A6 Nantongreport

1
Nantong report Nantong Daily A6 Friday,16 July 2021 Briefly By Peng Junjun few days ago, in order to build the Yangtze River del- ta on the rail together, Na- tional Development and Reform Commission pub- lished multiple level rail transit planning of Yang- tze River delta area ( in short form the planning), after it was approved by Yangtze River delta inte- grated development pro- motion leading group. On 21 June, the reporter learnt from municipal de- velopment and reform commission that in the early stage Nantong has been negotiating and com- municating with superiors actively, to introduce more ‘Nantong elements’ to the planning. There are in total 63 projects which will be implemented soon in the planning. Among them, projects which are related to our city take up about 10%. In the present, 6 rail- ways which are related to Nantong such as high speed railway along the Yangtze River Hefei- Nan- jing- Shanghai section (north high speed railway along the Yangtze River), Nantong- Suzhou- Ningbo railway (including the ex- tension in Rugao), Rudong-Nantong-Suzhou- Huzhou intercity railway (Rutongsuhu intercity rail- way), Xinyi- Changxing Railway capacity expan- sion and alteration, Nan- tong west railway station - Haimen- new airport line (Jianghai express), Nan- tong east railway station - new airport - Tongzhou bay (airport express) are listed in projects which will be carried out soon in the planning. Nantong new airport station is listed as type II hub, and Nantong station is listed as type III hub. Huchongqi railway is recognized as long term planning research project in national level for the first time. Several rail projects of Nantong included in national planning Among the 63 projects which will be implemented recently in the planning, ‘Nantong elements’ accounted for about 10% A By Yang Xinming On 29 June, at Rudong Niujiaosha sea which is 39 kilometers away from the coast, as the blade and generator body hub of the last wind turbine were con- nected precisely, all 80 5 megawatt wind tur- bines of Huaneng Shengdong Rudong H3 offshore wind farm proj- ect were installed. By then, Huaneng Rudong offshore wind farm proj- ect was completed. The total installed capacity reached 700 thousand kilowatts. It is the larg- est project in China up to now. Huaneng Rudong off- shore wind farm project in- cludes two phases. The to- tal investment is over 12 billion Yuan. Phase 1 Rudong Baxianjiao off- shore wind power project is the 1st offshore wind farm of Huaneng group. It was connected to the grid with full capacity on 30 September 2017. Phase 2 project is expected to be in operation with full ca- pacity by the end of the month. After Huaneng Rudong offshore wind farm is in operation completely. 150 wind turbines can gener- ate as much as 1.75 billion kilowatts to the grid per year, which can satisfy the demand of 1 million households in a year. The largest offshore wind power farm in China was completed and went into operation Annual power generated to the grid reached 1.75 billion kilowatt hours, can satisfy the power demand of 1 million households in a year By Li Hui On 23 June, flight NX172 of Air Macau which carried 73 passen- gers arrived at Nantong airport. The arrival of Air Macau meant the official launch of Nantong- Macau flight. At the early stage of Nantong- Macau flight, four return flights will be operated every Monday, Wednesday, Friday and Sunday. The flight takes 2 and a half hours. It is the third destinations of Air Macau in Jiangsu, after Nanjing and Changzhou. By Wang Fei On 22 June, Xinany- ing Ming and Qing dy- nasty ancient buildings maintenance and protection project was started offi- cially. Xinanying Ming and Qing buildings is one of the few large traditional yards which have been preserved relatively well in Nantong. It is also an im- portant physical evidence of development history of Nantong. By Xu Aiyin On 2 July, General Administration of Cus- toms published im- ported meat specified regulatory site list. Hai’ an bonded logistics center (type B) imported meat specified regulatory site is on the list. It became the first imported meat specified regulatory site in middle Jiangsu official- ly. The site is estimated to be in operation official- ly in October. By Shen Liang A few days ago international asteroid commit- tee made an an- nouncement that an asteroid whose serial number is 347336, discovered by purple mountain observa- tory, Chinese Academy of Sciences, was named ‘Zhang Miman asteroid’ officially, to recognize the major contributions to rev- olutionary change of early vertebrate evolution re- search made by academi- cian Zhang Mi- man, as the founder of re- search of ori- gin of quadru- ped in China. 85- year- old Zhang Miman, studied in Nantong middle school in the second se- mester in grade three of secondary school in 1950. In 1991, she was elected as academician of Chinese Academy of Sciences. In 2018, she won‘world out- standing women in scienc- es’title awarded by UNES- CO. Nantong to Macau flight launched officially Xinanying Ming and Qing dynasty building maintenance and protection project started Hai’animported meat specified regulatory site approvedbyGeneral Administration of Customs By Tang Xiaofeng and Li Tong On 29 June, another masterpiece of famous architect in the world Paul Andreu - Nantong Art Museum was open officially. It gleamed against Nantong grand theatre by Zilang lake. The external shape of Nantong Art Museum is like a art box which lights imagination. It tells the flexible and ac- cessible art atmosphere of Nantong culture. The total floor area of the hall is about 32 thou- sand square meters. The height of the building is 24 m. There are in total 21 professional exhibition halls in the museum, and international lecture halls, multi- function halls, meeting rooms and collection storage rooms. When it was open, six theme painting exhibi- tions were launched. Close to 700 works of about 500 artists were exhibited. The works in- clude Chinese paintings, calligraphy, engraving and oil paintings. The ex- hibition will last more than one month. Nantong Art Museum open officially By Xu Peiqin To promote Jianghai culture better and tell the stories of Nantong, Nantong eminent fig- ures museum is recruit- ing volunteers. The volunteer appli- cation is classified into individual application and group application. Individual applicants shall be between 22 to 62 years old, stay, work, or study in Nan- tong for long term. There is no restriction in nationality. And they shall be able to serve at least once per week, no less than 3 hours per time, no less than 12 hours per month, and no less than 114 hours in total per year. They shall speak standard mandarin, express fluent- ly, and people who can communicate in foreign languages have priority. The voluntary work po- sitions include two major types, exhibition hall ser- vice includes security check, order maintenance, tour guide, photography and words editing; exhibi- tion hall guides work on narrative service inside the hall. Nantong eminent figures museum recruiting volunteers Another asteroid‘set with’ Chinese name Outstanding alumni of Nantong high school aca- demician Zhang Miman won the honor

Transcript of A6 Nantongreport

Page 1: A6 Nantongreport

Nantong reportNantongDaily A6Friday,16 July 2021

Briefly

By Peng Junjun

few days ago, inorder to build theYangtze River del-

ta on the rail together, Na-tional Development andReform Commission pub-lished multiple level railtransit planning of Yang-tze River delta area ( inshort form the planning),after it was approved byYangtze River delta inte-grated development pro-motion leading group. On21 June, the reporterlearnt from municipal de-velopment and reformcommission that in theearly stage Nantong hasbeen negotiating and com-municating with superiorsactively, to introducemore‘Nantong elements’to the planning. There arein total 63 projects whichwill be implemented soonin the planning. Amongthem, projects which arerelated to our city take upabout 10%.In the present, 6 rail-

ways which are related toNantong such as highspeed railway along theYangtze River Hefei- Nan-jing- Shanghai section(north high speed railwayalong the Yangtze River),Nantong- Suzhou- Ningborailway (including the ex-tension in Rugao),Rudong-Nantong-Suzhou-Huzhou intercity railway(Rutongsuhu intercity rail-way), Xinyi- ChangxingRailway capacity expan-sion and alteration, Nan-tong west railway station -Haimen- new airport line(Jianghai express), Nan-tong east railway station -new airport - Tongzhoubay (airport express) arelisted in projects whichwill be carried out soon inthe planning. Nantong newairport station is listed astype II hub, and Nantongstation is listed as type IIIhub. Huchongqi railway isrecognized as long termplanning research project innational level for the firsttime.

Several rail projectsof Nantong includedin national planningAmong the 63 projects which will beimplemented recently in the planning,‘Nantong elements’ accounted forabout 10%

A

By Yang Xinming

On 29 June, atRudong Niujiaosha seawhich is 39 kilometersaway from the coast, asthe blade and generatorbody hub of the lastwind turbine were con-nected precisely, all 805 megawatt wind tur-bines of HuanengShengdong Rudong H3offshore wind farm proj-ect were installed. Bythen, Huaneng Rudongoffshore wind farm proj-ect was completed. Thetotal installed capacityreached 700 thousandkilowatts. It is the larg-est project in China upto now.Huaneng Rudong off-

shore wind farm project in-cludes two phases. The to-tal investment is over 12billion Yuan. Phase 1Rudong Baxianjiao off-shore wind power projectis the 1st offshore windfarm of Huaneng group. Itwas connected to the gridwith full capacity on 30September 2017. Phase 2project is expected to bein operation with full ca-pacity by the end of themonth.After Huaneng Rudong

offshore wind farm is inoperation completely. 150wind turbines can gener-ate as much as 1.75 billionkilowatts to the grid peryear, which can satisfy thedemand of 1 millionhouseholds in a year.

The largest offshore wind power farmin China was completed and wentinto operationAnnual power generated to the grid reached 1.75 billion kilowatthours, can satisfy the power demand of 1 million households in a year

By Li HuiOn 23 June, flight

NX172 of Air Macauwhich carried 73 passen-gers arrived at Nantongairport. The arrival of AirMacau meant the official

launch of Nantong-Macauflight.At the early stage of

Nantong- Macau flight,four return flights will beoperated every Monday,Wednesday, Friday andSunday. The flight takes 2and a half hours. It is thethird destinations of AirMacau in Jiangsu, afterNanjing and Changzhou.

By Wang FeiOn 22 June, Xinany-

ing Ming and Qing dy-nasty ancient buildings

maintenance and protectionproject was started offi-cially.Xinanying Ming and

Qing buildings is one ofthe few large traditionalyards which have beenpreserved relatively well inNantong. It is also an im-portant physical evidenceof development history ofNantong.

By Xu AiyinOn 2 July, General

Administration of Cus-toms published im-

ported meat specifiedregulatory site list. Hai’an bonded logistics center(type B) imported meatspecified regulatory siteis on the list. It becamethe first imported meatspecified regulatory sitein middle Jiangsu official-ly. The site is estimatedto be in operation official-ly in October.

By Shen Liang

A few daysago internationalasteroid commit-tee made an an-nouncement thatan asteroidwhose serial number is347336, discovered bypurple mountain observa-tory, Chinese Academy ofSciences, was named

‘Zhang Miman asteroid’officially, to recognize themajor contributions to rev-olutionary change of earlyvertebrate evolution re-search made by academi-

cian Zhang Mi-man, as thefounder of re-search of ori-gin of quadru-ped in China.85- year- old

Zhang Miman,studied in Nantong middleschool in the second se-mester in grade three ofsecondary school in 1950.In 1991, she was elected asacademician of ChineseAcademy of Sciences. In2018, she won‘world out-standing women in scienc-es’title awarded by UNES-CO.

Nantong to Macauflight launchedofficially

Xinanying Ming andQing dynastybuildingmaintenance andprotection projectstarted

Hai’an importedmeat specifiedregulatory siteapprovedbyGeneralAdministration ofCustoms

By Tang Xiaofengand Li Tong

On 29 June, anothermasterpiece of famousarchitect in the worldPaul Andreu - NantongArt Museum was openofficially. It gleamedagainst Nantong grandtheatre by Zilang lake.The external shape of

Nantong Art Museum islike a art box whichlights imagination. Ittells the flexible and ac-cessible art atmosphereof Nantong culture. Thetotal floor area of thehall is about 32 thou-

sand square meters. Theheight of the building is24 m. There are in total 21professional exhibitionhalls in the museum, andinternational lecturehalls, multi- functionhalls, meeting rooms andcollection storage rooms.When it was open, six

theme painting exhibi-tions were launched.Close to 700 works ofabout 500 artists wereexhibited. The works in-clude Chinese paintings,calligraphy, engravingand oil paintings. The ex-hibition will last morethan one month.

Nantong Art Museumopen officially

By Xu Peiqin

To promote Jianghaiculture better and tellthe stories of Nantong,Nantong eminent fig-ures museum is recruit-ing volunteers.The volunteer appli-

cation is classified intoindividual applicationand group application.Individual applicantsshall be between 22 to62 years old, stay,work, or study in Nan-tong for long term.There is no restriction innationality. And theyshall be able to serve at

least once per week, noless than 3 hours per time,no less than 12 hours permonth, and no less than114 hours in total per year.They shall speak standardmandarin, express fluent-ly, and people who cancommunicate in foreignlanguages have priority.The voluntary work po-

sitions include two majortypes, exhibition hall ser-vice includes securitycheck, order maintenance,tour guide, photographyand words editing; exhibi-tion hall guides work onnarrative service inside thehall.

Nantong eminent figuresmuseum recruiting volunteers

Another asteroid‘set with’Chinese nameOutstanding alumni of Nantong high school aca-demician Zhang Miman won the honor