of Environmental Management Plan (EMP). The environmental mitigation measures for construction and operation phases have been given in Table1.

Table 1. Proposed Environmental Mitigation Measures

Area Mitigation Measures Construction Stage: Water quality • Toilet and drinking water facilities for construction workers are provided by the

contractor at the construction site to avoid unhygienic condition at site. Air quality • Dust suppression measures are undertaken such as regular sprinkling of water

around vulnerable areas of the construction site by suitable methods to control fugitive dust during earthwork and construction material handling/ over hauling.

• Properly tuned construction machinery & vehicles in good working condition with low noise & emission are used and engines are turned off when not in use.

Noise level • Protective gears such as ear mufflers etc. are provided to construction personnel exposed to high noise levels.

Solid wastes • Waste construction materials are recycled and excess construction debris are disposed at designated places in tune with the local norms.

Landscape • Appropriate landscape including plantation of evergreen and ornamental flowering trees, palms, shrubs and ground covers at open spaces within the complex will be done, which would serve the dual purpose of controlling fugitive dust and improving the aesthetics of the area.

Safety • Adequate safety measures complying to the occupational safety manuals are adopted to prevent accidents/hazards to the construction workers.

Operation Stage: Water quality • Wastewater will be collected and disposed into municipal line.

One number of rainwater harvesting recharge wells will be developed Air quality • Trained staff will be handle traffic movement

• Regular monitoring of ambient air quality will be carried out as per norms. Solid wastes • Solid wastes will be segregated into organic and inorganic components.

• The recyclable inorganic wastes will be sold to prospective buyers. • The bio-degradable wastes will be disposed near by municipal bins.

Rainwater harvesting

• Adequate rainwater harvesting will be provided

Fire protection • Adequate fire protection facilities will be installed including fire detectors, fire alarm and fire fighting system as per National Building Code of India.

Landscape • Proper maintenance of landscape round the year including replacement of the decayed plants.

Safety • Adequate safety measures complying to the occupational safety manuals to prevent accidents/hazards to the maintenance workers.

Others • The building will be provided with disabled-friendly design, timber-free construction, energy efficient lighting & ventilation, and control of indoor

Page 43: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically

environment.

3.0 Environmental Monitoring Plan

It is imperative that the Project Authority set up regular monitoring stations to assess the quality of the surrounding environment after the commissioning of the project. An environmental monitoring programme is important as it provides useful information and helps to: • Verify the predictions on environmental impacts presented in this study, • Assist in detecting the development of any unwanted environmental situation, and thus, provides

opportunities for adopting appropriate control measures, and • Evaluate the performance and effectiveness of mitigation measures proposed in the EMP and

suggest improvements in management plan, if required, • Satisfy the legal and statutory obligations. The post project monitoring plan including areas, number and location of monitoring stations, frequency of sampling and parameters to be covered is summarized in Table 2. The monitoring will be the responsibility of EMC.

Table 2: Environmental Monitoring Plan Source Monitoring Location Parameters to be

Monitored Frequency

Ambient Air Quality At 3 locations (1 inside the complex and 2 outside in surrounding 1 km zone along predominant wind directions)

PM10, PM2.5, SO2, NOxOnce in a season and as per requirement of SPCB

Ambient Noise At 3 locations (1 inside the complex and 2 outside in surrounding 100 m zone)

Day and night equivalent noise level

Once in a season and as per requirement of SPCB

Stack Stack PM, SO2, NOx, CO Once in a season and as per requirement of SPCB

The post operational monitoring schedule will be under the supervision of the Site Engineer at the project site. Monitoring will be carried out by recognized laboratories.

4.0 Environment Management Cell An Environment Management Cell (EMC) will be responsible for implementation of the post project-monitoring plan for this project. The composition of the Environment Management Cell and responsibilities of its various members are given in Table 3.

Table 3. Environment Management Cell

S. No. Designation Proposed responsibility

1. Chairman of Society Overall responsibility for environment management and decision making for all environmental issues

2. Secretary Hires a Consultant and fulfills all legal Requirements as per MOEF/GPCB/CPCB

3. Supervisor Ensure environmental monitoring as per appropriate procedures

Page 44: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically

5.0 Environmental Budget

A capital cost provision of about Rs. 12.5 lakh has been kept in the project cost towards the environmental protection, control & mitigation measures and implementation of the EMP. The budgetary cost estimate for the EMP is given in Table 4.

Table 4 Environmental Budget

S.

No. Head Approximate

recurring cost per annum (Rs.

in lacs)

Approximate Capital cost (Rs. In lacs)

Basis for cost estimates

1. Air 1.0 2.5 Stack and DG room

2. Solid and hazardous

waste management

2.0 3.0 Provide bins door to door and transportation cost

3. Environment monitoring

3.5 0 The recurring cost would be incurred on hiring of consult-ants and payment of various statutory fees to regulatory

agencies. 4. Rain water 2.0 4.0 Collection system, treatment

and recharge well 5. Green belt 1.0 3.0 -

Total 9.5 12.5

6.0 General Principles in Greenbelt Design Plants grown in such a way so as to function as pollutant sinks are collectively referred as greenbelt. These plants should also provide an aesthetic backdrop for persons using the site and for the surrounding community. General principles in greenbelt design considered for this study are:

Type of pollution (air, noise, water and land pollution) likely from the activities at the site

Semi arid zone and sub-zone where the greenbelt is located (and hence the plant species which can be planted in the area).

Water quantity and quality available in the area

Soil quality in the area

Greenbelt is designed to minimize the predicted levels of the possible air and noise pollutants. While designing the scheme the following facilities are considered:

Site perimeter and approach road

Along the internal roads

In and around the building area

To ensure a permanent green shield around the periphery planting is recommended in two phases.

In the first phase one row of evergreen and fast growing trees (which grows up to 10-15m) with maturity period of around three years shall be planted at 3.0 meter interval along with fast growing ground covers to enhance the water holding capacity, improve the organic content and check the soil erosion.

In the second phase after eighteen months, second row of trees with large leaf surface area with large ever green canopy and longer life span shall be planted at 6.0 meters intervals.

6.1 Greenbelt Design for Site The selection of the trees is based on their phenology (thus road side trees will not have leaf fall during summer and rainy seasons when shade is most needed). Trees with more litter fall have been avoided.

Page 45: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically

The selection criteria of the species are based on pollution mitigation capacity (including particulate matter), large leaf surface area to deep root system and less litter fall. Faster growing trees with lighter canopy will be planted alternatively with relatively slow growing trees with wider canopy. Trees of about 6.0 m heights will be planted at 4.5 m intervals, 2.5 m away from the road curbing as per CPCB guidelines. Trees will be planted along the outer periphery at centerline of road between the set back line and the boundary of the plots. Palms and shrubs will be planted along the roads and around recreational lawns.

6.2 Greenbelt Management It is presumed that the selected plants will be grown as per normal horticultural practice and the authorities responsible for the plantation will make adequate provisions for water and protection of the saplings. A budgetary cost estimate is also prepared for greenbelt development.

Water source Water tankers may also be used at the initial stages of development of the plant.

Irrigation method Water hydrants may be installed at 50 m intervals to irrigate area under shrubs and ground covers.

6.3 Improving Indoor Air Quality The indoor air quality can be improved by any of the following:

Ventilation

Include the use of natural, dilution, local exhaust, or increased ventilation efficiency. The most effective engineering control for prevention of indoor air quality problems is assuring an adequate supply of fresh outdoor air through natural or mechanical ventilation.

When possible, use local exhaust ventilation and enclosure to capture and remove contaminants generated by specific processes. Room air in which contaminants are generated should be discharged directly outdoors rather than recirculated.

Outside air intakes should not be located in close proximity to potential sources of contamination (automobile garages, building exhausts, and roadways).

Work Place Recommendations

Eliminate or control all known and potential sources of microbial contaminants by prompt cleanup and repair of all areas where water collection and leakage has occurred including floors, roofs, drain pans, humidifiers containing reservoirs of stagnant water, air washers etc.

Remove and discard porous organic materials that are contaminated (e.g., damp insulation in ventilation system, ceiling tiles, and carpets).

Clean and disinfect non-porous surfaces where microbial growth has occurred

Maintain indoor air relative humidity below 60%

Adjust intake of outdoor air to avoid contamination from nearby soil, vegetable debris unless air is adequately conditioned.

Isolate, if feasible, areas of renovation, painting, carpet laying, pesticide application, etc., from occupied areas that are not under construction.

Supply adequate ventilation during and after completion of work to assist in diluting the contaminant levels.

Eliminate or reduce contamination of the air supply with cigarette smoke by banning smoking or restricting smoking to designated areas which have their air discharged directly to the outdoor rather than recirculated.

Page 46: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically

6.4 Safety Aspects of the Project The following needs to be implemented:

Fall Protection

The Contractor is required to provide fall protection to employees who are working at heights equal to or greater than 1.8 m. fall protection can be in the form of perimeter protection such as guardrails and toe rails, personal protective equipment (PPE), a safety monitoring system, or a fall protection plan. Activities that require personal fall protection systems include steel erection bolting, riveting, fitting-up and plumbing-up, work over water and some deep excavation work.

On buildings or structures not adaptable to temporary floors, and where scaffolds are not used, safety nets will be installed and maintained whenever the potential fall distance exceeds two storey.

The PPE standard should cover occupational foot, head, hearing, and eye protection.

Foot Protection: If machines or operations present the potential for foot injury, the Contractor must provide foot protection, which is of safe design and construction for the work to be performed. Workers and visitors should not be allowed on a construction site without safety boots.

Head Protection: If head hazards remain after all steps have been taken to control them (safety nets for work at heights, proper housekeeping), the Contractor must provide employees with appropriate head protection.

Noise Protection: Workers should be wearing hearing protection devices (ear plugs, ear muffs, canal caps) that are in good condition whenever they are involved in noisy activities.

Eye Protection: When machines or operations present potential eye injury from physical or chemical elements, the Contractor must select, provide, maintain and required affected employees to use appropriate eye protection. Eye protection (safety glasses and goggles, face shields and welding helmets) must be adequate and reasonably comfortable.

To the greatest extent possible, working surfaces must be kept dry to prevent slips and falls and to reduce the chance of nuisance odors from pooled water.

All equipment and materials should be stored in designated storage areas that are labeled as such.

Ladders and Stairs

The Contractor is required to inspect and maintain all ladders and temporary/portable steps to ensure that they are in good working condition.

Portable ladders used for access to an upper landing surface must extend a minimum of 1.8 m above the landing surface, or where not practical, be provided with grab rails and be secured against movement while in use.

All ladders must be used only on stable and level surfaces unless secured to prevent accidental movement. Ladders must not be used on slippery surfaces unless secured or provided with slip-resistant feet to prevent accidental movement.

The Contractor should provide a ladder (or stairway) at all work points of access where there is a break in elevation of 0.5 m or more.

When there is only one point of access between levels, it must be kept clear to permit free passage by workers. If free passage becomes restricted, a second point of access must be provided and used. At all times, at least one point of access must be kept clear.

All required stairway and ladder fall protection systems must be provided and installed before employees begin work that requires them to use stairways or ladders.

Scaffolds

Access to Scaffolds - access to and between scaffold platforms more than 0.6 m above or below the point of access will be made by portable/attachable ladders or ramps.

Employees must never use makeshift devices, such as boxes and barrels, to increase the scaffold platform working level height.

Page 47: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically

Trenching and Excavation

The area around the trench/excavation would be kept clear of surface encumbrances.

Water should not be allowed to accumulate in the excavation.

Adjacent structures would be shored in accordance with the design documents to prevent collapse.

Guardrails or some other means of protecting people from falling into the trench/excavation would be present.

The trench or excavation would be shored or sloped to prevent cave-ins.

Electrical Safety

If work has to be done near an overhead power line, the line must be de-energized and grounded before work is started.

A licensed electrician would have completed all temporary wiring and electrical installations required for construction activities.

Fuses and circuit breakers would be used to protect motherboards, conductors and equipment.

Extension cords for equipment or as part of a temporary wiring system will not be damaged or compromised in any way and insulation must be of the highest grade.

Anytime electrical equipment is deactivated for repair, or circuits are shut off, the equipment will be locked out and tagged at the point where it can be energized.

Temporary lights may not be suspended by their cords.

The Contractor would provide the necessary safety equipment, supplies and monitoring equipment to their personnel.

Cranes A competent person has been designated to supervise activities that require the use of cranes. Cranes would not be operated near any power lines. All picks would be carefully planned to ensure that the crane adequately hoist the load. The hoisting signals would be posted on the exterior of the crane.

Occupational Noise Exposure

The Contractor should implement engineering controls to reduce noise levels.

The Contractor should provide hearing protection to employees that are exposed to noise levels above the permissible limit.

Welding and Cutting

The Contractor's employees would be trained in hot work procedures.

There should be adequate ventilation to reduce the build up of metal fume.

The hot work operators would use proper personal protective equipment (i.e., welding helmet, burning goggles, face shield, welding gloves, and apron).

There would be a fire extinguisher present at all welding and burning activities.

Extinguishers would also be placed at locations where slag and sparks may fall.

Oxygen and flammable gas bottles are separated by at least 7 m when not in use.

The Contractor would control the release of gases, vapors, fumes, dusts, and mists with engineering controls (e.g., adequate ventilation).

General Guidelines

Signs and symbols would be visible during any construction activity that presents a hazard. Upon completion of such activity, the postings must be removed immediately.

The Contractor would post specific DANGER signs when an immediate hazard exists and specific CAUTION signs when the potential for a hazard exists. EXIT, NOTICE and specific safety signs may also be posted in the work area.

Page 48: AHMEDABAD - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/EC/Additional... · blowers to pressurize the lift -well so connected that it will automatically

Signage for traffic control, including directional signs, is applicable when the Contractor is disrupting traffic along a public way.

Danger signs are posted at all immediate hazards (i.e. Danger: Open Hole).

Caution signs are posted at all potential hazards (i.e. Caution: Construction Area, Caution: Buried Cable).

The floor that is being used as the erection floor must be solidly planked or decked over its entire surface except for access openings.

Every floor, working place and passageway would be kept free from protruding nails, splinters, holes or loose boards.

Combustible scrap and debris (wood, clearing/grubbing material) would be removed from the site daily or should be securely stored in covered containers.

The Contractor would have a spill prevention control and countermeasure plan that limits the risk of releases of oil or hazardous materials to the environment.