ACD Pedestals ACD Team at Goddard: Alex Moiseev

7
GLAST LAT Project IA weekly meeting , February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman

description

ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman. ACD Pedestals. - PowerPoint PPT Presentation

Transcript of ACD Pedestals ACD Team at Goddard: Alex Moiseev

Page 1: ACD Pedestals ACD Team at Goddard: Alex Moiseev

GLAST LAT Project IA weekly meeting , February 3, 2006

ACD subsystem Alex Moiseev 1

ACD Pedestals

ACD Team at Goddard: Alex Moiseev

Dave Thomspon

Bob Hartman

Page 2: ACD Pedestals ACD Team at Goddard: Alex Moiseev

GLAST LAT Project IA weekly meeting , February 3, 2006

ACD subsystem Alex Moiseev 2

ACD Pedestals ACD Pedestals

Pedestals monitoring: we want them to be within ±5 ADC counts of reference value (< ±1.25% of the mip, which is at minimum 400 ADC counts); otherwise reference values have to be changed respectively. Another variable is a temperature; pedestals vary with the temperature. Our tests at Goddard demonstrated that pedestals variation is acceptable within ± 5C temperature variation; thus pedestals are calibrated for 10C temperature bins.

All results presented here assume ambient temperature (18C – 28C)

Summary:

• we found that pedestals stay stable within needed range for extended period of time if there was no (known) external configuration changes made

• we found that some pedestals change by up to 40 ADC counts when:

- other GASU is used

- HV is applied or not applied to ACD (? – see below)

Page 3: ACD Pedestals ACD Team at Goddard: Alex Moiseev

GLAST LAT Project IA weekly meeting , February 3, 2006

ACD subsystem Alex Moiseev 3

ACD Pedestals (cont.) Tests ComparedACD Pedestals (cont.) Tests Compared

Mean of 3 runs

GSFC, May 23, 2005

GASU 1, HV On

Pre-thermal

GSFC, July 21, 2005

GASU 1, HV Off

Thermal 1,

GSFC, July 24, 2005

GASU 1, HV Off

Thermal 10,

GSFC, August 4, 2005

GASU 1, HV Off

Post-delivery,

SLAC, August, 2005

GASU 1, HV Off

ACD CPT 1,

SLAC, 12/28, 2005

GASU 2, HV Off

ACD CPT 2,

SLAC, 12/28, 2005

GASU 2, HV Off

B13 ZS Off

SLAC, January 14 , 2006

GASU 2, HV Off

B13 ZS Off

SLAC, January 14, 2006

GASU 2, HV OnPedestals Difference mean and Pre-

thermal

05

10152025303540

-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7

Bin

Pedestals Difference mean and Thermal 1

0

5

10

15

20

25

30

35

-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7

Bin

Pedestal Difference mean and Thermal 10

0

5

10

15

20

25

30

-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7

Bin

Pedestals Difference mean and Post-delivery

0

5

10

15

20

25

Bin

Pedestals Difference mean and ACD CPT-1

0

5

10

15

20

25

-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7

Bin

Pedestals Difference mean and ACD CPT-2

0

5

10

15

20

25

-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7

Bin

Pedestals Difference mean and 01/14/06 B13 no HV on ACD

0

5

10

15

20

25

-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7

Bin

Pedestals Difference mean and 01/14/06 B13 with HV On

0

510

1520

2530

35

-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7

Bin

Pedestals Difference CPt-1 and CPT-2

0

10

20

30

40

50

60

-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7

Bin

Pedestals Difference CPT-1 and B13 with no HV

0

10

20

30

40

50

60

70

-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7

Bin

Pedestals Difference CPT-1 and B13 with HV On

0

10

20

30

40

-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7

Bin

5 7

62

11

8

3 9

104

1

Red frame and plot numbers – compared with “Mean of 3 runs”

Blue frame and plot numbers – compared with ACD CPT 1 (new GASU)

Page 4: ACD Pedestals ACD Team at Goddard: Alex Moiseev

GLAST LAT Project IA weekly meeting , February 3, 2006

ACD subsystem Alex Moiseev 4

ACD Pedestals ( cont.)ACD Pedestals ( cont.)

• During a number of test runs at Goddard: Before and after Vibration, Acoustic, and Thermal tests, as well as after delivery of ACD to SLAC (in total over 3 months) – pedestals stay stable within ± 5 ADC counts (plots 1 - 4)

• Pedestals shifted significantly – by 5 and more ADC counts – when GASU was changed (ACD CPT, December 2005), 39 channels in total – plots 5 – 8. Channel-to-channel comparison with data from Margin Test (performed at Goddard) is well consistent with the assumption that FREE voltage changed to 3.25. This is very marginal to ACD Performance. Needs attention from Electronics Team!

• Pedestals again stay stable during CPT and full LAT B13 runs (with HV Off by mistake) – plots 9 and 10

• But some channels shifted when HV was brought On (plot 11)! – see next slide – new puzzle!

Page 5: ACD Pedestals ACD Team at Goddard: Alex Moiseev

GLAST LAT Project IA weekly meeting , February 3, 2006

ACD subsystem Alex Moiseev 5

Sudden pedestals change during B13Sudden pedestals change during B13

• Found a fact that in two B13 runs, separated by a few minutes, the first one (135005319) was running with ACD High Voltage turned Off by mistake.

• ACD High Voltage was turned On in all next B13 runs.

Channel Pedestal Position difference, ADC counts

0-002 -19

0-042 -15

1-124 -11

0-130 -23

1-222 -11

1-320 -20

0-230 -9

1-230 -18

0-330 -16

1-422 -17

0-430 -12

1-430 -18

•It appeared to be a luck for us to find a strange thing: there are 12 channels where pedestals shifted by more than 10 ADC counts between runs with and without HV (PedestalHV On – PedestalHV Off)

•All these changes have negative sign!

• All other channels stay stable, but with slight negative difference (about 1 ADC count)

• We have previously compared pedestals positions with and without HV applied and FOUND NO DIFFERENCE – “Mean of 3 runs” was taken with HV On, and “Prethermal”, “Thermal 1, 10”, “Post-Delivery” were taken with HV Off (ACD Long

Functional test, pedestal runs). This is a new problem!

Page 6: ACD Pedestals ACD Team at Goddard: Alex Moiseev

GLAST LAT Project IA weekly meeting , February 3, 2006

ACD subsystem Alex Moiseev 6

New PuzzleNew Puzzle

Puzzle:

• All that 12 shifted pedestals are from GAFEs with number 17 (last on the board) – one per each (!) ACD FREE board! – discovered by Dave Thompson

• All pedestals shifted in one direction – cannot be explained by voltage change because it causes both direction change

• All other pedestals stay stable within 1-2 ADC counts. There was small shift of all pedestals in the same direction by ~1 ADC bin. It is negligible, but the fact itself can contain a hint.

• This pedestal shift happened during a few minutes – the only change made was applying High Voltage – and pedestals changed!

• Pedestal change is significant to cause high rate – more than Zero Suppression threshold

• Need to repeat this test to confirm the effect

• So far NO IDEA how to explain it

Pedestals Difference CPT-1 and B13 with HV On

0

10

20

30

40

-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7

Bin

SHIFTED CHANNELS NOTHING!

Page 7: ACD Pedestals ACD Team at Goddard: Alex Moiseev

GLAST LAT Project IA weekly meeting , February 3, 2006

ACD subsystem Alex Moiseev 7

ConclusionsConclusions

Conclusions:

1. ACD Pedestals seem to be stable over time if no changes are made

2. We believe that pedestal change, when other GASU was installed, was caused by slight change of low voltage (3.3 V) supplied by GASU to ACD FREE board

3. Our previous tests demonstrated that pedestals behave by different way with variation of FREE voltage – some stay unchanged, some have changes in both direction. The fact that ALL changes in B13 runs have negative sign, does not agree with this

4. Our previous tests also demonstrated that pedestals do not depend on HV (On or Off)

5. We request for additional pedestal runs, with HV On and Off

6. Until the behavior of pedestals is completely understood, pedestals runs have to be run periodically

7. Would it be possible to run periodical trigger with switching to ZS Off mode?

8. The puzzle with “end” GAFE’s pedestal shift – needs explanation