Coversheet Scale: None A0.0 Glen Hazel Highrise Community Room & 945 Roselle Court Housing Authority City of Pittsburgh 100 Ross Street Pittsburgh, PA 15219 Pittsburgh, PA 15207 Terrace Improvements Key Plan PROJECT NORTH 4 November 2014 Consultants Multi-Lynx Companies, Inc. 241 Fourth Avenue Pittsburgh, PA 15222 412.798.4113 Watson Engineers 100 Jaspen Way McMurray, PA 15317 724.745.7513 GLEN HAZEL HIGHRISE COMMUNITY ROOM & TERRACE IMPROVEMENTS 4 November 2014 ROOM ID. NAME XXX ROOM No. DETAIL FLAG ELEVATION FLAGS X X X X AX.X 1 AX.X X AX.X DETAIL No. SHEET No. DETAIL No. DETAIL No. & DIRECTION SHEET No. SHEET No. DIRECTION DRAWING TITLE SHEET No. NAME SCALE X AX.X DRAWING No. SECTION FLAG X AX.X SHEET No. CUT & DIRECTION DETAIL No. DIRECTION DOOR ID. PARTITION TAG X XXXX DOOR No. ROOM No. X PARTITION TYPE X WINDOW TAG WINDOW TYPE KEYNOTE TAG KEYNOTE No. X Drawing Index General Notes A0.0 Coversheet L1.0 Site Demolition and Grading Plan L2.0 New Site and Planting Plan L3.0 Outdoor Kitchen Details L3.1 Raised Planting Bed Details L3.2 Pergola Details L3.3 Site Details A1.0 Floor Plans and Schedules A1.1 Drop Leaf Table and Interior Details Code Review Applicable Code: IEBC 2009 / Level 2 Alteration Occupancy: R-2 Residential: Highrise Apartment Building IRC ァ 302.2 Existing structure, no change of occupancy Compliance: Newly installed electrical equipment shall comply with the requirements of section 708 IEBC ァ 701.3 Fire Protection: Existing building is sprinklered IEBC ァ 704 Corridor Fire Rating: .5 hour IBC Table 1018.1 Fire Door Rating: 1/3 hour IBC Table 715.4 Means of Egress: 2 are existing, 1 additional door being provided IEBC ァ 705 Egress Doors: All doors opening onto an exit passageway at grade shall be self-closing IEBC ァ 705.4 Shall be at least 1 3/8" solid core wood or approved equivalent IEBC ァ 705.5.1 Codes: All work shall be done in strict accordance with applicable codes and regulations and the highest written standards specified by applicable trade associations. Permits and Inspections: The building permit and all other required permits and inspections shall be procured by the general contractor. Coordination: Contractors shall thoroughly familiarize themselves with existing conditions, finishes, and materials prior to submitting proposals. Field confirmation shall include, but not be limited to, critical dimensions, trueness of existing framing (where applicable) and critical substrates prior to commencing work. Notify architect of any discrepancies or imperfections noted above that would affect progress and/or installations of this contract. Cutting & Patching: All existing finishes disturbed during the course of this work shall be restored to original condition. New finishes shall match existing, where adjacent, as closely as possible, unless noted otherwise. Cleaning: All existing surfaces, cabinets, appliances, fixtures, etc. are to be cleaned with the appropriate cleaners prior to painting or refinishing (if applicable). When possible, use low or no VOC product to reduce toxins in the air. Fire-rated Construction: Any penetrations through existing fire rated construction is to be sealed with fire-retardant sealants. Material & Equipment: The contractor shall provide all materials, labor and equipment necessary for completion of the work. All materials shall be new unless specifically indicated otherwise. Materials damaged in transport or during construction shall be replaced at no cost to the tenant. Blocking: Provide concealed blocking for all wall mounted equipment, including cabinets, toilet accessories, ornamental metal, railings and the like, as described in the bid documents. Also provide concealed blocking for wall mounted equipment and cabinets indicated on the ffe drawings. Do not scale the drawings. All dimensions shall be field verified by the contractor. Materials noted on one drawing are typical for all materials similarly depicted. ACT A.F.F. ALUM. APPROX. BD. BTM. B/ CLG. CLR. CMU CONC. CONT. COORD. CPT. CT C.S. DIA. DPL DN D&R DWG EA. EX'G EXP. OP'G OSB P.LAM. PLYWD. PT'D / PNT'D REQ'D REINF. R&R RUB SIM. STL. T/ TYP. TINT / TNT'D T.S. U.N.O. U.T.R. VCT V.I.F. VIN WDW WD. V.PL.PT. Acoustic Ceiling Tile Above Finished Floor Aluminum Approximate Board Bottom Bottom Of Ceiling Clear Concrete Masonry Unit Concrete Continuous Coordinate Carpet Ceramic Tile Course Diameter Diamond Plate Down Detach and Reset Drawing Each Existing Expanded Opening Oriented Strand Board Plastic Laminate Plywood Painted Required Reinforced Remove and Replace Rubber Similar Steel Top Of Typical Tinted Tube Steel Unless Noted Otherwise Up Through Roof Vinyl Composition Tile Verify In Field Vinyl Window Wood Veneer, Plaster & Paint EXT. F.B.O. FIN. FIXT. FLR GA. GALV. G.C. GWB GYP. HORIZ. HR. INSUL INT. LINO. LVT MAX. MIN. M.O. MOD. BIT. MTL. MT'D N.I.C. N.T.S. Exterior Furnished By Owner Finish / Finished Fixture Floor Gauge Galvanized General Contractor Gysum Wall Board Gypsum Horizontal Hour Insulation Interior Linoleum Luxury Vinyl Tile Maximum Minimum Masonry Opening Modified Bitumen Metal Mounted Not In Contract Not To Scale Abbreviations and Graphics Legend

Transcript of A0.0 coversheet - Housing Authority of the City of Pittsburgh...Housing Authority City of Pittsburgh...

Page 1: A0.0 coversheet - Housing Authority of the City of Pittsburgh...Housing Authority City of Pittsburgh 100 Ross Street Pittsburgh, PA 15219 Pittsburgh, PA 15207 Terrace Improvements

Coversheet

Scale: None

A0.0

Glen Hazel HighriseCommunity Room &

945 Roselle Court

Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219

Pittsburgh, PA 15207

Terrace Improvements

Key Plan

PROJECTNORTH

4 November 2014

ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113

Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513

GLEN HAZEL HIGHRISE COMMUNITY ROOM & TERRACE IMPROVEMENTS4 November 2014

ROOM ID. NAMEXXX ROOM No.

DETAIL FLAG

ELEVATION FLAGSX

XX X

AX.X

1AX.X

XAX.X

DETAIL No.

SHEET No.

DETAIL No.

DETAIL No. & DIRECTION

SHEET No.

SHEET No.DIRECTION

DRAWING TITLE

SHEET No.

NAMESCALE

XAX.X

DRAWING No. SECTION FLAGX

AX.XSHEET No.CUT & DIRECTION

DETAIL No.

DIRECTION

DOOR ID.

PARTITION TAG

XXXXX

DOOR No.ROOM No.

XPARTITION TYPE

X

WINDOW TAG WINDOW TYPE

KEYNOTE TAG KEYNOTE No.

X

Drawing Index General NotesA0.0 Coversheet

L1.0 Site Demolition and Grading PlanL2.0 New Site and Planting PlanL3.0 Outdoor Kitchen DetailsL3.1 Raised Planting Bed DetailsL3.2 Pergola DetailsL3.3 Site Details

A1.0 Floor Plans and SchedulesA1.1 Drop Leaf Table and Interior Details

Code ReviewApplicable Code: IEBC 2009 / Level 2 Alteration

Occupancy: R-2 Residential: Highrise Apartment Building IRC § 302.2Existing structure, no change of occupancy

Compliance: Newly installed electrical equipment shall comply with the requirements of section 708

IEBC § 701.3

Fire Protection: Existing building is sprinklered IEBC § 704

Corridor Fire Rating: .5 hour IBC Table 1018.1Fire Door Rating: 1/3 hour IBC Table 715.4

Means of Egress: 2 are existing, 1 additional door being provided IEBC § 705

Egress Doors: All doors opening onto an exit passageway at grade shall be self-closing

IEBC § 705.4

Shall be at least 1 3/8" solid core wood or approved equivalent

IEBC § 705.5.1

Codes: All work shall be done in strict accordance with applicable codes and regulations and the highest written standards specified by applicable trade associations.

Permits and Inspections: The building permit and all other required permits and inspections shall be procured by the general contractor.

Coordination: Contractors shall thoroughly familiarize themselves with existing conditions, finishes, and materials prior to submitting proposals. Field confirmation shall include, but not be limited to, critical dimensions, trueness of existing framing (where applicable) and critical substrates prior to commencing work. Notify architect of any discrepancies or imperfections noted above that would affect progress and/or installations of this contract.

Cutting & Patching: All existing finishes disturbed during the course of this work shall be restored to original condition. New finishes shall match existing, where adjacent, as closely as possible, unless noted otherwise.

Cleaning: All existing surfaces, cabinets, appliances, fixtures, etc. are to be cleaned with the appropriate cleaners prior to painting or refinishing (if applicable). When possible, use low or no VOC product to reduce toxins in the air.

Fire-rated Construction: Any penetrations through existing fire rated construction is to be sealed with fire-retardant sealants.

Material & Equipment: The contractor shall provide all materials, labor and equipment necessary for completion of the work. All materials shall be new unless specifically indicated otherwise. Materials damaged in transport or during construction shall be replaced at no cost to the tenant.

Blocking: Provide concealed blocking for all wall mounted equipment, including cabinets, toilet accessories, ornamental metal, railings and the like, as described in the bid documents. Also provide concealed blocking for wall mounted equipment and cabinets indicated on the ffe drawings.

Do not scale the drawings. All dimensions shall be field verified by the contractor.

Materials noted on one drawing are typical for all materials similarly depicted.

ACTA.F.F.ALUM.APPROX.BD.BTM.B/CLG.CLR.CMUCONC.CONT.COORD.CPT.CTC.S.DIA.DPLDND&RDWGEA.EX'GEXP.

OP'GOSBP.LAM.PLYWD.PT'D / PNT'DREQ'DREINF.R&RRUBSIM.STL.T/TYP.TINT / TNT'DT.S.U.N.O.U.T.R.VCTV.I.F.VINWDWWD.V.PL.PT.

Acoustic Ceiling TileAbove Finished FloorAluminumApproximateBoardBottomBottom Of CeilingClearConcrete Masonry UnitConcreteContinuousCoordinateCarpetCeramic TileCourseDiameterDiamond PlateDownDetach and ResetDrawingEachExistingExpanded

OpeningOriented Strand BoardPlastic LaminatePlywoodPaintedRequiredReinforcedRemove and ReplaceRubberSimilarSteelTop OfTypicalTintedTube SteelUnless Noted OtherwiseUp Through RoofVinyl Composition TileVerify In FieldVinylWindowWoodVeneer, Plaster & Paint

EXT.F.B.O.FIN.FIXT.FLRGA.GALV.G.C.GWBGYP.HORIZ.HR.INSULINT.LINO.LVTMAX.MIN.M.O.MOD. BIT.MTL.MT'DN.I.C.N.T.S.

ExteriorFurnished By OwnerFinish / FinishedFixtureFloorGaugeGalvanizedGeneral ContractorGysum Wall BoardGypsumHorizontalHourInsulationInteriorLinoleumLuxury Vinyl TileMaximumMinimumMasonry OpeningModified BitumenMetalMountedNot In ContractNot To Scale

Abbreviations and Graphics Legend

Page 2: A0.0 coversheet - Housing Authority of the City of Pittsburgh...Housing Authority City of Pittsburgh 100 Ross Street Pittsburgh, PA 15219 Pittsburgh, PA 15207 Terrace Improvements

Weeds to be Removed

101

101

102

98

97

96

95

94

99

100

100

101

102

100

103

ACUNIT

Site Demolition / Grading PlanScale: 1:601

REMOVE EXISTING CONCRETE PAVEMENTAPPROX. 2975 SQ. FT.

REMOVE (3) TREES AND GRIND STUMPS

EXISTING LILAC SHRUB TO REMAIN, PROTECT AS REQUIRED

REMOVE SHRUBS

REMOVE BENCHREMOVE BENCH

REMOVE BENCH, POWERWASH, AND SALVAGE FOR REINSTALLATION TO FRONT YARD, LOCATION TBD BY ARCHITECT

REMOVE FENCE, DISCARD POSTS, SALVAGE ALL OTHER PARTS FOR REINSTALLATION

REMOVE WEEDS

(2) EXISTING GRILLS ARE TO BE REMOVED AND RELOCATED, POWERWASH TO CLEAN PRIOR TO RE-INSTALLATION

LIMIT OF WORK Existing contour to be changed

Pavement Demo

102

Proposed contour102

REGRADE

Demolition and

Scale: Noted

L1.0

Glen Hazel HighriseCommunity Room &

945 Roselle Court

Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219

Pittsburgh, PA 15207

Grading Plan

Terrace Improvements

Key Plan

4 November 2014

ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113

Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513

Page 3: A0.0 coversheet - Housing Authority of the City of Pittsburgh...Housing Authority City of Pittsburgh 100 Ross Street Pittsburgh, PA 15219 Pittsburgh, PA 15207 Terrace Improvements

ACUNIT

X XX X

XX

X

XX

XX

X

X

X

X

X

X

XX

XX

X

XX

XX

XX

X

X

X

X

X X

X

X

Planting Plan and FurnitureScale: 1" = 5'-0"1

LIMIT OF WORK

EU(7)

HH(5)

AR(8)

EP(11)

SN(8)

CR(12)

CO(8)

AT(14)

AF(17)

HC(22)

BC(12)

GM(26)

AX(20)

BM(43)

GM(30)

RF(15)

PS(15)

HX(15)

BM(15)MF

(16)

LS(6)

CV(2)

AP(1)

HP(3)

PA(4)

HS(3)

AS(20)

AH(8) ER

(24)

ER(8)

MX(1) MS

(3)

AC(1)

RX(2)

MI(13)

MI(5)

AH(4)

AR(6)

HV(1)

CF(6)

BC(12)

CK(3)

CK(3)

40'-0"

5L3.3

5L3.3

5L3.3

L4

L4L4

L4

L4

L4

L4L4

L4

L1 L1

L1 L1 L1

L1 L1

L2L2

L2 L2 L2

L2L2

L2

L5 L5

L5L5

L5

L5

L6

L6

L6

CLAY BOCCE COURT

NEW BELGIAN BLOCK NEW BELGIAN BLOCK EX'GNEW BELGIAN BLOCK JOINTS, TYP

CONCRETE A

CONCRETE B

Site Plan

Scale: Noted

L2.0

Glen Hazel HighriseCommunity Room &

945 Roselle Court

Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219

Pittsburgh, PA 15207

Terrace Improvements

Key Plan

4 November 2014

ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113

Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513

PLANT SCHEDULEQTY SYM BOTANICAL NAME (COMMON NAME) SIZE ROOT SPACING DETAIL NOTE

TREES1 AC Aesculus x carnea (Red Horse-Chestnut) 2''–2.5'' CAL B&B1 AP Acer pensylvanicum (Striped Maple) 6' – 7' HT. B&B multistem2 CV Chionanthus virginicus (White Fringetree) 5' – 6' HT. B&B multistem3 MS Magnolia stellata (Star Magnolia) 5' – 6' HT. B&B multistem

1 MX Malus 'Prairifire' (Prairifire Crabapple) 2''–2.5'' CAL B&B

GRASSES3 CK Calamagrostis 'Karl Foerster' (Feather Reedgrass) #3 FP3 HS Helictotrichon sempervirens (Blue Oatgrass) #1 FP

18 MI Miscanthus sinensis (Maidengrass) #5 FP

4 PA Pennisetum alopecuroides (Fountain Grass) #2 FP

SHRUBS11 AA Aronia arbutifolia (Red Chokeberry) 2.5'-3' HT. FP 30" O.C. ideal pH 7.56 CF Calycanthus floridus (Carolina allspice) 3'– 4' HT. FP 36" O.C.1 HV Hamamelis virginiana (Witch Hazel) 4' – 5' HT. B&B3 HP Hydrangea paniculata 'Limelight' (Panicle Hydrangea) 3'– 4' HT. FP2 RX Rhododendron cv. (Blue Rhododendron) 3'– 4' HT. FP ideal pH 5.5

PERENNIALS17 AF Agastache foeniculum (Anise Hyssop) #1 12" O.C.14 AR Actaea racemosa (Black Cohosh) #2 24" O.C.12 AH Anemone hupehensis (Japanese Anemone) #2 24" O.C.20 AS Astilbe x rosea 'Peach Blossom' (Early Pink Astilbe) #1 15" O.C.14 AT Asclepias tuberosa (Butterfly Weed) #1 15" O.C.20 AX Astilbe x arendsii (Red Astilbe) #1 15" O.C.24 BC Bergenia cordifolia (Heart-leaved Bergenia) #1 18" O.C.

58 BM Brunnera macrophylla (Brunnera) #SP5 15" O.C. non-variegated leaf

8 CO Coreosis verticillata (Treadleaf Coreopsis) #1 15" O.C.12 CR Coreosis verticillata 'Broad Street' (Red Treadleaf Coreopsis) #1 15" O.C.11 EP Echinacea purpurea (Purple Coneflower) #1 18" O.C.32 ER Epimedium x rubrum (Bishop's Hat) #17 EU Eupatorium purpureum (Sweet Joe Pye Weed) #2 30" O.C.56 GM Geranium macrorrhizum (Bigroot Geranium) #SP5 15" O.C.22 HC Hypericum calycinum (St. John's Wort) #1 18" O.C.5 HH Heliopsis helianthoides (Oxeye Sunflower) #2 30" O.C.15 HX Heuchera x cv. (Heuchera) #1 15" O.C.6 LS Lamprocapnos spectabilis (Bleeding Heart) #2 18" O.C.16 MF Monarda fistulosa (Wild Bergamot) #1 24" O.C.15 PS Polystichum setiferum (Soft Shield Fern) #2 24" O.C. ideal pH 6.515 RF Rudbeckia fulgida (Black-eyed Susan) #1 18" O.C.8 SN Symphyotrichum novae-angliae cv. (Blue New England Aster) #1 18" O.C.

3L3.3

3L3.3

2L3.3

2L3.3

2L3.3

1L3.3

1L3.3

3L3.3

3L3.3

Page 4: A0.0 coversheet - Housing Authority of the City of Pittsburgh...Housing Authority City of Pittsburgh 100 Ross Street Pittsburgh, PA 15219 Pittsburgh, PA 15207 Terrace Improvements

Outdoor Kitchen

Scale: As Noted

L3.0

Glen Hazel HighriseCommunity Room &

945 Roselle Court

Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219

Pittsburgh, PA 15207

Details

Terrace Improvements

Key Plan

PROJECTNORTH

4 November 2014

ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113

Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513

Kitchen Cabinets ElevationScale: 1/2" = 1'-0"3

Kitchen Cabinets / Grills ElevationScale: 1/2" = 1'-0"2

eq eq eq eq

exterior grills to be relocated as shown

board form concrete countertop, typ.

open

9"4"

Cabinet Section A-AScale: 1 1/2" = 1'-0"7

#3 rebar @ 9" each way

4" CMU w/ durowall (or equal) joint reinforcing every other course

3'-0"

cedar slat door

4" block, grout full

1'-8"

2'-3"

5" conc. sidewalk

3" sub-base

#3 rebar @ 2'-8" ctrs.

ext. outlet w/ cover,location tbd

3'-0"

2'-9"

Kitchen Plan : Foundation / CountertopScale: 1/2" = 1'-0"1

2

3X X

A1.1

8"

2'-6

1/2"

5'-6"

2'-6

1/2"

3'-0"

coun

tertop

6'-8" 5'-11"

1'-8" 1'-8"

board-formed concrete countertop, typ

7A1.1

5A1.1

4A1.1

6A1.1

5'-11"

2'-9 1

/4" +

/-

7'-1 5/8" countertop

19'-8 3/8" countertop

align

conc

w/ s

tone v

enee

r

outlet location tbd

outlet location tbd

2'-7"

Kitchen Exterior Elevation BScale: 1/2" = 1'-0"5

Kitchen Exterior Elevation AScale: 1/2" = 1'-0"4

open

Kitchen End ElevationScale: 1/2" = 1'-0"6

3'-0"

2'-9"

2'-9 1/2" +/-

Page 5: A0.0 coversheet - Housing Authority of the City of Pittsburgh...Housing Authority City of Pittsburgh 100 Ross Street Pittsburgh, PA 15219 Pittsburgh, PA 15207 Terrace Improvements

Planting Bed Longitudinal SectionScale: 3" = 1'-0"3

potting soil mixturezinc Flashingwaterproofingroot barrier

3/4" exterior plywood

pressure treated 2x4 turned sideways @ 12" o.c.

drainage composite

cedar 2x12

geotextile fabric

galv. hardware cloth

flashing

continuous slot

Planting Bed PlanScale: 1/4" = 1'-0"1

A

B

C

D4'-0"

4'-0"

4'-0"

2'-11

1/2"

6'-0"

6'-0"

6'-0"

2'-0"

2'-0"

pt 2x4 turned sideways @ 12" o.c., typ.

Raised Planting

Scale: Noted

L3.1

Glen Hazel HighriseCommunity Room &

945 Roselle Court

Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219

Pittsburgh, PA 15207

Bed Details

Terrace Improvements

Key Plan

4 November 2014

ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113

Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513

Planting Bed D ElevationScale: 1/4" = 1'-0"7

22'-0"

2'-3"

5'-0" 12'-0" 5'-0"

Planting Bed C ElevationScale: 1/4" = 1'-0"6

20'-0"

5'-0" 5'-0"10'-0"

2'-3"

Planting Bed B ElevationScale: 1/4" = 1'-0"5

18'-0"

5'-0" 5'-0"8'-0"

2'-3"

Planting Bed A ElevationScale: 1/4" = 1'-0"4

5'-0"

24'-8"

6'-8"5'-0"8'-0"

2'-3"

topsoilzinc flashingwaterproofingroot barrier

3/4" exterior plywood

galv. hangers

2x4 @ 12" o.c.

drainage composite

Planting Bed Cross SectionScale: 3" = 1'-0"2

7 3/4"

Post Connection DetailScale: 3" = 1'-0"6

1/2" dia. expansion anchor bolt, epoxy into concrete using Hilti HY-150 or equal

4x4 cedar postroute btm of post to accept galv. steel T

1/2"

11 1/

4"

5 5/8"

2 7/8"

2 7/8"

2'-3"

3 1/2"

WT 5x6

Page 6: A0.0 coversheet - Housing Authority of the City of Pittsburgh...Housing Authority City of Pittsburgh 100 Ross Street Pittsburgh, PA 15219 Pittsburgh, PA 15207 Terrace Improvements

PlanScale: 3/16" = 1'-0"1

1x2 attached to underside of 2x8 rafters

w14x22

8'-8"

10'-1

0 1/4"

30'-0"8'-0" 8'-0"

13'-2

"

8'-7

3/4"

4'-8 1

/4"2'-

0"

4'-4 1

/2"

Pergola Details

Scale: Noted

L3.2

Glen Hazel HighriseCommunity Room &

945 Roselle Court

Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219

Pittsburgh, PA 15207

Terrace Improvements

Key Plan

PROJECTNORTH

4 November 2014

ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113

Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513

Side ElevationScale: 3/16" = 1'-0"3

12'-1

0"

11'-8

1/2"

2x8 wood rafter attached to underside of W14x22

5.00°

12'-10 1/2"

22'-0 1/2"

w14x22 stl.beam

8'-8"

3'-0"

4"

w5x16 column

spotlight,typ. of 2

2'-8"

btm/be

am

btm/be

am

1"x2"x8'-0" wood

Rear ElevationScale: 3/16" = 1'-0"2

30'-0" 7'-8"

3'-0"

2'-8"

3'-0"

2'-8"

base plate

46'-0"

2x8 wood rafter attached to underside of W14x22 @ 2'-0" o.c.

W14x22 stl. beams

W5x16 stl. column(beyond)

8'-0" 8'-0"

Exploded AxonScale: 3/16" = 1'-0"4

1x2 attached to underside of 2x8 rafters

W14x22

2x8 wooden rafters attached to underside of W14x22 @2'-0" o.c.

top plate

sister 2x8's as shown. glue & screw.

base plate

Base PlateScale: 1 1/2" = 1'-0"8

1 1/2"

1 1/2"

10"

10"

3/4" x 10" x 10" base plate

hole for conduit

Top Plate PlanScale: 1 1/2" = 1'-0"7

5"

5"

1/2"X5"X5" top plate

Top Plate SectionScale: 1 1/2" = 1'-0"6

1/2"x5"x5" top plate

W5x16 stl. column

W14x22 stl. beam

2x8 wood rafter (beyond)

Connection DetailScale: 1 1/2" = 1'-0"5

W14x22 stl. beam

1/4"x2 3/4" lag screws

4"x1 1/2" clips

2x8 wood rafter, bird cut

shim

Page 7: A0.0 coversheet - Housing Authority of the City of Pittsburgh...Housing Authority City of Pittsburgh 100 Ross Street Pittsburgh, PA 15219 Pittsburgh, PA 15207 Terrace Improvements

Site Details

Scale: Noted

L3.3

Glen Hazel HighriseCommunity Room &

945 Roselle Court

Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219

Pittsburgh, PA 15207

Terrace Improvements

Key Plan

4 November 2014

ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113

Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513

TREE PLANTINGScale: 1" = 1'-0"1

DO NOT CUT LEADER

THIN BRANCHES & FOLIAGE BY 1/3 RETAINING NATURAL TREE SHAPE

REMOVE TOP 1/3 OF NATURAL FIBER BURLAP

REMOVE ENTIRELY IF BALLED IN SYNTHETIC, NON-BIODEGRADABLE FABRIC

REMOVE TOP 1/2 IF BALLED IN WIRE BASKET

DO NOT DAMAGE ROOT BALL

TAMP SOIL FIRMLY ADJACENT TO ROOT BALL

PLANT TREE TO PREVIOUS NURSERY GRADE

4" DEPTH OF BARK MULCH

FINISH GRADE

AMENDED TOPSOIL

3" IMPORTED TOPSOIL MIXED W/ TOP 6" OF EXISTING SUBSOIL

(3) WOOD POLES SPACED EVENLY AROUND OUTSIDE OF ROOTBALL

TIE POLES TO TRUNK W/ BURLAP ROPE

FOR MULTI-TRUNK TREES TIE POLES TO THE STRONGEST LEADING OR MIDDLE TRUNK W/ POLES SPACED SO THE ROPES ARE NOT IN CONTACT WITH OTHER TRUNKS

SUBGRADE

2'-0" 2'-0"

MULCHED CIRCLE

3"9"

PLANTING SAUCER WIDTH 8'-10' ACCORDING TO SIZE OF TREE

SMALL TREE OR SHRUB PLANTINGScale: 1" = 1'-0"2

DO NOT CUT LEADER

THIN BRANCHES & FOLIAGE (NOT ALL END TIPS) BY 1/3 RETAINING NATURAL PLANT SHAPE

REMOVE TOP 1/3 OF NATURAL FIBER BURLAP

REMOVE ENTIRELY IF BALLED IN SYNTHETIC, NON-BIODEGRADABLE FABRIC

REMOVE TOP 1/2 IF BALLED IN WIRE BASKET

DO NOT DAMAGE ROOT BALL

TAMP SOIL FIRMLY ADJACENT TO ROOT BALL

PLANT TO PREVIOUS NURSERY GRADE

4" DEPTH OF BARK MULCH

FINISH GRADE

AMENDED TOPSOIL

3" IMPORTED TOPSOIL MIXED W/ TOP 6" OF EXISTING SUBSOIL

SUBGRADE

2'-0" 2'-0"

MULCHED CIRCLE

PLANTING SAUCER WIDTH 4'-6'

HEDGE AND PERENNIAL PLANTINGScale: 1" = 1'-0"3

PLANT TO PREVIOUS NURSERY GRADE

3" DEPTH OF BARK MULCH2" FOR LOW GROUNDCOVERSKEEP MULCH OUT OF CROWNS

FINISH GRADE

AMENDED TOPSOIL

50% STERILIZED TOPSOIL MIXED W/ 50% EXISTING SUBSOILADJUST DEPTH TO PLANT SIZE

SUBGRADE

PLANT SPACING SEE PLANT SCHEDULE

ADJACENT PAVEMENT

4"-8

"3"

BOCCE COURTScale: 1/2" = 1'-0"?

DETAIL FORTHCOMING

NOTES:

PLANTS PROVIDED TO BE OF HIGH QUALITY MEETINGANSI Z60.1-2004 STANDARD OF NURSERY STOCK

AMENDED TOPSOIL: 40% NATIVE TOPSOIL40% STERILIZED TOPSOIL20% SHREDDED LEAVES

ADJUST SOIL PH WHEN NEEDED: USE LIME TO RAISE PHUSE SULPHUR TO LOWER PH

COMPACTED #2 AGGREGATE SUBBASE

4" EXPOSED AGGREGATE CONCRETE PAVEMENTScale: 1" = 1'-0"4

CONTROL JOINT 1" MIN. DEPTH

CONCRETE W/ EXPOSED AGGREGATE FINISH

6 X 6 X 6/6 WELDED WIRE FABRIC

SOLID, UNDISTURBED OR COMPACTED SUBGRADE COMPACT TO 95% STANDARD PROCTOR

1/4" EXPANSION JOINT

GEOTEXTILE FABRIC

EXPANSION JOINT: REMOVE TOP 1/2" OF EXPANSION MATERIAL, CAULK

R 1/8"

HORSESHOE PIT IN LAWNScale: 1/2" = 1'-0"8

COMPACTED #2 AGGREGATE

GEOTEXTILE

UNDISTURBED OR COMPACTED SUBGRADE

2x8 DECK FRAMING

2x8 FRAMING FORPIT COVER

FOLDING HINGED PIT COVER

3"

8" 110 UTILITY SAND

1" COLD ROLLED STEEL STAKE

1'-2

"

S.S. BARREL HINGES.S. BARREL HINGE

S.S. BARREL HINGE

ENLARGED HORSESHOE PIT PLANSScale: 1/2" = 1'-0"5

3'-0

"3'

-4"

3'-0

"

1'-6

"3'

-4"

1'-6

"

10" 4'-4" 1'-10"

4'-0" CLEAR

3'-0

" CLE

AR

4'-0" CLEAR

3'-0

" CLE

AR

1'-10" 4'-4" 10"

8"

1X6

DE

CK

ING

1X6

DE

CK

ING

1X6

DE

CK

ING

1X6

DE

CK

ING

1X6

DE

CK

ING

1X6

DE

CK

ING

HORSESHOE PIT COVER AND FRAMINGScale: 1/2" = 1'-0"7

2x8 FRAMING

2'-2" 2'-2"

3'-4

"

S.S. BARREL HINGES

4'-0"CLEAR

3'-0

"CLE

AR

6"

Page 8: A0.0 coversheet - Housing Authority of the City of Pittsburgh...Housing Authority City of Pittsburgh 100 Ross Street Pittsburgh, PA 15219 Pittsburgh, PA 15207 Terrace Improvements

Community Room - Demo PlanScale: 3/16" = 1'-0"1

remove portion of wall for new door installation

existing vct flooring to remain, prep for new flooring overlay

trench floor for new floor boxes, typ. of 2

remove ex'g carpet and glue shown hatched, levelsurface as req'd for new flooring

Community Room101

Corridor100

ex'g cabinets to remain

Floor Plans &

Scale: 3/16" = 1'-0"

A1.0

Glen Hazel HighriseCommunity Room &

945 Roselle Court

Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219

Pittsburgh, PA 15207

Schedules

Terrace Improvements

Key Plan

PROJECTNORTH

4 November 2014

ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113

Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513

existing wall outlet to daisy chainpower to new floor box

Community Room - New WorkScale: 3/16" = 1'-0"2

level floor at wall scar, install new dot pattern rubber flooring and threshold, color tbd

new fire door and partition, partition to continue to underside of structure above

new inset carpet tile "area rug"

new lvt plank flooring border, threecolors, pattern tbd

new lvt plank field color, tbd

14'-0

"

1'-0"

1'-0"

12'-0

"

4'-0"

5'-11

" +/-

existing wall outlet to daisy chain power to new floor box

6'-2" 1'-0" 8'-0" 1'-0"

3'-7"

5'-1"

1'-6"

Community Room101

Corridor100

1101

1

6A1.1

align

B1

C5

C5

C5

C5

B1

C5

C5

C5

C5

B1

C5

C5

C5

C5

B1

C5

C5

C5

C5

B1

C5

C5

C5

C5

B1

C5

C5

C5

C5

B1

C5

C5

C5

C5

B1

C5

C5

C5

C5

C1

C3

C2

C4

C4

B1

C5

C5

C5

C5

C2

Community Room - New Furniture PlanScale: 3/16" = 1'-0"4

Community Room101

Corridor100

Note: See Interior Furniture Specification for Furniture Schedule

ex'g bookshelves

Drop Leaf Table1,2,3A1.1

ex'g

cabin

ets

Community Room - Existing RCP w/ New WorkScale: 3/16" = 1'-0"3

new ceiling tile in existing grid, typthroughout. salvage several clean tile for

reuse in corridor

ex'g sprinkler head to remain in place

new wall mounted exit sign tomatch existing in room

relocated light fixturenew or modified grid req'd at new door location in corridor, replace tile as shown with salvaged tile from community rm.

paint all gwb bulkheads, typ

existing speaker to be re-mountedon ceiling mounted post

Note: All devices existing unless noted otherwise

clean diffusers, typ of 3

Note: All devices existing unless noted otherwise

Door ScheduleID DOOR SIZE FRAME GLAZING RATEDNo. Width Height Mat'l Mat'l Type Fire Label

1/ 101 3'0" 7'-0" vif wd hm 20 min 20 minRemarks:1. Match glazing and finishes to ex'g community rm/ corridor doors

Finish Schedule

NO. LOCATION FLOOR WALLS BASE CEILINGmat'l mat'l/ finish mat'l/ color mat'l/ finish

100 Corridor rubb dot gwb/pt'd rubb / tbd act / match ex'g101 Community Rm lvt gwb/pt'd rubb / tbd act / linear

Remarks:1. Corridor finishes only at new work area, match ex'g paint color

Exit Sign

Recessed Can Light

Sprinkler Head

Camera

Smoke Detector

LegendNew Floor Box

Existing Duplex

3 5/8" Mtl. Stud Wall PartitionUL # U419 (1 Hr)1

5/8" type X gwb, both sides

3 5/8" mtl. studs @ 16"o.c. - 20 gauge min.

4 7/8"

Page 9: A0.0 coversheet - Housing Authority of the City of Pittsburgh...Housing Authority City of Pittsburgh 100 Ross Street Pittsburgh, PA 15219 Pittsburgh, PA 15207 Terrace Improvements

Drop Leaf Table &

Scale: As Noted

A1.1

Glen Hazel HighriseCommunity Room &

945 Roselle Court

Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219

Pittsburgh, PA 15207

Interior Details

Terrace Improvements

Key Plan

PROJECTNORTH

4 November 2014

ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113

Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513

4'-0"

2'-9

13/16

"

eq.

eq.

eq.

eq.

7"

30" dia. base

3 1/2" dia.

15" mounting plate

7" leaf

180 deg drop leaf hinges

Drop Leaf Table - Plan and SectionScale: 3/4" = 1'-0"1

2'-6"

180 deg drop leaf hinges

Hinge DetailScale: 3" = 1'-0"3

Table Top Composition DetailScale: Actual Size2

plastic laminate top

2mm pvc edge at drop leaf

plastic laminate top

plastic laminate bottom

1 1/8" hi-density particle bd 2mm pvc edge

hollow metal framesolid core wood fire door (20 min.)

4 7/8"

cont. fire block sealant, both sides, typ.

Door Head/Jamb DetailScale: 1 1/2" = 1'-0"4

hollow metal frame

solid core wood fire door (20 min.)

cont. fire block sealant, bothsides, typ.

5/8" gwb to continue up tounderside of structure above, fire

seal at structure, typ

1

1

Door ElevationScale: 1/2" = 1'-0"5

3'-0"

field

verify

match new door to existing double door entrance to community room

Vinyl to Carpet Transition DetailScale: Actual Size6

new carpet tile flooringnew vinyl tile flooringflash patch apron 2'-0" wide

1/4"