AFC “JCIDS Requirements Approval Process”Start Point: Task 5 Output- Prioritized Challenge- Determine CSA Interest- Designated Lead
CFT/IPT Formed
Annual Mission Guidance
Task
6:
Gap
s an
d
Op
po
rtu
nit
ies
Task
7:
DO
TMLP
F-P
So
luti
on
Ass
ess
men
t
Task 8: Requirement Refinement
Material Solution
Determination
CFT/IPT/CDID:- Develop all
Requirement Documents
- Staffing (FFME & HQDA)
- Comment Adjudication
Futures and Concepts• Database Administration• Receive Req Document• Quality Control
• Format• Review Req Meets AMG• KPP/KSA Review• Feasibility Assessment• Meets MDO OBJs
• ID Stakeholder Position• CERTIFICATION ready for
AFC CG APPROVAL
Secretariat (as needed)Joint Staff Interface KM/DS
DSI Coordination• Receive via CAMS• FFME/Army Position
Clarification• Triage Venue• Track/Facilitate• Decision Forum
Secretariat• DRAFT Approval
Memo
• Determine Army Position
• Risk Decision• Establishes
AAO• Approves
KPP/KSA• Requirement
ValidationAll Army Materiel
Requirements
CFT Documents
HQDA G8
HQDA submission to Joint Gatekeeper
(KM/DS)
Approval“As Needed”
JSD & FCB Assignment& staffing
(J-8 Gatekeeper)
JCB
JROC
CARDS # Assignment (G8)
FCB
Writing <120 daysStaffing = 30 daysAdjudication 30-60 days FCC certification = 30 days AFC Decision = 30 days
Joint Info 61 daysJCB Interest 89 daysJROC Interest 103 days
G8-FDJ Issue CARDS # 15 days
DSI draft approval memo 15 daysCG AFC signature 15 days
Terms of Reference
• Requirement: Established need to accomplish probable military objectives.
• Requirement Certification: Statement of adequacy by the responsible agency in support of the validation process.
• Requirement Validation: Review of documentation by authority to confirm applicability to accomplish mission objectives. Validation is a precursor to approval.
• Requirement Approval: Authority to apply resources toward a validated requirement to accomplish mission objectives. Approved requirements are entered into the Catalogue of Approved Requirements Document System (CARDS).
• Capability: A ability to execute or accomplish specified task, under stated conditions in accordance with specific standards.
JCIDS Requirements Approval Process – “As Is” vs AFC Process• Three staffing events replaced by a “single” enterprise level event
• TRADOC Worldwide staffing, ARCIC validation review, & HQDA staffing become FFME/HQDA staffing using CAMS• FFME/HQDA staffing led by CFT/IPT/FM Proponent using CAMS, start facilitated by FCC Gatekeepers• Unresolved critical organizational positions do not stop progress, final disposition at AFC Decision Forum
BECOMES
• AROC Review Forums flattened to one monthly AFC Decision Forum……or• If CSA withholds validation/approval authority (CFT documents), G8 schedules appropriate forums to prepare for CSA
engagement at the AROC
BECOMES DSI, AFC HQ receivesDecision package
CAMS
YesAFC Validation
AROCReview
G8 submits forInitial Joint
ReviewNoReturn to
CFT/IPT/CDID for rework
KMDS
• Joint review of Army validated requirements remains unchanged• End to end nominal timelines of 97 (ICD, IS-ICD, Joint DCR) to 103 days (CDD, IS-CDD, CDD update) per JCIDS Manual
CFT/IPT/CDIDWrites Requirement
DSI, AFC HQ receives
Decision package
FFME/HQDA staffing
Comment resolution
FCCCertification,
Ready for AFCCG Decision
CAMS CAMS
D Initial Joint Review
Comment resolution
F
HQDA G8review/
resubmit
Final Certifications(FCB Draft)
Joint Staff BriefingsWorking Group, FCB,
JROCM publishedDocument returned
to the Army
FCB Chair briefsJCB & JROC
FCB Draft review for JROC & JCB
Interest F
Yes, then Prepbrief
No
HQDA G8review/
resubmit
FCB ChairReady to Validate
JROCor JCB
Interest
YesE
Joint Information
Ready for Joint review
Yes
Comment resolutionE
GJoint review complete
Document returnedto the Army for approval
HQDA G8assigns
CARDS #
DSI, AFC HQ preparesApproval memo for
CG AFC
FCCpublishes AFCCG approval
CG AFC signsApproval memo with
CARDS #
FCC updates CAMS & cQuiP, approved
Requirement archived
G
G
CFT/IPT/CDID writesRequirement
FCC sendsDecision package
to DSI, AFC HQ
FFME/HQDA staffing
Comment resolution
FCCCertification,
Ready for AFCCG Decision
Staffing via NIPR email and SIPR CAMS CAMS
DSI, AFC HQ receivesDecision package
CAMS
YesAFC Validation
AROCReview
G8 submits forInitial Joint
ReviewNo
Return to CFT/IPT/CDID
for rework
KMDS
No
Develop/Staff/adjudicateA BFCC Certifies ready for AFC decision
C AFC single Decision Forum
CSA discretion, no delegation of approval authority
FCCAdjudication
Review
FCCAdjudication
Review