Aerogel Upgrade Status ShinIchi Esumi

29
ShinIchi Esumi f or the high pt u pgrade team collaboration meeting in Nashville, Jun 10-13 2003 1 Aerogel Upgrade Status ShinIchi Esumi for the high pt upgrade team Introduction Design parameters Readout electronics Beam test with prototypes Simulation Plan

description

Aerogel Upgrade Status ShinIchi Esumi for the high pt upgrade team Introduction Design parameters Readout electronics Beam test with prototypes Simulation Plan. π/ K. K / p. TOF. σ ~ 100ps. 0~2.5. 0~5. RICH. n = 1.00044. 5~17. 17~. ACC. - PowerPoint PPT Presentation

Transcript of Aerogel Upgrade Status ShinIchi Esumi

Page 1: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

1

Aerogel Upgrade Status

ShinIchi Esumi for the high pt upgrade team

IntroductionDesign parametersReadout electronicsBeam test with prototypesSimulationPlan 

Page 2: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

2

Page 3: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

3

Page 4: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

4

     5~9

  1~5n ~ 1.01ACC

     17~

    5~17n = 1.00044RICH

0~50~2.5σ ~ 100psTOF

K / pπ/ K

n=1.0112

Page 5: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

5

z (beam) direction

azimuthal anglevertex

parti

cle

track

Page 6: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

6

11cm

11cm

22cm

Aerogelair

n=1.0112+- 0.0002

Prototype in run3-pp

Page 7: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

7

Page 8: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

8

Page 9: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

9

Page 10: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

10

Part name

Para. Kind TypeMaximum workingvoltage

Dielectricwithstanding

voltage

Power rating

R110 k ohm

Coat-InsulateFixed Metal

Film Resistor

MF 1/2 350 V 700 V 1/2 W

R2 -

R11330 k ohm

MF 1/4 250 V 500 V 1/4 W

R12200 k ohm

MF 1/4 250 V 500 V 1/4 W

C1 - C3

10 nF High VoltageCeramic

Condenser

DD1464E103P500

500 V

C4 4.7 nFDEBE33F472ZA3B

3150 V

Design of Bleeder

( Ver. 2 )

Motoi Inaba

Page 11: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

11

Schedule

Five types of Bleeder Ver.3 will be delivered in June.

We test them and select one for mass-production.

Type

A

B

C

D

E

Divider Resistor

330 k ohm

470 k ohm

560 k ohm

680 k ohm

750 k ohm

Idling current

0.453 mA

0.318 mA

0.267 mA

0.220 mA

0.200 mA

Power consumption

680 mW

478 mW

401 mW

330 mW

300 mW(at 1500 V) (at 1500 V)

Comments

Hamamatsu Standard

Intend to use

New bleeders will be soldered with PMTs at Tsukuba Univ.by Motoi INABA.

Page 12: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

12

Calibration system using LED

LED200 ohm

TTL

PHENIXTTL (LED)

DRIVER

PPG

Specialcategory-5cable.

1

2

3

8

10

9

8

7

6

5

4

3

2

1

Page 13: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

13

Gate of ADC

( ~ 11 p. e.)

Output signal of Driver

Gate of ADC

Input signal (100 [Hz])

TTLDRIVER PMT

LED

PMT

50 ohm

Signals on the bench test

Page 14: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

14

Current design of Aerogel Counter

Aerogel Counter 160 segments of Aerogel Counter are located in Sector 1 at west arm. 160ch of PMT signals are led to North side, and another 160ch are led to South side.PreAmp 20 PreAmp boards are placed both side of Aerogel Counter.FEE & HV rack Racks for FEE and HV modules are located the second floor at west arm.

2.0m

#Preamp:201.2m

1.5m 3.5m

Trig

FEE

LVHV

Aerogel One sector:80 segments160 channels

<4m?

1 DCM channel/ one sectorTo DCM

From GTM

Kyoichiro OzawaNarumi KuriharaTakashi Matsumoto

Page 15: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

15

Aerogel Box.80 segments.160 channels.

North side of Read out electronics

Preamp8 preamp circuits are on one board.20 boards are in one side.

5 transition cards.Integrate 8 multi coaxial cablesin one board.

Read out module

G Link to DCM

5 AMU/ADCModules have320ch of inputs.

Signal cableRG1741.5~3.5 m

Multi coaxial cable.3 ~ 4 m

Page 16: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

16

Input to 3ch

25ns

50mV

140mV

3mV

5mV

1mV

4ch output

1ch output

6ch output

3ch input

3ch output

Example: 50mV input pulse to 3ch

•Signal line which is next to 3ch is most affected.•Each signal of cross talk is bipolar signal.•Maximum pulse height of cross talk is 5mV.•When the input was 200mV of pulse height, the •maximum pulse height is 10mV. •For ADC measurement, the cross talk signal carry no charge.

Cross talk in Preamp

Page 17: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

17

Particle selection by TOF(2GeV/c, positive)

Beam test at KEK-ps

Page 18: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

18

X

Beam

(0,0)

15cm

15cmPMT1PMT2

Y

Y

X

Beam

(0,0)

11.5cm

21cm

PMT1

PMT2

Y

X

Beam

(0,0)

22cm

12cmPMT1PMT2Aerogel

PMT PMT

BEAM

Air12cm

12cm

12cm

AerogelPMT PMT

BEAM

12cm

12cm

Page 19: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

19

λa

bs

λ sct

BEAM

Optical simulation Satoshi Takagi Masahiro Konno

beam datasimulation

Page 20: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

20

# of p.e.

Mylar Box + Goretex 2.07

Paper Box + Goretex 2.00

7 Sheets of Mylar 4.45

Aerogel 13.88

cosmic ray test in our lab. Satoshi Takagi

Page 21: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

21

Magnetic shield test at Lab

Maya Shimomura

Page 22: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

22

Online monitoring

Shingo Sakai

TDC ADC

TDC

ADC

Run3-pp prototype test

Page 23: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

23

Offline analysis Hiroshi Masui

~8 p.e.

low gain ADC high gain ADC

~8 p.e.

single pmt hitsingle pmt hitcoincidence hits

to be evaluated with external tracking

Page 24: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

24

#of fired cell/ central event

~ 8% occupancy back ground sourcesseen in aerogel detector

z

x

PISA simulation

Satoshi Takagi

Page 25: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

25

Hijing simulation + TOF/RICH/ACC response

kaon

effi

cien

cyka

on p

urity

momentum

TOF(p) && ACC

ACC && RICH

PID and trigger simulation Masahiro Konno Maya Shimomura

kaon thresh.in ACC

pion thresh.   in RICH

proton thresh. in ACC

Page 26: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

26

LVL2 trigger plan for run4-AuAu

(1) select all PC3 hits in aerogel shadow;(2) select all PC1/PC3 tracks with reasonable    vertex cut (say BBC+-10cm);(3) cut on momentum (we'll have ~5% resolution);(4) check for a RICH ring;(5) match hit to EMC cluster;(6) match to the hists in aerogel, use both timing     and amplitude;(7) use all this information to make a decision;

Page 27: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

27

1. Aluminum Box (Dubna) Two Pre-production boxes in BNL $ Construction of 160 boxes + alpha *

2. PMT 2-1 PMT 320 PMTs (R6233-01HA, Hamamatsu) delivered to Univ. of Tsukuba $ Light shield paint for the back of PMT * Bleeder soldering * Calibration (Gain, Noise, Timing response) *

2-2 Bleeder (INABA-original) Some tests needed * Delivery in June *

2-3 Connectors (AMP, Tyco Elec. Corp.) HV x 2, Signal x 2, LED x 1 Delivery ?

2-4 Short cables (~15cm, Bleeder - Connector) HV x 2, Signal x 2 Preparation *

2-5 G-10 board Construction by CI Industry Co.Ltd *

2-6 Black cloth for light shielding (Lid - G10 board) Preparation *

2-7 PMT+Shield holder (A, B) Material ; Unilate (PET). Construction by CI Industry Co.Ltd (Now estimated) *

3. Magnetic shield case Tested by Maya $ ->Cylindrical shape (Length ; 80 mm / Outer diameter ; 80 mm / Thickness ;0.5 mm), Material ; Permalloy. Construction (Now estimated) *

4. Internal Box 4-1 Mylar sheet Cosmic ray test done (0.35 pe per sheet) $ -> Transparent polyester film (100um thick.) Delivery and cutting (Now estimated) *

4-2 Goretex sheet DRP Reflectors (reflectivity > 99%, 500um thick), Japan Goretex Inc. Delivery and cutting (Now estimated, 2 weeks after order.) *

5. Aerogel SP-12M, Matsushita Electric Works, Ltd. Refractive index ; n = 1.0112 +- 0.0002 Tile Size ; 112.5 +-1 mm x 112.5 +- 1 mm x 11.0 +- 0.5 mm Very fragile Already delivered to Univ. of Tsukuba $

6. Others Epoxy glue (as sample) Double-sided tape, Stapler (Goretex) Sponge rubber (packing)

Bleeder   (Tsukuba) Type: INABA-original Ver. 3 Size: 80 * 75 * 1.6 mm^3   (P. C. Board)             80 * 75 * 14 mm^3    (Including parts) Power consumption: 456 mW   (at 1000 V)                                        685 mW   (at 1500 V) Maximum working voltage: 2500 V       (Maximum voltage of PMT is 1500 V ! ) Dielectric withstanding voltage:          > 3200 V   (from long term test.)          = 5000 V   (from parts specification)       (Maximum voltage of PMT is 1500 V ! ) Delivery schedule: In June.

High Voltage Cable   (Tsukuba ? BNL ?) Type: Not yet (GX03173-01 ? The same as TOF ?) Production company: OTTO SUHNER AG. Delivery schedule: 3 weeks after ordered.

Signal Cable      PMT-to-PreAMP (CNS, Tokyo-Univ.)(BNL)(Tsukuba) Type: RG-58A/U or RG-122/U or RG-174/U.               (50-ohm coaxial cable).               Now testing at CNS. Production company: Cabling pattern: Not yet. Number of cables: 320.    (160 for Run-4). Delivery schedule:

      PreAMP-to-FEE (CNS, Tokyo-Univ.)(BNL) Type: UL8233.               (50-ohm multi-coaxial cable). Number of channels per cable: 8. Production company: Cabling pattern: Not yet. Number of cables: 40.    (20 for Run-4). Delivery schedule: A test cable on May 20th.

Page 28: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

28

PreAMP (Pre-amplifier)   (CNS, Tokyo-Univ.) OPAMP chip: AD 8009    (Analog Devices, Inc.)             (1 GHz, 5,500 V/μs low distortion amplifier.) Type: Voltage sensitive non-reverse amplifier. Design: Circuit diagram.                   Photograph. Gain: 2.25 Number of channels per board: 8. Number of boards: 40 (20 for Run-4). Power regulator chip: TA7805 (positive), TA79005 (negative). Operating voltage: +8.5 V & -8.5 V (more than 300 mA)                                     (Minimum voltages for stable operation.) Size: 90 * 70 mm^2 Output impedance: 50 ohm Cooling: Required. ESD protection: Yes. Crate: Design by CNS (10 boards / crate). Delivery schedule: Protp-type has delivered.                                     Now testing at CNS.                                     Mass production will be completed in July.

FEE (Front-End Electronics)   (CNS, Tokyo-Univ.) Design: The same as RICH FEE. Production company: Kindai Denshi Co.Ltd. (Japan). Dynamic range of charge: 0 - 160 p. e. Components: 10 AMU/ADC boards                            2 readout board.                            1(or 2) conrtol board.                            10 transition card. Crate: One is ready in CNS.                Another one is ordered. Transition card: Prototype on May 26th. Power supply: Delivery schedule: In July, and then, testing.

Trigger module   (CNS, Tokyo-Univ.) Type: Aerogel LVL-1 trigger. Design: Not fixed yet. Delivery schedule: Not installed in Run-4.                      (Use LVL-2 trigger for Run-4 Au-Au.)

LED driver   (BNL)(Tsukuba) Type: A TTL driver for PHENIX. Production: PHENIX, BNL. Number of output channels: 10. Drivability: 80 LEDs. (10 LEDs / channel). Crate: Standard NIM module. LED: E1L33-3B. (Toyoda Gosei Co., Ltd.)               Peak wavelength is 468 nm (Blue). Low voltage: +6 V, -6 V, +24 V, -24V. Cooling: Required. Delivery schedule: Testing at Tsukuba in April and in May.

High voltage module   (BNL) Type: Production company: Number of output channels: 320 or 160. (160 or 80 for Run-4.) Number of output channels per module: Crate: Delivery schedule: Unknown.

Low voltage module   (BNL) Type: Production company: Output voltage: Not fixed yet.         (+6 V, -6 V, +9 V, -9V, +12 V, -12 V, +24 V, -24 V. ?) Number of output channels per module: Crate: Delivery schedule: Unknown.

Page 29: Aerogel Upgrade Status                          ShinIchi Esumi

ShinIchi Esumi for the high pt upgrade team

collaboration meeting in Nashville, Jun 10-13 2003

29

Plan

Finalize CDRDesign and mechanical reviewsElectric and safety reviewsFinal beam testsConstruction (box cell, frame, LED, breeder, preamp, FEE)Assembly InstallationSimulation and reconstruction software