ahmed hamdy cv
-
Upload
ahmed-hamdy -
Category
Documents
-
view
224 -
download
0
Transcript of ahmed hamdy cv
AHMED HAMDY HUSSEIN
Al hadad,Bassyon,Gharbia ,Egypt.
+201062428708 - +201204330189
Objective To aspire challenging and dynamic career in Mechanical, Piping, Welding Quality controls Quality assurance, where I can apply and improve my knowledge and experience.
Profile
Skills and Strength
Certifications
More than 6 years of experience as QA/QC Welding & Piping Inspector for projects related to Oil & Gas, Petrochemicals, Water and Steels of esteemed organization like Saudi Aramco ,Enppi , Petroenergy , Petromaint , Tarrad Co. -Good knowledge of Construction, Inspection, Testing, Pre- Commissioning and Commissioning Related to Pipelines/Piping & Static Equipments, Mechanical Structures, Vessels, Tanks etc., for Oil, Gas, Petrochemicals, Water and Steel Industries. - Good knowledge of NDT activities. - Good knowledge in preparation of Hydro test Packages. - Good knowledge in preparation of QCP, ITP, WPS & PQR. - Good knowledge of ASME, API, Saudi Aramco, AWS and other International Stds. - Capable of handling group of Inspectors and Workmen.
- Aramco approval status one as QA_QC Mech'l Welding Inspector
- API653 Certified Tank Inspector(20-Mar-15exam) - API570Certified Piping Inspector(13-Feb-15 exam) - CWI Certificate No.: 12042151 Expiration date :Apr/1/2015 - ASNT Level II in - Visual Test (VT) - Radiographic Test (RT) - Ultrasonic Test(UT) - Liquid Penetration Test (PT) - Magnetic Particles Test (MT)
- Languages : Arabic (Native Language),English(Very
Good) - Operating Systems : Windows XP/7/8 - Software : Microsoft Office(Word, Excel, PowerPoint)
Education
- University : Suez Canal - Faculty : Petroleum and Mining Engineering. - Department : Metallurgy and Material Science - Date of Graduation : Jul-2008
DutiesofQA/QCPosition
- Responsible for all aspects related to Project quality assurance and quality control.
- Completion of necessary documentation to verify the work performed (WPS, WPQ).
- Ensuring that inspection requests are implemented. - Ensuring that all test reports are verified to meet the contract
requirements. - To ensure all materials delivered to site are inspected and conform to
specified requirements. - Issue and administer Non Conformance Reports as necessary and ensure
follow up. - Completion of final quality documentation in a presentable manner in
accordance with the conditions of contract. - Responsible for overseeing / auditing of subcontractor Quality
Management systems.
- Controlling all inspection activities on site (Welding Inspection, Testing the Welders, Dimensional Survey, NDE Operation (VT, RT, PT, MT, UT).
- Check welding equipment, weld preparation, fit up, cleanliness, preheat, interpass cleaning, interpass temperature, PWHT, electrode storage and handling etc
- familiar with international codes, Aramco standards, inspection and testing requirement for pre- welding, in processes welding and post welding activities.
- Carry out the inspections as per approved ITP, check sheets and related procedures.
- Review company specifications, drawings, method statements, QC procedures and inspection test plans. Maintain daily reports and log of daily activities. - Familiar preparation of Weld Map. - Control and verification of electrode storage and distribution. - Regular and timely raised RFI?s to witness and verify technical - Inspection and materials testing as required by ITP?s and IFC Drawings. - Support the Project Management Team and QA/QC Manager.
DutiesOfPipingQC
- Follow pre-fabrication and erection of piping and pipe supports.
- Walking-down of piping systems and punch listing.
- Hydro-testing, pneumatic testing and verifying mechanical completion.
- Pre-commissioning, commissioning and startup of different systems.
- Follow-up implementation of Safety instructions on site.
- Supervision and follow up of the fabrication and maintenance of stationary equipment (vessels, towers, Heat -exchangers, etc.).
- Studying the vendor drawings and preparing drawings for fabrication.
ProfessionalExperience
- Performing necessary modifications on site.
- The pre-commissioning & commissioning of utilities lines.
As Qc Engineer
Client / ETHEDCO Main Contractor / ENPPI&TOYO(JV) Subcontractor / PETROJET Project / EGYPTIAN POLYETHYLENE PROJECT (Dec-2014------present)
PROJECT DESCRIPTION:
- A Polyethylene Plant produces a total capacity of 400,000 T/Y divided into Linear Low Density Polyethylene (LLDPE) and High Density Polyethylene (HDPE) through two trains of 200,000 T/Y each using polymer grade of Ethylene as
feedstock using UNIVATION License
AS QA/QC manager Client / BAPETCO&SHELL Main Contractor / ENPPI Subcontractor / PETROJET Project / ASSIL&KARAM GAS DEVELOPMENT (Sep-2014------present)
As QA/QC welding & piping inspector Client / BAPETCO&SHELL
Main Contractor / ENPPI Subcontractor / PETROJET Project / ASSIL&KARAM GAS DEVELOPMENT (June-2013------Sep-2014)
Project scope:
- Construction of new Karam trunk line duplex st.st(25km) - Construction of new Assil trunk line cs (15km) - Construction of new flow line, Manifolds - Construction of new well heads - Construction of new 5 tanks. - CRP(Co2 Removal Plant erection - Construction of new project yard - Extension for new operation yard - Construction of second condition material yard - Increase the capacity bed project construction camp - Construction of new sewage line to handle the new building and new
RO building - Modularised Amine Plant, including incinerator/hot oil heater –
Global Process Systems - Inlet facilities for Assil & Karam separately, including cooling and
metering - Control Room - Field Auxilary Room (FAR) for control systems and power
distribution - RO unit for Amine Plant with additional capacity for BED3 - Storage tanks (4x) for Amine (2x), Water and Hot oil - Flare systems (HP and LP) and knock-out vessels - Fuel gas systems, drains, firewater system, instrument air
distribution, roads, foundations, etc. - Future space for mercury removal and pre-pre-compression
As QC welding, inspector
(Dec- 2012-----June-2013) Client / SAUDI ARAMCO (KSA) Contractor / R.H.Al-Marri & sons company for contracting Project / Shaybah NGL (pipe line Diam. 36”) at KSA length 637 km
As QA/QC Engineer
(Jan-2012----- Oct-2012) Client / PETROENERGY Contractor / PETROLINES (SPPC (Sudanian Petroleum Pipelines Co). Project / HADIDA BALILA PIPELINE 190 KM 12” pipeline CS X65 and its related facilities
As welding inspector
Alexandria Petroleum Maintenance co.( Petromaint) (May- 2009-----June-2010)
Client
Projects :
PETROBEL - Maintenance & Inspection on Temsah Glycol
Regeneration Units (GR1&GR2) on plot piping (12”)
GUPCO - Fabrication of Well 25,27&44 Pipeline at EL Razzak fields
- Fabrication of Well 12&amriya Pipeline at Abo EL Gharadik fields
Pharaohs Gold Mine
- Fabrication of (7) tanks used for heavy fuel & Diesel tanks
- Fabrication of pipe network (heavy fuel, Diesel,
cooling water, Waste water, Steam, potable water) for tank farm
Petromaint - Fabrication of (5) tanks for Petroshahd
As QA/QC Engineer International Company for Project &contracts (TARRAD CO.) (Aug- 2008--------May- 2009)& (June- 2010------Jan 2012)
Ezz Suez Flat Steel
Water Cooled Duct Line (PIPING) (Roof Panel & Elbow)
Rolling Factory Ezz DK.
- Steel structure supports for Roller Table - Steel structure supports for weighting system
AMOC
- Fabrication of soft water line - Fabrication of VR tank (15000 m3)
Edarra for Urban dev.
- Fabrication of firefighting line
EZZ DK
- Major repair for reformer & recuperator at D.R plant
- CCM cooling beam ,sep. wall, roller tables - Fabrication of compressor network (seal legs
lines, flushing water lines, sensing lines and gas compressor lines…..)
- Fabrication of slurry pipe line (5”) TARRADCOWork shop
- Fabrication of (10) oil tanks capacity 1000 ib - Fabrication of ASHTEK truce app. 100 ton - Fabrication of AMOC piping for tanks drain
Diam. 6” - Fabrication of (7) tanks for GUPCO