Windows 7 Aero Snap/Aero Peek/Aero Shake And Windows Flip 3D 1.
AERO - downloads.siegenia.com · H47.WANS010EN-02 09.2018 3/24 Installation and operating...
Transcript of AERO - downloads.siegenia.com · H47.WANS010EN-02 09.2018 3/24 Installation and operating...
INSTALLATION AND OPERATING INSTRUCTIONS
AERO
Wall-mounted ventilator with sound absorption.
AEROTUBE DD 110AEROTUBE DD 160
Window systems
Door systems
Comfort systems
09.20192/24 H47.WANS010EN-04
Content
Content
1 TARGET GROUP OF THIS DOCUMENTATION .....................................3
2 INTENDED USE ..........................................3
3 IMPROPER USE ..........................................3
4 DIMENSIONS .............................................3
5 FEEDBACK ON DOCUMENTATION .............3
6 SCOPE OF DELIVERY AND ACCESSORIES ...4
6.1 AEROTUBE ..................................................... 46.2 Weather grille variant ................................... 46.3 Vent duct EPP ................................................ 4
7 INSTALLATION ...........................................5
7.1. Installation.of.vent.duct.and weather grille variant .................................... 5
7.1.1 Drilling the core hole (room side) and.installation.of.ventilation.pipe ....................... 5
7.1.2. Installation.of.stainless.steel.weather.grille ......... 67.1.3. Installation.of.PVC.weather.grille ......................... 87.1.4. Installation.of.PVC.weather.grille.D.160 ............... 87.2. Installation.of.ventilation.pipe
and vent duct EPP ......................................... 97.2.1 Drilling the core hole (room side)
and.installation.of.ventilation.pipe ....................... 97.2.2. Installation.of.vent.duct.type.FL ......................... 117.2.3. Installation.of.vent.duct.type.SFL ....................... 137.3. Installation.of.wind.pressure.barrier ........... 157.4. Installation.of.the.inner.panel.E28 .............. 157.5. Installation.of.inner.panel.E18 .................... 17
8 OPERATION..............................................18
8.1. Control.of.air.flow.(inner.panel.E28) ........... 188.2. Control.of.air.flow.(inner.panel.E18) ........... 18
9 CARE AND MAINTENANCE ......................19
9.1 Cleaning ...................................................... 199.2. Replacing.the.filter.(inner.panel.E28) .......... 199.3. Replacing.the.filter.(inner.panel.E18) .......... 20
10 TECHNICAL SPECIFICATIONS ...................21
10.1 AEROTUBE DD 110 ...................................... 2110.2 AEROTUBE DD 160 ...................................... 22
11 DIMENSIONS ...........................................23
H47.WANS010EN-04 09.2019 3/24
Installation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160 AERO
1 Target group of this documentation
• This.documentation.is.intended.for.use.by.specialists and end users.
• All.instructions.concerning.assembly,.installation.and repairs described in this document are to be performed exclusively by experienced professionals with.training.and.practice.in.the.installation,.commissioning,.servicing.and.maintenance.of.decentralised.ventilation.units.
• All.instructions.on.operation,.care.and.maintenance.as.well.as.the.rectification.of.malfunctions.described.here are intended for specialists end users.
• Following.installation,.the.installation.company.must.hand.over.the.installation.and.operating.instructions.to.the.end.user.
2 Intended use
• The AEROTUBE.is.a.passive.air.ventilator..The.room.is.ventilated.as.the.indoor.and.outdoor.air.pressures.are.equalised.(pressure.differential).
• The unit must always be installed by an experienced specialist,.in.accordance.with.the.installation.and.planning.documents.of.SIEGENIA..The.installation.instructions.in.this.document.must.be.complied.with.at.all.times.
• The AEROTUBE must be mounted in the intended installation.position.
• Do not use the AEROTUBE in environments with corrosive.or.explosive.atmospheres.(dust,.vapour.or.gas).
• Use the unit only with original accessories from SIEGENIA.
• Use the AEROTUBE only when it is in a technically sound.condition..Do.not.modify.the.unit's.components in any way.
• Ventilation.openings.must.be.kept.free.and.must.not.be.blocked.by.other.equipment,.furniture.or.objects
• The.ventilation.pipe.can.be.shortened.to.the.required.length.(minimum.length.of.ventilation.pipe.150 mm).
3 Improper use
Any.use.or.application.of.this.product.that.is.not.in.accordance.with.its.proper.use,.or.any.adaptation.of.or.modifications.made.to.the.product.and.its.associated.components,.for.which.the.express.consent.
of.SIEGENIA.has.not.been.obtained,.are.strictly.prohibited. SIEGENIA accepts no liability whatsoever for any material losses or injury to people caused by failure.to.comply.with.this.stipulation.
4 Dimensions
All.the.dimensions.in.this.documentation.are.specified.in millimetres (mm).
5 Feedback on documentation
We.welcome.your.comments.and.suggestions.on.how.to.improve.our.documentation.
Please e-mail us your comments to '[email protected]'.
09.20194/24 H47.WANS010EN-04
AEROInstallation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160
6 Scope of delivery and accessories
The scope of delivery can vary depending on the device equipment.
6.1 AEROTUBE1
2
5
6
7
3
4
8
9
1 Inner panel E282 Inner panel E183 Filter.G2.for.inner.panel.E284 Filter.G2.for.inner.panel.E185 Wind.pressure.barrier.for.ventilation.pipe.Ø.1606 Ventilation.pipe.Ø.160.mm.(AEROTUBE DD 160)7 Ventilation.pipe.Ø.110.mm.(AEROTUBE DD 110)8 Bag of screws (4 screws and dowels)9 Installation.and.operating.instructions
Accessories Material number3 Replacement.filter.G2
for inner panel E28 (2 pieces)L3470090-093110
4 Replacement.filter.G2 for inner panel E18 (2 pieces)
L3470080-096110
6.2 Weather grille variant
1 2
3
4 65
1 PVC weather grille D 110 (only AEROTUBE DD 110)2 PVC weather grille D 160 (only AEROTUBE DD 160)3 Insert.ring.for.ventilation.pipe4 Stainless steel weather grille hood5 Wall.mounting6 Fixing.set
6.3 Vent duct EPP
10
6
5
7
94 1
2
3
2
6
5
8
7
4 1
9
10
9
1 Plastic.cover2 Vent.duct.FL./.SFL3 Transition.piece.SFL
Accessories Material number4 Weather.grille,.perforated.grid L5474610-0000105 Weather.grille,.lamella L5474600-0030106 Outlet duct* −7 Fixing.set* −8 Extension (max. 5 pieces) L5474510-0990109 Insulation.plate.FL L5474510-09901010 Pipe adapter D 110 L5474620-097010
*Outlet duct and fixing set Included in scope of delivery "weather grille".
H47.WANS010EN-04 09.2019 5/24
Installation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160 AERO
7 Installation
7.1 Installation of vent duct and weather grille variant
• Remove the AEROTUBE.carefully.from.the.packaging.and do not place it on the casing or front panel. We recommend.storing.the.unit.on.a.soft.surface.(e.g..cardboard.or.sheet).during.installation.
• Check.AEROTUBE.for.cleanliness.prior.to.installation..If.necessary,.thoroughly.clean.the.unit.as.described.
• Install the AEROTUBE.in.its.intended.installation.position.and.seal.it.in.accordance.with.the.installation.directives.applicable.on.site.
7.1.1 Drilling the core hole (room side) and installation of ventilation pipe
AEROTUBE.DD.110:.≥.Ø.120AEROTUBE.DD.160:.≥.Ø.164
0,5°
– 1°
Ø
1
Drill the core hole
X
2
Shorten pipe
3
Insert pipe in the wall
4
Insulate pipe (according to requirement)
5
Seal pipe
Inside.=.airtight.sealOutside = free-air seal
09.20196/24 H47.WANS010EN-04
AEROInstallation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160
7.1.2 Installation of stainless steel weather grille
1
Ø 8 mm
4
1
2
2 5
3
4x
6
H47.WANS010EN-04 09.2019 7/24
Installation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160 AERO
7 9
4x
8
09.20198/24 H47.WANS010EN-04
AEROInstallation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160
7.1.3 Installation of PVC weather grille
1
2
7.1.4 Installation of PVC weather grille D 160
1
2
3
H47.WANS010EN-04 09.2019 9/24
Installation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160 AERO
7.2 Installation of ventilation pipe and vent duct EPP
ATTENTION
Sharp edges on the weather grille and perforated grid
There.is.a.risk.of.injury.from.sharp.edges
• Wear.protective.gloves
• Remove the AEROTUBE.carefully.from.the.packaging.and do not place it on the casing or front panel. We recommend.storing.the.unit.on.a.soft.surface.(e.g..cardboard.or.sheet).during.installation.
• Check.AEROTUBE.for.cleanliness.prior.to.installation..If.necessary,.thoroughly.clean.the.unit.as.described.
• Install the AEROTUBE.in.its.intended.installation.position.and.seal.it.in.accordance.with.the.installation.directives.applicable.on.site.
7.2.1 Drilling the core hole (room side) and installation of ventilation pipe
AEROTUBE.DD.110:.≥.Ø.120AEROTUBE.DD.160:.≥.Ø.164
0,5°
– 1°
Ø
1
Drill the core hole
X
A B C
Vent
duc
t EPP
Insulatio
n.plate
Ventilation.pipe
2
Insulatio
n
Shorten pipe:
A Insertion.depth.of.ventilation.pipe.in.vent.duct.EPP (min. 8 mm; max. 15 mm)
+ B Back-up.insulation.of.vent.duct.(combine.insulation.plates.according.to.required.wall.insulation)
+ C Wall.thickness.incl..plaster
X Pipe length
09.201910/24 H47.WANS010EN-04
AEROInstallation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160
3 5
Insert pipe in the wall Seal pipe
Inside.=.airtight.sealOutside = free-air seal
4
Insulate pipe (according to requirement)
H47.WANS010EN-04 09.2019 11/24
Installation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160 AERO
7.2.2 Installation of vent duct type FL
1
250
2
Shorten.duct.using.a.saw.or.cutter.knife.within.the.marked.area.
Insert.plastic.cover
3
There.is.a.separating.bar.inside.the.duct..If.the.duct.is.shortened.by.more.than.200.mm,.the.separating.bar.must.be.cut.using.the.cutter.knife.
Position.duct.on.pipe.and.fix.to.outside.wall.(screw.or.glue)
09.201912/24 H47.WANS010EN-04
AEROInstallation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160
4 7
Attach.thermal.insulation Remove.plastic.cover
5
2
1
8
Attach.thermal.insulation Position.outlet.duct.and.weather.grille.in.the.vent.duct
6
2x
9
Plaster the wall and duct Fix.the.weather.grille.with.dowels/screws
H47.WANS010EN-04 09.2019 13/24
Installation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160 AERO
7.2.3 Installation of vent duct type SFL
1
There.is.a.separating.bar.inside.the.duct..If.the.duct.is.shortened.by.more.than.200.mm,.the.separating.bar.must.be.cut.using.the.cutter.knife.
①
②
3
Push.transition.piece.onto.duct..The.corner.drive.can.point.to.the.left.or.right.according.to.the.installation.location.
Insert.plastic.cover.①,.②.fix.transition.piece.to.duct.with adhesive tape
250
2 4
Shorten.duct.using.a.saw.or.cutter.knife.within.the.marked.area.
Position.duct.on.pipe.and.fix.to.outside.wall.(screw.or.glue)
09.201914/24 H47.WANS010EN-04
AEROInstallation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160
5 8
Attach.thermal.insulation Remove.plastic.cover
6
2
1
9
Attach.thermal.insulation Position.outlet.duct.①.and.weather.grille.②.in.the.vent duct
7
2x
10
Plaster the wall and duct Fix.the.weather.grille.with.dowels/screws
H47.WANS010EN-04 09.2019 15/24
Installation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160 AERO
7.3 Installation of wind pressure barrier
Push wind pressure barrier into the middle of the ventilation.pipe
7.4 Installation of the inner panel E28
1
4x
4x
ø 6
3
1
2
4x
2 4
09.201916/24 H47.WANS010EN-04
AEROInstallation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160
4x
5 7
90°
6
21
3
8
Push.the.filter.into.the.casing.as.far.as.the.wall The cable outlet in the inner panel must be on the slider side.
H47.WANS010EN-04 09.2019 17/24
Installation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160 AERO
7.5 Installation of inner panel E18
1
4x
1
2
4
1
2
4x
2 5
Push.filter.behind.the.fixing.clips
4x
4x
ø 6
3 6
09.201918/24 H47.WANS010EN-04
AEROInstallation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160
8 Operation
8.1 Control of air flow (inner panel E28)
Open sliders
Close sliders
8.2 Control of air flow (inner panel E18)
Tilt.position
Parallel-action.gap
Close
H47.WANS010EN-04 09.2019 19/24
Installation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160 AERO
9 Care and maintenance
9.1 Cleaning
• Never use cleaning agents that are aggressive or contain.solvents,.or.sharp-edged.objects,.as.these.may damage the surfaces of the casing.
• Never clean the unit with a high-pressure cleaner or steam-jet cleaner.
• Clean AEROTUBE with a cloth moistened with a mild soap.solution.or.cleaning.agent.
• The.filter.should.be.replaced.every.12.months,.at.the.latest (according to equipment).
• Only.use.the.original.filters.from.SIEGENIA..You.can.purchase.replacement.filters.from.SIEGENIA.or.from.specialist retailers (see accessories page 4).
9.2 Replacing the filter (inner panel E28)
1
2
Remove.the.dirty.filter.from.the.casing.and.dispose.of.it
90°
3
4
Push.the.new.filter.into.the.casing.as.far.as.the.wall
21
3
5
The cable outlet in the inner panel must be on the slider side.
09.201920/24 H47.WANS010EN-04
AEROInstallation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160
9.3 Replacing the filter (inner panel E18)
1 3
Push.the.new.filter.behind.the.fixing.clips
2 4
Remove.the.dirty.filter.from.the.casing.and.dispose.of.it
H47.WANS010EN-04 09.2019 21/24
Installation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160 AERO
10 Technical specifications
10.1 AEROTUBE DD 110
AEROTUBE DD 110
Weather grille PVC weather grille
Inner panel E18 E18Tilt.gap.7,5.mm Tilt gap 15 mm
Air throughput(without SK)
at 2 Paat 4 Paat 5 Paat 7 Paat 8 Paat 10 Paat 20 Pa
7 m3/h9 m3/h11 m3/h12 m³/h13 m3/h16 m3/h21 m3/h
8 m3/h11 m3/h12 m3/h14 m3/h15 m3/h17 m3/h27 m3/h
AEROTUBE DD 110
Weather grille PVC weather grille
Inner panel E18Tilt.gap.7,5.mm
Pipe length 500 mm 340 mm 270 mm
Sound absorption Dn,e,w1 58 dB 55 dB 54 dB
AEROTUBE DD 110
Vent duct EPP type.FL type.SFL
Inner panel E18Tilt.gap.7,5.mm
Pipe length 340 mm 270 mm 340 mm 270 mm
Sound absorption Dn,e,w1 64 dB 63 dB 67 dB 67 dB
1) Measured in accordance with DIN EN 10140-2 Further combination options on request
09.201922/24 H47.WANS010EN-04
AEROInstallation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160
10.2 AEROTUBE DD 160
AEROTUBE DD 160
Weather grille Stainless steel weather grille hood
Inner panel E18 E287,5.mm.Parallel-action.gap open
Air throughput(without SK)
at 2 Paat 4 Paat 5 Paat 7 Paat 8 Paat 10 Paat 20 Pa
8 m3/h12 m3/h14 m3/h17 m³/h18 m3/h22 m3/h32 m3/h
13 m3/h20 m3/h22 m3/h27 m3/h30 m3/h31 m3/h49 m3/h
AEROTUBE DD 160
Weather grille Stainless steel weather grille hood
Inner panel E18 E18 E28Tilt.gap.7,5.mm 7,5.mm.Parallel-action.gap open
Pipe length 340 mm 270 mm 340 mm 270 mm 340 mm 270 mm
Sound absorption Dn,e,w1
without SKSK2SK3SK4
57 dB62 dB63 dB65 dB
53 dB56 dB57 dB59 dB
54 dB59 dB60 dB62 dB
50 dB53 dB54 dB56 dB
54 dB59 dB60 dB62 dB
50 dB53 dB54 dB56 dB
AEROTUBE DD 160
Vent duct EPP type.FL type.SFL
Inner panel E18Tilt.gap.7,5.mm
Pipe length 340 mm 270 mm 340 mm 270 mm
Sound absorption Dn,e,w1
without SKSK2SK3SK4
65 dB69 dB71 dB73 dB
64 dB67 dB68 dB71 dB
71 dB73 dB75 dB75 dB
66 dB69 dB69 dB72 dB
1) Measured in accordance with DIN EN 10140-2 Further combination options on request
H47.WANS010EN-04 09.2019 23/24
Installation and operating instructionsAEROTUBE DD 110 / AEROTUBE DD 160 AERO
11 Dimensions
AEROTUBE DD 110 / AEROTUBE DD 160
1 PVC weather grille
63
□ 27
9
41 7
500
Ø14
01166
□ 17
8
□ 22
5
53 6 8
50037 mm
Ø 1
84 m
m
2
2 PVC weather grille D 160
3 Stainless steel weather grille hood
4 Ventilation.pipe.Ø.110.mm
5 Ventilation.pipe.Ø.160.mm
6 Wind pressure barrier
7 Inner panel E28
8 Inner panel E18
Examples.of.presentations
63
□ 27
9
41 7
500
Ø14
01166
□ 17
8
□ 22
5
53 6 8
50037 mm
Ø 1
84 m
m
2
Vent duct EPP, type FL Vent duct EPP, type SFL:
100250600
360
t = 60
600 180
min
. 500
100
360
360
250
t = 60
Cropping area Penetrable area e.g..for.screws.or.insulation.fixings