Subject: EngineerPage Label: 1Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:04 PMColor:
Add PCD File No. PPR 1913
dsdgrimm (18)
Subject: Reviewed ByPage Label: 1Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:05 PMColor:
Subject: EngineerPage Label: 3Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:07 PMColor:
Should this be the owner of the property?
Subject: EngineerPage Label: 4Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:08 PMColor:
ESQCP shows 29 acres.
Subject: EngineerPage Label: 4Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:09 PMColor:
submit a maintenance agreement and O&M
Subject: EngineerPage Label: 9Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:14 PMColor:
A portion is within the 500-year floodplain. Revise.
Subject: EngineerPage Label: 9Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:19 PMColor:
The GEC shows grading within a small portion ofthe 100-year floodplain. Revise.
Add PCD File No. PPR 1913
Reviewed by dsdgrimm
04/23/20195:56:30 PM
Should this be theowner of the property?
ESQCP shows 29 acres.
submit a maintenanceagreement and O&M
A portion is within the500-year floodplain.Revise.
The GEC shows grading within a smallportion of the 100-year floodplain. Revise.
Subject: EngineerPage Label: 9Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:20 PMColor:
GEC outlet detail shows a 30" pipe. Revise.
Subject: EngineerPage Label: 10Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:21 PMColor:
It appears that this FIRM is from 1997. Please usethe updated 2018 FIRM.
Subject: EngineerPage Label: 11Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:22 PMColor:
Note: This is a duplicate page
Subject: EngineerPage Label: 13Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:23 PMColor:
It appears that you are missing pages here. Theother three steps of the Four Step Process aremissing. Please include those steps.
Subject: EngineerPage Label: 15Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:26 PMColor:
Where is this located in the criteria? Chapter 6 ofCity DCM Vol. 1, Section 3.2.4 Minimum Time ofConcentration shows a minimum of 10 minutes forundeveloped areas and a minimum of 5 minutesfor urbanized areas. This is not an urbanized areaand should have a minimum time of 10 minutes.
Subject: EngineerPage Label: 15Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:27 PMColor:
Provide the calculations for your initial flow time.
Subject: EngineerPage Label: 17Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:28 PMColor:
Where is this located in the criteria? Chapter 6 ofCity DCM Vol. 1, Section 3.2.4 Minimum Time ofConcentration shows a minimum of 10 minutes forundeveloped areas and a minimum of 5 minutesfor urbanized areas.
Subject: EngineerPage Label: 17Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:29 PMColor:
Provide the calculations for your initial flow time.
GEC outlet detail shows a 30" pipe. Revise.
It appears that this FIRM isfrom 1997. Please use theupdated 2018 FIRM.
Note: This is a duplicate page
It appears that you are missing pages here.The other three steps of the Four Step Processare missing. Please include those steps.
Where is this located in the criteria?Chapter 6 of City DCM Vol. 1, Section 3.2.4Minimum Time of Concentration shows aminimum of 10 minutes for undevelopedareas and a minimum of 5 minutes forurbanized areas. This is not an urbanizedarea and should have a minimum time of10 minutes.
Provide the calculations for your initial flow time.
Where is this located in the criteria? Chapter 6 ofCity DCM Vol. 1, Section 3.2.4 Minimum Time ofConcentration shows a minimum of 10 minutes forundeveloped areas and a minimum of 5 minutes forurbanized areas.
Provide the calculations for your initial flow time.
Subject: EngineerPage Label: 30Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:31 PMColor:
Input the optional override data based on theactually dimensions of the pond in the GEC.
Subject: EngineerPage Label: 30Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:32 PMColor:
Provide the UD Spreadsheet calculations for theoutlet structure.
Subject: EngineerPage Label: 38Lock: LockedAuthor: dsdgrimmDate: 4/24/2019 1:39:33 PMColor:
Where are the flow paths for Basin 1 and 4 locatedon this map? Please provide.
Inpu
t the
opt
iona
lov
errid
e da
ta b
ased
on
the
actu
ally
dim
ensi
ons
of th
epo
nd in
the
GE
C.
Pro
vide
the
UD
Spr
eads
heet
cal
cula
tions
for
the
outle
t str
uctu
re.
Where are the flowpaths for Basin 1 and4 located on this map?Please provide.