Abstract of Papers:-
Long Term Durability of Clock Spring Repairs – Recent Removals and Examinations
The Clock Spring repair system was the subject of a rigorous Research and Development
program conducted under the management of the Gas Research Institute (GRI). The
program extended over a decade and considered long term degradation.
As part of this program an extensive field validation program was required by the US
Department of Transportation. This requirement was added to verify the laboratory
experimental results and to provide and to validate the real world behaviour on actual
pipelines. Statistical sampling was required and a matrix of various soil types, location and
environmental conditions were created as the basis for the field validation study. The
results were published in the public report GRI 1998-0032. This peer reviewed report was
relied upon by the industry and regulators as the basis of documentation to suggest
amended code language for both liquid and natural gas pipeline which was subsequently
proposed and adopted in CFR 192 and 195.
![Page 3: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/3.jpg)
Abstract of Papers (cont’d) :-
Over two decades of time has past since the GRI established the first steering committee of
industry experts to design the scope and methods of the investigations. Subsequently
several hundred thousand Clock Spring repairs have been made. Units have been installed
in many countries and in almost all conceivable environmental conditions.
The purpose of this paper is to document where various repairs have been taken out of
service and to document the subsequent investigations and findings in respect to the
condition and overall effectiveness of the repair.
![Page 4: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/4.jpg)
Clock Spring®
Long Term Durability of Clock Spring
Repairs: Recent Removals and
Examinations
Darren Looi
Asia Pacific Representative
Clock Spring Company, L.P.
![Page 5: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/5.jpg)
Abstract
With over 20 years of commercial
experience and over 750,000 repairs
installed in over 72 countries the purpose of
this paper is to case study recent removals
of Clock Spring repairs from high pressure
pipelines and riser service and to
substantiate the original test and validation
data and acceptance of Clock Spring as a
permanent repair system.
![Page 6: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/6.jpg)
The history
The removals
The conclusions
![Page 7: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/7.jpg)
The History
The R+D of Clock Spring started in the early
1980’s and was driven by actual pipeline
operators who were interested in a repair
alternative to:
- Welded steel sleeves
- Hot tapping / cut and replace
![Page 8: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/8.jpg)
The History
Industry pre-requisites were established:
- Repair had to be proven to be permanent
- Easy and quick to install for all pipe diameters
- No hot work
- No shielding of C.P
- No shut down of pipeline operation
![Page 9: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/9.jpg)
Industry pre-requisites cont….
- Suitable for use in all environments andsoil types.
- A standard off the shelf product to suit alldefects of up to 80% metal loss on anyoperating pressure pipeline.
The History
![Page 10: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/10.jpg)
Industry pre-requisites cont….
- Validated with a mathematical modelwhich allows permanency to beconfirmed in accordance to variousdefect assessment criteria (B31.G,modified and effective area), classlocation and based on material propertiesderived from an extrapolation of a 50 yearperformance.
The History
![Page 11: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/11.jpg)
The History
A steering committee wasestablished under the auspices of theGas Research Institute (GRI) andincluded:
- The GRI
- Battelle
- South West Research
- Kiefner & Associates
![Page 12: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/12.jpg)
Steering committee cont….
- Stress Engineering Services
- North Western University
- ITW – Devcon
- PRCI
- Pipeline Operators
- NCF Industries
- The Clock Spring Company, L.P.
The History
![Page 13: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/13.jpg)
The History
In addition the US DOT/OPS providedtheir own requirements and pre-requisites for an acceptable repairdesign including:
• Tensile tests
• Stress rupture tests
• Lap shear strength
• Durability
• Burst pressure testing
• Adhesive testing
• Fatigue testing
• Field tests
• Durability tests
![Page 14: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/14.jpg)
The History
The GRI R+D program took 10 years and involved both in-
depth laboratory and in-field testing to determine if a
composite product could meet the established industry,
GRI and DOT pre-requisites and provided thorough
evaluation of:
- The most suitable fibre type and architecture
- Resin matrix
- Adhesive and filler systems
![Page 15: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/15.jpg)
Composite Coil
• Composite coil
• E-glass filaments
• Polyester resin
• Memory matrix
• Conforms tightly to
pipe
• Unidirectional
filaments
• Hoop reinforcement
![Page 16: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/16.jpg)
Adhesive
• Methyl Methacrylate
Polymer
• Proprietary composition
• 1200 psi lap shear
strength
![Page 17: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/17.jpg)
Filler
• High compressive strength• Greater than 8,000 psi
compressive strength
• Transfers load from the pipe to the Clock Spring
![Page 18: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/18.jpg)
History
Throughout the 10 year R+D program
topical reports were released by the GRI
for peer review and evaluation.
The GRI stated in 1998 “Several years ago
the research team proved the durability of
the Clock Spring product through
hydrostatic testing and accelerated
corrosion testing.”
![Page 19: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/19.jpg)
History
“These laboratory predictions indicated that
Clock Spring can provide safe repairs
beyond 50 years. However to further verify
its performance required that repaired
sections remain buried for up to 7 years in
actual operating conditions.”
![Page 20: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/20.jpg)
History
“Through this recent field based research
we confirmed repairs will last at least 50
years but we feel that most repairs will last
much longer.”
![Page 21: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/21.jpg)
History
Following this work the DOT accepted the
use of alternative repair technologies for
high pressure oil and gas transmission
pipeline service providing the pipeline is
“repaired by a method that can permanently
restore the serviceability of the pipe as
shown by reliable engineering tests and
analyses.”
![Page 22: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/22.jpg)
History
Many other recognised approvals werealso given allowing the acceptance ofcomposite repair sleeves including:
ASME 31.4
ASME 31.8
API 1160
API 570
![Page 23: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/23.jpg)
History
Clock Spring has now been used
for over 20 years in all regions of
the world.
![Page 24: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/24.jpg)
Africa
![Page 25: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/25.jpg)
Middle East
![Page 26: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/26.jpg)
U.S.A.
![Page 27: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/27.jpg)
Asia
![Page 28: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/28.jpg)
In all environments
The History
![Page 29: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/29.jpg)
Offshore
![Page 30: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/30.jpg)
Desert
![Page 31: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/31.jpg)
Tropical
![Page 32: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/32.jpg)
Underwater
![Page 33: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/33.jpg)
The History
For many applications
![Page 34: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/34.jpg)
Tank Farms
![Page 35: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/35.jpg)
Refinery
![Page 36: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/36.jpg)
Pipe Supports
![Page 37: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/37.jpg)
Structural
![Page 38: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/38.jpg)
The Removals
CASE 1
Location: North America
Pipeline: High pressure natural gas 30”
Repair made in: 2005
Removed in: 2010
![Page 39: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/39.jpg)
The Removals
Reason for removal:
An OLI survey performed in 2009 indicated
corrosion growth under the repair.
Conclusion:
The units were difficult to remove and well
bonded in place. No new corrosion under
the repair was identified.
![Page 40: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/40.jpg)
![Page 41: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/41.jpg)
![Page 42: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/42.jpg)
The Removals
CASE 2
Location: Asia
Pipeline: 20” oil export pipeline.
Initial repair: significant dent due to poor
backfill.
Repair made in: 2006
Removed in: 2010
![Page 43: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/43.jpg)
The Removals
Reason for removal:
Operator decided to cut and replace the
section to allow safe passage of future OLI
surveys.
![Page 44: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/44.jpg)
Repair excavation
![Page 45: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/45.jpg)
Installed Clock Spring after coating removal
![Page 46: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/46.jpg)
Cutting the coil into sections for removal
![Page 47: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/47.jpg)
Cuts in both 3 and 9 o’clock positions
![Page 48: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/48.jpg)
Removing the cut sections by chisel
![Page 49: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/49.jpg)
Crowbars used to prise the coil from the pipe
![Page 50: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/50.jpg)
Layers of the bonded Clock Spring and filler on
the pipe
![Page 51: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/51.jpg)
Final coil removal
![Page 52: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/52.jpg)
Removing the filler from the pipe surface using a
chisel
![Page 53: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/53.jpg)
Final filler removal – no corrosion present
![Page 54: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/54.jpg)
The removed Clock Spring sections including the
original molded filler from the dent section
![Page 55: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/55.jpg)
The Removals
CASE 3
Location: North America
Pipeline: 30” oil pipeline.
Initial repair: 1995 external corrosion and
potential reinforcement of SCC.
Removed in: 2010
![Page 56: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/56.jpg)
The Removals
Reason for removal:
Evaluation of performance of Clock Spring
repair.
Conclusion:
The unit had to be sand blasted and pry
bars used to remove the various layers of
the coil. The coil was well bonded within
each layer and to the carrier pipe.
![Page 57: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/57.jpg)
Conclusion cont….
No evidence of any active corrosion, no
evidence of any cathodic disbondment or
cathodic shielding effects. After 15 years of
service the repair remained sound and
durable.
![Page 58: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/58.jpg)
![Page 59: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/59.jpg)
![Page 60: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/60.jpg)
The Removals
CASE 4
Location: Middle East
Pipeline: 18” high pressure high
temperature oil riser in the splash zone.
Initial repair: 1997 external corrosion.
Removed in: 2006
![Page 61: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/61.jpg)
The Removals
Reason for removal:
The riser was selected for shut down and
replacement and client decided to evaluate
the repair performance.
Conclusions:
The repair was well bonded to the riser and
very difficult and time consuming to remove.
After 9 years …….
![Page 62: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/62.jpg)
Coil cut away in sections to be removed
![Page 63: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/63.jpg)
Cleaning to remove filler, adhesive and fibre still
bonded to the riser
![Page 64: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/64.jpg)
Final preparation for UT inspection
![Page 65: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/65.jpg)
Conclusions
Several more case studies are availableand reported in the correspondingtechnical paper.
- As part of the initial validation processthe US DOT required the GRI to conductlong term field validation.
![Page 66: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/66.jpg)
- This was conducted over a 7 yearperiod and was an integral part of theoverall permanent repair acceptanceand validation of the Clock Springproduct.
Conclusions
![Page 67: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/67.jpg)
- The findings in the above case studiesand removals of repairs with up to 15years operating service are consistentwith the original reported anddocumented long term testing asconducted in the 10 year GRI program.
Conclusions
![Page 68: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/68.jpg)
Conclusions
- The operational history of the case
studied repairs shows the GRI made
sound technical decisions in terms
of the composite architecture used
and the constituent components
within the Clock Spring repair.
![Page 69: Abstract of Papers:- - Online Portalportal.malaysiangas.com/document/publication/... · Abstract of Papers ... (B31.G, modified and effective area), class ... ASME 31.4 ASME 31.8](https://reader034.fdocuments.in/reader034/viewer/2022051602/5ae3cdab7f8b9a0d7d8e1a4d/html5/thumbnails/69.jpg)
- The approvals attributed to the use of a
long term, tested composite repair
sleeves for reinforcement of corrosion
and mechanical damage on high
pressure pipeline and riser systems
has been validated.
Conclusions