Aaron Wilson & Brian Hensel Infrastructure & Mobility ...

19
Aaron Wilson & Brian Hensel Infrastructure & Mobility Planning December 9, 2020

Transcript of Aaron Wilson & Brian Hensel Infrastructure & Mobility ...

Aaron Wilson & Brian Hensel

Infrastructure & Mobility Planning

December 9, 2020

MPO• Pavement performance measures

• Historically, windshield survey and inconsistent with MDT pavement assessment

• Better alignment with assessed pavement when coordinating with other projects; water, sidewalk and utility improvements

City and County• Budget assessments

• What are current (October 2019) conditions

• Reports to assess future budgetary needs

• Work plan inputs

Overall reporting• MPO – Urbanized Area (UZA) summary report

• City – City Limits detailed report

• County – County (Outside City Limits) detailed report

Purpose & Outcome

Data collection

• Lidar

• Lasers!

• Imagery

LIDAR• Inventories

• Traffic Signs, Street Paint condition, Storm drains, Manholes, Curb/Gutter/Sidewalk, ADA facilities

• Problem Identification• Sight Obstruction, Pavement Condition (Identified)

Inventory Potential

Pavement Asset Management

8

Use PCI and modeling to develop data-driven approaches to

pavement maintenance

Asset Management Tools

9

MicroPAVER

• Models and projects pavement condition under different

maintenance schedules & budgets

• Inputs:

• Road classification

• Deterioration model

• Current PCI

• Maintenance costs (chip seal, mill/overlay, reconstruction)

• Budgets

Pavement deterioration

Maintenance costs

Estimated cost to “fix all”

12

Current budget projections

13

Current budget projections

Budget Scenarios

15

Asset Management

Infrastructure & maintenance coordination

Construction schedule for 2021

Milling/Paving

Street From To Classification Prescribed by PMS

Ben Hogan (BaRSAA) Broadveiw Place Highland Park Collector Yes

North Ave (BaRSAA) 26th Reserve Local No

26th (BaRSAA) North Central Local No

W. Central (BaRSAA) Central Reserve Local No

High Park (BaRSAA) 39th Simons Collector Yes/portions

Missoula Ave (BaRSAA) Van Buren Lolo St Collector Yes/portions

Intermittent mill/pave/overlays

Rattlesnake Drive Lolo Creek Crossing Collector No

Lincoln Hills Drive R.S. Drive Columbine Collector No

Cohosset Wapikia Saranac local No

Arrowhead Cohossett Tahoe local Yes/portions

Myrtle/3rd (crosswalk improvements) done before mid May 2021 Water project on 3rd local No

Linda Vista Paul Ln Scott Allen Collector Yes/portions

Scott Allen Linda Vista Alicia Collector No

Howell (south 1/2 of Street) 1 ADA Holmes Mitchel local No

Maple at Broadway (Water punch list item per MDT)

Mount Brooks Bow Collector No (Water project)

Shakespeare Phillips Defoe local No(Water project)

Higgins Ave University Brooks Arterial No, MDT Special Project,

FY 22 (done after July 1

Key takeaways

o Our current budgets are not keeping up with need

o However, we need more data to determine accuracy of projections

o This report is just the first baseline

o Can help evaluate work plans, but MicroPAVER won’t tell us exactly what to do

o Part of an overall asset management strategy – Streets, utilities, public infrastructure

19