26. SARAIKELA-NABARD-1-2015-16 - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR...
-
Upload
phamnguyet -
Category
Documents
-
view
232 -
download
6
Transcript of 26. SARAIKELA-NABARD-1-2015-16 - jswm.nic.injswm.nic.in/File/Top_Box/PPR/NABARD PPR...
PRELIMINARY PROJECT REPORT (PPR)PRELIMINARY PROJECT REPORT (PPR)PRELIMINARY PROJECT REPORT (PPR)PRELIMINARY PROJECT REPORT (PPR)
NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT
(NABARD)(NABARD)(NABARD)(NABARD)
BLOCK:BLOCK:BLOCK:BLOCK: KUKRUKUKRUKUKRUKUKRU & ICHAGARH& ICHAGARH& ICHAGARH& ICHAGARH
DISTRICT: DISTRICT: DISTRICT: DISTRICT: SARAIKELASARAIKELASARAIKELASARAIKELA----KHARSAWANKHARSAWANKHARSAWANKHARSAWAN
PIAPIAPIAPIA
SAHAYOGI MAHILASAHAYOGI MAHILASAHAYOGI MAHILASAHAYOGI MAHILA
SARAIKELASARAIKELASARAIKELASARAIKELA
NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: NAME OF THE PROJECT: SARAIKELASARAIKELASARAIKELASARAIKELA----NABARDNABARDNABARDNABARD----1111////2012012012015555----11116666
SUBMITTED TOSUBMITTED TOSUBMITTED TOSUBMITTED TO
NATIONNATIONNATIONNATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENTAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENTAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENTAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT
RANCHIRANCHIRANCHIRANCHI
STATE LEVEL NODAL AGENCYSTATE LEVEL NODAL AGENCYSTATE LEVEL NODAL AGENCYSTATE LEVEL NODAL AGENCY---- JHARKHAND STATE WATERSHED MISSIONJHARKHAND STATE WATERSHED MISSIONJHARKHAND STATE WATERSHED MISSIONJHARKHAND STATE WATERSHED MISSION
DEPARTMENT OF RURAL DEVELOPMENTDEPARTMENT OF RURAL DEVELOPMENTDEPARTMENT OF RURAL DEVELOPMENTDEPARTMENT OF RURAL DEVELOPMENT
4444THTHTHTH FLOOR, FFP BUILDING, DHURWA, RANCHIFLOOR, FFP BUILDING, DHURWA, RANCHIFLOOR, FFP BUILDING, DHURWA, RANCHIFLOOR, FFP BUILDING, DHURWA, RANCHI---- 834004834004834004834004
TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 TELEPHONE/ FAX: 91 ---- 651651651651----2446217244621724462172446217, 2401974, 2401974, 2401974, 2401974
EEEE----MAIL : MAIL : MAIL : MAIL : [email protected], WEB SITE:WEB SITE:WEB SITE:WEB SITE: jswm.nic.in
1
PROPOSED PROJECT
SARAIKELA-NABARD-1/2015-16
2
Format for Preliminary Project Report (PPR)
I. Institutional Structures.
I. A. State Level Nodal Agencies
I. B. District Level Watershed Units
II. Selection of Watershed Projects
III. Profile of the each selected watershed project
IV. Agro-climatic condition of project area.
V. Demography & land distribution
VI. Livelihoods
VII. Expected project out comes
VIII. Mandatory certificates
IX. Status of on-going projects
X. Abstract of project proposed for sanction
3
I. Institutional Structures
I. A. State Level Nodal Agencies (SLNAs):
Table-PPR 1: Details of SLNA
1 2 3 4 5 6
Sl.No. State Type of SLNA# Date of Notification Date of MoU with
DoLR Total no. of members of SLNA
1 Jharkhand
Jharkhand state Watershed Mission (No.
103/2009-10 dated 17/7/2009, Registered
Under society registration Act 21 of 1860, )
4673 Dated 20-06-09
Under Process 19 including (CEO)
Whether it is a Department /Mission/ Society/Authority/Others (pl. specify) Society (contd.)
Table-PPR 1: Details of SLNA (Contd.)
7 8
Chairperson CEO
Name Designation Name Designation Date of
Appointment Nature of
appointment Tenure (No.
of Years) Contact Ph. No./Fax/E-
Governing Body: Mr. SUDHIR
PRASAD, IAS
Development Commissioner
Mr B Nijalingappa, IFS
Chief Executive Officer State Level Nodal
Agency-Jharkhand State Watershed Mission Rural Development
Department Govt. of Jharkhand
Vide notification
no. 887 dated 22-02-2010
On deputation 3 Years
0651-2401974
Executive Committee-
MrARUN, IAS
Secretary, Rural
Development # APC/ ACS/ Dev. Commissioner/ Others (pl. specify) $ Deputation/ Contract
4
Table - PPR 2: Details of functionaries in the JSWM-SLNA
Details of the persons engaged in the SLNA- Jharkhand State Watershed Mission funded by DoLR
Sl.No Name &
Designation
Monthly
remuneration
Date of
Appointment
Nature of
appointment
Tenure
(No. of
years)
Contract Ph. No. /
Subject of
Expertise
Qualification Experience Role
1.
Shri Madan
Sengupta
Administrative Officer
40,000 26-05-2010 On Contract 1 Yr. 9431114862
[email protected] Law &
Administration
M.Sc. (Geology),
LLB.
About 32 Years
experience.
Administration, Supervision, EC /GB Meetings
organisations etc.
2.
Shri. Narayan
Kumar Mishra Technical Expert
(Agriculture /Agril. Engineering)
50,000 29
th May,
2010 On contract 1 Yr.
9431574367, [email protected]
Watershed Management,
Soil and Water Conservation, GIS & Remote
Sensing
Master of Engineering (Ag), B Tech
(Agril. Engineering).
PGDRD, NET, GATE
12years of relevant
experiences in watershed mgt. and
development, agriculture dev., rural and social
dev.,
To give the technical
assistance & Monitoring &
evaluation of the projects.
3.
Shri. Anupam
Bharti
Technical Expert (Livelihood)
50,000 29.05.10 On Contract 1 Yr. 9308351370
Horticulture, Rural
development
M Sc (horticulture)
10 years of relevant
experience in agriculture, rural dev.,
horticulture, marketing,
retail
To give the technical
assistance & Monitoring &
evaluation of the projects.
4.
Shri. Kaushlendra
Kumar
Techninical Expert in Capacity Building
(Water Management)
50,000 29.05.2010 On contract 1 Yr. 9431071292
Soil & Water Conservation
and Watershed managemrnt
B Tech (Agricultural
Engineering ), M Tech in
Agricultural Engineering
(Soil and Water
Conservation) and PGDRD
12 years of working
experiences in watershed
management, soil and water conservation,
rural development
and GIS
To give the technical
assistance & Monitoring &
evaluation of the projects
5.
Shri. Lakhan Lal
Mahato GIS Expert
40,000 29-05-2010 On Contract 1 Yr. 9470335956
[email protected] GIS & Remote
Sensing
M.Tech (Remote Sensing)
14 years In the field of
GIS and Remote Sensing
GIS, RS and Geodatabase management
6. Smt. Jyoti Pushpa
Finance Officer 40,000 24.08.2010 On Contract 1 Yr.
9905582591 [email protected]
Accountancy CA 13 Years Finance
Management
7.
Smt. Pratibha
Kumari
Accounts Officer 35,000 15.09.2010 On Contract 1 Yr. [email protected] Finance
M Com, MBA in Finance
5 Yrs 6 Months
Accounts Management
8. Smt. Shyama, 25,000 1st June 2010 On Contract 1 Yr. 9472018349 Finance M Com, MBA 8 years Accounting
5
Details of the persons engaged in the SLNA- Jharkhand State Watershed Mission funded by DoLR
Sl.No Name &
Designation
Monthly
remuneration
Date of
Appointment
Nature of
appointment
Tenure
(No. of
years)
Contract Ph. No. /
Subject of
Expertise
Qualification Experience Role
Account Assistant in Finance
9.
Shri. Ajeet Kumar
Ravi
Account Assistant 25,000
26th
May, 2010
On Contract 1 Yr. 9471764888/
[email protected] Accounts
M.com (Finance),
B Com (Account
Hons)
7 years Accounting,
Auditing, Taxation etc
10. Shri. Vipul Akash
Programmer 25,000
28th
February, 2014
On Contract 1 Yr. 9472741901 /
[email protected] MIS Expert MCA 5 years
MIS Expert, On line MIS Entry
11.
Shri. Amrendra
Kumar DEO-cum-Assistant
15,000 29-05-2010 On Contract 1 Yr. 9431184303 /
[email protected] Database Admin.
MCA About 7 Years File dispatch and
receipt
12. Tulsi Ram
DEO-cum-Assistant 15,000
13th
June, 2012
On Contract 1 Yr. [email protected] computer operator
BCA 8 years Data Entry &
Assistant
13. Promod Rajak
DEO-cum-Assistant 15,000 8
th June, 2012 On Contract 1 Yr.
8539809046 [email protected]
computer operator
MCA 6 years Data Entry &
Website maintance
14. Md. M.H.Imam
DEO-cum-Assistant 15,000 6
th June, 2012 On Contract 1 Yr.
9304334055 [email protected]
computer operator
M.Sc (IT), MBA
9 Years Data Entry &
Assistant
Note: 1. Total outlay per Month for 12 SLNA-JSWM staffs under IWMP is Rs. 4.40 Lakhs
R – Recurring; NR- Non-recurring * From column no. 3, totals no. of persons, from column no. 7 to 9, totals, may be indicated for the State at the end of the table.
6
Table PPR-3: Details of State Level Data Cell (SLDC) functionaries
1 2 3 4 5 6 7 8 9
S. No
Total no. of the
persons
working
in the
SLNA for
IWMP
Name & Designation Qualification Experience
Work allocation Monthly remuner
ation
(Rs.)
Total budget of SLDC
(Rs. In Lakh)
Funding expected from DoLR
(Rs. In Lakh)
R NR R NR
1 1 Shri. Vinod Kumar. V. H, Project Co-ordinator
M Tech (Water Resources)
6 years Creation and updation of Geodatabase under IWMP Project using satellite data
30,000.00
2 1 Shri. Anuj Shankar, MIS State Coordinator
MCA 4 years Updation of all the thematic layer using MIS Software development
15000.00
3 3 Shri. Abdul Saqoor, Field Supervisor
M Sc (IT) 5 years Updation of data using GIS & Remote Sensing software and collection of field level data under watershed project
10000.00
4 Vishal Kumar Field Supervisor
B Sc (Fisheries), MBA, Rural Management
5 years Updation of data using GIS & Remote Sensing software and collection of field level data under watershed project
10000.00
5 Ratnesh Kumar Sharma Field Supervisor
M Sc (Math), Advance Diploma in Computer Application
6 years Updation of data using GIS & Remote Sensing software and collection of field level data under watershed project
10000.00
Total 5 65,000.00
Note- 1. Payment of above experts / staffs is being paid by state budget of JSAC 2. SLDC has been established at JSAC. However it is planning to establish SLDC in the office of JSWM. R – Recurring; NR- Non-recurring * From column no. 3, totals no. of persons, from column no. 7 to 9, totals, may be indicated for the State at the end of the table.
7
I. B. District Level Watershed Units Table-PPR 4: Details of functionaries in the DRDA Watershed Cell*
S. No.
Name of the
District
Name of the
executing Agency#
Status of Chairman
@
Date of signing of MoU
with SLNA
Total no. of persons
working for Watershed programme
Names & Designation
Qualification Experience Work allocation
24
IWMP Districts
WCDC D.D.C NA 3 ( in each
district)
1. Technical Expert
Bachelor degree in the fields of agriculture/ horticulture/hydrology/soil engineering and animal husbandry with goog academic records
The candidate should have at least 5 years field / research experience in the fields of soil and water conservation/ forestry/ dry land agriculture/horticulture/ watershed management or related fields like assessment, management and mitigation of drought climatic and other associated risks, crop husbandry, crop specific technology, horticultural practices, livelihoods, animal husbandry etc
Remarks: 1. The committee will advice the district data cell for monitoring and evaluation. 2. The committee will facilitate for preparing of prospective plan 3. The committee will identify voluntary organization
2. Accountant
A serving govt. officer on deputation or a retd. Govt. officer from a finance/ accounts service
5 years experience in related work at reputed firm/organization
3. Data Entry Operator
BSc Hons (Computer Science) or BCA or PGDCA or MCA will be preferred.
2 years experience in field of MIS
(contd.)
11 12
Monthly remuneration/year in each district (in Rs.)
Total Annual budget of Watershed Cell in each district (Rs. In Lakh)
R NR
1. Project Manager cum Technical Expert - 25000 / 3 Lakh 2. Accountant - 10000/1.20 Lakh 3. DEO - 7500/0.9 Lakh
5.10 lakh 4.00 lakh
R – Recurring; NR- Non-recurring *From column no. 2, no. of districts; from column no. 3, no. of executive agencies; from column no. 6, no. of persons working in the executive agencies of watershed programme; from column no.7, total no. of personnel engaged in the watershed cells, from column no. 11 to 13, totals for the State may be indicated at the end of the table. WCDC/ DRDA/Zilla Parishad (ZP)/ State Department (please specify)/ Any other (Please specify) @collector/CEO ZP/ CDO/ DDO/ PD/ Any other (please specify)
8
II. SELECTION OF WATERSHED PROJECTS
Table-PPR 5: status of District-wise area covered under the watershed programme* (MIS Table-M(SP)2)
S. No.
Names of Districts
Total micro-watersheds in the
District
Micro-watersheds covered so far
Net watersheds to be covered
Dept. of Land Resources
Other Ministries/ Depts.
Total watersheds covered
Pre-IWMP projects (DPAP + DDP +
IWDP)
Any other watershed project
No. Area (ha.) No. Area (ha.) No. Area (ha.) No. Area (ha.) No. Area (ha.)
1 Saraikela-Kharsawan
339 2,65,230 33 29,784 10 5,805 43 35,589 194 2,00,049
Note: As per State Specific Perspective Plan (SPSP) 102 Micro-Watersheds ( Area: 29,592.00 Ha) is not available for treatment due to Urban areas,
Habitations, Mining areas, Water bodies etc.
STATUS OF IWMP PROJECTS SANCTIONED OF SARAIKELA KHARSAWAN DISTRICT
S.No District Block Name of Project No. of
Cluster
No. of
MWS
Treatable Area
( in Ha)
1.
SARAIKELA KHARSAWAN
Rajnagar SARAIKELA KHARSAWAN-
IWMP-1/2009-10 1 10 5042.70
2. Ichagarh, Chandil SARAIKELA KHARSAWAN-
IWMP-2/2011-12 1 5 5246.25
3. Ichagarh SARAIKELA KHARSAWAN-
IWMP-3/2011-12 1 7 6360.39
4. Gobindpur SARAIKELA KHARSAWAN-
IWMP-4/2011-12 1 7 5458.44
5. Kharsawan
SARAIKELA KHARSAWAN-
IWMP-5/2013-14 1 4
5797.3684
TOTAL 5 33 27,905.1484 Source of data: Jharkhand Space Applications Center, Deptt. of IT, Govt. of Jharkhand and SLNA-JSWM
9
Table-PPR 6: Prioritized list of projects proposed for sanction during the financial year 2015-16
1 2 3 4 5 6 7 8
S. No.
District Name of
the
project
No. of micro-
watersheds
proposed to covered
Proposed project area
(ha)
Type of project
(Hilly/Dese
rt/Others)
Proposed Project cost
(Rs. In
lakh)
Weightage under the criteria#
i ii iii iv v vi vii viii ix x xi xii xiii Total
1 Saraikela-
Kharsawan NABARD 10 5313.3974 Others 1062.6795 7.5 5 5 10 10 0 15 7.5 15 10 5 15 00 105
* from column no. 2, total no. of districts, from column no. 3, total no. of projects selected for sanction, from column no.4, total no. of micro-watersheds to
be covered, from column no.5, total project area proposed, from column no. 7, total cost proposed, may be indicated for the entire State at the end of the table.
# Criteria and weightage for selection of watershed
S No.
Criteria Maximum score
Ranges & scores
i Poverty index(%of poor to population)
10 Above 80% (10) 80 to 50 % (7.5) 50 to 20 % (5) Below 20% (2.5)
ii % of SC/ST population 10 More than 40% (10) 20 to 40 % (5) Less than 20% (3)
iii Actual wages 5 Actual wages are significantly lower than minimum wages (5)
Actual wages are equal to or higher than minimum wages (0)
iv % of small and marginal farmers
10 More than 80% (10) 50 to 80% (5) Less than 50 (3)
v Ground water status 15 Over exploited (15) Critical (10) Sub critical (5) Safe (0)
vi Moisture index/ DPAP/DDP Block
10 -66.7 & below (10) DDP Block -33.3 to -66.6 (5) DPAP Block 0 to -33.2 (0) Non DPAP/DDP Block
vii Area under assured irrigation
15 Less than 10% (15) 10 to 20% (10) 20 to 30% (5) Above 30% (Reject)
viii Drinking water 10 No source (10) Problematic village (7.5) Partially covered (5) Fully covered (0)
ix Degraded land 15 High – above 20% (15) Medium – 10 to 20 % (10) Low – less than 10 % of TGA (5)
x Productivity potential of the land
10 Lands with low production & where productivity can be significantly enhanced with reasonable efforts (10)
Land with moderate production & where productivity can be enhanced with reasonable efforts (5)
Lands with high production & where productivity can be marginally enhanced with reasonable efforts (0)
xi Contiguity to another watershed that has already been developed/treated
10 Contiguous to previously treated watershed & contiguity within the micro
Contiguity with in the micro watersheds in the project but non contiguous to previously
Neither contiguous to previously treated watershed nor contiguity
10
watersheds in the project (10) treated watershed (5) within the micro watersheds in the project (0)
xii Cluster approach in the plains (more than one contiguous micro-watersheds in the project)
15 Above 6 micro-watersheds in cluster (15)
4 to 6 micro watersheds in cluster (10)
2 to 4 micro watersheds in cluster (5)
xiii Cluster approach in the hills (More than one contiguous micro- watersheds in the project)
15 Above 5 micro-watersheds in cluster (15)
3 to 5 micro watersheds in cluster (10)
2 to 3 micro watersheds in cluster (5)
Total 150 150 90 41 2.5
11
PROJECT WISE PROFILE OF THE SELECTED WATERSHED PROJECT
Table – PPR 7: Project at a Glance
1 Name of the State JHARKHAND
2 Name & type# (Hilly/ Desert/ Others) of project
OTHERS
3 Name of the District SARAIKELA KHARSAWAN
4 Name of the Blocks KUKRU & ICHAGARH
5 Name of Gram Panchayats BANDU CHIMTA GOURANG KOCHA ICHADIH JANUM KUKRU
LATEMDA MAYSARA PARGAMA PATKUM TIRULDIH URIA
6 Names & Census Code of Villages covered Sl.No Village Name Census Code Sl.No Village Name Census Code
1 Adardih 02899700 23 Ichadih 02899000
2 Bakaltoria 02900600 24 Ichagarh 02900700
3 Bakar Kuri 02898900 25 Janum 02905200
4 Bandabir 02899100 26 Jargo 02899200
5 Berasisiram 02905400 27 Kalichamda 02904800
6 Burudih 02898600 28 Karka 02900100
7 Buruhata 02900200 29 Karkidih 02898800
8 Chamda 02904700 30 Kendaenda 02907900
9 Chano 02897700 31 Khokhro 02897600
10 Chauki 02899600 32 Khudilong 02907600
11 Dalgam 02904300 33 Kukru 02898400
12 Datam 02897900 34 Kumari 02908000
13 Dere 02898500 35 Kunjaban 02902700
14 Diadih 02899800 36 Lapsadih 02900500
15 Dulmi 02907700 37 Latenda 02899300
16 Durri 02900400 38 Matekumdih 02900300
17 Edaldih 02898700 39 Maysara 02899500
18 Garadih 02900000 40 Patkum 02904200
19 Gaurang Kocha 02904100 41 Shishi 02898000
20 Heremuli 02897800 42 Shyam Nagar 02907500
21 Hesalang 02907400 43 Udhatanr 02907800
22 Hurlung 02904600
12
7 Names & Census Code of micro- watersheds
1 2 3 4 5 6
Sl. No. Micro Watershed Code
Area of the Micro
Watershed (in Ha)
Proposed Area to be treated (in Ha)
Project Cost (Proposed Area X 0.20)
(Rs.in Lakh)
Remarks
1 4H3C1e3f 495.5356 429.7601 85.95202
Proposed Area to be treated = PF/Others+ Rainfed+
Per.Pasture+ Cult.WL
2 4H3C1e4a 824.3037 734.9535 146.9907
3 4H3C1e4f 740.9440 671.9791 134.39582
4 4H3C1e5a 695.6471 630.4170 126.0834
5. 4H3C1e5b 992.9872 886.9134 177.38268
6. 4H3C2b1c 546.9587 501.6209 100.32418
7. 4H3C2c7e 322.2192 269.1763 53.83526
8. 4H3C2c7f 449.5713 433.0796 86.61592
9. 4H3C2c7g 586.8413 444.5424 88.90848
10. 4H3C2c7h 487.1354 310.9553 62.19106
GRAND TOTAL 6142.1435 5313.3974 1062.67948
8 Four major reasons for selection of watershed
� IAP District ( District is affected by Left Wing Extremist (LWE)
� Erosion prone area
� Poor human development index
� Proportion of scheduled caste / STs Population.
9 Area of the Project (ha.) 6142.1435
10 Area proposed to be treated (ha.) 5313.3974
11 Project cost (Rs. In Lakhs) 1062.6795
12 Name & Address of proposed PIA SAHAYOGI MAHILASAHAYOGI MAHILASAHAYOGI MAHILASAHAYOGI MAHILA, , , , SARAIKELASARAIKELASARAIKELASARAIKELA
13 Any other (please specify) -
13
Table – PPR 8: Details of previously identified DPAP /DDP areas proposed under IWMP (ha.) during the financial year*
1 2 3 4 5 6 7 8 9 10 11 12
S. No.
Names of Districts
Name of the
project proposed
Name of Block
Type of District (DPAP/
DDP /IWDP/IAP)
Area of District
(ha.)
No. of IWMP
projects sanctioned
in the District
Area of sanctioned
Projects (in Ha)
Net area to be covered
Area of the proposed project
Area proposed to
be covered by schemes
other than DoLR
Net balance area
1 Saraikela Kharsawan
NABARD KUKRU & ICHAGARH
IWDP 265230 5 27,905.15 1,77,941.22 5313.3974 NA 1,39,029.90
*from column no. 2, total no. of districts, from column no. 3, total no. of projects proposed, from column no.4, total no. of Blocks, from column no.6 to 12,
totals, may be indicated for the entire State at the end of the table.
14
PPR 9: Land Use pattern to the project
DISTRICT: SARAIKELA, BLOCK: KUKRU & ICHAGARH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Sl.
No.
Micro
Watershed
Code
Area of
the Micro
Watershed
Village
Name
Geographical
Area of the
Village
(Full/Part)
Forest
Area
(7+8)
RF PF/
Others
Agricultur
al Land in
use
(10+11)
Rainfed Irrigated
Land
Permane
nt
Pasture
Wasteland Proposed
Area to be
treated
(7+8+10+
12+13)
Budget
(Proposed
Area X 0.20)
(Rs.in Lakh)
Cultiva
ble
Non
Cultivab
le
1 4H3C1e3f 495.5356 Berasisiram 2.2824 0.0000 0.0000 0.0000 2.2824 2.0194 0.2629 0.0000 0.0000 0.0000 2.0194 0.4039
Dulmi 162.0710 0.0000 0.0000 0.0000 112.8118 102.0496 10.7622 1.1132 39.5686 8.5774 142.7314 28.5463
Hesalang 20.3579 0.1646 0.0000 0.1646 20.1933 17.8671 2.3263 0.0000 0.0000 0.0000 18.0317 3.6063
Janum 6.6902 2.5216 0.0000 2.5216 2.6952 2.3847 0.3105 0.0000 0.3893 1.0841 5.2956 1.0591
Khudilong 110.7917 19.4875 0.0000 19.4875 76.3331 68.2952 8.0379 0.0000 6.9900 7.9810 94.7728 18.9546
Maysara 5.2234 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.2234 0.0000 0.0000
Shyam
Nagar 61.8900 11.9912 0.0000 11.9912 49.1722 43.5075 5.6646 0.0000 0.0000 0.7267 55.4987 11.0997
Udhatanr 126.2290 0.0000 0.0000 0.0000 57.4611 51.4104 6.0507 0.0000 60.0000 8.7679 111.4104 22.2821
Total 495.5356 34.1649 0.0000 34.1649 320.9490 287.5339 33.4151 1.1132 106.9480 32.3604 429.7601 85.9520
2 4H3C1e4a 824.3037 Bandabir 130.1157 6.5966 0.0000 6.5966 100.1510 90.5966 9.5544 1.1012 0.6410 21.6260 98.9353 19.7871
Chauki 5.2777 0.1555 0.0000 0.1555 0.1997 0.1767 0.0230 0.0000 0.0000 4.9226 0.3322 0.0664
Ichadih 106.1206 21.6925 0.0000 21.6925 82.6693 73.9642 8.7051 0.0000 0.7814 0.9774 96.4381 19.2876
Janum 263.3616 59.0443 0.0000 59.0443 137.5912 124.4650 13.1262 1.1387 60.6026 4.9849 245.2505 49.0501
Kendaenda 201.5316 39.2074 0.0000 39.2074 37.8499 33.4896 4.3603 0.0000 120.0000 4.4744 192.6970 38.5394
Khudilong 6.8730 1.5469 0.0000 1.5469 3.7487 3.3169 0.4319 0.0000 0.0000 1.5774 4.8638 0.9728
Maysara 23.5386 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 20.0000 3.5386 20.0000 4.0000
Udhatanr 87.4847 0.0000 0.0000 0.0000 29.8787 26.4367 3.4420 0.0000 50.0000 7.6060 76.4367 15.2873
Total 824.3037 128.2431 0.0000 128.2431 392.0885 352.4456 39.6429 2.2399 252.0250 49.7073 734.9535 146.9907
3 4H3C1e4f 740.9440 Bandabir 27.5048 1.0380 0.0000 1.0380 22.8921 20.2549 2.6372 0.0000 3.5748 0.0000 24.8676 4.9735
Ichadih 10.0881 0.0000 0.0000 0.0000 8.6492 7.6528 0.9964 0.0000 1.4390 0.0000 9.0917 1.8183
Janum 26.3703 14.5732 0.0000 14.5732 10.8961 9.6408 1.2552 0.0000 0.9010 0.0000 25.1151 5.0230
Jargo 80.3468 19.5641 0.0000 19.5641 41.0114 36.2869 4.7245 0.0000 14.5493 5.2219 70.4004 14.0801
Kukru 232.3611 4.1919 0.0000 4.1919 141.2835 127.8050 13.4784 1.1425 79.3764 6.3668 212.5159 42.5032
Latenda 364.2729 7.9062 0.0000 7.9062 297.2963 271.8775 25.4188 2.9632 47.2415 8.8656 329.9884 65.9977
Total 740.9440 47.2735 0.0000 47.2735 522.0286 473.5180 48.5106 4.1057 147.0819 20.4544 671.9791 134.3958
4 4H3C1e5a 695.6471 Adardih 182.7220 0.0000 0.0000 0.0000 125.0358 113.1074 11.9284 1.1265 55.2412 1.3184 169.4751 33.8950
15
DISTRICT: SARAIKELA, BLOCK: KUKRU & ICHAGARH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Sl.
No.
Micro
Watershed
Code
Area of
the Micro
Watershed
Village
Name
Geographical
Area of the
Village
(Full/Part)
Forest
Area
(7+8)
RF PF/
Others
Agricultur
al Land in
use
(10+11)
Rainfed Irrigated
Land
Permane
nt
Pasture
Wasteland Proposed
Area to be
treated
(7+8+10+
12+13)
Budget
(Proposed
Area X 0.20)
(Rs.in Lakh)
Cultiva
ble
Non
Cultivab
le
Bakar Kuri 12.9761 0.0449 0.0000 0.0449 12.9312 11.4415 1.4897 0.0000 0.0000 0.0000 11.4864 2.2973
Buruhata 20.8069 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 20.0000 0.8069 20.0000 4.0000
Chauki 245.4259 0.0000 0.0000 0.0000 136.3056 123.3020 13.0036 1.1378 100.0000 7.9825 224.4398 44.8880
Garadih 0.1955 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.1955 0.0000 0.0000
Ichadih 212.9883 17.7036 0.0000 17.7036 177.3124 160.3968 16.9156 1.1786 11.0231 5.7707 190.3020 38.0604
Kendaenda 1.3948 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.3948 0.0000 0.0000
Kukru 14.3569 0.0000 0.0000 0.0000 3.9920 3.5321 0.4599 0.0000 10.3649 0.0000 13.8970 2.7794
Latenda 0.8165 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.8165 0.0000 0.8165 0.1633
Maysara 3.9642 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 3.9642 0.0000 0.0000
Total 695.6471 17.7485 0.0000 17.7485 455.5769 411.7798 43.7971 3.4429 197.4457 21.4331 630.4170 126.0834
5 4H3C1e5b 992.9872 Adardih 52.0403 0.0000 0.0000 0.0000 44.9950 39.8116 5.1834 0.0000 1.8764 5.1689 41.6880 8.3376
Bakar Kuri 247.1758 15.4199 0.0000 15.4199 216.1455 197.6651 18.4804 2.2183 10.0000 3.3921 225.3032 45.0606
Burudih 25.4292 2.6153 0.0000 2.6153 22.8139 20.1857 2.6282 0.0000 0.0000 0.0000 22.8010 4.5602
Chano 3.3307 0.7121 0.0000 0.7121 1.5633 1.3832 0.1801 0.0000 1.0553 0.0000 3.1506 0.6301
Datam 23.4443 3.9114 0.0000 3.9114 12.6149 11.1617 1.4532 0.0000 6.9179 0.0000 21.9910 4.3982
Dere 174.5581 55.1694 0.0000 55.1694 89.7911 80.3361 9.4550 0.0000 21.6602 7.9375 157.1656 31.4331
Diadih 0.4767 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.4767 0.0000 0.0000
Edaldih 99.9857 13.5095 0.0000 13.5095 76.6227 68.5543 8.0684 0.0000 1.3041 8.5494 83.3679 16.6736
Heremuli 74.5634 9.4185 0.0000 9.4185 61.7835 55.2777 6.5058 0.0000 1.6733 1.6881 66.3695 13.2739
Ichadih 6.7828 0.0000 0.0000 0.0000 6.7828 6.0014 0.7814 0.0000 0.0000 0.0000 6.0014 1.2003
Karkidih 148.3389 0.0000 0.0000 0.0000 91.8716 82.1975 9.6741 0.0000 48.2267 8.2406 130.4242 26.0848
Khokhro 0.0144 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0144 0.0000 0.0000
Kukru 135.8283 4.8292 0.0000 4.8292 77.8358 69.6397 8.1961 0.0000 53.1634 0.0000 127.6322 25.5264
Shishi 1.0187 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.0187 0.0000 1.0187 0.2037
Total 992.9872 105.5852 0.0000 105.5852 702.8200 632.2139 70.6061 2.2183 146.8960 35.4678 886.9134 177.3827
6 4H3C2b1c 546.9587 Dalgam 47.1547 1.8414 0.0000 1.8414 42.4538 37.5631 4.8907 0.0000 0.0000 2.8595 39.4046 7.8809
Gaurang
Kocha 39.5565 8.9430 0.0000 8.9430 27.6414 24.4571 3.1843 0.0000 0.0000 2.9720 33.4002 6.6800
Hurlung 37.9238 5.8785 0.0000 5.8785 5.2418 4.6379 0.6039 0.0000 20.0000 6.8036 30.5164 6.1033
16
DISTRICT: SARAIKELA, BLOCK: KUKRU & ICHAGARH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Sl.
No.
Micro
Watershed
Code
Area of
the Micro
Watershed
Village
Name
Geographical
Area of the
Village
(Full/Part)
Forest
Area
(7+8)
RF PF/
Others
Agricultur
al Land in
use
(10+11)
Rainfed Irrigated
Land
Permane
nt
Pasture
Wasteland Proposed
Area to be
treated
(7+8+10+
12+13)
Budget
(Proposed
Area X 0.20)
(Rs.in Lakh)
Cultiva
ble
Non
Cultivab
le
Ichagarh 1.3652 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.3652 0.0000 0.0000
Kunjaban 0.2511 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.2511 0.0000 0.0000
Lapsadih 0.0423 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0423 0.0000 0.0000
Patkum 420.6651 24.6236 0.0000 24.6236 231.5927 211.7915 19.8012 2.2334 159.6513 2.5642 398.2997 79.6599
Total 546.9587 41.2865 0.0000 41.2865 306.9297 278.4497 28.4800 2.2334 179.6513 16.8578 501.6209 100.3242
7 4H3C2c7e 322.2192 Bakaltoria 2.9666 0.0000 0.0000 0.0000 2.9666 2.6248 0.3417 0.0000 0.0000 0.0000 2.6248 0.5250
Ichagarh 61.9443 0.0000 0.0000 0.0000 42.3902 37.5068 4.8833 0.0000 10.0000 9.5541 47.5068 9.5014
Karka 68.4005 10.4623 0.0000 10.4623 39.1941 34.6789 4.5152 0.0000 9.3430 9.4011 54.4842 10.8968
Lapsadih 181.9858 8.5945 0.0000 8.5945 115.9058 104.8484 11.0574 1.1176 50.0000 6.3680 164.5605 32.9121
Patkum 6.9220 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.9220 0.0000 0.0000
Total 322.2192 19.0568 0.0000 19.0568 200.4566 179.6589 20.7977 1.1176 69.3430 32.2453 269.1763 53.8353
8 4H3C2c7f 449.5713 Adardih 0.0276 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0276 0.0000 0.0000
Buruhata 175.1222 62.0177 0.0000 62.0177 5.3990 4.7770 0.6220 0.0000 107.0220 0.6835 173.8167 34.7633
Chauki 0.6229 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.6229 0.0000 0.0000
Garadih 35.2474 0.1850 0.0000 0.1850 16.1007 14.2459 1.8548 0.0000 14.1093 4.8525 28.5402 5.7080
Karka 13.6630 5.3120 0.0000 5.3120 0.1054 0.0933 0.0121 0.0000 6.3229 1.9227 11.7282 2.3456
Matekumdih 16.1448 7.4471 0.0000 7.4471 0.0000 0.0000 0.0000 0.0000 8.6977 0.0000 16.1448 3.2290
Maysara 208.7433 0.0000 0.0000 0.0000 7.3751 6.5255 0.8496 0.0000 196.3242 5.0441 202.8497 40.5699
Total 449.5713 74.9617 0.0000 74.9617 28.9802 25.6417 3.3385 0.0000 332.4761 13.1532 433.0796 86.6159
9 4H3C2c7g 586.8413 Buruhata 98.0710 18.3663 0.0000 18.3663 63.7044 56.9963 6.7081 0.0000 4.7691 11.2311 80.1317 16.0263
Chamda 11.6598 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 11.6598 0.0000 0.0000
Durri 143.2351 0.0000 0.0000 0.0000 17.2434 15.2570 1.9864 0.0000 120.1826 5.8091 135.4396 27.0879
Hurlung 10.0496 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 10.0496 0.0000 0.0000
Kalichamda 216.9954 0.0930 0.0000 0.0930 56.3444 50.4113 5.9331 0.0000 100.0000 60.5579 150.5044 30.1009
Karka 29.6677 4.3326 0.0000 4.3326 25.0179 22.1359 2.8821 0.0000 0.1612 0.1559 26.6297 5.3259
Lapsadih 25.8460 1.0575 0.0000 1.0575 4.1489 3.6709 0.4780 0.0000 0.0000 20.6397 4.7284 0.9457
Matekumdih 51.3007 16.8278 0.0000 16.8278 23.9584 21.1983 2.7600 0.0000 9.0825 1.4321 47.1086 9.4217
Patkum 0.0162 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0162 0.0000 0.0000
17
DISTRICT: SARAIKELA, BLOCK: KUKRU & ICHAGARH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Sl.
No.
Micro
Watershed
Code
Area of
the Micro
Watershed
Village
Name
Geographical
Area of the
Village
(Full/Part)
Forest
Area
(7+8)
RF PF/
Others
Agricultur
al Land in
use
(10+11)
Rainfed Irrigated
Land
Permane
nt
Pasture
Wasteland Proposed
Area to be
treated
(7+8+10+
12+13)
Budget
(Proposed
Area X 0.20)
(Rs.in Lakh)
Cultiva
ble
Non
Cultivab
le
Total 586.8413 40.6773 0.0000 40.6773 190.4174 169.6698 20.7476 0.0000 234.1954 121.5513 444.5424 88.9085
10 4H3C2c7h 487.1354 Kalichamda 277.9826 5.3001 0.0000 5.3001 79.1579 70.8226 8.3353 0.0000 103.4602 90.0644 179.5829 35.9166
Kumari 0.3526 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.3526 0.0000 0.0000
Matekumdih 8.5095 2.1658 0.0000 2.1658 0.4994 0.4419 0.0575 0.0000 5.8442 0.0000 8.4519 1.6904
Maysara 200.2907 5.7659 0.0000 5.7659 75.9628 67.9640 7.9989 0.0000 49.1905 69.3714 122.9204 24.5841
Total 487.1354 13.2319 0.0000 13.2319 155.6202 139.2285 16.3918 0.0000 158.4949 159.7884 310.9553 62.1911
Grand Total 6142.1435 522.2294 0.0000 522.2294 3275.8671 2950.1398 325.7273 16.4710 1824.5572 503.0188 5313.3974 1062.6795
Source of data: Jharkhand Space Applications Center, Deptt. Of IT, Govt. of Jharkhand
18
IV. AGRO – CLIMATIC CONDITION
Briefly describe the agro- climatic condition of project area including the Agro-climatic zone of project area, soil types, rainfall, major crops, etc.
Table – PPR 10: Details of Agro – climatic condition*
1 2 3 4 5 6 7 8 9
S. No.
Name of the Project
Name of the Agro-climatic zone covers project area
Area in ha Names of the
villages
Major soil types
Topography
Average rainfall in
mm (preceding 5
years average)
Major crops
a) Type b) Area in
ha a) Name
b) Area in ha
1 NABARD ZONE-VI
South Eastern Plateau
6142.1435 Detailed
enclosed in Table PPR-7
Fine loamy, mixed,
hypothermic Typic
Plinthustalfs Fine, mixed
6142.1435 Undulating
with moderate
slop
1511 mm
Paddy 2700
Rabi 475
Vegetable 245
Others 250
TOTAL 3670
* From column no. 5, total no. Of villages, from column no. 6, total Area, from column no. 9, total no. Of crops and total cropped area, may be indicated for the project at the end of the table.
19
Table-PPR 11: Details of flood and drought in the project area
1 2 3 4 5
Sl. No. Particulars Villages
Periodicity
Not affected Annual
Any other (please specify)
1 Flood No. of villages NA
Name(s) of villages NA
2 Drought No. of villages
All 43 Villages
Name(s) of villages Detailed
enclosed in Table PPR-7
3 to 5 yrs.
Table – PPR 12: Details of soil erosion in the project area
1 2 3 4 5
Cause Type of erosion
Area affected (ha) Run off
(mm/year) Average soil loss
(Tonnes / ha / year)
Due to undulating topography Sheet / Rill /
Gully 750/165/70 1020 47.90
20
V. DEMOGRAPHY AND LAND DISTRIBUTION
Growth in population during the last three census’, per capita availability of land, sex ratio, population age group in the project area, literacy level, migration, workforce available in different sectors of the economy, demography of SC, ST, BPL and landless families in the project area in the last ten years, etc. (Attached as Ann-01and Ann-02)
Demography and Land Distribution
Population
Sl. No.
Name of Village HH Total Male Female SC ST Others Sex Ratio Total Male Female Total Male Female
1 Adardih 650 3217 1640 1577 284 145 139 81 42 39 2852
958
2 Bakaltoria 130 532 279 253 493 257 236 1 1 0 38
3 Bakar Kuri 226 1269 642 627 87 47 40 112 67 45 1070
4 Bandabir 218 967 493 474 52 29 23 128 68 60 787
5 Berasisiram 1013 5017 2641 2376 178 87 91 658 363 295 4181
6 Burudih 85 389 187 202 0 0 0 340 163 177 49
7 Buruhata 138 749 399 350 42 23 19 144 73 71 563
8 Chamda 64 307 166 141 13 10 3 36 17 19 258
9 Chano 59 349 196 153 0 0 0 317 175 142 32
10 Chauki 90 440 233 207 0 0 0 74 40 34 366
11 Dalgam 83 382 198 184 0 0 0 46 24 22 336
12 Datam 129 677 345 332 95 47 48 183 95 88 399
13 Dere 70 361 182 179 0 0 0 148 76 72 213
14 Diadih 147 744 398 346 0 0 0 33 15 18 711
15 Dulmi 314 1606 799 807 100 48 52 31 16 15 1475
16 Durri 0 0 0 0 0 0 0 0 0 0 0
17 Edaldih 62 259 128 131 49 17 32 147 73 74 63
18 Garadih 67 311 163 148 0 0 0 7 1 6 304
19 Gaurang Kocha 398 1961 996 965 43 25 18 715 342 373 1203
20 Heremuli 92 403 209 194 58 29 29 169 87 82 176
21 Hesalang 302 1530 777 753 11 6 5 41 20 21 1478
22 Hurlung 51 252 131 121 0 0 0 252 131 121 0
23 Ichadih 306 1447 753 694 27 13 14 264 129 135 1156
24 Ichagarh 284 1399 708 691 275 130 145 55 32 23 1069
25 Janum 399 1965 1025 940 136 76 60 136 67 69 1693
26 Jargo 157 730 379 351 0 0 0 125 62 63 605
27 Kalichamda 64 266 124 142 5 3 2 138 65 73 123
28 Karka 70 320 163 157 5 2 3 291 147 144 24
21
Demography and Land Distribution
Population
Sl. No.
Name of Village HH Total Male Female SC ST Others Sex Ratio Total Male Female Total Male Female
29 Karkidih 89 456 236 220 0 0 0 127 62 65 329
30 Kendaenda 105 456 238 218 0 0 0 81 43 38 375
31 Khokhro 117 675 346 329 0 0 0 331 166 165 344
32 Khudilong 131 574 299 275 15 8 7 22 13 9 537
33 Kukru 498 2640 1367 1273 76 45 31 341 162 179 2223
34 Kumari 58 282 159 123 0 0 0 55 30 25 227
35 Kunjaban 15 67 28 39 53 24 29 0 0 0 14
36 Lapsadih 48 215 109 106 45 23 22 158 80 78 12
37 Latenda 331 1541 803 738 140 79 61 83 46 37 1318
38 Matekumdih 33 147 80 67 0 0 0 147 80 67 0
39 Maysara 181 930 469 461 0 0 0 145 71 74 785
40 Patkum 302 1515 791 724 63 34 29 288 149 139 1164
41 Shishi 99 512 251 261 44 18 26 93 45 48 375
42 Shyam Nagar 75 329 178 151 4 3 1 69 40 29 256
43 Udhatanr 153 677 363 314 18 10 8 7 3 4 652
GRAND TOTAL 7903 38865 20071 18794 2411 1238 1173 6619 3381 3238 29835 958
22
VI. LIVELIHOODS
Briefly describe the existing livelihoods, raw material available, possible livelihood interventions, scope for capacity building etc. in the project area
Table – PPR 13: Summary of livelihoods
1 2 3 4 5 6
S. No.
Names of the villages
Existing livelihood activities
Possible livelihood interventions under the project
Current status of migration
(No. of people)
Main reasons for migration
1 Detailed enclosed in Table PPR-7
Cultivation,
collection of fire
wood, Making Pattal,
Poultry, Employment
from NREGA,
P.N.G.S.Y & other
Govt. development
activities.
Scientific agricultural practices will
improved the land yield, Cash crop
will be grown, Production of fruit &
vegetables will increase, Fodder stock
will be available for bovines, Dairy
farms will be opened, Training
programmes will make villagers
skilldful, Agro-farm forestry will make
villagers self dependent in food
grains, fuel & small timber
requirement. M.F.P. will also increase
& will increase the earning of the
villagers
1175
Unemployment Under
employment, irratic
monsoon, Rainfed
farming, non avaibility of competitive market, low agriculturea yield, less digrinity of
labour
23
VII. EXPECTED PROJECT OUTCOMES
VII. (i). Expected employment related outcomes:
Table – PPR 14: Employment generation
1 2 3 4
S. No.
Names of the villages
Wage employment Self employment
No. of maydays No. of beneficiaries No. of beneficiaries
SC ST Others Women
Total SC ST Others Women Total SC ST Others Women Total
1 Adardih 710 203 7130 3943 11985 114 32 1141 631 1918 99 28 998 552 1678
2 Bakaltoria 1233 3 95 633 1963 197 0 15 101 314 173 0 13 89 275
3 Bakar Kuri 218 280 2675 1568 4740 35 45 428 251 758 30 39 375 219 664
4 Bandabir 130 320 1968 1185 3603 21 51 315 190 576 18 45 275 166 504
5 Berasisiram 445 1645 10453 5940 18483 71 263 1672 950 2957 62 230 1463 832 2588
6 Burudih 0 850 123 505 1478 0 136 20 81 236 0 119 17 71 207
7 Buruhata 105 360 1408 875 2748 17 58 225 140 440 15 50 197 123 385
8 Chamda 33 90 645 353 1120 5 14 103 56 179 5 13 90 49 157
9 Chano 0 793 80 383 1255 0 127 13 61 201 0 111 11 54 176
10 Chauki 0 185 915 518 1618 0 30 146 83 259 0 26 128 72 226
11 Dalgam 0 115 840 460 1415 0 18 134 74 226 0 16 118 64 198
12 Datam 238 458 998 830 2523 38 73 160 133 404 33 64 140 116 353
13 Dere 0 370 533 448 1350 0 59 85 72 216 0 52 75 63 189
14 Diadih 0 83 1778 865 2725 0 13 284 138 436 0 12 249 121 382
15 Dulmi 250 78 3688 2018 6033 40 12 590 323 965 35 11 516 282 845
16 Durri 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
17 Edaldih 123 368 158 328 975 20 59 25 52 156 17 51 22 46 137
18 Garadih 0 18 760 370 1148 0 3 122 59 184 0 2 106 52 161
19 Gaurang Kocha 108 1788 3008 2413 7315 17 286 481 386 1170 15 250 421 338 1024
20 Heremuli 145 423 440 485 1493 23 68 70 78 239 20 59 62 68 209
21 Hesalang 28 103 3695 1883 5708 4 16 591 301 913 4 14 517 264 799
22 Hurlung 0 630 0 303 933 0 101 0 48 149 0 88 0 42 131
23 Ichadih 68 660 2890 1735 5353 11 106 462 278 856 9 92 405 243 749
24 Ichagarh 688 138 2673 1728 5225 110 22 428 276 836 96 19 374 242 732
25 Janum 340 340 4233 2350 7263 54 54 677 376 1162 48 48 593 329 1017
24
1 2 3 4
S. No.
Names of the villages
Wage employment Self employment
No. of maydays No. of beneficiaries No. of beneficiaries
SC ST Others Women
Total SC ST Others Women Total SC ST Others Women Total
26 Jargo 0 313 1513 878 2703 0 50 242 140 432 0 44 212 123 378
27 Kalichamda 13 345 308 355 1020 2 55 49 57 163 2 48 43 50 143
28 Karka 13 728 60 393 1193 2 116 10 63 191 2 102 8 55 167
29 Karkidih 0 318 823 550 1690 0 51 132 88 270 0 44 115 77 237
30 Kendaenda 0 203 938 545 1685 0 32 150 87 270 0 28 131 76 236
31 Khokhro 0 828 860 823 2510 0 132 138 132 402 0 116 120 115 351
32 Khudilong 38 55 1343 688 2123 6 9 215 110 340 5 8 188 96 297
33 Kukru 190 853 5558 3183 9783 30 136 889 509 1565 27 119 778 446 1370
34 Kumari 0 138 568 308 1013 0 22 91 49 162 0 19 79 43 142
35 Kunjaban 133 0 35 98 265 21 0 6 16 42 19 0 5 14 37
36 Lapsadih 113 395 30 265 803 18 63 5 42 128 16 55 4 37 112
37 Latenda 350 208 3295 1845 5698 56 33 527 295 912 49 29 461 258 798
38 Matekumdih 0 368 0 168 535 0 59 0 27 86 0 51 0 23 75
39 Maysara 0 363 1963 1153 3478 0 58 314 184 556 0 51 275 161 487
40 Patkum 158 720 2910 1810 5598 25 115 466 290 896 22 101 407 253 784
41 Shishi 110 233 938 653 1933 18 37 150 104 309 15 33 131 91 271
42 Shyam Nagar 10 173 640 378 1200 2 28 102 60 192 1 24 90 53 168
43 Udhatanr 45 18 1630 785 2478 7 3 261 126 396 6 2 228 110 347
GRAND TOTAL 6035 16560 74598 46997 144160 964 2645 11934 7517 23062 843 2313 10440 6578 20186
• From column no. 2, total no. of villages, from column no. 3 & 4, category-wise totals may be given at the end of the table for the project.
25
Table – PPR 15: Details of migration from project area
1 2 3 4 5 6
Sl. No.
Names of villages No. of persons
migrating No. Of days per year
of migration Major reason(s) for
migrating
Expected reduction in no. Of persons
migrating
Detailed enclosed in Table PPR-7
1175 60 days – 120 days
Unemployment, Erratic monsoon, Rainfed farming,
Non availability of competitive
market, Less dignity of labor
950
* from column no. 2, total no. of villages, from column no. 3, total no. of persons migrating; from column no.4, average no. of days for
annual migration; from column no.6, total expected reduction on no. of persons migrating, for the project may be given at the end of the
table.
VII. (ii). Water related outcomes:
Table – PPR 16: Details of average ground water table depth in the project areas (in meters)
1 2 3 4 5 6
Sl. No. Names of villages
Sources Pre – Project level Expected
post – project level
Remarks
Detailed
enclosed in Table PPR-7
Open wells 6.47 -8.85 M 2.25 – 3.65
M Extensive soil moisture conservation measures along
with plantation of barren lands are expected to raise
ground water table.
Bore wells 65-85 M 50 -60 M
Others (specify)
Source of data: Data available through local source.
26
Table – PPR 17: Status of Drinking water*
1 2 3 4 5
S. No.
Names of the Villages
Availability of drinking water (no. Of months in a year)
Quality of drinking water Comments
Pre- project
Expected Post - Project Pre-
project Expected Post -
Project
1 Detailed enclosed in
Table PPR-7 10
month Round the year Good Better quality
* From column no. 2, total no. of villages implementing the programme, from column no. 3, average no. of months may be given at the end of
the table for the entire project.
27
VII. (i). Expected employment related outcomes:
Table – PPR 18: Major crops grown and their productivity in the project area
1 2 3 4
S. No. Name of the
Crop
Current status Expected post project status
Area in (ha.) Productivity
(Quintal/ ha.) Area (ha.)
Productivity (Quintal/ ha.)
Kharif, Cereal, Pulses
2700 18.35 3200 21.75
Rabi Wheat Pulses and oilseed
475 9.10 575 12.50
Zaid/ Other season vegetable
245 7.15 320 11.15
* From column no. 2, total no. of crops, from column no. 3 & 4, total cropped area, average productivity, for the project may be given at the
end of the table.
28
VIII. MANDATORY CERTIFICATION
“It is certified that the State Government of will abide by the following mandatory conditions laid down by DoLR
1 The area of the proposed projects are not covered under assured irrigation
2 The area of the proposed project is not covered or overlapping with any other watershed projects sanctioned by the cnetal govt./ state govt./ autonomous bodies & others
3 The State must sign all the mandatory MoUs before implementing the project
4 The timeframes and milestones of the projects will be followed
5 The Budget requested for must follows the criteria laid down in the Common Guidelines, 2008
6 The State must release matching State Share within 15 days from release of each installment of central funds.
7 Purchase of vehicles and other equipments are not permitted and nor is construction of buildings allowed. Only purchase of computers and related software is permitted
8 Savings, If any, in each component of the project cost can be utilized only for activities in the Watershed works
9 The WCDC will have one Member exclusively responsible for monitoring
10 All work will be evaluated after each phase of completion. Fund release will depend on favourable reports received from evaluators
11 Evaluators must include only institutions and agencies and not individuals.
12 The State and DRDA cell will furnish monitoring reports and periodical reports as desired by DoLR
13 Composition of the WDT must be clearly spelt out and the team members must be fully in place at the time of signing of the MoU of contract between the PIA and DRDA Cell
14 That DRDA shall release the funds to the PIAs and the watershed committees within 15 days of receipt of the funds
15 The Watershed Committee must be a registered society under the Societies Registration Act, 1860
16 At least one of the WDT Members must be a Woman
29
17 The Gram Sabhas of the proposed project areas have passed resolutions for people’s contribution towards WDF
18 Resource-use agreement on the principles of equity and sustainability must be worked out among the User Groups prior to the concerned work being undertaken
19 The DPR must give detailed justification for the proposed project duration
20 No PIA will start project work within three months of the receipt of first installment by DWDU/ agency or else it can come under the purview of foreclosure
21 The State will not undertake unnecessary foreclosure of the projects. In the event of foreclosure, the State will refund the amount and furnish all necessary defalcation, misappropriation, mis- utilization, deliberate negligence and laxity which has caused foreclosure of the project.
Date:
Signature of officer authorized by State Govt.*
NAME OF OFFICER (IN CAPITAL LETTERS)
DESIGNATION
* Letter of Authority from Secretary of the concerned Department, authorizing the concerned officer to sign the above undertaking, should be enclosed
with PPR.
30
IX. STATUS OF ON-GOING PROJECTS (DPAP / DDP/ IWDP)
Table – PPR 19: Details of pending UCs : Statewise*
1 2 3 4 5 6 7 8 9 10 11
S.
No District Project
Instal-
ment
No.
Financial year of
release
of fund
Amount released
(Rs. In
Lakhs)
Amount utilized
(Rs. In
Lakhs)
Submission of
UC
Date of
submission of UC
Reasons for not submitting/delayed
submission of UC
Pending UC
Due date
Amount
(Rs, in Lakhs)
Date
Amount
(Rs, in Lakhs)
Period Amount (Rs, in Lakhs
1 Saraikela Kharsawan
NA
* From column no. 2, total no. of Districts, from column no. 3, total no. of projects; from column no.6, Total amount released, from column no.7, total
amount utilized, from column no. 8, total amount due, from column no. 9, total amount for which UCs submitted, from column no. 11, total amount of the
pending UCs, may be mentioned at the end of the table for the entire State.
31
X. ABSTRACT OF PROJECTS PROPOSED FOR SANCTION DURING FINANCIAL YEAR 2015-16
1 Number of districts to be covered under the present
proposal 1
2 No. of Watersheds projects proposed to be taken up
under NABARD
Hilly/Desert Others
2
3 Total area to be covered under proposed projects (in
ha) (a) Hilly & Desert areas#
(b) Others Total
6142.1435
4 Area to be treated (in ha) 5313.3974
5 Total cost of the proposed Watershed projects (Rs.
in lakhs) (a) Hilly & Desert areas#
(c) Others Total
1062.6795 Lakhs
6 First installment required from central funds for the proposed watershed projects
212.5359 Lakhs
********************************************************************************************************************************************