Africa Diving Service Presents Performing under pressure

Transcript of Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11....

Page 1: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

Africa Diving Service Presents

Performing under pressure

Page 2: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS a dynamic forward-thinking progressive organization born from the very depth of globalprofessionals in order to deliver the service that is required and expected.Established back in 2010 and still driven by the directors who continue to inject their vision forthe company moving forward. We all know and appreciate that a strong balanced organizationdepends on the quality of their people and at ADS we believe we have some of the best in theindustry, all have firsthand experience whether they be Business, ROV, Survey or diving. All haveserved within those fields and collectively remain one of our best assets .Diving, ROV and Survey IMCA member now registered for operations in the Middle East, Africaand Europe .Members of the International Institute of Risk and Safety Management (IIRSM),NIPEX Registered, ABS, DNV-GL and Lloyds certified, BV ISO 9001:2015, OHSAS 18001:2007certified. We are also an ExxonMobil approved contractor with the new GP standards. Total andChevron approved, we were also approved by the Shell Centre of Excellence Aberdeen. (First everNigerian company to gain this approval)

Page 3: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS are an equal opportunity employer drawing on our global network of contractors to provide the very best in professionalism to our clients.

• Air Diving• NITROX Diving• Saturation Diving • ROV• Survey• NDT Inspection• IRM• Salvage• PMT, Engineering

& CAD facility

Provide the ultimate in subsea Intervention Services and Project Management.

Offices in Africa and the Middle East

Performing under pressure

Page 4: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS have committed resources to perfecting the use of Nitrox Diving techniques providing our clients extended in water duration allowing greater commercial value.

Page 5: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS Personnel have developed expertise within not only Oil &Gas sectors but increasingly within Renewable energy including Offshore Wind and Tidal

Dubai Offices 2020

Page 6: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS Supporting Offshore Renewable Industry• Dedicated Survey Professionals.• ROV Services.• Route Clearance .• Beach Pullin and Construction. • Trenching and Burial• Cable Lay • Offshore Construction Support, Articulated Split

Pipe, Tekmar Installation, Free Span Corrections, Cable Stabilization

Page 7: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS Directors Confirm the Commitment to all components of the HSE/QHSE charter. The safety and quality culture within ADS Ridgely ingrained and will

not be compromised.

Page 8: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS – AIR / NITROX / SAT DIVING & ROV PROJECTS 2012 – PRESENT

Client Scope of work Vessel Period ExxonMobil IRM – SPM Maintenance – Diving, ROV & Survey DP DSV Vinnice July 20 - Ongoing

Amni / Addax – WAV Pipeline location and rectification, pipeline commissioning Jascon 53 February - May 2020

Chevron SPM Piles & Chains installation, 30inch pipleline repair, pipeline pigging and testing Swiber Resolute February 2020

Amni / ADDAX – WAV Construction, riser installation, spool installation and commissioning Jascon 8 February 2020 – Present

Amni / ADDAX – WAV Pipelay support, 12in 600 & 1500 flange tie-ins Jascon 2 January 2020 – Present

ExxonMobil Pre-FEED Survey and riser gaurd installation, Diving, ROV & Survey NSC Glory December 2020

SS7 - ExxonMobil NITROX & ROV - Riser instaltions , 24 inch Spool installations & removals – pressure testing Siem Day June 2019 – Sep 2019

TOTAL - Samsung Egina FPSO Riser Guard Inspection & mooring system repairs Temis MH March 2019 – July 2019

SS7 – ExxonMobil Saturation Support Seven Pelican March 2019 –Aug 2019

TOTAL – Saipem Egina FPSO Installation Normand Maximus August 2018 – March 2019

SS7 - ExxonMobil NITROX & ROV - Pipelay – Riser instaltions , 24 inch Spool installations & removals – pressure testing Antares July 2018 - Aug 2019

TOTAL – Saipem Egina Buoy Installation Normand Maximus July 2018 – Jan 2019

ExxonMobil NITROX, ROV & Survey - Riser Repair / Riser Guard Installation Glory Barge May 2018 – June 2018

ExxonMobil Inspection / Repair / Maintenance – Diving & ROV Surf Supporter DP2 April 2017 – Oct 2018

ExxonMobil Emergency Reaction & Repair – Diving, ROV & Survey (SSM) Vinnice (DP2) Mar 2018 – April 2019

Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL Feb 2018 – Aug 2018

ExxonMobil ERHA CALM Buoy Inspection (FPSO) Deep C Boa Jan 2018 – Feb 2018

Page 9: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

Client Scope of work Vessel Period ExxonMobil 24” Gas Flare line Repair (ASABO) – Diving, ROV & Survey DSV Vinnice (DP2) Nov 2017 – Jan 2018

ExxonMobil Ehra Chain Inspections (Site inspection) - Diving, ROV & Survey DSV Vinnice (DP2) March 2017

ExxonMobil SBM Installation - Diving & ROV Surf Supporter (DP2) Feb - March 2017

ExxonMobil / WAV 42” Repair – PCRT / DWS / SMART-Flange / 4 x Spools / Mattresses - UXO Jascon 8 Barge Nov 2016 / Jan 2017

ExxonMobil 24” Repair – PCRT / DWS / SMART / Spools – Diving, ROV & Survey Glory Barge Oct 2016 – Feb 2017

ExxonMobil 36” repair – PCRT / DWS / SMART-Flange / Spools – Diving & ROV Surf Supporter DP2 Aug 2016 – Nov 2016

ExxonMobil Inspection / Repair / Maintenance – Diving & ROV Surf Supporter (DP2) April 2016 – August 2016

WAV – STG - Chevron Jacket Installation – surveys - SONAM Jascon 25 – DP3 / 8 point mooring Feb – May 2016

WAV – STG - Chevron Pipelay – flushing and testing – pigging Jascon 30 – DP3 Dec – April 2016

BOGL - ExxonMobil Inspection / Repair / Maintenance for the FMS group – Diving & ROV Avianna (DP2) Oct 2015 – May 2016

SS7 - ExxonMobil NITROX – PUPP – 24inch Riser replacement and Spools installation Antares Aug – Oct 2014

ExxonMobil Inspection / Repair / Maintenance for the FMS group – Diving & ROV Maridive 232 (DP2) April 2014 -2015

SS7 - ExxonMobil NITROX & ROV - Testing – frame installation Antares April 2014

WAV – STG - Chevron Jacket Installation Jascon 25 Dec 2013 - May 2014

SS7 - ExxonMobil NITROX - 24 inch Spool installations & removals – pressure testing Viking Forcados Jascon 28 – DP2 Nov 2013 - Feb 2014

SS7 - ExxonMobil NITROX - 24 & 10 inch Spool installations & removals – SMART-flange PM Salem Dec 2013 - March 2014

WAV – STG - Chevron NITROX - SBM installation – Spool installation – mattresses – testing – flange protectors – NITROX and AIR diving Jascon 55 – DP2 Sept 2013 - March 2014

WAV – STG - Chevron Commisioning of 24inch pipeline (L90) Jascon 8 Sept 2013 - Nov 2014

ADS – AIR / NITROX / SAT DIVING & ROV PROJECTS 2012 – PRESENT

Page 10: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

Client Scope of work Vessel Period WAV – STG - Chevron Pipelay – flushing and testing – pigging - matresses Jascon 30 – DP3 Aug 2013 - Oct 2013

SS7 - ExxonMobil Riser and conductor guard installations – riser surveys SS7 Inagha July 2013 - Sept 2014

SS7 - ExxonMobil Riser and conductor guard installations – riser surveys Antares May 2013 - July 2014

WAV – STG - NPDC ROV – survey and touch down monitoring Jascon 23 April 2013 - July 2013

WAV – STG - NPDC Saturation diving & ROV – pipelay / pipe repair Lewek Toucan May 2013 - July 2013

WAV – STG - Chevron Shallow water trenching & survey Rosanna / Jascon 8 Feb 2013 - April 2014

WAV – STG - Chevron 24 inch pipelay Jascon 30 March 2013 - May 2013

WAV - STG - Chevron Shallow 24’’ pipelay – pipeline repair – excavation of pipe Jascon 2 Jan 2013 - July 2013

WAV - STG - Chevron Shallow water 24 inch pipeline trenching Jascon 8 Rosanna Nov 2012 - Jan 2013

Fugro Mattress installation, pipeline repair. Jascon 8 Mar 2012 - May 2012

ADS – AIR / NITROX / SAT DIVING & ROV PROJECTS 2012 – PRESENT

Page 11: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

DUBAI OFFICE

Fully Operational Office for Project Management and Engineering

Page 12: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS BASE

Operational from December 2014

Page 13: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

INTTERACTIVE CLASSROOM FACILITY

ADS Compound has a fully function air

conditioned classroom facility with Interactive

E-Board and bathroom facilities.

Courses have been carried out on site by KB

Associates and also online.

Page 14: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS OPERATIONS02 CLEAN-ROOM

02 Clean Room fitted with

• 2 x 10L UV Baths with heatand time control for theBIOX solution

• Light magnifier• UV & normal wall and

ceiling lights• SS tables, shelves and sink

with wash head• O2 cleaning procedure• AC & Extractor fans

Page 15: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS DESIGNED NITROX CONTAINER

Due to the unparalleled success ADS has experienced using Nitrogen Enriched Air Mixes (NITROX) on both theSS7 / Globestar7 ExxonMobil Trunk Project and for WAV on the EGP3A Project ADS commissioned theconstruction of a custom 20ft Nitrox container by SMP in the UK. Unit is now in the UAE

This will offer the following project critical advantages:

• Ease of Mobilisation – One 20ft Container will allow plug and play NITROX gas mixes to be run to ADS divecontrol containers.

• NITROX Production On-board the Vessel - The NITROX Membrane system built into the container systemsallows us to produce our own nitrogen on site thereby eliminating the need for bulky pre-mixed gas quads tobe sent offshore. The saving to the client in logistics and transportation is immense and gas mixes can betailored to suit project requirements in situ.

• ADS also now has 4 x ABS Classed Air / NITROX Spreads, that can produce their own NITROX offshorewith testing capabilities

Page 16: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS NITROX CAPABILITIESADS CUSTOM NITROX CONTAINER BY SMP

Page 17: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS AIR / NITROX SYSTEMSFOUR AVAILABLE (LATEST VERSION BELOW)

Design of the ABS Classed systems were by ADS and Unique combining the input from the end user andthe engineering of the suppliers. Redesign of the panel was carried out – 10ft DNV containers with theAir and NITROX racks hard plumbed – each system carries both and can easily change from Air toNITROX as is required on the job. Designed to give the client maximum efficiency and made for approvalfor ExxonMobil, Shell and Total.

Page 18: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS EQUIPMENTADS OWNED TOOLING

• IMCA Air / NITROX Dive spreads x 6 (4 x ABS classed all IMCA)

• 3 x NITROX Blenders

• 4 x ROV with 10ft Control Room and LARS for each

• Double Basket LARS x 3

• Single Basket LARS x 7

• SRP x 5

• Rhino 590 workboats x 3

• Rhino 900 workboat twin inboards x 1

• Rhino 750 - twin outboard x 1

• Boltight / Hydra-tight tensioning Equipment x 2

• WACHS cold cutting saw

• Flange Pullers x 2

• Flange Splitters x 4

• Flange misalignment tool x 3

• Nut splitters x 2

• Various hydraulic tools from, impact, saw, grinders etc.

• NDT Equipment – CP, UT, FMD, MPI, ACFM

• HP Water-jet

• Cavi-Blaster x 2

• Pipe Handling Frame

• 5T DMA’s x 8

Lots more various tools for subsea intervention

Page 19: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

WAREHOUSE

Page 20: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS Diving – 42-inch Repair

42” Completed 1st

week of Feb 2017

Page 21: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS DIVING CONSTRUCTION PROJECTS WHAT WE DO

Page 22: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS Diving 2018 – FPSO Installation – ADS Carried out all Installation Diving for Samsung / Saipem / Total on this Project from the Shoreside to

Commissioning

Page 23: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS Diving 2018 – Egina FPSO

Page 24: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS NITROX Diving – SS7

• System 3 & 4 set up for construction diving

• Air / NITROX

• Rhino 900 SRP Boat

Page 25: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS NITROX DIVING SPREAD MOBILISED for SS7 / ExxonMobil

Page 26: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS NITROX DIVING MOBILISED ON-BOARD J2, J8, J28 & J55WAV contracts have included• pipe-lay

• Trenching

• SBM installation

• Commissioning

• Pipe manifold removal and

reinstallation

• Air & NITROX diving

• Saturation diving

• ROV – survey

• Jacket & Spool installations

Page 27: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS DIVING SPREAD MOBILISED ON-BOARD SS7 ANTARES

ADS has carried out numerous contracts for SS7 in ExxonMobil from various vessels – anchor barge – jack ups and DP vessels.

Currently looking at further repair work to start later in 2016 – Procedures ongoing at this time

Page 28: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS DIVING PIPELINE REPAIR WHAT WE DO

Page 29: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

2016 – CNL Pipe lay

for SONAM Project

ADS Diving 2016

Page 30: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS Diving - Jacket / Spool / Riser Installation

Construction work from the Jascon 25

Page 31: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS Diving / ROV – Surf Supporter DP2 2016 – Ongoing still

IRM Contract with ExxonMobil - starting with SBM Installation

Page 32: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

ADS Diving– FPSO Inspection

Casualty drills

Chain link inspection

Page 33: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

General ManagerPaul Stansfield

Technical SupportJ.J TerblancheShawn Collins

Organization Chart

HSEAlex Ezimadu

Company Organigram Offshore Organigram

VESSEL

Managing Consultant

Peter Holmes

Operations Manager Craig Seaton

Offshore Vessel

Manager

Project Manager

Scaffolders

ROV Supervisor

Welders / Pipe fitters

3rd Party Services

Vessel Master

Client Rep.

Marine Crew

Dive Spervisor ADS

Dive

Superintendent ADS

Construction Supervisor

HSE Rep

Key Personnel

Executive Director: Derek EvansManaging Consultant: Peter Holmes Managing Director Olujide AsaGeneral Manager: Paul StansfieldHSE Alex EzimaduOperations Manager: Craig SeatonProjects Manager Rik BrattinOffice Manager: Yewande OgunrindeQuality Manager: Biodun CokerEquipment Manager Stephan WesselsProject Engineer Victor AniyiAccount Officer Sylvester AdegboyegaSupply Chain Manager Governor EyitemiLogistics: Yewande OgunrindeLogistics Coordinator Taiwo AkandeYard/Store Officer Taiwo DadaAdmin. Assistant Erezi Ota-DetaACE Logistics: DurbanBase Manager Ian Bruce

Divers - ADSMinimum 5 man

dive team

Dive Techs

Client HSE Representative

Client QA/QC Representative

Blaster / Painters

Crane Driver(also Marine Crew)

Executive DirectorDerek Evans

Dive Medics x 2 must be within the

5 man team

Riggers

Projects ManagerRik Brattin

Offshore Manager /

Superintendent

ROV ConsultantMarine Solutions

Supply Chain Manager

Governor Eyitemi

Techincal/Equipment Manager

Stephan Wessels

Doc No: ADS/QMS/05/ORG/07 Rev 3

Logistics / WarehouseYewande Ogunrinde

Airport ProtocolKingsley Isiguzo

ACE - Durban

DriversAlex Eromosele

Dennis OnuhEzekiel Odeh

Hammed OduguwaBright Bassey

Project Engineer Victor Aniyi

Managing DirectorOlujide Asa

Accounts OfficerSylvester

Adegboyega

Office ManagerYewande Ogunrinde

Legal Advisor Chimezie Kalunta

Admin/Logistics Coordinator

Taiwo Akande

Admin AssistantErezi Ota-Deta

Quality ManagerBiodun Coker

Finance OfficerKingsley Edet

Yard/Store OfficerTaiwo Dada

Boat/Yard EngineerYusuf King

Welder/Tech. SupportOladele Ajagun

Base Manager Ian Bruce

Page 34: Africa Diving Service Presentsads-diving.com/.../2020/11/ADS-Presentation-template.pdf · 2020. 11. 20. · Samsung (SHI) Assistance with FPSO EGINA Preparation for Installation LADOL

We conclude this presentation by saying we look forward to renewing old acquaintances and forward to new ones.