ACTIVE 2018-2021 STIPSTATEWIDE TRANSPORTATION IMPROVEMENT
PROGRAM
ACTIVE STIPPRINTED5/8/2018
For information on projects included in this document, please contact ODOT at
https://www.oregon.gov/ODOT/TD/STIP/Pages/STIPDocs.aspx#2018-2021_STIP
O R E G O N D E P A R T M E N T O F T R A N S P O R T A T I O N
http://www.oregon.gov/odot/Pages/index.aspx
2018-2021 Active STIP CLACKAMAS
Name: Clackamas County Regional Freight ITS Key: 18001
Description Improves the reliability of the regional freight system by reducing freight delays in known congested areas through a variety of ITC system enhancements.
Region: 1
MPO: Portland Metro MPO Work Type: OP-ITS
Applicant: CLACKAMAS COUNTY Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total
Year 2018 2020 2014
Total $347,199.00 $1,699,120.00 $204,879.00 $2,251,198.00
Fund 1 ACP0 $311,541.66 M230 $954,458.91 M230 $89,621.43
Match $35,657.34 $109,242.09 $10,257.57
Fund 2 L230 $570,161.47 L23E $51,097.02
Match $65,257.53 $5,849.00
Fund 3 L230 $43,118.98
Match $4,935.00
Footnote:
Most Recent Amendment ApprovedAmendment No: 18-21-0149 Approval Date: 10/30/2017
Requested Action: Slip CN to 2020. Update name and description to match MTIP.
2018-2021 Active STIP CLACKAMAS
Name: SMART Employer Outreach Program 2013 Key: 18119
Description Travel options including vanpooling, riding transit, bicycling, walking and telecommuting. Region: 1
MPO: Portland Metro MPO Work Type: TR-OPS
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
0.00 REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total
Year 2018
Total $79,000.00 $79,000.00
Fund 1 Z230 $70,887.00
Match $8,113.00
Footnote:
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 2 of 634 As of 5/8/2018 6:30:09 AMPrinted 5/8/2018 6:32:56 AM 1475 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
2018-2021 Active STIP CLACKAMAS
Name: US26: SE 282nd Ave (Boring Rd) Oxing Key: 18583
Description Increase the clearance on US26 under the SE 282nd Ave (Boring Rd) Structure (Bridge no. 09381) and perform joint and deck work on the structure.
Region: 1
MPO: Portland Metro MPO Work Type: BRIDGE, PRESRV
Applicant: ODOT Status: PROJECT UNDER CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
17.52 to 17.58 0.06 US-26 MT HOOD REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total
Year 2015 2017 2018 2018
Total $1,095,000.00 $608,000.00 $3,028,339.02 $50,000.00 $4,781,339.02
Fund 1 M001 $982,544.00 M240 $384,044.40 Z001 $2,715,085.35 S010 $50,000.00
Match $112,456.00 $43,955.60 $310,753.67
Fund 2 Z231 $161,514.00 OTH0 $2,500.00
Match $18,486.00
Footnote:
Most Recent Amendment ApprovedAmendment No: 18-21-0373 Approval Date: 12/28/2017
Requested Action: Add an OT phase of $50,000 from bridge savings and adding $15,000 from Region 1 Reserves.
2018-2021 Active STIP CLACKAMAS
Name: OR99E RAILROAD TUNNEL ILLUMINATION AND ITS Key: 18759
Description Upgrade the illumination systems of the roadway and pedestrian tunnels that pass under the railroad. Install a Variable Message Sign (VMS) south of the tunnel.
Region: 1
MPO: Portland Metro MPO Work Type: OP-SSI
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
12.60 to 12.65 0.05 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total
Year 2016 2018
Total $453,000.00 $1,487,000.00 $1,940,000.00
Fund 1 Z240 $406,477.00 ACP0 $1,334,285.00
Match $46,523.00 $152,715.00
Footnote: $1,940,000 Total R1 Ops funding
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 3 of 634 As of 5/8/2018 6:30:09 AMPrinted 5/8/2018 6:32:56 AM 1475 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
2018-2021 Active STIP CLACKAMAS
Name: OR99E:Rockfall - Oregon City Tunnel to Old Canemah Park Key: 18769
Description Inspect and repair mesh. Scale slope behind mesh removing loose rock and vegetation. Rock bolting as needed and clear catchment area / roadside ditch
Region: 1
MPO: Portland Metro MPO Work Type: OP-SLD
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
12.62 to 12.87 0.25 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS
13.15 to 13.36 0.21 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS
13.82 to 14.06 0.24 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total
Year 2016 2018 2018
Total $316,000.00 $1,210,365.16 $200,000.00 $1,726,365.16
Fund 1 Z240 $193,816.80 Z240 $1,086,060.66 S010 $200,000.00
Match $22,183.20 $124,304.50
Fund 2 ACP0 $89,730.00
Match $10,270.00
Footnote: $1,889,000 Total R1 Operations funding
Most Recent Amendment ApprovedAmendment No: 18-21-1013 Approval Date: 4/19/2018
Requested Action:
Increase CN to $1,733,000 to meet high bid. (Increase of $360,000 from CN Current STIP Amount of $1,373,000. $316,000 approved PE + $1,373,000 approved CN + $200,000 OT = $1,889,000 approved project total. $360,000 / $1,889,000 = 19.1%).
2018-2021 Active STIP CLACKAMAS
Name: OR212: SE Richey Rd - US26 Key: 18772
Description Paving of the highway in conjunction with targeted deeper pavement repairs within the project limits. Missing or non-compliant ADA sidewalk ramps will be brought up to standard. Drainage and storm water treatment improvements may be required. Culvert at Deep Creek to be replaced.
Region: 1
MPO: Portland Metro MPO Work Type: OPERAT, PRESRV
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
6.85 to 8.87 2.02 OR-212 CLACKAMAS-BORING REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total
Year 2015 2018 2019
Total $1,480,591.00 $230,000.00 $3,037,000.00 $4,747,591.00
Fund 1 ACP0 $628,110.00 M001 $206,379.00 ACP0 $2,725,100.10
Match $71,890.00 $23,621.00 $311,899.90
Fund 2 Z001 $459,050.60
Match $52,540.40
Fund 3 L05E $241,374.00
Match $27,626.00
Footnote: $3,047,591 Total R1 Preservation funds, $700,000 HB2017 and $1,000,000 R1 Operations
Most Recent Amendment ApprovedAmendment No: 18-21-0961 Approval Date: 4/20/2018
Requested Action:
Split $275,075 from K18780 to K19356, K18772 & K19355. Create a UR phase for K18772 w/ $150,000 from R1 Ops Program. Technical correction to K19355 CN to match charter and MTIP (reduce by $100.00).
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 4 of 634 As of 5/8/2018 6:30:09 AMPrinted 5/8/2018 6:32:56 AM 1475 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
2018-2021 Active STIP CLACKAMAS
Name: OR99E: S Pine St - SW Berg Parkway (Canby) Key: 18775
Description Repave this section of highway, replace signs, signal loops, install pedestrian push buttons and construct sidewalk curb ramps. Region: 1
MPO: Non-MPO Work Type: PRESRV
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
20.60 to 21.86 1.26 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total
Year 2015 2021 2021
Total $894,555.01 $177,000.00 $5,036,000.00 $6,107,555.01
Fund 1 Z231 $533,494.21 ACP0 $158,822.10 ACP0 $4,518,802.80
Match $61,060.80 $18,177.90 $517,197.20
Fund 2 M231 $269,190.00
Match $30,810.00
Footnote: $300,000 Preservation, $594,555 R1 Shelf Ready and $5,213,000 HB2017
2018-2021 Active STIP CLACKAMAS
Name: S Ivy Street (Canby) Key: 18805
Description Construct sidewalks and bike lane on S Ivy Street between OR-99E and Lee Elementary School and install a signal at the intersection with Township Road.
Region: 1
MPO: Non-MPO Work Type: BIKPED
Applicant: CITY OF CANBY Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total
Year 2017 2019 2020
Total $293,000.00 $211,000.00 $1,684,806.00 $2,188,806.00
Fund 1 Z302 $234,400.00 ACP0 $168,800.00 ACP0 $1,347,845.00
Match $58,600.00 $42,200.00 $336,961.00
Footnote:
Most Recent Amendment ApprovedAmendment No: 18-21-0601 Approval Date: 1/25/2018
Requested Action: Slip RW to 2019 and CN to 2020
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 5 of 634 A