Accelerating Manufacturing Productivity
Copyright ©2009 SEMATECH, Inc. SEMATECH, and the SEMATECH logo are registered servicemarks of SEMATECH, Inc. International SEMATECH Manufacturing Initiative, ISMI, Advanced Materials Research Center and AMRC are servicemarks of SEMATECH, Inc. All other servicemarks and trademarks are the property of their respective owners.
450 mm Status Update
Tom Jefferson
450 mm Program ManagerDecember 7, 2009
2 December 2009 2
450 mm Progress in 2009
Dec-2008 Dec-2009
Wafer Inventory
Sintered wafers available for development
•Mechanical-grade single crystal wafers available for development
Process and Metrology Equipment
None •Particle inspection, wafer edge inspection, and particle removal equipment installed in ISMI’s cleanroom
•Film thickness equipment now available
•Performance metrics defined for 60 tool types
•Additional equipment capabilities are under development now
Factory Integration
380K handling cycles and 18K loadport cycles completed
•>5M handling robot cycles and >530K loadport open/close cycles completed with prototype carriers.
•4 EFEMs, 6 loadports, multiple carriers, and 2 PGVs under test
Standards Mechanical wafer standard passed, factory integration standards in blue ballot
•Test wafer standard in ballot
•FOUP and loadport standards are completed and passed
Solid Progress – But Many Challenges Remain
2 December 2009 3
450 mm Global Equipment Requirements
450 mm will re-use 300 mm guidelines and standards when possible to leverage learning where existing concepts are proven
300 mm Carryforward
Safety/EHS:
• S2, S8, CE Mark
• FMRC 4910/UL 2360
Facilities/Utilities:
• Height <12 ft
• Sub-fab:Fab footprint <0.75
• SEMI F47
Automation:
• E84, GEM300
Productivity:
• No TPT loss due to # of loadports on tool
450 mm
Safety/ESH:
• ISMI guidelines (manual handling risk characterization, fall protection, mass balance characterization)
• ≤1.0X utilities consumption, wasteemissions/effluent per wafer processed
Facilities/Utilities:
• ≤1.0X Footprint scalar (relative to throughput)
• ≤1.0X Install duration
• ≤1.0X Qual duration
2 December 2009 4
• The wafer quality is improving as suppliers and equipment manufacturers advance on the learning curve and new equipment becomes available.
NanoPhotonics haze maps reveal improvement between first and second polished wafer batch
Planetary pad ground single crystal wafer
Peter Wolters AC 2000-P³ processing 450 mm single crystal wafers
Wafer Quality Improvements
2 December 2009 5
450 mm Test Wafer Status
• Processing and measurement of test wafers has begun
• 450 mm wafers have received wet clean processing and particle measurements have been made– Experimental SC1 and DI processes from two different suppliers– Initial particle measurements appear repeatable
• NanoPhotonics tool calibrated down to 90 nm diameter with PSL
• Dielectric film metrology has passed source inspection and is ready for shipment– Manual load spectroscopic ellipsometer with 450 mm stage– Calibrated with known film thicknesses and types (non-450 mm)– Measured native oxide on both 450 mm sintered and single crystal
wafers
2 December 2009 6
ISMI Particle & Edge Inspection Tool- NanoPhotonics and Brooks Automation
450 mm metrology modules (particle and edge inspection)
450 mm EFEM
450 mm standard 12 mm pitch FOUP and loadport
Particle and edge inspection tool is qualified and has made measurements
First metrology tool shipped to ISMI
2 December 2009 7
ISMI Prototype Wafer Cleans Tool- SSEC
• First process tool shipped to ISMI
• Installation has begun
• Single wafer cleaning
• SC1/SC2 cleans
Photo Courtesy of Solid State Equipment Corp. (SSEC)Photo Courtesy of Solid State Equipment Corp. (SSEC)
2 December 2009 8
450 mm FOUPs and Shippers
• 450 mm FOUP and loadport standards are complete
• Horizontal multi-application carrier (H-MAC) prototype is under test
•H-MAC will replace FOSB in 450 mm for wafer shipment
•Same envelope and interface features as FOUP
Gudeng Rev 3 (12 mm) YB FOUPs Entegris Rev 3 (12 mm) FOUP Entegris Rev 0 (12 mm) H-MAC
2 December 2009 9
450 mm Resource Conservation Vision:No per wafer increase in energy and water use, air emissions, or waste
300 mm
450 mm450 mm Wafer = 2.25X
surface area
450 mm presents a unique opportunity to achieve a 55% reduction in resource use per cm2
Data from the 200–300 mm conversion tells us significant improvements can be achieved
Realizing this vision requires close cooperation between suppliers and end users
45%
300 mm n/cm2
450 mm n/cm2
2 December 2009 10
Key Messages - ISMI 450 mm Program (December 2009)
• ISMI maintains its focus on planning a cost-effective 450 mm transition and will continue to drive the activities required to support the needs of its members who are interested in realizing the 450 mm transition.
• 450 mm Test Wafer Generation Activity has started– ISMI’s first two 450 mm metrology tools are installed and operational; installation of the
first process equipment has begun.
• ISMI has defined the performance targets and test methods to execute 450 mm equipment demonstrations.
– ISMI member companies have clearly stated that they will use consortia demonstration results as input to their 450 mm equipment selection decisions.
• ISMI’s Interoperability Test Bed (ITB) has achieved its objective of enabling the evaluation of early prototypes to accelerate the development of factory integration standards.
• Initial progress has been made, but many challenges remain to realize a comprehensive 450 mm infrastructure at advanced technology nodes.
– ISMI will continue to engage constructively with interested suppliers and device makers to develop and validate solutions.
2 December 2009 11
For Further Information …
http://ismi.sematech.org/wafersize/index.htm
-or-
Tom JeffersonManager, ISMI 450 mm Program
.