AEROTERM CARGO AREA D JOHN F. KENNEDY INTERNATIONAL …

14
NOT FOR CONSTRUCTION SHEET TITLE: SHEET NUMBER: PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: REV: DATE: COMMENT: BY: PROJECT: REV: DATE: COMMENT: BY: OF SUBMISSIONS LOCATION: SEAL: 413 Browning Court, Purcellville, VA 20132, Phone: 703.771.9844 W E X C E L S I O R D E A D R S . O ' M A L L E Y 0 8 2 2 6 0 - 1 S T A T E 0 F N E W Y 0 R K L I C E N S E D P R O F E S S I O N A L E N G I N E E R FOOTINGS, FOUNDATIONS, SLAB, GROUND IMPROVEMENT X001.00 COVER SHEET / GENERAL NOTES 11052FDC 11052FDC_REV F 08/14/2020 JPT CEV 14 NFC 08/14/2020 REVIEW SET CEV B 09/04/2020 PER DESIGN REVIEW COMMENTS CEV C 09/14/2020 100% QAD SUBMISSION CEV D 10/28/2020 ISSUED FOR PERMIT CEV E 11/09/2020 ISSUED FOR PERMIT CEV F 10/01/2021 ISSUED FOR PERMIT CEV/KSL AS SHOWN AEROTERM CARGO AREA D JOHN F. KENNEDY QUEENS COUNTY, NEW YORK TAA NUMBER: Y-9070.07 INTERNATIONAL AIRPORT 1 AEROTERM CARGO AREA D JOHN F. KENNEDY INTERNATIONAL AIRPORT QUEENS COUNTY, NEW YORK SHEET INDEX SHEET NO. DESCRIPTION X-001.00 COVER SHEET / GENERAL NOTES X-002.00 TO X-011.00 FULL DISPLACEMENT COLUMN LAYOUT - PLAN VIEW X-012.00 TO X-014.00 DETAILS DESIGN PARAMETERS CALCULATIONS: "DESIGN CALCULATIONS FULL DISPLACEMENT COLUMN FOUNDATION SUPPORT SYSTEM" REVISION E, DATED OCTOBER 1, 2021 FULL DISPLACEMENT COLUMN DIAMETER: 12 INCHES & 16 INCHES (IN) SHAFT FULL DISPLACEMENT COLUMN LENGTH: VARIES FULL DISPLACEMENT COLUMN CAPACITY: 95 KIPS (12 IN), 150 KIPS (16 IN) LOAD TEST LOCATION: BORING B-14 AREA ALLOWABLE COMPOSITE BEARING PRESSURE: 5.0 KSF MAX. FOOTING SETTLEMENT: 1.0 INCH MAX. DIFFERENTIAL FOOTING SETTLEMENT (ADJACENT COLUMNS): 0.5 INCHES 1. BORING LOCATIONS ARE SHOWN FOR INFORMATION ONLY AND ARE APPROXIMATE LOCATIONS TAKEN FROM THE ABOVE-REFERENCED REPORT. SEE THE BORING LOGS INCLUDED IN THE ABOVE-REFERENCED REPORT. GEOSTRUCTURES, INC. SHALL BE NOTIFIED IMMEDIATELY IF SUBSURFACE OR SITE CONDITIONS VARY FROM THOSE USED FOR DESIGN. 2. FOOTING LOCATIONS AND ORIENTATIONS SHOWN ON THESE PLANS ARE FOR INFORMATION ONLY. GEOSTRUCTURES, INC. ACCEPTS NO RESPONSIBILITY FOR LOCATIONS OR DIMENSIONS OF FOOTINGS SHOWN ON THESE PLANS. GEOSTRUCTURES, INC. SHALL BE NOTIFIED IMMEDIATELY IF INFORMATION ON THESE PLANS OR STRUCTURAL LOADS CONFLICTS WITH STRUCTURAL OR ARCHITECTURAL DRAWINGS. 3. THE FDC GROUND IMPROVEMENT SYSTEM HAS BEEN DESIGNED TO CONTROL SETTLEMENTS UNDER THE APPLIED FOOTING CONTACT PRESSURES RESULTING FROM THE STRUCTURE LOADS ON THE FOOTINGS AND FOOTING SIZES PROVIDED (REFER TO DESIGN CALCULATIONS). THESE APPLIED CONTACT PRESSURES MAY BE LESS THAN THE ALLOWABLE BEARING PRESSURE USED FOR STRUCTURAL DESIGN OF THE FOOTINGS. FOOTING CONTACT PRESSURES SHALL NOT BE INCREASED WITHOUT A COMMENSURATE REVIEW/REVISION OF THE FDC DESIGN. CONSTRUCTION NOTES: FULL DISPLACEMENT COLUMN FOUNDATIONS 1. FULL DISPLACEMENT COLUMNS (FDC) SHALL BE INSTALLED IN THE FIELD WITHIN 6 INCHES OF LOCATIONS SHOWN ON THESE PLANS. SEE DETAIL 2 ON SHEET X012.00 FOR VERTICAL CLEARANCE. 2. FDC DESIGN SHALL BE CONFIRMED BY FULL-SCALE FOOTING LOAD TESTS PERFORMED AT THE SITE IN GENERAL ACCORDANCE WITH ASTM D 1194 / D1143. 3. PRODUCTION FDC'S SHALL NOT BE INSTALLED PRIOR TO PERFORMING AND ACCEPTING THE RESULTS OF THE FULL-SCALE LOAD TESTS, UNLESS APPROVED BY GEOSTRUCTURES, INC. 4. A QUALIFIED, FULL-TIME QUALITY CONTROL (QC) REPRESENTATIVE PROVIDED BY THE FDC INSTALLER (INSTALLER) SHALL BE RESPONSIBLE FOR INSTALLATION OF THE FDC'S IN ACCORDANCE WITH THE DESIGN, AND SHALL REPORT ALL FDC CONSTRUCTION ACTIVITIES TO GEOSTRUCTURES, INC. IF AUTHORIZED BY THE OWNER, THE QC REPRESENTATIVE SHALL COORDINATE QC ACTIVITIES WITH THE TESTING AGENCY HIRED BY THE OWNER. THE TESTING AGENCY SHALL NOT DIRECT FDC INSTALLATION PROCEDURES. 5. FULL DISPLACEMENT COLUMNS SHALL BE ACCEPTED BASED ON THE FOLLOWING CRITERIA UNLESS OTHERWISE APPROVED IN WRITING BY GEOSTRUCTURES, INC.: A. FULL DISPLACEMENT COLUMNS TO BE INSTALLED TO THE INSTALLATION CRITERIA DEVELOPED FROM A PASSING LOAD TEST. B. THE GROUT MIX DESIGN SHALL PRODUCE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI. THE GROUT MIX DESIGN SHALL BE PRE-APPROVED BY GEOSTRUCTURES, INC. AND SHALL DEMONSTRATE SUITABLE PERFORMANCE DURING LOAD TESTING. 6. FULL DISPLACEMENT COLUMNS NOT MEETING THE REQUIREMENTS DEFINED IN THE DESIGN AND LOAD TEST SHALL BE REINSTALLED TO MEET PROJECT REQUIREMENTS UNLESS OTHERWISE APPROVED IN WRITING BY GEOSTRUCTURES, INC. 7. FOOTING ELEVATIONS ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND SHALL BE REPORTED IN WRITING TO THE INSTALLER'S QC REPRESENTATIVE PRIOR TO INSTALLING FDC'S. 8. UTILITY LOCATIONS ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. GEOSTRUCTURES, INC. SHOULD BE NOTIFIED OF ANY CONFLICTS WITH FDC LOCATIONS SHOWN ON THE PLANS. ALL EXISTING AND PROPOSED UTILITIES WITHIN AND ADJACENT TO THE PROPOSED BUILDING FOOTPRINT SHALL BE FIELD VERIFIED BY THE GENERAL CONTRACTOR AND COORDINATED WITH THE FDC FOUNDATION INSTALLER BEFORE FDC INSTALLATION SHALL PROCEED. 9. FULL DISPLACEMENT COLUMNS ARE LOCATED AT THE CENTERLINE OF STRIP FOOTINGS UNLESS DIMENSIONED OTHERWISE. 10. ANY ENGINEERED FILL REQUIRED FOR THE PROJECT SHALL BE PLACED AND COMPACTED IN ACCORDANCE WITH THE GEOTECHNICAL ENGINEER OF RECORD'S (GER) REQUIREMENTS. 11. ALL SETTLEMENT AS A RESULT OF FILL PLACEMENT PRIOR TO AND AFTER FDC INSTALLATION SHALL BE COMPLETED AS DETERMINED BY THE GER. 12. ALL FDC'S SHALL EXTEND THROUGH FILL MATERIAL, AND THROUGH THE ORGANIC LAYER TO NATURAL SOIL. 13. FULL DISPLACEMENT COLUMNS THAT CANNOT BE INSTALLED TO THEIR PLANNED BOTTOM OF FDC ELEVATIONS WILL BE EVALUATED AND DESIGN ADJUSTMENTS WILL BE MADE ON A CASE-BY-CASE BASIS. CONCRETE FOOTING EXCAVATION PREPARATION 1. EXCAVATION AND SURFACE COMPACTION OF ALL FOOTING SUBGRADES SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 2. OVEREXCAVATION BELOW THE BOTTOM OF THE FOOTING SHALL BE LIMITED TO 3 INCHES. THIS INCLUDES LIMITING THE TEETH OF EXCAVATORS FROM OVEREXCAVATION BEYOND THREE INCHES BELOW THE FOOTING ELEVATION. 3. WATER SHALL NOT BE ALLOWED TO ACCUMULATE IN THE FOOTING EXCAVATIONS PRIOR TO CONCRETE PLACEMENT. 4. PRIOR TO PLACING FOOTING CONCRETE OR MUD MAT, THE FOOTING SUBGRADE AND AGGREGATE PAD SHALL BE COMPACTED WITH A WALK-BEHIND IMPACT-TYPE COMPACTOR. COMPACTION SHALL BE PERFORMED OVER THE ENTIRE FOOTING SUBGRADE TO COMPACT ANY LOOSE SURFACE SOIL AND LOOSE SURFACE PIER AGGREGATE. 5. THE TESTING AGENCY SHALL INSPECT EACH FOOTING SUBGRADE AND APPROVE IT IN WRITING ON THE SAME DAY THAT THE CONCRETE OR MUD MAT IS PLACED IN THE FOOTING EXCAVATION. THE APPROVAL SHALL STATE THAT ALL FOOTING SUBGRADES INCLUDING MATRIX SOILS AND FULL DISPLACEMENT COLUMN TOPS HAVE NOT BEEN OVEREXCAVATED MORE THAN 3 INCHES BELOW THE BOTTOM OF THE FOOTING, HAVE BEEN KEPT FREE OF WATER ACCUMULATION, AND HAVE BEEN COMPACTED WITH A WALK-BEHIND IMPACT-TYPE COMPACTOR ON THE SAME DAY THAT THE CONCRETE OR MUDMAT WAS PLACED. 6. FOOTING CONCRETE SHALL BE PLACED THE SAME DAY AS FOOTING EXCAVATIONS ARE COMPLETED. IF IMMEDIATE PLACEMENT IS NOT POSSIBLE, THEN A MUD MAT CONSISTING OF A 3-INCH MINIMUM THICKNESS OF LEAN CONCRETE SHALL BE PLACED OVER THE FOOTING SUBGRADE. 7. FOOTING CONCRETE/MUD MAT SHALL BE PLACED DIRECTLY ON TOP OF COMPACTED AGGREGATE PAD. FOOTINGS SHOULD BE WIDENED AS NECESSARY TO COVER ENTIRE FDC WITH FOOTING CONRETE/MUD MAT. 8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEASURING TOP-OF-FOOTING ELEVATIONS TO ACCURACY OF 1/8-INCH. MEASUREMENTS SHALL BE TAKEN BY A LICENSED PROFESSIONAL SURVEYOR BEFORE LOADS ARE APPLIED TO THE FOOTINGS. 9. FOOTING STEP LOCATIONS SHALL BE COORDINATED WITH THE FULL DISPLACEMENT COLUMN ELEMENTS. 10. ANY SETTLEMENT AS A RESULT OF FINAL GRADING SHALL BE COMPLETE PRIOR TO SLAB INSTALLATION. 11. ALL SOIL HANDLING, PLACEMENT, DISPOSAL, REPORTING AND OTHER ACTIVITIES SHALL BE CONDUCTED IN ACCORDANCE WITH THE REQUIREMENTS OUTLINED IN THE ENVIRONMENTAL MANAGEMENT PLAN. FULL DISPLACEMENT COLUMNS INSTALLATION PROCEDURES 1. THE GROUT MIX DESIGN SHALL PRODUCE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI. THE GROUT MIX DESIGN SHALL BE PRE-APPROVED BY GEOSTRUCTURES, INC. AND SHALL DEMONSTRATE SUITABLE PERFORMANCE DURING LOAD TESTING. ONE 3-DAY AND ONE 7-DAY UNCONFINED COMPRESSIVE STRENGTH TEST SHALL BE PERFORMED ON SAMPLES RETRIEVED DURING THE INSTALLATION OF THE LOAD TEST PIER. ONE 3-DAY AND ONE 7-DAY SAMPLE SHALL ALSO BE TESTED PER WEEK OF PRODUCTION. 2. FULL DISPLACEMENT COLUMNS (FDC) SHALL BE ADVANCED USING A SPECIALLY DESIGNED FULL DISPLACING AUGER STRIKE. THE HOLLOW-SHAFT AUGER SHALL BE CAPABLE OF DELIVERING GROUT INTO THE SOIL CAVITY AS THE AUGER IS WITHDRAWN. THE FULL SCALE FOOTING LOAD TEST WILL BE CONDUCTED IN ACCORDANCE WITH ASTM D 1194/ D 1143. 3. THE HOLLOW-SHAFT AUGER SHALL BE ADVANCED TO THE MEET THE INSTALLATION CRITERIA AS DEVELOPED AFTER A PASSING LOAD TEST. 4. ONCE AT TERMINATION DEPTH, GROUT SHALL BE PUMPED INTO THE HOLLOW-SHAFT AUGER. THE HOLLOW-SHAFT AUGER SHALL THEN BE GRADUALLY RAISED PERMITTING THE GROUT TO BE RELEASED INTO THE CAVITY. 5. THE TOP OF THE ELEMENT SHALL BE CONSTRUCTED AS DETERMINED BY GEOSTRUCTURES, INC. AND SHOWN IN THESE DRAWINGS. 6. CONCRETE MAY BE USED AS AN ALTERNATE TO GROUT PENDING APPROVAL BY GEOSTRUCTURES, INC. DESIGN NOTES: DESIGN INFORMATION GEOTECHNICAL ENGINEER: LANGAN ENGINEERING & ENVIRONMENTAL SERVICES GEOTECHNICAL REPORT: "PHASE II GEOTECHNICAL INVESTIGATION REPORT, AERO JFK II, LLC (AER), BUILDING 260/261 AIRSIDE, JOHN F. KENNEDY INTERNATIONAL AIRPORT," DATED OCTOBER 2018 "PHASE I GEOTECHNICAL INVESTIGATION REPORT, AERO JFK II, LLC (AER), BUILDING 260/261 AIRSIDE, JOHN F. KENNEDY INTERNATIONAL AIRPORT," DATED AUGUST 2018, MODIFIED OCTOBER 2018 "ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING 260 CARGO D," PREPARED BY LANGAN, DATED SEPTEMBER 2020. STRUCTURAL ENGINEER: HARRISON-HAMNETT, P.C. STRUCTURAL PLANS: "JOHN F. KENNEDY INTERNATIONAL AIRPORT AEROTERM CARGO AREA D," ISSUED FOR PERMIT, DATED SEPTEMBER 30, 2020 STRUCTURAL LOADS: "S001 CODE SUMMARY AND GENERAL NOTES," DATED SEPTEMBER 30, 2020 VICINITY MAP N.T.S. GENERAL NOTES: 1. THIS WORK IS EXEMPT FROM ENERGY CODE COMPLIANCE. 2. ALL WORK SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE NEW YORK CITY BUILDING CODE, AND ANY OTHER APPLICABLE CODES AND ORDINANCES. 3. UNLESS OTHERWISE NOTED, THE CONTRACTOR SHALL PROVIDE AND PAY FOR ALL LABOR, EQUIPMENT, TOOLS, MACHINERY, TRANSPORTATION, AND OTHER FACILITIES NECESSARY FOR THE PROPER EXECUTION OF THE WORK. 4. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE ARCHITECT FOR APPROVAL BEFORE START OF CONSTRUCTION. LOAD TRANSFER PLATORM NOTES 1. LOAD TRANSFER PLATFORM SHALL CONSIST OF A 3-FOOT LAYER OF COMPACTED P-209 STONE OR TYPE B STRUCTURAL FILL AS DEFINED BELOW: 2. LTP FILL SHALL BE PLACED IN LAYERS HAVING A MAXIMUM UNCOMPACTED LIFT THICKNESS OF 10 INCHES. 3. EACH LTP LIFT SHALL BE COMPACTED IN THE PRESENCE OF A GEOTECHNICAL ENGINEER FAMILIAR WITH THE CONTENTS AND COMPACTION ACCEPTANCE CRITERIA OUTLINED IN THE GEOTECHNICAL REPORT. 4. FILL MATERIAL SHALL BE MAINTAINED, PLACED, AND COMPACTED AT ± 3 PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT. SIEVE SIZE DESIGN RANGE (% BY WEIGHT) 2-INCH (50 MM) 100 1.5-INCH (38 MM) 95 - 100 1-INCH (25 MM) 70 - 95 3 4 -INCH (19 MM) 55 - 85 NO. 4 (4.75 MM) 30 - 60 NO. 40 (0.45 MM) 10 - 30 NO. 200 (0.075 MM) 0 - 8 DocuSign Envelope ID: 71C6976E-02E6-4590-B800-812CED24A0FD 10/1/2021

Transcript of AEROTERM CARGO AREA D JOHN F. KENNEDY INTERNATIONAL …

NOT FOR CONSTRUCTION

SHEET TITLE:

SHEET NUMBER:

PROJECT No.:DRAWN BY:CHECKED BY:DATE:SCALE:CAD I.D.:

REV: DATE: COMMENT: BY:

PRO

JEC

T:

REV: DATE: COMMENT: BY:

OF

SUBMISSIONS

LOC

ATIO

N:

SEAL:

413

Brow

ning

Cou

rt, P

urce

llville

, VA

2013

2, P

hone

: 703

.771

.984

4

W

E X C E L S IO R

DE

A

DRS . O'MALLE

Y

0 8 2 2 6 0 - 1

ST

ATE 0F NEW Y0RK

L IC ENSED

PROFES SION A L ENGINEE

R

FOOTINGS, FOUNDATIONS, SLAB,GROUND IMPROVEMENT

X001.00

COVER SHEET /GENERAL NOTES

11052FDC

11052FDC_REV F

08/14/2020

JPTCEV

14

NFC 08/14/2020 REVIEWSET CEV

B 09/04/2020 PER DESIGNREVIEW COMMENTS CEV

C 09/14/2020 100% QADSUBMISSION CEV

D 10/28/2020 ISSUEDFOR PERMIT CEV

E 11/09/2020 ISSUEDFOR PERMIT CEV

F 10/01/2021 ISSUEDFOR PERMIT CEV/KSL

AS SHOWN

AE

RO

TE

RM

CA

RG

O A

RE

A D

JOH

N F

. KE

NN

ED

Y

QU

EE

NS

CO

UN

TY

,N

EW

YO

RK

TA

A N

UM

BE

R: Y

-907

0.07

INT

ER

NA

TIO

NA

L A

IRP

OR

T

1

AEROTERM CARGO AREA DJOHN F. KENNEDY

INTERNATIONAL AIRPORTQUEENS COUNTY, NEW YORK

SHEET INDEXSHEET NO. DESCRIPTION

X-001.00 COVER SHEET / GENERAL NOTESX-002.00 TO X-011.00 FULL DISPLACEMENT COLUMN LAYOUT - PLAN VIEWX-012.00 TO X-014.00 DETAILS

DESIGN PARAMETERS

CALCULATIONS: "DESIGN CALCULATIONS FULL DISPLACEMENTCOLUMN FOUNDATION SUPPORT SYSTEM"REVISION E, DATED OCTOBER 1, 2021

FULL DISPLACEMENT COLUMN DIAMETER: 12 INCHES & 16 INCHES (IN) SHAFTFULL DISPLACEMENT COLUMN LENGTH: VARIESFULL DISPLACEMENT COLUMN CAPACITY: 95 KIPS (12 IN), 150 KIPS (16 IN)LOAD TEST LOCATION: BORING B-14 AREAALLOWABLE COMPOSITEBEARING PRESSURE: 5.0 KSFMAX. FOOTING SETTLEMENT: 1.0 INCHMAX. DIFFERENTIAL FOOTINGSETTLEMENT (ADJACENT COLUMNS): 0.5 INCHES

1. BORING LOCATIONS ARE SHOWN FOR INFORMATION ONLY AND ARE APPROXIMATELOCATIONS TAKEN FROM THE ABOVE-REFERENCED REPORT. SEE THE BORINGLOGS INCLUDED IN THE ABOVE-REFERENCED REPORT. GEOSTRUCTURES, INC.SHALL BE NOTIFIED IMMEDIATELY IF SUBSURFACE OR SITE CONDITIONS VARYFROM THOSE USED FOR DESIGN.

2. FOOTING LOCATIONS AND ORIENTATIONS SHOWN ON THESE PLANS ARE FORINFORMATION ONLY. GEOSTRUCTURES, INC. ACCEPTS NO RESPONSIBILITY FORLOCATIONS OR DIMENSIONS OF FOOTINGS SHOWN ON THESE PLANS.GEOSTRUCTURES, INC. SHALL BE NOTIFIED IMMEDIATELY IF INFORMATION ONTHESE PLANS OR STRUCTURAL LOADS CONFLICTS WITH STRUCTURAL ORARCHITECTURAL DRAWINGS.

3. THE FDC GROUND IMPROVEMENT SYSTEM HAS BEEN DESIGNED TO CONTROLSETTLEMENTS UNDER THE APPLIED FOOTING CONTACT PRESSURES RESULTINGFROM THE STRUCTURE LOADS ON THE FOOTINGS AND FOOTING SIZES PROVIDED(REFER TO DESIGN CALCULATIONS). THESE APPLIED CONTACT PRESSURES MAY BELESS THAN THE ALLOWABLE BEARING PRESSURE USED FOR STRUCTURAL DESIGNOF THE FOOTINGS. FOOTING CONTACT PRESSURES SHALL NOT BE INCREASEDWITHOUT A COMMENSURATE REVIEW/REVISION OF THE FDC DESIGN.

CONSTRUCTION NOTES:

FULL DISPLACEMENT COLUMN FOUNDATIONS

1. FULL DISPLACEMENT COLUMNS (FDC) SHALL BE INSTALLED IN THE FIELD WITHIN 6INCHES OF LOCATIONS SHOWN ON THESE PLANS. SEE DETAIL 2 ON SHEET X012.00 FORVERTICAL CLEARANCE.

2. FDC DESIGN SHALL BE CONFIRMED BY FULL-SCALE FOOTING LOAD TESTS PERFORMEDAT THE SITE IN GENERAL ACCORDANCE WITH ASTM D 1194 / D1143.

3. PRODUCTION FDC'S SHALL NOT BE INSTALLED PRIOR TO PERFORMING AND ACCEPTINGTHE RESULTS OF THE FULL-SCALE LOAD TESTS, UNLESS APPROVED BYGEOSTRUCTURES, INC.

4. A QUALIFIED, FULL-TIME QUALITY CONTROL (QC) REPRESENTATIVE PROVIDED BY THEFDC INSTALLER (INSTALLER) SHALL BE RESPONSIBLE FOR INSTALLATION OF THE FDC'S INACCORDANCE WITH THE DESIGN, AND SHALL REPORT ALL FDC CONSTRUCTIONACTIVITIES TO GEOSTRUCTURES, INC. IF AUTHORIZED BY THE OWNER, THE QCREPRESENTATIVE SHALL COORDINATE QC ACTIVITIES WITH THE TESTING AGENCY HIREDBY THE OWNER. THE TESTING AGENCY SHALL NOT DIRECT FDC INSTALLATIONPROCEDURES.

5. FULL DISPLACEMENT COLUMNS SHALL BE ACCEPTED BASED ON THE FOLLOWINGCRITERIA UNLESS OTHERWISE APPROVED IN WRITING BY GEOSTRUCTURES, INC.:

A. FULL DISPLACEMENT COLUMNS TO BE INSTALLED TO THE INSTALLATION CRITERIADEVELOPED FROM A PASSING LOAD TEST.

B. THE GROUT MIX DESIGN SHALL PRODUCE A MINIMUM COMPRESSIVE STRENGTH OF4,000 PSI. THE GROUT MIX DESIGN SHALL BE PRE-APPROVED BY GEOSTRUCTURES,INC. AND SHALL DEMONSTRATE SUITABLE PERFORMANCE DURING LOAD TESTING.

6. FULL DISPLACEMENT COLUMNS NOT MEETING THE REQUIREMENTS DEFINED IN THEDESIGN AND LOAD TEST SHALL BE REINSTALLED TO MEET PROJECT REQUIREMENTSUNLESS OTHERWISE APPROVED IN WRITING BY GEOSTRUCTURES, INC.

7. FOOTING ELEVATIONS ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR ANDSHALL BE REPORTED IN WRITING TO THE INSTALLER'S QC REPRESENTATIVE PRIOR TOINSTALLING FDC'S.

8. UTILITY LOCATIONS ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.GEOSTRUCTURES, INC. SHOULD BE NOTIFIED OF ANY CONFLICTS WITH FDC LOCATIONSSHOWN ON THE PLANS. ALL EXISTING AND PROPOSED UTILITIES WITHIN AND ADJACENTTO THE PROPOSED BUILDING FOOTPRINT SHALL BE FIELD VERIFIED BY THE GENERALCONTRACTOR AND COORDINATED WITH THE FDC FOUNDATION INSTALLER BEFORE FDCINSTALLATION SHALL PROCEED.

9. FULL DISPLACEMENT COLUMNS ARE LOCATED AT THE CENTERLINE OF STRIP FOOTINGSUNLESS DIMENSIONED OTHERWISE.

10. ANY ENGINEERED FILL REQUIRED FOR THE PROJECT SHALL BE PLACED AND COMPACTEDIN ACCORDANCE WITH THE GEOTECHNICAL ENGINEER OF RECORD'S (GER)REQUIREMENTS.

11. ALL SETTLEMENT AS A RESULT OF FILL PLACEMENT PRIOR TO AND AFTER FDCINSTALLATION SHALL BE COMPLETED AS DETERMINED BY THE GER.

12. ALL FDC'S SHALL EXTEND THROUGH FILL MATERIAL, AND THROUGH THE ORGANIC LAYERTO NATURAL SOIL.

13. FULL DISPLACEMENT COLUMNS THAT CANNOT BE INSTALLED TO THEIR PLANNEDBOTTOM OF FDC ELEVATIONS WILL BE EVALUATED AND DESIGN ADJUSTMENTS WILL BEMADE ON A CASE-BY-CASE BASIS.

CONCRETE FOOTING EXCAVATION PREPARATION

1. EXCAVATION AND SURFACE COMPACTION OF ALL FOOTING SUBGRADES SHALL BETHE RESPONSIBILITY OF THE GENERAL CONTRACTOR.

2. OVEREXCAVATION BELOW THE BOTTOM OF THE FOOTING SHALL BE LIMITED TO 3INCHES. THIS INCLUDES LIMITING THE TEETH OF EXCAVATORS FROMOVEREXCAVATION BEYOND THREE INCHES BELOW THE FOOTING ELEVATION.

3. WATER SHALL NOT BE ALLOWED TO ACCUMULATE IN THE FOOTING EXCAVATIONSPRIOR TO CONCRETE PLACEMENT.

4. PRIOR TO PLACING FOOTING CONCRETE OR MUD MAT, THE FOOTING SUBGRADE ANDAGGREGATE PAD SHALL BE COMPACTED WITH A WALK-BEHIND IMPACT-TYPECOMPACTOR. COMPACTION SHALL BE PERFORMED OVER THE ENTIRE FOOTINGSUBGRADE TO COMPACT ANY LOOSE SURFACE SOIL AND LOOSE SURFACE PIERAGGREGATE.

5. THE TESTING AGENCY SHALL INSPECT EACH FOOTING SUBGRADE AND APPROVE IT INWRITING ON THE SAME DAY THAT THE CONCRETE OR MUD MAT IS PLACED IN THEFOOTING EXCAVATION. THE APPROVAL SHALL STATE THAT ALL FOOTING SUBGRADESINCLUDING MATRIX SOILS AND FULL DISPLACEMENT COLUMN TOPS HAVE NOT BEENOVEREXCAVATED MORE THAN 3 INCHES BELOW THE BOTTOM OF THE FOOTING, HAVEBEEN KEPT FREE OF WATER ACCUMULATION, AND HAVE BEEN COMPACTED WITH AWALK-BEHIND IMPACT-TYPE COMPACTOR ON THE SAME DAY THAT THE CONCRETE ORMUDMAT WAS PLACED.

6. FOOTING CONCRETE SHALL BE PLACED THE SAME DAY AS FOOTING EXCAVATIONSARE COMPLETED. IF IMMEDIATE PLACEMENT IS NOT POSSIBLE, THEN A MUD MATCONSISTING OF A 3-INCH MINIMUM THICKNESS OF LEAN CONCRETE SHALL BE PLACEDOVER THE FOOTING SUBGRADE.

7. FOOTING CONCRETE/MUD MAT SHALL BE PLACED DIRECTLY ON TOP OF COMPACTEDAGGREGATE PAD. FOOTINGS SHOULD BE WIDENED AS NECESSARY TO COVER ENTIREFDC WITH FOOTING CONRETE/MUD MAT.

8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEASURING TOP-OF-FOOTINGELEVATIONS TO ACCURACY OF 1/8-INCH. MEASUREMENTS SHALL BE TAKEN BY ALICENSED PROFESSIONAL SURVEYOR BEFORE LOADS ARE APPLIED TO THEFOOTINGS.

9. FOOTING STEP LOCATIONS SHALL BE COORDINATED WITH THE FULL DISPLACEMENTCOLUMN ELEMENTS.

10. ANY SETTLEMENT AS A RESULT OF FINAL GRADING SHALL BE COMPLETE PRIOR TOSLAB INSTALLATION.

11. ALL SOIL HANDLING, PLACEMENT, DISPOSAL, REPORTING AND OTHER ACTIVITIESSHALL BE CONDUCTED IN ACCORDANCE WITH THE REQUIREMENTS OUTLINED IN THEENVIRONMENTAL MANAGEMENT PLAN.

FULL DISPLACEMENT COLUMNS INSTALLATIONPROCEDURES

1. THE GROUT MIX DESIGN SHALL PRODUCE A MINIMUM COMPRESSIVE STRENGTH OF4,000 PSI. THE GROUT MIX DESIGN SHALL BE PRE-APPROVED BY GEOSTRUCTURES,INC. AND SHALL DEMONSTRATE SUITABLE PERFORMANCE DURING LOAD TESTING.ONE 3-DAY AND ONE 7-DAY UNCONFINED COMPRESSIVE STRENGTH TEST SHALL BEPERFORMED ON SAMPLES RETRIEVED DURING THE INSTALLATION OF THE LOADTEST PIER. ONE 3-DAY AND ONE 7-DAY SAMPLE SHALL ALSO BE TESTED PER WEEKOF PRODUCTION.

2. FULL DISPLACEMENT COLUMNS (FDC) SHALL BE ADVANCED USING A SPECIALLYDESIGNED FULL DISPLACING AUGER STRIKE. THE HOLLOW-SHAFT AUGER SHALL BECAPABLE OF DELIVERING GROUT INTO THE SOIL CAVITY AS THE AUGER ISWITHDRAWN. THE FULL SCALE FOOTING LOAD TEST WILL BE CONDUCTED INACCORDANCE WITH ASTM D 1194/ D 1143.

3. THE HOLLOW-SHAFT AUGER SHALL BE ADVANCED TO THE MEET THE INSTALLATIONCRITERIA AS DEVELOPED AFTER A PASSING LOAD TEST.

4. ONCE AT TERMINATION DEPTH, GROUT SHALL BE PUMPED INTO THE HOLLOW-SHAFTAUGER. THE HOLLOW-SHAFT AUGER SHALL THEN BE GRADUALLY RAISEDPERMITTING THE GROUT TO BE RELEASED INTO THE CAVITY.

5. THE TOP OF THE ELEMENT SHALL BE CONSTRUCTED AS DETERMINED BYGEOSTRUCTURES, INC. AND SHOWN IN THESE DRAWINGS.

6. CONCRETE MAY BE USED AS AN ALTERNATE TO GROUT PENDING APPROVAL BYGEOSTRUCTURES, INC.

DESIGN NOTES:

DESIGN INFORMATIONGEOTECHNICAL ENGINEER: LANGAN ENGINEERING & ENVIRONMENTAL SERVICESGEOTECHNICAL REPORT: "PHASE II GEOTECHNICAL INVESTIGATION REPORT,

AERO JFK II, LLC (AER), BUILDING 260/261 AIRSIDE, JOHNF. KENNEDY INTERNATIONAL AIRPORT," DATEDOCTOBER 2018"PHASE I GEOTECHNICAL INVESTIGATION REPORT, AEROJFK II, LLC (AER), BUILDING 260/261 AIRSIDE, JOHN F.KENNEDY INTERNATIONAL AIRPORT," DATED AUGUST2018, MODIFIED OCTOBER 2018"ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING260 CARGO D," PREPARED BY LANGAN, DATEDSEPTEMBER 2020.

STRUCTURAL ENGINEER: HARRISON-HAMNETT, P.C.STRUCTURAL PLANS: "JOHN F. KENNEDY INTERNATIONAL AIRPORT AEROTERM

CARGO AREA D," ISSUED FOR PERMIT, DATEDSEPTEMBER 30, 2020

STRUCTURAL LOADS: "S001 CODE SUMMARY AND GENERAL NOTES," DATEDSEPTEMBER 30, 2020

VICINITY MAPN.T.S.

GENERAL NOTES:

1. THIS WORK IS EXEMPT FROM ENERGY CODE COMPLIANCE.2. ALL WORK SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE NEW

YORK CITY BUILDING CODE, AND ANY OTHER APPLICABLE CODES ANDORDINANCES.

3. UNLESS OTHERWISE NOTED, THE CONTRACTOR SHALL PROVIDE AND PAY FORALL LABOR, EQUIPMENT, TOOLS, MACHINERY, TRANSPORTATION, AND OTHERFACILITIES NECESSARY FOR THE PROPER EXECUTION OF THE WORK.

4. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE ARCHITECT FORAPPROVAL BEFORE START OF CONSTRUCTION.

LOAD TRANSFER PLATORM NOTES

1. LOAD TRANSFER PLATFORM SHALL CONSIST OF A 3-FOOT LAYER OF COMPACTED P-209STONE OR TYPE B STRUCTURAL FILL AS DEFINED BELOW:

2. LTP FILL SHALL BE PLACED IN LAYERS HAVING A MAXIMUM UNCOMPACTED LIFTTHICKNESS OF 10 INCHES.

3. EACH LTP LIFT SHALL BE COMPACTED IN THE PRESENCE OF A GEOTECHNICAL ENGINEERFAMILIAR WITH THE CONTENTS AND COMPACTION ACCEPTANCE CRITERIA OUTLINED INTHE GEOTECHNICAL REPORT.

4. FILL MATERIAL SHALL BE MAINTAINED, PLACED, AND COMPACTED AT ± 3 PERCENTAGEPOINTS OF THE OPTIMUM MOISTURE CONTENT.

SIEVE SIZE DESIGN RANGE (% BY WEIGHT)2-INCH (50 MM) 100

1.5-INCH (38 MM) 95 - 1001-INCH (25 MM) 70 - 9534-INCH (19 MM) 55 - 85

NO. 4 (4.75 MM) 30 - 60NO. 40 (0.45 MM) 10 - 30

NO. 200 (0.075 MM) 0 - 8

DocuSign Envelope ID: 71C6976E-02E6-4590-B800-812CED24A0FD

10/1/2021

AutoCAD SHX Text
C:\Users\jtrusko\AppData\Local\Temp\AcPublish_14856\11052FDC_REV F.dwg

B-47B-60B-48

B-25B-26

SCPT18-03

F60F60F60

F80AF80AF80AF50A

F50A F50A F50A

F50A

F50A

1 2 3 4

ZZ

A

B

C

22 FT

8.16

22 FT8.1

6

22 FT8.1

6 22 FT

8.16 22 FT

8.16

22 FT8.16

22 FT8.83

22 FT8.83

22 FT8.83

22 FT

8.1622

FT9.33

22 FT9.3

3

22 FT9.33

FS

FS

22 FT

8.16

22 FT

4.1622 FT

6.1622 FT

8.1622 FT

8.1622 FT

8.1622

FT8.1622 FT

8.16

22 FT8.16

22 FT

8.16

22 FT

8.16

22 FT

4.16

11.2522 FT

11'-514"

9'-10

1 4"

20'-012"

26'-9

7 8"

12'

3X012.00

4X012.00

2X012.00

6X012.00

6.8322 FT

6.8322 FT 3

X012.00

9.0022 FT

8.8322 FT 2

X013.001

X013.00

11'-6

"(T

YP.)

11'-6"(TYP.)

F50A22 FT

4.16

22 FT

4.16

F50A

1

1.21.1

A.1

2.1

2 3

4342

TYP. 16" Ø FULLDISPLACEMENT

COLUMN

BORINGLOCATION

NORTH

FULL DISPLACEMENTCOLUMN SHAFT LENGTH

BOTTOM-OF-FOOTINGELEVATION (FT, MSL)

FTG. MARK

## FT

###.#

#

FOOTINGSTEP

FS

SCPTLOCATION SCPT18-#

SLAB ZONEDELINEATOR

SLAB SUPPORT

VARIESREFER TO PLAN

VARI

ESRE

FER

TO P

LAN

###.#### FT

BOTTOM OF SLABELEVATION (FT, MSL)

FULLDISPLACEMENTCOLUMN SHAFTLENGTH

FOOTINGS WITHBOTTOM-OF-FOOTING

ELEVATION 5 FT, MSL ORLOWER. SEE DETAIL 3 ON

SHEET X012.00.

B-#

F#TYP. 12" Ø FULLDISPLACEMENT

COLUMN#

FTG. ID

NOT FOR CONSTRUCTION

SHEET TITLE:

SHEET NUMBER:

PROJECT No.:DRAWN BY:CHECKED BY:DATE:SCALE:CAD I.D.:

REV: DATE: COMMENT: BY:

PRO

JEC

T:

REV: DATE: COMMENT: BY:

OF

SUBMISSIONS

LOC

ATIO

N:

SEAL:

413

Brow

ning

Cou

rt, P

urce

llville

, VA

2013

2, P

hone

: 703

.771

.984

4

W

E X C E L S IO R

DE

A

DRS . O'MALLE

Y

0 8 2 2 6 0 - 1

ST

ATE 0F NEW Y0RK

L IC ENSED

PROFES SION A L ENGINEE

R

FOOTINGS, FOUNDATIONS, SLAB,GROUND IMPROVEMENT

X002.00

FULLDISPLACEMENT COLUMN

LAYOUT - PLAN VIEW

11052FDC

11052FDC_REV F

08/14/2020

JPTCEV

14

NFC 08/14/2020 REVIEWSET CEV

B 09/04/2020 PER DESIGNREVIEW COMMENTS CEV

C 09/14/2020 100% QADSUBMISSION CEV

D 10/28/2020 ISSUEDFOR PERMIT CEV

E 11/09/2020 ISSUEDFOR PERMIT CEV

F 10/01/2021 ISSUEDFOR PERMIT CEV/KSL

AS SHOWN

AE

RO

TE

RM

CA

RG

O A

RE

A D

JOH

N F

. KE

NN

ED

Y

QU

EE

NS

CO

UN

TY

,N

EW

YO

RK

TA

A N

UM

BE

R: Y

-907

0.07

INT

ER

NA

TIO

NA

L A

IRP

OR

T

2FULL DISPLACEMENT COLUMN LAYOUT - PLAN VIEW1 SCALE: 3/32" = 1'

80 2 64 1612

PLAN KEY

LEGEND

MATCHLINE SHEET FDC-7

MA

TC

HL

INE

SH

EE

T F

DC

-3

X007.00 X008.00 X009.00 X010.00 X011.00

X002.00 X003.00 X004.00 X005.00 X006.00

DocuSign Envelope ID: 71C6976E-02E6-4590-B800-812CED24A0FD

10/1/2021

AutoCAD SHX Text
C:\Users\jtrusko\AppData\Local\Temp\AcPublish_14856\11052FDC_REV F.dwg

B-23

B-4

B-5

B-6

B-8

B-21

B-22

SCPT18-07

F60 F70

F180

F80AF60A

F80AF80A

F80

5 6 7 8

22 FT8.83 22 FT

8.83 22 FT

6.8322 FT

8.83

22 FT9.3

3

22 FT9.00 22

FT8.83

22 FT4.8

3

22 FT

4.1622 FT

4.16

22 FT

4.1622 FT

4.16

11.2522 FT

APPROXIMATE EXISTINGSTORM SEWER (TO BEABANDONED)

APPROXIMATE SHORINGLINE FOR PROPOSED

STORM SEWER

BOND BREAKER/CASING FOR FDC.EXTEND A MINIMUM OF 5'-0"

BELOW ZONE OF INFLUENCE PERDETAIL 5 ON SHEET X013.00

22 FT6.8

3

22'

5X013.00

3X012.00

4X012.00

2X012.00

9.9122 FT

9.0022 FT

9.0022 FT 9.00

22 FT

9.0022 FT

4X013.00

1X013.00

2X013.00

F60A

11'-6

"(T

YP.)

11'-6"(TYP.)

F50A

22 FT

4.16

22 FT

4.16

F50A

22 FT4.16

22 FT4.16

5 64 7 8 9 10 11 12 13

4544

8.8322 FT

9.9122 FT

9.0022 FT

3.3322 FT

3.3322 FT

15'-558"

14'-6

5 8"

15'-558"

14'-6

5 8"

15'-558"

14'-6

5 8"

TYP. 16" Ø FULLDISPLACEMENT

COLUMN

BORINGLOCATION

NORTH

FULL DISPLACEMENTCOLUMN SHAFT LENGTH

BOTTOM-OF-FOOTINGELEVATION (FT, MSL)

FTG. MARK

## FT

###.#

#

FOOTINGSTEP

FS

SCPTLOCATION SCPT18-#

SLAB ZONEDELINEATOR

SLAB SUPPORT

VARIESREFER TO PLAN

VARI

ESRE

FER

TO P

LAN

###.#### FT

BOTTOM OF SLABELEVATION (FT, MSL)

FULLDISPLACEMENTCOLUMN SHAFTLENGTH

FOOTINGS WITHBOTTOM-OF-FOOTING

ELEVATION 5 FT, MSL ORLOWER. SEE DETAIL 3 ON

SHEET X012.00.

B-#

F#TYP. 12" Ø FULLDISPLACEMENT

COLUMN#

FTG. ID

ZZ

A

B

C

A.1

NOT FOR CONSTRUCTION

SHEET TITLE:

SHEET NUMBER:

PROJECT No.:DRAWN BY:CHECKED BY:DATE:SCALE:CAD I.D.:

REV: DATE: COMMENT: BY:

PRO

JEC

T:

REV: DATE: COMMENT: BY:

OF

SUBMISSIONS

LOC

ATIO

N:

SEAL:

413

Brow

ning

Cou

rt, P

urce

llville

, VA

2013

2, P

hone

: 703

.771

.984

4

W

E X C E L S IO R

DE

A

DRS . O'MALLE

Y

0 8 2 2 6 0 - 1

ST

ATE 0F NEW Y0RK

L IC ENSED

PROFES SION A L ENGINEE

R

FOOTINGS, FOUNDATIONS, SLAB,GROUND IMPROVEMENT

X003.00

FULLDISPLACEMENT COLUMN

LAYOUT - PLAN VIEW

11052FDC

11052FDC_REV F

08/14/2020

JPTCEV

14

NFC 08/14/2020 REVIEWSET CEV

B 09/04/2020 PER DESIGNREVIEW COMMENTS CEV

C 09/14/2020 100% QADSUBMISSION CEV

D 10/28/2020 ISSUEDFOR PERMIT CEV

E 11/09/2020 ISSUEDFOR PERMIT CEV

F 10/01/2021 ISSUEDFOR PERMIT CEV/KSL

AS SHOWN

AE

RO

TE

RM

CA

RG

O A

RE

A D

JOH

N F

. KE

NN

ED

Y

QU

EE

NS

CO

UN

TY

,N

EW

YO

RK

TA

A N

UM

BE

R: Y

-907

0.07

INT

ER

NA

TIO

NA

L A

IRP

OR

T

3FULL DISPLACEMENT COLUMN LAYOUT - PLAN VIEW1 SCALE: 3/32" = 1'

80 2 64 1612

PLAN KEY

LEGEND

MATCHLINE SHEET FDC-8

MA

TC

HL

INE

SH

EE

T F

DC

-4

MA

TC

HL

INE

SH

EE

T F

DC

-2

X007.00 X008.00 X009.00 X010.00 X011.00

X002.00 X003.00 X004.00 X005.00 X006.00

DocuSign Envelope ID: 71C6976E-02E6-4590-B800-812CED24A0FD

10/1/2021

AutoCAD SHX Text
C:\Users\jtrusko\AppData\Local\Temp\AcPublish_14856\11052FDC_REV F.dwg

B-34

B-32

B-31

B-33

B-19

B-33

F60F60F60F60

F80AF80AF80AF80A

9 10 11 12

22 FT

8.83 22 FT

8.83 22 FT

8.83 22 FT

8.83

22 FT9.33

22 FT

9.33 22 FT

9.33

22 FT

9.33

22 FT

4.1622 FT

4.16

22 FT

4.16

22 FT

4.16

22 FT

4.16

GENERALFLOOR

A.5/C-12.5/2011.2522 FT

3X012.00

4X012.00

2X012.00

8.8322 FT1

X013.00

11'-6

"(T

YP.)

11'-6"(TYP.)

F50A

22 FT

4.16

22 FT

4.16

F50A

22 FT

4.16

22 FT

4.16

14

10.8322 FT10

'-9"

(TYP

.)

10'-9"(TYP.)

3.3322 FT

3.3322 FT

3.3322 FT

3.3322 FT

3.3322 FT

14'-1158"

14'-6

5 8"

15'-558"

14'-6

5 8"

15'-558"

14'-6

5 8"

15'-558"

14'-6

5 8"

15'-558"

14'-6

5 8"

TYP. 16" Ø FULLDISPLACEMENT

COLUMN

BORINGLOCATION

NORTH

FULL DISPLACEMENTCOLUMN SHAFT LENGTH

BOTTOM-OF-FOOTINGELEVATION (FT, MSL)

FTG. MARK

## FT

###.#

#

FOOTINGSTEP

FS

SCPTLOCATION SCPT18-#

SLAB ZONEDELINEATOR

SLAB SUPPORT

VARIESREFER TO PLAN

VARI

ESRE

FER

TO P

LAN

###.#### FT

BOTTOM OF SLABELEVATION (FT, MSL)

FULLDISPLACEMENTCOLUMN SHAFTLENGTH

FOOTINGS WITHBOTTOM-OF-FOOTING

ELEVATION 5 FT, MSL ORLOWER. SEE DETAIL 3 ON

SHEET X012.00.

B-#

F#TYP. 12" Ø FULLDISPLACEMENT

COLUMN#

FTG. ID

ZZ

A

B

C

A.1

NOT FOR CONSTRUCTION

SHEET TITLE:

SHEET NUMBER:

PROJECT No.:DRAWN BY:CHECKED BY:DATE:SCALE:CAD I.D.:

REV: DATE: COMMENT: BY:

PRO

JEC

T:

REV: DATE: COMMENT: BY:

OF

SUBMISSIONS

LOC

ATIO

N:

SEAL:

413

Brow

ning

Cou

rt, P

urce

llville

, VA

2013

2, P

hone

: 703

.771

.984

4

W

E X C E L S IO R

DE

A

DRS . O'MALLE

Y

0 8 2 2 6 0 - 1

ST

ATE 0F NEW Y0RK

L IC ENSED

PROFES SION A L ENGINEE

R

FOOTINGS, FOUNDATIONS, SLAB,GROUND IMPROVEMENT

X004.00

FULLDISPLACEMENT COLUMN

LAYOUT - PLAN VIEW

11052FDC

11052FDC_REV F

08/14/2020

JPTCEV

14

NFC 08/14/2020 REVIEWSET CEV

B 09/04/2020 PER DESIGNREVIEW COMMENTS CEV

C 09/14/2020 100% QADSUBMISSION CEV

D 10/28/2020 ISSUEDFOR PERMIT CEV

E 11/09/2020 ISSUEDFOR PERMIT CEV

F 10/01/2021 ISSUEDFOR PERMIT CEV/KSL

AS SHOWN

AE

RO

TE

RM

CA

RG

O A

RE

A D

JOH

N F

. KE

NN

ED

Y

QU

EE

NS

CO

UN

TY

,N

EW

YO

RK

TA

A N

UM

BE

R: Y

-907

0.07

INT

ER

NA

TIO

NA

L A

IRP

OR

T

4FULL DISPLACEMENT COLUMN LAYOUT - PLAN VIEW1 SCALE: 3/32" = 1'

80 2 64 1612

PLAN KEY

LEGEND

MATCHLINE SHEET FDC-9

MA

TC

HL

INE

SH

EE

T F

DC

-5

MA

TC

HL

INE

SH

EE

T F

DC

-3

X007.00 X008.00 X009.00 X010.00 X011.00

X002.00 X003.00 X004.00 X005.00 X006.00

DocuSign Envelope ID: 71C6976E-02E6-4590-B800-812CED24A0FD

10/1/2021

AutoCAD SHX Text
C:\Users\jtrusko\AppData\Local\Temp\AcPublish_14856\11052FDC_REV F.dwg

B-28

B-29

B-51B-63B-30

F60F60F60F60

F180

F80AF80AF80AF80AF80A

13 14 15 16 17

22 FT8.83

22 FT8.83

22 FT8.83

22 FT8.83

22 FT8.83

22 FT9.33

22 FT9.33

22 FT9.33

22 FT9.33

22 FT4.8

3

22 FT

4.1622 FT

4.1622 FT

4.16

A.5/C-12.5/20A.5/C-12.5/20

GEN

ERAL

FLO

OR

A.5/

C-12

.5/2

0

GEN

ERAL

FLO

OR

A.5/

C-12

.5/2

0

11.2522 FT

11.0022 FT

2X012.00

3X012.00

4X012.00

2X012.00

9.0022 FT

9.0022 FT

9.0022 FT

9.0022 FT

9.0022 FT

9.0022 FT 9.00

22 FT9.00

22 FT

9.0022 FT1

X013.002

X013.00

11'-6

"(T

YP.)

11'-6"(TYP.)

F50A

22 FT

4.16

22 FT

4.16

F50A

22 FT

4.16

22 FT

4.16

F50A

22 FT

4.16

22 FT

4.16

1715 16 18 19 20 2221 23 24 2625 27 2928

10.8322 FT10

'-9"

(TYP

.)

10'-9"(TYP.)

3.3322 FT 3.33

22 FT3.33

22 FT3.33

22 FT

15'-558"

14'-6

5 8"

15'-558"

14'-6

5 8"

15'-558"

14'-6

5 8"

TYP. 16" Ø FULLDISPLACEMENT

COLUMN

BORINGLOCATION

NORTH

FULL DISPLACEMENTCOLUMN SHAFT LENGTH

BOTTOM-OF-FOOTINGELEVATION (FT, MSL)

FTG. MARK

## FT

###.#

#

FOOTINGSTEP

FS

SCPTLOCATION SCPT18-#

SLAB ZONEDELINEATOR

SLAB SUPPORT

VARIESREFER TO PLAN

VARI

ESRE

FER

TO P

LAN

###.#### FT

BOTTOM OF SLABELEVATION (FT, MSL)

FULLDISPLACEMENTCOLUMN SHAFTLENGTH

FOOTINGS WITHBOTTOM-OF-FOOTING

ELEVATION 5 FT, MSL ORLOWER. SEE DETAIL 3 ON

SHEET X012.00.

B-#

F#TYP. 12" Ø FULLDISPLACEMENT

COLUMN#

FTG. ID

ZZ

A

B

C

A.1

NOT FOR CONSTRUCTION

SHEET TITLE:

SHEET NUMBER:

PROJECT No.:DRAWN BY:CHECKED BY:DATE:SCALE:CAD I.D.:

REV: DATE: COMMENT: BY:

PRO

JEC

T:

REV: DATE: COMMENT: BY:

OF

SUBMISSIONS

LOC

ATIO

N:

SEAL:

413

Brow

ning

Cou

rt, P

urce

llville

, VA

2013

2, P

hone

: 703

.771

.984

4

W

E X C E L S IO R

DE

A

DRS . O'MALLE

Y

0 8 2 2 6 0 - 1

ST

ATE 0F NEW Y0RK

L IC ENSED

PROFES SION A L ENGINEE

R

FOOTINGS, FOUNDATIONS, SLAB,GROUND IMPROVEMENT

X005.00

FULLDISPLACEMENT COLUMN

LAYOUT - PLAN VIEW

11052FDC

11052FDC_REV F

08/14/2020

JPTCEV

14

NFC 08/14/2020 REVIEWSET CEV

B 09/04/2020 PER DESIGNREVIEW COMMENTS CEV

C 09/14/2020 100% QADSUBMISSION CEV

D 10/28/2020 ISSUEDFOR PERMIT CEV

E 11/09/2020 ISSUEDFOR PERMIT CEV

F 10/01/2021 ISSUEDFOR PERMIT CEV/KSL

AS SHOWN

AE

RO

TE

RM

CA

RG

O A

RE

A D

JOH

N F

. KE

NN

ED

Y

QU

EE

NS

CO

UN

TY

,N

EW

YO

RK

TA

A N

UM

BE

R: Y

-907

0.07

INT

ER

NA

TIO

NA

L A

IRP

OR

T

5FULL DISPLACEMENT COLUMN LAYOUT - PLAN VIEW1 SCALE: 3/32" = 1'

80 2 64 1612

PLAN KEY

LEGEND

MATCHLINE SHEET FDC-10

MA

TC

HL

INE

SH

EE

T F

DC

-6

MA

TC

HL

INE

SH

EE

T F

DC

-4

X007.00 X008.00 X009.00 X010.00 X011.00

X002.00 X003.00 X004.00 X005.00 X006.00

DocuSign Envelope ID: 71C6976E-02E6-4590-B800-812CED24A0FD

10/1/2021

AutoCAD SHX Text
C:\Users\jtrusko\AppData\Local\Temp\AcPublish_14856\11052FDC_REV F.dwg

B-53

F60F60F60F60

F80AF80AF80A

F50A F50AF50A

F50A

F50A F50A

18 19 20 21 22

ZZ

A

B

C

22 FT

4.16 22 FT

4.16

22 FT

4.16 22 FT

6.16

22 FT6.1

6

22 FT

8.83 22 FT

8.83 22 FT

8.83 22 FT

8.83

22 FT

6.16

22 FT

9.33 22 FT

9.33 22 FT

9.33 22 FT

9.33

22 FT8.16

FS

FS

22 FT8.1

6

22 FT8.16

22 FT6.16

22 FT

6.16

22 FT6.16

22 FT4.1622 FT

4.16

22 FT

4.1622 FT

4.16

22 FT

4.16

GENERALFLOOR

A.5/C-12.5/20

GEN

ERAL

FLO

OR

A.5/

C-12

.5/2

0G

ENER

ALFL

OO

RA.

5/C-

12.5

/20

11.2522 FT

10.8322 FT10

'-9"

(TYP

.)

10'-9"(TYP.)

9'-11"

11'

2X012.00

3X012.00

4X012.00

6X012.00

4.1622 FT9.00

22 FT8.8322 FT

9.0022 FT

9.0022 FT

9.0022 FT 9.00

22 FT2

X013.001

X013.00

F50AF80A

11'-6

"(T

YP.)

11'-6"(TYP.)

21.1 21.2 21.3

A.1

30 31 32 33 34 35 36 38 403937

41

TYP. 16" Ø FULLDISPLACEMENT

COLUMN

BORINGLOCATION

NORTH

FULL DISPLACEMENTCOLUMN SHAFT LENGTH

BOTTOM-OF-FOOTINGELEVATION (FT, MSL)

FTG. MARK

## FT

###.#

#

FOOTINGSTEP

FS

SCPTLOCATION SCPT18-#

SLAB ZONEDELINEATOR

SLAB SUPPORT

VARIESREFER TO PLAN

VARI

ESRE

FER

TO P

LAN

###.#### FT

BOTTOM OF SLABELEVATION (FT, MSL)

FULLDISPLACEMENTCOLUMN SHAFTLENGTH

FOOTINGS WITHBOTTOM-OF-FOOTING

ELEVATION 5 FT, MSL ORLOWER. SEE DETAIL 3 ON

SHEET X012.00.

B-#

F#TYP. 12" Ø FULLDISPLACEMENT

COLUMN#

FTG. ID

NOT FOR CONSTRUCTION

SHEET TITLE:

SHEET NUMBER:

PROJECT No.:DRAWN BY:CHECKED BY:DATE:SCALE:CAD I.D.:

REV: DATE: COMMENT: BY:

PRO

JEC

T:

REV: DATE: COMMENT: BY:

OF

SUBMISSIONS

LOC

ATIO

N:

SEAL:

413

Brow

ning

Cou

rt, P

urce

llville

, VA

2013

2, P

hone

: 703

.771

.984

4

W

E X C E L S IO R

DE

A

DRS . O'MALLE

Y

0 8 2 2 6 0 - 1

ST

ATE 0F NEW Y0RK

L IC ENSED

PROFES SION A L ENGINEE

R

FOOTINGS, FOUNDATIONS, SLAB,GROUND IMPROVEMENT

X006.00

FULLDISPLACEMENT COLUMN

LAYOUT - PLAN VIEW

11052FDC

11052FDC_REV F

08/14/2020

JPTCEV

14

NFC 08/14/2020 REVIEWSET CEV

B 09/04/2020 PER DESIGNREVIEW COMMENTS CEV

C 09/14/2020 100% QADSUBMISSION CEV

D 10/28/2020 ISSUEDFOR PERMIT CEV

E 11/09/2020 ISSUEDFOR PERMIT CEV

F 10/01/2021 ISSUEDFOR PERMIT CEV/KSL

AS SHOWN

AE

RO

TE

RM

CA

RG

O A

RE

A D

JOH

N F

. KE

NN

ED

Y

QU

EE

NS

CO

UN

TY

,N

EW

YO

RK

TA

A N

UM

BE

R: Y

-907

0.07

INT

ER

NA

TIO

NA

L A

IRP

OR

T

6FULL DISPLACEMENT COLUMN LAYOUT - PLAN VIEW1 SCALE: 3/32" = 1'

80 2 64 1612

PLAN KEY

LEGEND

MATCHLINE SHEET FDC-11

MA

TC

HL

INE

SH

EE

T F

DC

-5

X007.00 X008.00 X009.00 X010.00 X011.00

X002.00 X003.00 X004.00 X005.00 X006.00

DocuSign Envelope ID: 71C6976E-02E6-4590-B800-812CED24A0FD

10/1/2021

AutoCAD SHX Text
C:\Users\jtrusko\AppData\Local\Temp\AcPublish_14856\11052FDC_REV F.dwg

B-61

F60 F60 F60

F60 F60F50A

F50A

1 2 3 4

D

E

F

22 FT

8.16

22 FT9.33

22 FT9.3

3

22 FT9.33

22 FT9.3

3

22 FT9.3

3

22 FT9.3

322 FT

8.16

22 FT

8.16

22 FT

8.16

22 FT

8.16

22 FT

8.1622 FT

8.16

11.2522 FT

1X014.00

11'-0"(TYP.)

2X012.00

4X012.00

10.0822 FT

F60

11'-6

"(T

YP.)

11'-6"(TYP.)

GEN

ERAL

FLO

OR

E.5/

F-1/

1.5

E.5/F-1/1.5 GENERALFLOOR

10.8322 FT10

'-9"

(TYP

.)

10'-9"(TYP.)

TYP. 16" Ø FULLDISPLACEMENT

COLUMN

BORINGLOCATION

NORTH

FULL DISPLACEMENTCOLUMN SHAFT LENGTH

BOTTOM-OF-FOOTINGELEVATION (FT, MSL)

FTG. MARK

## FT

###.#

#

FOOTINGSTEP

FS

SCPTLOCATION SCPT18-#

SLAB ZONEDELINEATOR

SLAB SUPPORT

VARIESREFER TO PLAN

VARI

ESRE

FER

TO P

LAN

###.#### FT

BOTTOM OF SLABELEVATION (FT, MSL)

FULLDISPLACEMENTCOLUMN SHAFTLENGTH

FOOTINGS WITHBOTTOM-OF-FOOTING

ELEVATION 5 FT, MSL ORLOWER. SEE DETAIL 3 ON

SHEET X012.00.

B-#

F#TYP. 12" Ø FULLDISPLACEMENT

COLUMN#

FTG. ID

NOT FOR CONSTRUCTION

SHEET TITLE:

SHEET NUMBER:

PROJECT No.:DRAWN BY:CHECKED BY:DATE:SCALE:CAD I.D.:

REV: DATE: COMMENT: BY:

PRO

JEC

T:

REV: DATE: COMMENT: BY:

OF

SUBMISSIONS

LOC

ATIO

N:

SEAL:

413

Brow

ning

Cou

rt, P

urce

llville

, VA

2013

2, P

hone

: 703

.771

.984

4

W

E X C E L S IO R

DE

A

DRS . O'MALLE

Y

0 8 2 2 6 0 - 1

ST

ATE 0F NEW Y0RK

L IC ENSED

PROFES SION A L ENGINEE

R

FOOTINGS, FOUNDATIONS, SLAB,GROUND IMPROVEMENT

X007.00

FULLDISPLACEMENT COLUMN

LAYOUT - PLAN VIEW

11052FDC

11052FDC_REV F

08/14/2020

JPTCEV

14

NFC 08/14/2020 REVIEWSET CEV

B 09/04/2020 PER DESIGNREVIEW COMMENTS CEV

C 09/14/2020 100% QADSUBMISSION CEV

D 10/28/2020 ISSUEDFOR PERMIT CEV

E 11/09/2020 ISSUEDFOR PERMIT CEV

F 10/01/2021 ISSUEDFOR PERMIT CEV/KSL

AS SHOWN

AE

RO

TE

RM

CA

RG

O A

RE

A D

JOH

N F

. KE

NN

ED

Y

QU

EE

NS

CO

UN

TY

,N

EW

YO

RK

TA

A N

UM

BE

R: Y

-907

0.07

INT

ER

NA

TIO

NA

L A

IRP

OR

T

7FULL DISPLACEMENT COLUMN LAYOUT - PLAN VIEW1 SCALE: 3/32" = 1'

80 2 64 1612

PLAN KEY

LEGEND

MATCHLINE SHEET FDC-2

MA

TC

HL

INE

SH

EE

T F

DC

-8

X007.00 X008.00 X009.00 X010.00 X011.00

X002.00 X003.00 X004.00 X005.00 X006.00

DocuSign Envelope ID: 71C6976E-02E6-4590-B800-812CED24A0FD

10/1/2021

AutoCAD SHX Text
C:\Users\jtrusko\AppData\Local\Temp\AcPublish_14856\11052FDC_REV F.dwg

B-45

B-46

B-13

B-11

B-12

B-9

B-10

B-7

SCPT18-04

SCPT18-08

F60 F60

F60 F70

F50130

5 6 7 8

22 FT3.33

22 FT9.3

3

22 FT9.33

22 FT9.3

3

22 FT9.00

22 FT

7.83

22 FT

8.1622 FT

8.16

GENERALFLOOR D.5/F-7/15

10.8322 FT

11.2522 FT

10'-9

"(T

YP.)

10'-9"(TYP.)

APPROXIMATE SHORINGLINE FOR PROPOSED

STORM SEWER

APPROXIMATE EXISTINGSTORM SEWER (TO BEABANDONED)

BOND BREAKER/CASING FORFDC. EXTEND A MINIMUM OF 5'-0"

BELOW ZONE OF INFLUENCE PERDETAIL 5 ON SHEET X013.00

11'-0"(TYP.)

11'-0"(TYP.)

5X013.00

1

1X014.00

2X012.00

10.0822 FT

4X012.00

11'-6

"(T

YP.)

11'-6"(TYP.)

F50130

22 FT

7.83

F120280

4746

3.3322 FT

3.3322 FT

3.3322 FT

TYP. 16" Ø FULLDISPLACEMENT

COLUMN

BORINGLOCATION

NORTH

FULL DISPLACEMENTCOLUMN SHAFT LENGTH

BOTTOM-OF-FOOTINGELEVATION (FT, MSL)

FTG. MARK

## FT

###.#

#

FOOTINGSTEP

FS

SCPTLOCATION SCPT18-#

SLAB ZONEDELINEATOR

SLAB SUPPORT

VARIESREFER TO PLAN

VARI

ESRE

FER

TO P

LAN

###.#### FT

BOTTOM OF SLABELEVATION (FT, MSL)

FULLDISPLACEMENTCOLUMN SHAFTLENGTH

FOOTINGS WITHBOTTOM-OF-FOOTING

ELEVATION 5 FT, MSL ORLOWER. SEE DETAIL 3 ON

SHEET X012.00.

B-#

F#TYP. 12" Ø FULLDISPLACEMENT

COLUMN#

FTG. ID

D

E

F

NOT FOR CONSTRUCTION

SHEET TITLE:

SHEET NUMBER:

PROJECT No.:DRAWN BY:CHECKED BY:DATE:SCALE:CAD I.D.:

REV: DATE: COMMENT: BY:

PRO

JEC

T:

REV: DATE: COMMENT: BY:

OF

SUBMISSIONS

LOC

ATIO

N:

SEAL:

413

Brow

ning

Cou

rt, P

urce

llville

, VA

2013

2, P

hone

: 703

.771

.984

4

W

E X C E L S IO R

DE

A

DRS . O'MALLE

Y

0 8 2 2 6 0 - 1

ST

ATE 0F NEW Y0RK

L IC ENSED

PROFES SION A L ENGINEE

R

FOOTINGS, FOUNDATIONS, SLAB,GROUND IMPROVEMENT

X008.00

FULLDISPLACEMENT COLUMN

LAYOUT - PLAN VIEW

11052FDC

11052FDC_REV F

08/14/2020

JPTCEV

14

NFC 08/14/2020 REVIEWSET CEV

B 09/04/2020 PER DESIGNREVIEW COMMENTS CEV

C 09/14/2020 100% QADSUBMISSION CEV

D 10/28/2020 ISSUEDFOR PERMIT CEV

E 11/09/2020 ISSUEDFOR PERMIT CEV

F 10/01/2021 ISSUEDFOR PERMIT CEV/KSL

AS SHOWN

AE

RO

TE

RM

CA

RG

O A

RE

A D

JOH

N F

. KE

NN

ED

Y

QU

EE

NS

CO

UN

TY

,N

EW

YO

RK

TA

A N

UM

BE

R: Y

-907

0.07

INT

ER

NA

TIO

NA

L A

IRP

OR

T

8FULL DISPLACEMENT COLUMN LAYOUT - PLAN VIEW1 SCALE: 3/32" = 1'

80 2 64 1612

PLAN KEY

LEGEND

MATCHLINE SHEET FDC-3

MA

TC

HL

INE

SH

EE

T F

DC

-9

MA

TC

HL

INE

SH

EE

T F

DC

-7

X007.00 X008.00 X009.00 X010.00 X011.00

X002.00 X003.00 X004.00 X005.00 X006.00

DocuSign Envelope ID: 71C6976E-02E6-4590-B800-812CED24A0FD

10/1/2021

AutoCAD SHX Text
C:\Users\jtrusko\AppData\Local\Temp\AcPublish_14856\11052FDC_REV F.dwg

B-17

B-14

B-18 B-35 B-36

B-38

SCPT18-09

F60 F60 F60 F60

F60 F60 F60 F60

9 10 11 12

APPROXIMATEMODULUS TESTLOCATION

22 FT7.33

22 FT7.3

3

22 FT9.3

3

22 FT7.33

22 FT9.3

322

FT9.3322

FT9.33

22 FT9.3

3

22 FT

8.1622 FT8.16

D.5/F-7/15D.5/F-7/15

11.2522 FT

GEN

ERAL

FLO

OR

D.5/

F-7/

15

APPROXIMATE EXISTINGSTORM SEWER (TO BEABANDONED)

11'-0"(TYP.)

15'-3716"

26'-1

018"

1X014.00

2X012.00

4X012.00

3.3322 FT

10.0822 FT

11'-6

"(T

YP.)

11'-6"(TYP.)51504948

57 58 59

52

10.8322 FT10

'-9"

(TYP

.)

10'-9"(TYP.)

3.3322 FT

3.3322 FT

3.3322 FT

3.3322 FT

3.3322 FT

15'-3716"

26'-1

018"

3.3322 FT

15'-3716"

26'-1

018"

3.3322 FT

TYP. 16" Ø FULLDISPLACEMENT

COLUMN

BORINGLOCATION

NORTH

FULL DISPLACEMENTCOLUMN SHAFT LENGTH

BOTTOM-OF-FOOTINGELEVATION (FT, MSL)

FTG. MARK

## FT

###.#

#

FOOTINGSTEP

FS

SCPTLOCATION SCPT18-#

SLAB ZONEDELINEATOR

SLAB SUPPORT

VARIESREFER TO PLAN

VARI

ESRE

FER

TO P

LAN

###.#### FT

BOTTOM OF SLABELEVATION (FT, MSL)

FULLDISPLACEMENTCOLUMN SHAFTLENGTH

FOOTINGS WITHBOTTOM-OF-FOOTING

ELEVATION 5 FT, MSL ORLOWER. SEE DETAIL 3 ON

SHEET X012.00.

B-#

F#TYP. 12" Ø FULLDISPLACEMENT

COLUMN#

FTG. ID

D

E

F

NOT FOR CONSTRUCTION

SHEET TITLE:

SHEET NUMBER:

PROJECT No.:DRAWN BY:CHECKED BY:DATE:SCALE:CAD I.D.:

REV: DATE: COMMENT: BY:

PRO

JEC

T:

REV: DATE: COMMENT: BY:

OF

SUBMISSIONS

LOC

ATIO

N:

SEAL:

413

Brow

ning

Cou

rt, P

urce

llville

, VA

2013

2, P

hone

: 703

.771

.984

4

W

E X C E L S IO R

DE

A

DRS . O'MALLE

Y

0 8 2 2 6 0 - 1

ST

ATE 0F NEW Y0RK

L IC ENSED

PROFES SION A L ENGINEE

R

FOOTINGS, FOUNDATIONS, SLAB,GROUND IMPROVEMENT

X009.00

FULLDISPLACEMENT COLUMN

LAYOUT - PLAN VIEW

11052FDC

11052FDC_REV F

08/14/2020

JPTCEV

14

NFC 08/14/2020 REVIEWSET CEV

B 09/04/2020 PER DESIGNREVIEW COMMENTS CEV

C 09/14/2020 100% QADSUBMISSION CEV

D 10/28/2020 ISSUEDFOR PERMIT CEV

E 11/09/2020 ISSUEDFOR PERMIT CEV

F 10/01/2021 ISSUEDFOR PERMIT CEV/KSL

AS SHOWN

AE

RO

TE

RM

CA

RG

O A

RE

A D

JOH

N F

. KE

NN

ED

Y

QU

EE

NS

CO

UN

TY

,N

EW

YO

RK

TA

A N

UM

BE

R: Y

-907

0.07

INT

ER

NA

TIO

NA

L A

IRP

OR

T

9FULL DISPLACEMENT COLUMN LAYOUT - PLAN VIEW1 SCALE: 3/32" = 1'

80 2 64 1612

PLAN KEY

LEGEND

MATCHLINE SHEET FDC-4

MA

TC

HL

INE

SH

EE

T F

DC

-10

MA

TC

HL

INE

SH

EE

T F

DC

-8

X007.00 X008.00 X009.00 X010.00 X011.00

X002.00 X003.00 X004.00 X005.00 X006.00

DocuSign Envelope ID: 71C6976E-02E6-4590-B800-812CED24A0FD

10/1/2021

AutoCAD SHX Text
C:\Users\jtrusko\AppData\Local\Temp\AcPublish_14856\11052FDC_REV F.dwg

B-37

B-39B-40

B-50

B-64

SCPT18-11

SCPT18-12

F60 F60 F60 F60

F60 F60 F60 F60F70

F140

13 14 15 16 17

22 FT4.83

22 FT9.33

22 FT9.33

22 FT9.33

22 FT9.33

22 FT9.33

22 FT9.33

22 FT9.33

22 FT9.3

3

22 FT8.1622 FT

8.16

GENERALFLOORD.5/F-7/15

10.8322 FT

11.2522 FT

22 FT9.00

10'-9

"(T

YP.)

10'-9"(TYP.)

11'-0"(TYP.)

11'-0"(TYP.)

1X014.00

2X012.00

4X012.00

10.0822 FT

11'-6

"(T

YP.)

11'-6"(TYP.)

53 54 55 56

3.3322 FT

3.3322 FT

3.3322 FT

TYP. 16" Ø FULLDISPLACEMENT

COLUMN

BORINGLOCATION

NORTH

FULL DISPLACEMENTCOLUMN SHAFT LENGTH

BOTTOM-OF-FOOTINGELEVATION (FT, MSL)

FTG. MARK

## FT

###.#

#

FOOTINGSTEP

FS

SCPTLOCATION SCPT18-#

SLAB ZONEDELINEATOR

SLAB SUPPORT

VARIESREFER TO PLAN

VARI

ESRE

FER

TO P

LAN

###.#### FT

BOTTOM OF SLABELEVATION (FT, MSL)

FULLDISPLACEMENTCOLUMN SHAFTLENGTH

FOOTINGS WITHBOTTOM-OF-FOOTING

ELEVATION 5 FT, MSL ORLOWER. SEE DETAIL 3 ON

SHEET X012.00.

B-#

F#TYP. 12" Ø FULLDISPLACEMENT

COLUMN#

FTG. IDD

E

F

NOT FOR CONSTRUCTION

SHEET TITLE:

SHEET NUMBER:

PROJECT No.:DRAWN BY:CHECKED BY:DATE:SCALE:CAD I.D.:

REV: DATE: COMMENT: BY:

PRO

JEC

T:

REV: DATE: COMMENT: BY:

OF

SUBMISSIONS

LOC

ATIO

N:

SEAL:

413

Brow

ning

Cou

rt, P

urce

llville

, VA

2013

2, P

hone

: 703

.771

.984

4

W

E X C E L S IO R

DE

A

DRS . O'MALLE

Y

0 8 2 2 6 0 - 1

ST

ATE 0F NEW Y0RK

L IC ENSED

PROFES SION A L ENGINEE

R

FOOTINGS, FOUNDATIONS, SLAB,GROUND IMPROVEMENT

X010.00

FULLDISPLACEMENT COLUMN

LAYOUT - PLAN VIEW

11052FDC

11052FDC_REV F

08/14/2020

JPTCEV

14

NFC 08/14/2020 REVIEWSET CEV

B 09/04/2020 PER DESIGNREVIEW COMMENTS CEV

C 09/14/2020 100% QADSUBMISSION CEV

D 10/28/2020 ISSUEDFOR PERMIT CEV

E 11/09/2020 ISSUEDFOR PERMIT CEV

F 10/01/2021 ISSUEDFOR PERMIT CEV/KSL

AS SHOWN

AE

RO

TE

RM

CA

RG

O A

RE

A D

JOH

N F

. KE

NN

ED

Y

QU

EE

NS

CO

UN

TY

,N

EW

YO

RK

TA

A N

UM

BE

R: Y

-907

0.07

INT

ER

NA

TIO

NA

L A

IRP

OR

T

10FULL DISPLACEMENT COLUMN LAYOUT - PLAN VIEW1 SCALE: 3/32" = 1'

80 2 64 1612

PLAN KEY

LEGEND

MATCHLINE SHEET FDC-5

MA

TC

HL

INE

SH

EE

T F

DC

-11

MA

TC

HL

INE

SH

EE

T F

DC

-9

X007.00 X008.00 X009.00 X010.00 X011.00

X002.00 X003.00 X004.00 X005.00 X006.00

DocuSign Envelope ID: 71C6976E-02E6-4590-B800-812CED24A0FD

10/1/2021

AutoCAD SHX Text
C:\Users\jtrusko\AppData\Local\Temp\AcPublish_14856\11052FDC_REV F.dwg

B-55

B-56

F60 F60 F60 F60

F60 F60 F60 F60

F50A

F60F60F60

F50A

18 19 20

21 22

D

E

F

G

22 FT9.33

22 FT9.33

22 FT9.33

22 FT9.33

22 FT8.16

22 FT4.16

22 FT9.33

22 FT9.33

22 FT9.33

22 FT9.33

22 FT8.16

22 FT9.33

22 FT9.33

22 FT9.33

22 FT4.16

FS

FS

22 FT8.16

22 FT4.16

22 FT4.16

22 FT8.1

6

22 FT8.1

6

22 FT8.16

22 FT

8.16

22 FT8.16

GEN

ERAL

FLO

OR

E/G

-21/

22

GENERALFLOOR

F/G-21/22

11.2522 FT

10.6622 FT

F50A

9'-6"

(TYP

.)

9'-6"(TYP.)

11'-0"(TYP.)

11'-0

"(T

YP.)

1X014.00

1X014.00

2X012.00

4X012.00

6X012.00

10.0822 FT

F50A

11'-6

"(T

YP.)

11'-6"(TYP.)

TYP. 16" Ø FULLDISPLACEMENT

COLUMN

BORINGLOCATION

NORTH

FULL DISPLACEMENTCOLUMN SHAFT LENGTH

BOTTOM-OF-FOOTINGELEVATION (FT, MSL)

FTG. MARK

## FT

###.#

#

FOOTINGSTEP

FS

SCPTLOCATION SCPT18-#

SLAB ZONEDELINEATOR

SLAB SUPPORT

VARIESREFER TO PLAN

VARI

ESRE

FER

TO P

LAN

###.#### FT

BOTTOM OF SLABELEVATION (FT, MSL)

FULLDISPLACEMENTCOLUMN SHAFTLENGTH

FOOTINGS WITHBOTTOM-OF-FOOTING

ELEVATION 5 FT, MSL ORLOWER. SEE DETAIL 3 ON

SHEET X012.00.

B-#

F#TYP. 12" Ø FULLDISPLACEMENT

COLUMN#

FTG. ID

NOT FOR CONSTRUCTION

SHEET TITLE:

SHEET NUMBER:

PROJECT No.:DRAWN BY:CHECKED BY:DATE:SCALE:CAD I.D.:

REV: DATE: COMMENT: BY:

PRO

JEC

T:

REV: DATE: COMMENT: BY:

OF

SUBMISSIONS

LOC

ATIO

N:

SEAL:

413

Brow

ning

Cou

rt, P

urce

llville

, VA

2013

2, P

hone

: 703

.771

.984

4

W

E X C E L S IO R

DE

A

DRS . O'MALLE

Y

0 8 2 2 6 0 - 1

ST

ATE 0F NEW Y0RK

L IC ENSED

PROFES SION A L ENGINEE

R

FOOTINGS, FOUNDATIONS, SLAB,GROUND IMPROVEMENT

X011.00

FULLDISPLACEMENT COLUMN

LAYOUT - PLAN VIEW

11052FDC

11052FDC_REV F

08/14/2020

JPTCEV

14

NFC 08/14/2020 REVIEWSET CEV

B 09/04/2020 PER DESIGNREVIEW COMMENTS CEV

C 09/14/2020 100% QADSUBMISSION CEV

D 10/28/2020 ISSUEDFOR PERMIT CEV

E 11/09/2020 ISSUEDFOR PERMIT CEV

F 10/01/2021 ISSUEDFOR PERMIT CEV/KSL

AS SHOWN

AE

RO

TE

RM

CA

RG

O A

RE

A D

JOH

N F

. KE

NN

ED

Y

QU

EE

NS

CO

UN

TY

,N

EW

YO

RK

TA

A N

UM

BE

R: Y

-907

0.07

INT

ER

NA

TIO

NA

L A

IRP

OR

T

11FULL DISPLACEMENT COLUMN LAYOUT - PLAN VIEW1 SCALE: 3/32" = 1'

80 2 64 1612

PLAN KEY

LEGEND MATCHLINE SHEET FDC-6

MA

TC

HL

INE

SH

EE

T F

DC

-5

X007.00 X008.00 X009.00 X010.00 X011.00

X002.00 X003.00 X004.00 X005.00 X006.00

DocuSign Envelope ID: 71C6976E-02E6-4590-B800-812CED24A0FD

10/1/2021

AutoCAD SHX Text
C:\Users\jtrusko\AppData\Local\Temp\AcPublish_14856\11052FDC_REV F.dwg

FULLDISPLACEMENTCOLUMN (FDC)

2'-6"

FOOTING TO BE SUPPORTED BYFULL DISPLACEMENT COLUMNS

1

1

EXCAVATIONS SHALL NOTENCROACH WITHIN THIS ZONE.EXCEPTIONS MUST BE APPROVEDBY GEOSTRUCTURES ON ACASE-BY-CASE BASIS.

SHAF

T LE

NGTH

VAR

IES

SEE

PLAN

FOOTING TO BESUPPORTED BY FULL

DISPLACEMENT COLUMNS

FULLDISPLACEMENTCOLUMN (FDC)

9" GRAVEL PAD(BY OTHERS)

BOTTOM-OF-FOOTINGELEVATION (SEE PLAN)9"

NOTE:FDC TOP ELEVATION SHALL BE 6 TO 12 INCHESBELOW BOTTOM-OF-FOOTING ELEVATION.

SHAF

T LE

NGTH

FULLDISPLACEMENTCOLUMN (FDC)

EXTENDBOTTOM-OF-FOOTINGSTEP AS NECESSARY TOEXPOSE FULLDISPLACEMENTCOLUMNS

1'-0" MIN

TYP. FOOTING STEP TO BESUPPORTED BY FULL

DISPLACEMENT COLUMNS

SLAB TO BE SUPPORTEDBY FULL DISPLACEMENT

COLUMNS

SHAF

T LE

NGTH

VAR

IES

SEE

PLAN

FULLDISPLACEMENTCOLUMN (FDC)

3'-0" LTP(BY OTHERS)

3'-0"

LTP

9" GRAVEL PAD(BY OTHERS)

SHAF

T LE

NGTH

VAR

IES

SEE

PLAN

FULLDISPLACEMENTCOLUMN (FDC)

FOOTING TO BESUPPORTED BY FULL

DISPLACEMENT COLUMNS

BOTTOM-OF-FOOTING =ELEVATION 5.00 FEET OR LESS(SEE PLAN)

9"

NOT FOR CONSTRUCTION

SHEET TITLE:

SHEET NUMBER:

PROJECT No.:DRAWN BY:CHECKED BY:DATE:SCALE:CAD I.D.:

REV: DATE: COMMENT: BY:

PRO

JEC

T:

REV: DATE: COMMENT: BY:

OF

SUBMISSIONS

LOC

ATIO

N:

SEAL:

413

Brow

ning

Cou

rt, P

urce

llville

, VA

2013

2, P

hone

: 703

.771

.984

4

W

E X C E L S IO R

DE

A

DRS . O'MALLE

Y

0 8 2 2 6 0 - 1

ST

ATE 0F NEW Y0RK

L IC ENSED

PROFES SION A L ENGINEE

R

FOOTINGS, FOUNDATIONS, SLAB,GROUND IMPROVEMENT

X012.00

DETAILS

11052FDC

11052FDC_REV F

08/14/2020

JPTCEV

14

NFC 08/14/2020 REVIEWSET CEV

B 09/04/2020 PER DESIGNREVIEW COMMENTS CEV

C 09/14/2020 100% QADSUBMISSION CEV

D 10/28/2020 ISSUEDFOR PERMIT CEV

E 11/09/2020 ISSUEDFOR PERMIT CEV

F 10/01/2021 ISSUEDFOR PERMIT CEV/KSL

AS SHOWN

AE

RO

TE

RM

CA

RG

O A

RE

A D

JOH

N F

. KE

NN

ED

Y

QU

EE

NS

CO

UN

TY

,N

EW

YO

RK

TA

A N

UM

BE

R: Y

-907

0.07

INT

ER

NA

TIO

NA

L A

IRP

OR

T

12Scale: N.T.S.

ADJACENT EXCAVATION DETAIL4Scale: N.T.S.

TYPICAL FULL DISPLACEMENT COLUMN SLAB SUPPORT DETAIL3 Scale: N.T.S.

FULL DISPLACEMENT COLUMN FOOTING STEP SUPPORT DETAIL5

Scale: N.T.S.

TYPICAL FULL DISPLACEMENT COLUMN1 Scale: N.T.S.

TYPICAL FULL DISPLACEMENT COLUMN WHEN BOF ≤ 5.00 FT2

DocuSign Envelope ID: 71C6976E-02E6-4590-B800-812CED24A0FD

10/1/2021

AutoCAD SHX Text
C:\Users\jtrusko\AppData\Local\Temp\AcPublish_14856\11052FDC_REV F.dwg

SLAB TO BE SUPPORTEDBY FULL DISPLACEMENT

COLUMNS

FULLDISPLACEMENTCOLUMN (FDC)

9"1'-

0"

1'-0"

SHAF

T LE

NGTH

VAR

IES

SEE

PLAN

FULLDISPLACEMENTCOLUMN (FDC)

LOAD TRANSFERPLATFORM (BY OTHERS)

8"2'-

6"

PIPE DIAMETERAND TYPE VARIES

2'-0" MIN.

1'-0"

MIN

.

1

1

SLAB TO BE SUPPORTEDBY FULL DISPLACEMENT

COLUMNSSLAB TO BE SUPPORTEDBY FULL DISPLACEMENTCOLUMNS

FULLDISPLACEMENTCOLUMN (FDC)

3'-0"

LTP

SLAB TO BE SUPPORTEDBY FULL DISPLACEMENTCOLUMNS

FULLDISPLACEMENTCOLUMN (FDC)

3'-0"

LTP

3'-0"

LTP

10"

3'-0"

SLAB TO BE SUPPORTEDBY FULL DISPLACEMENTCOLUMNS

EXISTING 7'-6" I.D. RCPINTERCEPTOR SEWERABANDONED IN PLACE

PROPOSED 7'-6" I.D. RCPINTERCEPTOR SEWER,SEE CIVIL DRAWINGS

BONDBREAKER/CASING

FOR COLUMNFOUNDATIONS.

EXTEND A MINIMUM5'-0" BELOW ZONE

OF INFLUENCE

ZONE OF INFLU

ENCE

FULL DISPLACEMENTCOLUMN (FDC) (TYP.)

FOOTING TO BE SUPPORTEDBY FULL DISPLACEMENT

COLUMNS

MINIPILES & REINFORCEDCONCRETE CRADLE, SEECIVIL DRAWINGS

NOT FOR CONSTRUCTION

SHEET TITLE:

SHEET NUMBER:

PROJECT No.:DRAWN BY:CHECKED BY:DATE:SCALE:CAD I.D.:

REV: DATE: COMMENT: BY:

PRO

JEC

T:

REV: DATE: COMMENT: BY:

OF

SUBMISSIONS

LOC

ATIO

N:

SEAL:

413

Brow

ning

Cou

rt, P

urce

llville

, VA

2013

2, P

hone

: 703

.771

.984

4

W

E X C E L S IO R

DE

A

DRS . O'MALLE

Y

0 8 2 2 6 0 - 1

ST

ATE 0F NEW Y0RK

L IC ENSED

PROFES SION A L ENGINEE

R

FOOTINGS, FOUNDATIONS, SLAB,GROUND IMPROVEMENT

X013.00

DETAILS

11052FDC

11052FDC_REV F

08/14/2020

JPTCEV

14

NFC 08/14/2020 REVIEWSET CEV

B 09/04/2020 PER DESIGNREVIEW COMMENTS CEV

C 09/14/2020 100% QADSUBMISSION CEV

D 10/28/2020 ISSUEDFOR PERMIT CEV

E 11/09/2020 ISSUEDFOR PERMIT CEV

F 10/01/2021 ISSUEDFOR PERMIT CEV/KSL

AS SHOWN

AE

RO

TE

RM

CA

RG

O A

RE

A D

JOH

N F

. KE

NN

ED

Y

QU

EE

NS

CO

UN

TY

,N

EW

YO

RK

TA

A N

UM

BE

R: Y

-907

0.07

INT

ER

NA

TIO

NA

L A

IRP

OR

T

13

Scale: N.T.S.

PIT DETAIL4Scale: N.T.S.

UNDERSLAB UTILITY DETAIL3

Scale: N.T.S.

EDGE DETAIL 11

Scale: N.T.S.

EDGE DETAIL 22 Scale: N.T.S.

INTERCEPTOR SEWER DETAIL5

DocuSign Envelope ID: 71C6976E-02E6-4590-B800-812CED24A0FD

10/1/2021

AutoCAD SHX Text
C:\Users\jtrusko\AppData\Local\Temp\AcPublish_14856\11052FDC_REV F.dwg

FINISHED GRADE

SHAF

T LE

NGTH

VAR

IES

SEE

PLAN

FULLDISPLACEMENTCOLUMN (FDC)

17"

4"6"

27"

DENSE GRADED AGGREGATEBASE COURSE

PLANT MIX MACADAM

PCC

SLAB TO BE SUPPORTEDBY FULL DISPLACEMENT

COLUMNS

FULLDISPLACEMENTCOLUMN (FDC)

1'-0"

BOTTOM-OF-FOOTINGELEVATION (SEE PLAN)

NOTES:1) COORDINATE ELEVATOR LOCATIONS WITHARCHITECTURAL DRAWINGS (TYP.)

3'-0"

LTP

3'-0"

LTP

F50A1 FDC

2'-6"5'-0"

2'-6"

5'-0"

F60/F60A1 FDC

F701 FDC

3'-0"6'-0"

3'-0"

6'-0"

3'-6"7'-0"

3'-6"

7'-0"

F801 FDC

4'-0"8'-0"

4'-0"

8'-0"

F80/F80A2 FDC'S

1'-11"6'-1"

8'-0"

1'-11

"6'-

1"8'-

0"

4'-2"13'-10"

4'-2"

13'-1

0"18

'-0"

18'-0"

F501302 FDC'S

2'-6"5'-0"

F702 FDC'S

F1804 FDC'S

1'-8"5'-4"

7'-0"

1'-8"5'-

4"7'-

0"

F1202804 FDC'S

3'-2"8'-10"

12'-0"

3'-2"

10'-5

"

28'-0

"

17'-7

"24

'-10"

2'-8"

10'-4

"13

'-0"

3'-7"5'-0"

2'-2"5'-

0"

F50AZZ-6.31 FDC

NOT FOR CONSTRUCTION

SHEET TITLE:

SHEET NUMBER:

PROJECT No.:DRAWN BY:CHECKED BY:DATE:SCALE:CAD I.D.:

REV: DATE: COMMENT: BY:

PRO

JEC

T:

REV: DATE: COMMENT: BY:

OF

SUBMISSIONS

LOC

ATIO

N:

SEAL:

413

Brow

ning

Cou

rt, P

urce

llville

, VA

2013

2, P

hone

: 703

.771

.984

4

W

E X C E L S IO R

DE

A

DRS . O'MALLE

Y

0 8 2 2 6 0 - 1

ST

ATE 0F NEW Y0RK

L IC ENSED

PROFES SION A L ENGINEE

R

FOOTINGS, FOUNDATIONS, SLAB,GROUND IMPROVEMENT

X014.00

DETAILS

11052FDC

11052FDC_REV F

08/14/2020

JPTCEV

14

NFC 08/14/2020 REVIEWSET CEV

B 09/04/2020 PER DESIGNREVIEW COMMENTS CEV

C 09/14/2020 100% QADSUBMISSION CEV

D 10/28/2020 ISSUEDFOR PERMIT CEV

E 11/09/2020 ISSUEDFOR PERMIT CEV

F 10/01/2021 ISSUEDFOR PERMIT CEV/KSL

AS SHOWN

AE

RO

TE

RM

CA

RG

O A

RE

A D

JOH

N F

. KE

NN

ED

Y

QU

EE

NS

CO

UN

TY

,N

EW

YO

RK

TA

A N

UM

BE

R: Y

-907

0.07

INT

ER

NA

TIO

NA

L A

IRP

OR

T

14

Scale: N.T.S.

AIRSIDE PLANE/AIRCRAFT PARKING DETAIL2

Scale: N.T.S.

ELEVATOR DETAIL3Scale: 3/16" = 1'

FULL DISPLACEMENT COLUMN FOOTING SUPPORT DETAILS1

DocuSign Envelope ID: 71C6976E-02E6-4590-B800-812CED24A0FD

10/1/2021

AutoCAD SHX Text
C:\Users\jtrusko\AppData\Local\Temp\AcPublish_14856\11052FDC_REV F.dwg