A7 · Above Ramp or Stair Nosing. 3/8" Solid Rod Welded to Pipe and Wall Bracket Wall Bracket...
Transcript of A7 · Above Ramp or Stair Nosing. 3/8" Solid Rod Welded to Pipe and Wall Bracket Wall Bracket...
WALL BRACKET - SPACEEQUALLY 5'-0" O.C. MAX.& 1'-0" FROM ENDS
WALL MOUNT BRACKET
WALL MOUNT
FINISH EDGE OF WALL
1 1/2" STD Handrail Pipe Rail. MountAbove Ramp or Stair Nosing.
3/8" Solid Rod Welded toPipe and Wall Bracket
Wall Bracket
Countersunk Anchors
MIN1 1/2"
Steel Angle Welded toEmbedded Steel Angle(Prime and Paint)
3' - 6
"
1 1/2" x 1 1/2" Steel Tube,Weld to Posts(Prime and Paint)
Fully Weld Tube SteelPosts to Steel Angle
2" x 2" Steel Tube, Weld to Posts(Prime and Paint)
3/4" Steel Barstock @ 6" O.C.(Prime and Paint)
INTERMEDIATE POST NOMORE THAN 60" O.C.
PRIME AND PAINT ALLFERROUS METALS
4"
1 1/2" x 1 1/2" Steel Tube,Weld to Posts(Prime and Paint)
4"
J-Mould
5/8" Gypsum Wall BoardL.W. Stud Framing
Floor SlabRe: Structural
Bar JoistRe: Structural
2" x 2" Steel Tube Posts Beyond@ 5'-0" O.C. Max Spacing/SpreadPattern to Fit(Prime and Paint)
1 1/2" x 1 1/2" Steel Tube,Weld to Posts(Prime and Paint)
2" x 2" Steel Tube, Weld to Posts(Prime and Paint)
3/4" Steel Barstock @ 6" O.C.(Prime and Paint)
ELEVATION
Steel Angle Welded toEmbedded Steel Angle(Prime and Paint)
Fully Weld Tube SteelPosts to Steel Angle
TOGGLE OR EXPANSION BOLTAS REQUIRED TO PROPERLYSECURE HANDRAIL TO WALL
MALLEABLE IRONEND CAP
MALLEABLE IRON FLAT TOPEWALL BRACKET @ 5'-0" O.C.
3' - 0
"
1' - 11"
3' - 0
"
S.S. Plate Cover, Fasten withAppropriate Clip Fastener
T.S 1 1/2" Diam. ContinuousHandrail (Prime and Paint)
T.S 1 1/2" Diam. Continuous Rail(Prime and Paint)
Steel Sleeve Set in Slab
Fully Weld Tube Steel to Sleeve
5"
3' - 0
"
T.S 1 1/2" Diam. Post @ 5'-0"O.C. Max Spacing/SpreadPattern to Fit as Shown on1/A7.2 and 2/A7.2 (Prime andPaint)
8" CMU w/ Ladder TypeReinforcing @ 16" O.C. Vertically
Fluid Applied Air/Weather BarrierOver CMU (Applies to Both Sides)
2" Air Space (Applies to Both Sides)
Brick Veneer w/ Masonry Ties@ 16" O.C. each way
(Applies to Both Sides)
Weep Cell Vent @ 24" O.C.
Mortar Net
Termination Bar Seal Over w/ Liquid Flashing
Continuous Coated Copper Flashing
Stainless Steel Base Flashing
Compacted Fill
Cast-in-Place Concrete Slaband Footing Re: Structural
15 mil Vapor Barrier
Crushed Stone
Fill w/ Grout
8" CMU Bond Beam
Fluid Applied Air/Weather BarrierOver CMU (Applies to Both Sides)
2" Air Space (Applies to Both Sides)
Brick Veneer w/ Masonry Ties @16" O.C. each way
(Applies to Both Sides)
Metal Flashing(Applies to Both Sides)
MembraneBrick CapGrout
Fluid Applied Air/Weather BarrierOver Concrete Stem Wall
8" CMU w/ Ladder TypeReinforcing @ 16" O.C. Vertically
Fluid Applied Air/Weather BarrierOver CMU Both Sides(Applies to Both Sides)
Weep Cell Vent @ 24" O.C.
Mortar Net
Termination Bar Seal Over w/ Liquid Flashing
Continuous Coated Copper Flashing
Stainless Steel Base Flashing
Compacted Fill
Cast-in-Place Concrete Slaband Footing Re: Structural
15 mil Vapor Barrier
Crushed Stone
Weep Cell Vent @ 24" O.C.
Mortar Net
Termination Bar Seal Over w/ Liquid Flashing
Continuous Coated Copper Flashing
Stainless Steel Base Flashing
Fill w/ Grout
2" Air Space (Applies to Both Sides)
Brick Veneer w/ Masonry Ties@ 16" O.C. each way(Applies to Both Sides)
REGISTERED R
ETIHCA
CT
ST A T E O F ISS SSI
II
M
PP
Michael W.
4822
Taylor
PROJECT NO.
CHECKED BY:DRAWN BY:
PryorMorrow PCC 2016Copyright
SCALE:
PryorMorrow
9/1/
2017
3:3
5:16
PM
As indicated
Col
umbu
s, M
issi
ssip
pi
2016111LAS
MWT
STAIR/RAMP/RAILINGDETAILS
A7.4
Demo
nstra
tion S
choo
l Ren
ovati
onG.
S.#1
04-18
7
Bure
au o
f Bui
ldin
g, G
roun
ds a
nd R
eal P
rope
rty M
anag
emen
t
3" = 1'-0"4 HANDRAIL ATTACHMENT 3" = 1'-0"7 RAILING DETAIL
1 1/2" = 1'-0"5 HANDRAIL ATTACHMENT @ WALL 3" = 1'-0"6 RAILING DETAIL
3" = 1'-0"2 DETAIL
3" = 1'-0"3 DETAIL
3" = 1'-0"1 DETAIL
MAR
KDA
TEDE
SCRI
PTIO
NSD
June
17,
201
6SC
HEM
ATIC
DES
IGN
DD
Nov
embe
r 30,
201
6D
ESIG
N D
EVEL
OPM
ENT
CD
May
31,
201
7C
ON
STR
UC
TIO
N D
OC
UM
ENTS
(75%
)C
DJu
ly 1
4, 2
017
CO
NST
RU
CTI
ON
DO
CU
MEN
TS (1
00%
)C
DSe
ptem
ber 5
, 201
7O
FFIC
IAL
BID
DO
CU
MEN
TS
2017