Accent image here Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2) Over Warren Avenue FHWA Rhode Island Showcase October 30, 2014

Transcript of Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp...

Page 1: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

Accent image here

Primary Image here

ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2) Over Warren Avenue FHWA Rhode Island Showcase October 30, 2014

Page 2: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Presentation Outline

• Overview of the Project Scope

• ABC Project Planning

• ABC Design & Construction

• Construction / Contractor Perspective

Page 3: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

FHWA Every Day Counts Initiative Designed to identify and deploy innovation aimed at shortening project

delivery, enhancing the safety of our roadways and protecting the

environment.

Page 4: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

RIDOT Goals • Safety

• Innovative

• Using Accelerated Bridge Construction Methods • Precast substructure, PBE’s

• Minimize Time • Road closure eliminated phasing

• Cost Effective • Balanced accelerating construction with user costs

• Efficient Intermodal Transportation Network

• Restored link from East Bay to Providence Crossing

Page 5: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

RIDOT Goals (Continued) • Public Attentiveness

• Minimize Public Impact • Replace in 20 days with ABC, 2+ years conventional

• Increase Public Awareness • City Officials • Attended Council Meeting • Outreach through multiple media venues: radio,

social, paper, internet, link to web cam on DOT website, door to door with handouts

Page 6: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

Overview of the Project

Scope

Accelerated Replacement of Bridge No. 465 I-195 On-Ramp (DR-2) over Warren Avenue

SHRP 2 Solutions

Page 7: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Site Location WB I-195 EB I-195

Bridge 465

TAUNTON AVE N

Page 8: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Summary of Existing Bridge

• BRIDGE SUPERSTRUCTURE: Precast Prestressed Concrete I-beams and Reinforced concrete Tee beams

• BRIDGE SPAN: 3 simply supported spans of 31’ – 1 3/8” (span 1) 61’- 1½” (span 2), 31’ – 1 3/8” (span 3)

• BRIDGE WIDTH: 23’ – 0” curb to curb, 28’ – 2” out to out

• SUBSTRUCTURE: Unreinforced concrete gravity abutments on piles and two column reinforced concrete bents on piles

• BRIDGE SKEW: 25o – 9’ – 6”

• BRIDGE SIDEWALKS: Safety walks on both sides

• ROADWAY SURFACE: 3” bituminous wearing surface

Page 9: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Existing Bridge Condition

Page 10: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Overview of Project Scope • Bridge 465

• Replace Superstructure & Piers • Evaluate Abutments • Consider Feasibility of ABC Methods

• I-195 Westbound On-Ramp Approaches • Full Depth Construction for Bridge

Replacement • Guardrail Replacement • Pavement Milling & Overlay

• Warren Avenue • Sidewalk Replacement • Wheelchair Ramp Upgrade • Pavement Milling & Overlay

TAUNTON AVE

N

Bridge 465

WARREN AVE ON-RAMP

Page 11: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Why ABC for New Bridge? • No phase construction option due to narrow 23’ – 0” roadway width

• Significant reduction of bridge closure time

• Detour options available

• Reduce impact to traffic and the public

Page 12: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

ABC

Project Planning

Accelerated Replacement of Bridge No. 465 I-195 On-Ramp (DR-2) over Warren Avenue

SHRP 2 Solutions

Page 13: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

FHWA Framework for Decision-Making

Page 14: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Rapid Onsite Construction Factors • High Traffic Volumes YES

• Emergency Replacement Necessary YES

• Evacuation Route NO

• Required Lane Closures / Detours YES

• Impact on Total Project Critical Path YES

Use Prefabrication

Page 15: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

One Month Duration Closure of

On-Ramp over Warren Ave

SHRP 2 Solutions

Closure of I-195 On-Ramp (Bridge 465)

Page 16: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

Closure of On-Ramp over Warren Ave & Closure of

Warren Avenue below Bridge 465

(including sidewalks)

Closure of I-195 Off-Ramp (Exit 5)

SHRP 2 Solutions

Closure of Ramps – Two Weekends

Two Weekends

Page 17: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Milestones • #1 Weekend Closure – Demolition

• Re-Open Warren Ave and Exit 5 Ramp

• #2 Weekend Closure – Place Superstructure • Re-Open Warren Ave and Exit 5 Ramp

• #3 One Month Duration - Complete Bridge Construction • Re-open On-ramp Traffic Over Warren Avenue

• #4 Substantial Completion • Complete All Work for Bridge 465 And Warren

Avenue.

Page 18: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Incentive / Disincentive • #1 Completion of Weekend Closure #1 - $400 Per Hour

• Maximum Incentive $20,000

• #2 Completion of Weekend Closure #2 - $400 Per Hour

• Maximum Incentive $20,000

• #3 Bridge Open to Traffic – $12,000 Per Calendar Day

• Maximum Incentive $120,000

Liquidated Damages Substantial Completion – $1,500 Per Day

Page 19: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Incentive / Disincentive • Vehicle Operating Cost

• Value of Travel Time Savings

N Bridge 465

P

Page 20: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

ABC Design & Construction

Accelerated Replacement of Bridge No. 465 I-195 On-Ramp (DR-2) over Warren Avenue

SHRP 2 Solutions

Page 21: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Overview map

Bridge 465 Constructed in 1959

Page 22: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Bridge 465 – LBG Scope of Work • Replace Superstructure & Piers

• Analyze Abutments & Wingwalls for LRFD Compliance

• Revise profile to meet 14’-3” Minimum Clearance

• Consider ABC Methods

Page 23: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Bridge 465 – Proposed Improvements & Deviation from Original Scope

Full Bridge Replacement:

• Replace Superstructure

• Replace Abutments

• Replace Wingwalls

• Replace Pier Cap, Columns & Footings

Page 24: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Project ABC Methods and Techniques

Prefabricated Bridge Elements &

Systems (PBES)

Modular Construction

Structure Erection

Techniques

Geotechnical Techniques

Page 25: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

STEEL BEAM

Bridge 465 – Prefabricated Elements

Page 26: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Bridge 465 – Prefabricated Elements

PRESTRESSED CONCRETE BEAMS AND PRECAST DECK PANELS

Page 27: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Bridge 465 – Prefabricated Elements

NEXT BEAM

Page 28: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Bridge 465 – Prefabricated Elements

Prefabricated Substructure

Page 29: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Bridge 465 – Proposed Single Span Option

29

80’

Page 30: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Bridge 465 – Laydown Areas

B

B

A

Page 31: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Proposed Transverse Section

Page 32: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Superstructure Modular Unit

Page 33: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Superstructure Modular Unit

Page 34: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

FOUNDATION SUPPORT IMPROVEMENTS

Page 35: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Proposed Abutment

Page 36: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

North Abutment Foundation

Page 37: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

North Abutment Foundation

Page 38: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Abutment Footing Closure Pour

Page 39: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Abutment Footing Closure Pour

Page 40: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Precast Wingwall Footing

Page 41: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Precast Abutment Stem Elements

Page 42: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Precast Abutment Stem Elements

Page 43: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Precast Wingwall Stems & Footings

Page 44: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Precast Wingwall Stems & Footings

Page 45: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Completed Precast North Abutment

Page 46: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

Completed Precast North Abutment

Page 47: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

• Install bearing assemblies. • Install superstructure modular units. • Install diaphragms between beams S2 and S3. • Form and place the reinforcement and concrete for the superstructure closure pour. • Place the precast approach slabs and place the reinforcement and concrete for the

approach closure pour. • Form and place concrete for the safety barrier closure pour. • Place the approach roadway base material. • Place the bridge wearing surface. • Install the strip seal at the north abutment and saw cut pavement and the south

abutment.

Remaining Construction

Page 48: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

Construction / Contractor Perspective

Accelerated Replacement of Bridge No. 465 I-195 On-Ramp (DR-2) over Warren Avenue

SHRP 2 Solutions

Page 49: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

SHRP 2 Solutions

History

Page 50: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

XXX

• Fit for Aetna Bridge

• Incentive/Disincentive

• Duration of Project

Factors Considered Pre-Bid

SHRP 2 Solutions

Page 51: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

XXX

• Proper Planning

• Communication with Owner/Engineer

• Capable Resident Engineer

• Quality Subcontractors

Key to Success

SHRP 2 Solutions

Page 52: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

XXX

• Tolerances for Precast

• Time Allowed for Submittals

• Precasters Preparedness (mass concrete, 3D

modeling, schedule, etc)

• Area for Construction (equipment, fill, etc)

• Unknowns – weather, equipment

breakdowns, etc.

SHRP 2 Solutions

Challenges

Page 53: Accent image here ABC OF BRIDGE NO. 465 I-195 Ramp …shrp2.transportation.org/Documents/Renewal/1-RIDOTWarenAveBridge... · Primary Image here ABC OF BRIDGE NO. 465 I-195 Ramp (Dr-2)

Thank You

David Fish, P.E. Managing Engineer, RIDOT

Jessica Rodas Project Manager, RIDOT

Phineas Fowler, P.E. Principal Structural Engineer, Louis Berger

John Fitzgerald, P.E. Senior Structural Engineer, Louis Berger

Jeffrey Bostock Vice President, AETNA Bridge Co.