Accelerators R&D at IFIC

8
1 Accelerators R&D at IFIC Scientific Staff: A. Faus-Golfe, C. Alabau, J.J. García, S. Verdu, J. Alabau Technical Staff: J.V. Civera, C. Blanch 19 June Enlight Meeting 09

description

Accelerators R&D at IFIC. Scientific Staff: A. Faus-Golfe, C. Alabau, J.J. García, S. Verdu, J. Alabau Technical Staff: J.V. Civera, C. Blanch. Main ongoing projects. ATF-ATF2 : Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC) - PowerPoint PPT Presentation

Transcript of Accelerators R&D at IFIC

Page 1: Accelerators R&D at IFIC

1

Accelerators R&D at IFIC

Scientific Staff:A. Faus-Golfe, C. Alabau, J.J. García, S. Verdu, J. Alabau

Technical Staff: J.V. Civera, C. Blanch

19 June Enlight Meeting 09

Page 2: Accelerators R&D at IFIC

Main ongoing projects

ATF-ATF2:

Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC)

Instrumentation: New Multi-OTR system (SLAC, KEK)

BPM supports with micromovers for FONT4 (KEK, JAI)

CLIC-CTF3: BPM’s for TBL (UPC, CERN)

19 June Enlight Meeting 09

Page 3: Accelerators R&D at IFIC

Main ongoing projects

Extraction line drives the beam

from ATF to ATF2

ATF-ATF2:

Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC)

Instrumentation: New Multi-OTR system (SLAC, KEK)

BPM supports with micromovers for FONT4 (KEK, JAI)

CLIC-CTF3: BPM’s for TBL (UPC, CERN)

19 June Enlight Meeting 09

Page 4: Accelerators R&D at IFIC

Main ongoing projects

ATF-ATF2:

Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC)

Instrumentation: New Multi-OTR system (SLAC, KEK)

BPM supports with micromovers for FONT4 (KEK, JAI)

CLIC-CTF3: BPM’s for TBL (UPC, CERN)

Hypothesis:Non-linear magnetic fields while passing off-axis through the shared magnets

Since several years, the vertical emittance measured in the diagnostic section of the EXT line is significantly larger than the emittance measured in the DR.

19 June Enlight Meeting 09

Page 5: Accelerators R&D at IFIC

Main ongoing projects

ATF-ATF2:

Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC)

Instrumentation: New Multi-OTR system (SLAC, KEK)

BPM supports with micromovers for FONT4 (KEK, JAI)

CLIC-CTF3: BPM’s for TBL (UPC, CERN)

19 June Enlight Meeting 09

Page 6: Accelerators R&D at IFIC

Main ongoing projects

ATF-ATF2:

Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC)

Instrumentation: New Multi-OTR system (SLAC, KEK)

BPM supports with micromovers for FONT4 (KEK, JAI)

CLIC-CTF3: BPM’s for TBL (UPC, CERN)

FONT – Feedback On Nanosecond Timescales

BPM supports for micromovers:

Realignment of BPM to increase the resolution

19 June Enlight Meeting 09

Page 7: Accelerators R&D at IFIC

Main ongoing projects

ATF-ATF2:

Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC)

Instrumentation: New Multi-OTR system (SLAC, KEK)

BPM supports with micromovers for FONT4 (KEK, JAI)

CLIC-CTF3: BPM’s for TBL (UPC, CERN)

BPS PrototypeInductive Pick-up (IPU)

19 June Enlight Meeting 09

Page 8: Accelerators R&D at IFIC

Main future projects

ILC: BDS instrumentation studies

LHC: non-linear collimation options for sLHC (SPS experiments) (EUCARD)

IFIMED: Imaging and Accelerators applied to Medicicine

• Monitoring of secondary beams (beam position and size) (CERN; LLR, CNAO)

• Cyclinacs applications (TERA, CTF3)

•CABOTO: Carbon Boster for Therapy in Oncology•Beam screen monitor