AflaGuard-slide

1
Timing of AflaGuard Application At-Harvest Aflatoxin Level (ppm) Untreated Check 79** V9 48 V12 9 V15 32 VT (full tassel) 131 ** 20 ppm or below is desired level for general use Results are from A. McClure 2010 AflaGuard timing trial; Jackson TN

description

- PowerPoint PPT Presentation

Transcript of AflaGuard-slide

Page 1: AflaGuard-slide

Timing of AflaGuardApplication

At-Harvest Aflatoxin Level(ppm)

Untreated Check 79**

V9 48

V12 9

V15 32

VT (full tassel) 131

** 20 ppm or below is desired level for general useResults are from A. McClure 2010 AflaGuard timing trial; Jackson TN