WISDOMWISDOMAgenda
Topic Speaker
Wednesday
Coffee and welcome
Project update over last 6 months GDM (general stuff, financials etc)
Workpackage reviews, updates and plans for next 6 months
Workpackage leaders
Dinner
Thursday
WP5 and final demonstrator All
Plans for final annual review in Brussels
AOB – Follow on project?
WISDOMWISDOMWP1 – Project Management
• Project extended until end November 09– Approved by EU 30th April 09– No additional funding– Workpackages and deliverables amended
WISDOMWISDOMNew Workpackage List
No Workpackage title LeadContractorNo
Personmonths
Startmonth
Endmonth
DeliverableNo
WP1 Project Management 1 10 M0 M42 D1.1-1.7
WP2 Definition of photonic firewall architecture 2 9 M0 M6 D2.1- 2.2
WP3 New security algorithm design 5 29 M6 M30 D3.1-3.3
WP4 Optical processing sub-system development 3 56 M6 M34 D4.1-4.5
WP5 Wirespeed photonic firewall security validation 4 21 M27 M41 D5.1-5.3
WP6 Manufacturability, scalability and functionality study 1 12 M0 M42 D6.1-6.3
WP7 Dissemination and exploitation 1 6 M0 M42 D7.1-7.3
TOTAL 143
WISDOMWISDOMWorkpackage Modifications
Workpackage 1: Project Management
Workpackage leader - CIP
No change to workpackage tasks. The deliverable dates have been modified and are detailed in the new deliverable table included later. There is the third year technical and administrative report at M36 as planned, but in addition, there is now an administrative report at M42
WISDOMWISDOMWorkpackage Modifications
Workpackage 4: Optical processing sub-system development
Workpackage leader - UCC
The technical activity in this workpackage is unchanged. The end date for the activity is now M34. This reflects the delay associated with delivery of the integrated optical components.
Workpackage 5: Wirespeed photonic firewall security validation
Workpackage leader - Avanex
Technical activity is unchanged. The workpackage end date has shifted by six months.
WISDOMWISDOMWorkpackage Modifications
Workpackage 6: Manufacturability, scalability and functionality study
Workpackage leader - CIP
Technical activity is unchanged. The workpackage end date has shifted by six months.
Workpackage 7: Dissemination and exploitation
Workpackage leader - CIP
Technical activity is unchanged. The workpackage end date has shifted by six months.
WISDOMWISDOMWorkplan
WISDOMWISDOMDeliverable List
WISDOMWISDOMAvanex
• Avanex (now Oclaro) closing facilities in France and leaving project
• Schedule likely to be end June• As far as the technical activity on WISDOM is concerned
(for the workpackages currently open), Avanex were responsible for:– Development of the electronic control boards to drive the optical
hardware (WP4) – Management of WP5 (Final demonstrator), with their role being
in part providing support for the troubleshooting of the boards – Support on WP6 in terms of manufacturability and scalability – Support on WP7 for exploitation and dissemination.
WISDOMWISDOMProposal for Work
Handover• WP4 contribution
– Complete as the electronic boards have been delivered. – Initial testing both by UCC and CIP. – Ongoing troubleshooting support (part of WP5 activity) will now be compromised.
• The proposal is for UCC and CIP to accelerate the testing and validation of
those boards over the next two weeks and work with Avanex to resolve any technical issues.
• In addition, Avanex have agreed to provide the technical drawings, supplier details, etc to allow partners to work through any remaining issues should they arise, and have further boards made should that be required.
• Management of WP5 will be transferred to CIP as we (with BT) will be setting up the final demonstrator in Ipswich.
• Avanex have already provided contributions to WP6 in terms of the scalability and manufacturability of the electronics. Any further contributions from them on that WP will be provided before the end of June. Avanex will be included on additional publications arising from the use of the electronic boards and results of the final demonstrator.
• The other partners will absorb any additional tasks under WP7.
WISDOMWISDOMManpower CIP BT UCC Avanex FORTH TOTAL
PARTNERS Research/innovation activities
WP2: Definition of photonic firewall architecture
2 2 2 1 2 9
WP3: New security algorithm design
1 9 1 0 18 29
WP4: Optical processing sub-system development
38 0 10 7 1 56
WP5: Wirespeed photonic firewall security validation
3 2 4 6 6 21
WP6: Manufactureability, scaleability and functionality study
5 1 1 4 1 12
WP7: Dissemination and exploitation
2 1 1 1 1 6
Total research/innovation
51 15 19 19 29 133
Consortium management activities
WP1: Project management
6 1 1 1 1 10
Total consortium management
6 1 1 1 1 10
TOTAL ACTIVITIES 57 16 20 20 30 143
WISDOMWISDOMYear 3 Manpower
(so far)
plan spent plan spent plan spent plan spent plan spent plan spent plan spent plan spent
CIP 1.20 0.4 0.4 0.1 5.4 12.25 3 0.5 1.8 0.5 0.8 0.65 12.60 14.4 55.31 49.96
BT 0.33 3.6 0 2 0.4 0.4 6.73 0 17.56 10.18
UCC 0.33 0.1 0.4 0.1 1.4 2 4 0.1 0.4 0 0.4 0.1 6.93 2.4 20.31 14.81Avanex France 0.33 0 1 6 1.4 0.4 9.13 0 20.06 9.28
FORTH 0.33 0.2 7.2 14 0.1 0.1 6 0.4 0.4 0.1 0.4 0.2 14.43 15 30.91 26.614
TOTAL 2.52 0.7 11.6 14.2 7.9 14.35 21 1 4.4 0.6 2.4 0.95 49.82 31.8 144.15 110.844Total from start of project 27.22
WP5Wirespeed Photonic Firewall Validation
WP6 WP7
Total for YearTotal from start
project
Manufacture and Scaleability
Dissemination & ExploitationPartner
WP1 WP3 WP4
Project Management Algorith Design Optical Sub-systems
Data unchanged from Cork meeting – update required for period report this month
WISDOMWISDOMYear 3 External Spend
(so far)
PartnerTotal for period
Total for Project (Actuals
Y1+Y2+Y3)
Total Budget for Project
Actuals Project Budget Actuals Project Budget Actuals Project Budget Actuals Project Budget Actuals Project Budget Project Budget
Totals to date 260,182 28,954 25,224 1,054 315,414 1,327,515 1,911,671Totals for year 2 515,795 28,954 25,224 1,054 315,414
Totals from year 1 320,209 87,961 18,108 623,681Total for project 836,004 1,447,298 116,915 357,988 43,332 89,635 1,054 16,745 939,095 1,327,515 1,911,671
105,782
33,632
0
176,000
0
Personnel Materials Travel & Subsistence Audit Certificates
22,655 554CIP 83,565 519,094 16,171 704,331
BT 172,870 0 15,760 8,865
159,627 5,492
0 5,910 83,269 203,406
500UCC 16,617 187,867 12,783
81,756 12,805
86,188 3,732 22,655
Avanex 193,063 0 1,970 119,482 289,595
FORTH 160,000 374,404 0 14,657 16,000 22,655 2,955 294,199 414,672
2,955 180,134 299,667
2,955 650,431
Data unchanged from Cork meeting – update required for period report this month
WISDOMWISDOMSpend across
categories
Partner
Total for Project (Actuals
Y1+Y2+Y3)
Total Budget for Project
Total to date Project BudgetTotal to
date Project Budget Total to
date Project Budget Total to
date Project Budget Project Budget Project Budget
Totals to date 1,096,186 1,447,298 170,128 357,988 58,330 89,635 2,871 16,745 1,327,515 1,911,671
2,955 294,199 414,672
1,970 119,482 289,595
2,955 180,134 299,667
14,657 23,638 22,655 642FORTH 269,919 374,404 0
81,756 3,924 12,805 0Avanex 100,608 193,063 14,950
86,188 13,225 22,655 1,000UCC 108,942 187,867 56,967
5,910 83,269 203,40615,760 4,052 8,865 0BT 79,217 172,870 0
650,431 704,331CIP 537,500 519,094 98,211 159,627 13,491 22,655 1,229
Personnel Materials Travel & Subsistence Audit Certificates
2,955
WISDOMWISDOMProgress To Date:
DeliverablesDeliverableNo
Deliverable title Delivery date
Nature Disseminationlevel
D7.1 Project presentation M03 P PU
D1.1 Mid-year technical progress report M06 R CO
D2.1 Optical firewall architecture with target specifications for the optical sub-systems
M06 R RE
D2.2 Outline proposals for algorithm design M06 R CO
D7.2 Web site development M06 P PU
D4.1 Optical sub-system boundary conditions M09 R CO
D1.2 First year technical, administrative and future plan report
M12 R CO
D1.2b First year periodic activity report M12 R CO
D3.1 Security Applications Partitioning M12 P CO
D4.2 Hybrid optical circuit layouts M12 R PU
D4.3 Outline operating conditions for optical sub-system firmware
M15 R CO
D1.3 Mid-year technical report M18 R CO
D7.2b Mid-term report on WISDOM exploitation and dissemination plans
M18 R CO
D1.4 Second year technical, administrative and future plan report
M24 R CO
D1.4b Second year periodic activity report M24 R CO
WISDOMWISDOMNext DeliverablesDeliverableNo
Deliverable title Delivery date
Nature Disseminationlevel
D3.2 Identification of simplified Security Algorithms Components
M24 R CO
D6.1 Manufacturability of the complex sub-systems M24 R PU
D3.3 Definition of a Security Application Programming Interface: SAPI
M30 R CO
D4.4 Hybrid Sub-system Devices M36 P PU
D4.5 Control firmware and software for hybrid sub-systems M30 P RE
D1.5 Mid-year technical report M30 R CO
D5.1 Optical Firewall Testbed M30 P CO
D5.2 Firewall response to simulated security attack. M41 R CO
D5.3 Overall performance of the firewall. M41 R PU
D6.2 Optimum location of optical firewall and optical/electronic balance
M41 R RE
D6.3 Scalability of the optical firewall M41 R PU
D1.6 Third year technical and administrative report M36 R CO
D1.7 Final project administrative report M42 R PU
D7.3 Third year report on WISDOM exploitation and dissemination plans
M42 R CO
D7.4 Route to commercialisation and exploitation including activity on raising public participation and awareness
M42 R RE
WISDOMWISDOMNext 6 months
• WP3 & WP4 completing– Electronic controls and firmware will have been delivered – Expect first iteration of hybrid circuits (June)
• WP5 will become primary focus– Need to decide on final demonstrator– Location - CIP?– Available equipment & leasing?
• WP6 – Scaleability in terms of speed (line rate), complexity (number of
gates per device) and rule checking scaleability• WP7
– ECOC09– Further discussions with system companies