A0.0 coversheet - Housing Authority of the City of Pittsburgh...Housing Authority City of Pittsburgh...
Transcript of A0.0 coversheet - Housing Authority of the City of Pittsburgh...Housing Authority City of Pittsburgh...
Coversheet
Scale: None
A0.0
Glen Hazel HighriseCommunity Room &
945 Roselle Court
Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219
Pittsburgh, PA 15207
Terrace Improvements
Key Plan
PROJECTNORTH
4 November 2014
ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113
Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513
GLEN HAZEL HIGHRISE COMMUNITY ROOM & TERRACE IMPROVEMENTS4 November 2014
ROOM ID. NAMEXXX ROOM No.
DETAIL FLAG
ELEVATION FLAGSX
XX X
AX.X
1AX.X
XAX.X
DETAIL No.
SHEET No.
DETAIL No.
DETAIL No. & DIRECTION
SHEET No.
SHEET No.DIRECTION
DRAWING TITLE
SHEET No.
NAMESCALE
XAX.X
DRAWING No. SECTION FLAGX
AX.XSHEET No.CUT & DIRECTION
DETAIL No.
DIRECTION
DOOR ID.
PARTITION TAG
XXXXX
DOOR No.ROOM No.
XPARTITION TYPE
X
WINDOW TAG WINDOW TYPE
KEYNOTE TAG KEYNOTE No.
X
Drawing Index General NotesA0.0 Coversheet
L1.0 Site Demolition and Grading PlanL2.0 New Site and Planting PlanL3.0 Outdoor Kitchen DetailsL3.1 Raised Planting Bed DetailsL3.2 Pergola DetailsL3.3 Site Details
A1.0 Floor Plans and SchedulesA1.1 Drop Leaf Table and Interior Details
Code ReviewApplicable Code: IEBC 2009 / Level 2 Alteration
Occupancy: R-2 Residential: Highrise Apartment Building IRC § 302.2Existing structure, no change of occupancy
Compliance: Newly installed electrical equipment shall comply with the requirements of section 708
IEBC § 701.3
Fire Protection: Existing building is sprinklered IEBC § 704
Corridor Fire Rating: .5 hour IBC Table 1018.1Fire Door Rating: 1/3 hour IBC Table 715.4
Means of Egress: 2 are existing, 1 additional door being provided IEBC § 705
Egress Doors: All doors opening onto an exit passageway at grade shall be self-closing
IEBC § 705.4
Shall be at least 1 3/8" solid core wood or approved equivalent
IEBC § 705.5.1
Codes: All work shall be done in strict accordance with applicable codes and regulations and the highest written standards specified by applicable trade associations.
Permits and Inspections: The building permit and all other required permits and inspections shall be procured by the general contractor.
Coordination: Contractors shall thoroughly familiarize themselves with existing conditions, finishes, and materials prior to submitting proposals. Field confirmation shall include, but not be limited to, critical dimensions, trueness of existing framing (where applicable) and critical substrates prior to commencing work. Notify architect of any discrepancies or imperfections noted above that would affect progress and/or installations of this contract.
Cutting & Patching: All existing finishes disturbed during the course of this work shall be restored to original condition. New finishes shall match existing, where adjacent, as closely as possible, unless noted otherwise.
Cleaning: All existing surfaces, cabinets, appliances, fixtures, etc. are to be cleaned with the appropriate cleaners prior to painting or refinishing (if applicable). When possible, use low or no VOC product to reduce toxins in the air.
Fire-rated Construction: Any penetrations through existing fire rated construction is to be sealed with fire-retardant sealants.
Material & Equipment: The contractor shall provide all materials, labor and equipment necessary for completion of the work. All materials shall be new unless specifically indicated otherwise. Materials damaged in transport or during construction shall be replaced at no cost to the tenant.
Blocking: Provide concealed blocking for all wall mounted equipment, including cabinets, toilet accessories, ornamental metal, railings and the like, as described in the bid documents. Also provide concealed blocking for wall mounted equipment and cabinets indicated on the ffe drawings.
Do not scale the drawings. All dimensions shall be field verified by the contractor.
Materials noted on one drawing are typical for all materials similarly depicted.
ACTA.F.F.ALUM.APPROX.BD.BTM.B/CLG.CLR.CMUCONC.CONT.COORD.CPT.CTC.S.DIA.DPLDND&RDWGEA.EX'GEXP.
OP'GOSBP.LAM.PLYWD.PT'D / PNT'DREQ'DREINF.R&RRUBSIM.STL.T/TYP.TINT / TNT'DT.S.U.N.O.U.T.R.VCTV.I.F.VINWDWWD.V.PL.PT.
Acoustic Ceiling TileAbove Finished FloorAluminumApproximateBoardBottomBottom Of CeilingClearConcrete Masonry UnitConcreteContinuousCoordinateCarpetCeramic TileCourseDiameterDiamond PlateDownDetach and ResetDrawingEachExistingExpanded
OpeningOriented Strand BoardPlastic LaminatePlywoodPaintedRequiredReinforcedRemove and ReplaceRubberSimilarSteelTop OfTypicalTintedTube SteelUnless Noted OtherwiseUp Through RoofVinyl Composition TileVerify In FieldVinylWindowWoodVeneer, Plaster & Paint
EXT.F.B.O.FIN.FIXT.FLRGA.GALV.G.C.GWBGYP.HORIZ.HR.INSULINT.LINO.LVTMAX.MIN.M.O.MOD. BIT.MTL.MT'DN.I.C.N.T.S.
ExteriorFurnished By OwnerFinish / FinishedFixtureFloorGaugeGalvanizedGeneral ContractorGysum Wall BoardGypsumHorizontalHourInsulationInteriorLinoleumLuxury Vinyl TileMaximumMinimumMasonry OpeningModified BitumenMetalMountedNot In ContractNot To Scale
Abbreviations and Graphics Legend
Weeds to be Removed
101
101
102
98
97
96
95
94
99
100
100
101
102
100
103
ACUNIT
Site Demolition / Grading PlanScale: 1:601
REMOVE EXISTING CONCRETE PAVEMENTAPPROX. 2975 SQ. FT.
REMOVE (3) TREES AND GRIND STUMPS
EXISTING LILAC SHRUB TO REMAIN, PROTECT AS REQUIRED
REMOVE SHRUBS
REMOVE BENCHREMOVE BENCH
REMOVE BENCH, POWERWASH, AND SALVAGE FOR REINSTALLATION TO FRONT YARD, LOCATION TBD BY ARCHITECT
REMOVE FENCE, DISCARD POSTS, SALVAGE ALL OTHER PARTS FOR REINSTALLATION
REMOVE WEEDS
(2) EXISTING GRILLS ARE TO BE REMOVED AND RELOCATED, POWERWASH TO CLEAN PRIOR TO RE-INSTALLATION
LIMIT OF WORK Existing contour to be changed
Pavement Demo
102
Proposed contour102
REGRADE
Demolition and
Scale: Noted
L1.0
Glen Hazel HighriseCommunity Room &
945 Roselle Court
Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219
Pittsburgh, PA 15207
Grading Plan
Terrace Improvements
Key Plan
4 November 2014
ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113
Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513
ACUNIT
X XX X
XX
X
XX
XX
X
X
X
X
X
X
XX
XX
X
XX
XX
XX
X
X
X
X
X X
X
X
Planting Plan and FurnitureScale: 1" = 5'-0"1
LIMIT OF WORK
EU(7)
HH(5)
AR(8)
EP(11)
SN(8)
CR(12)
CO(8)
AT(14)
AF(17)
HC(22)
BC(12)
GM(26)
AX(20)
BM(43)
GM(30)
RF(15)
PS(15)
HX(15)
BM(15)MF
(16)
LS(6)
CV(2)
AP(1)
HP(3)
PA(4)
HS(3)
AS(20)
AH(8) ER
(24)
ER(8)
MX(1) MS
(3)
AC(1)
RX(2)
MI(13)
MI(5)
AH(4)
AR(6)
HV(1)
CF(6)
BC(12)
CK(3)
CK(3)
40'-0"
5L3.3
5L3.3
5L3.3
L4
L4L4
L4
L4
L4
L4L4
L4
L1 L1
L1 L1 L1
L1 L1
L2L2
L2 L2 L2
L2L2
L2
L5 L5
L5L5
L5
L5
L6
L6
L6
CLAY BOCCE COURT
NEW BELGIAN BLOCK NEW BELGIAN BLOCK EX'GNEW BELGIAN BLOCK JOINTS, TYP
CONCRETE A
CONCRETE B
Site Plan
Scale: Noted
L2.0
Glen Hazel HighriseCommunity Room &
945 Roselle Court
Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219
Pittsburgh, PA 15207
Terrace Improvements
Key Plan
4 November 2014
ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113
Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513
PLANT SCHEDULEQTY SYM BOTANICAL NAME (COMMON NAME) SIZE ROOT SPACING DETAIL NOTE
TREES1 AC Aesculus x carnea (Red Horse-Chestnut) 2''–2.5'' CAL B&B1 AP Acer pensylvanicum (Striped Maple) 6' – 7' HT. B&B multistem2 CV Chionanthus virginicus (White Fringetree) 5' – 6' HT. B&B multistem3 MS Magnolia stellata (Star Magnolia) 5' – 6' HT. B&B multistem
1 MX Malus 'Prairifire' (Prairifire Crabapple) 2''–2.5'' CAL B&B
GRASSES3 CK Calamagrostis 'Karl Foerster' (Feather Reedgrass) #3 FP3 HS Helictotrichon sempervirens (Blue Oatgrass) #1 FP
18 MI Miscanthus sinensis (Maidengrass) #5 FP
4 PA Pennisetum alopecuroides (Fountain Grass) #2 FP
SHRUBS11 AA Aronia arbutifolia (Red Chokeberry) 2.5'-3' HT. FP 30" O.C. ideal pH 7.56 CF Calycanthus floridus (Carolina allspice) 3'– 4' HT. FP 36" O.C.1 HV Hamamelis virginiana (Witch Hazel) 4' – 5' HT. B&B3 HP Hydrangea paniculata 'Limelight' (Panicle Hydrangea) 3'– 4' HT. FP2 RX Rhododendron cv. (Blue Rhododendron) 3'– 4' HT. FP ideal pH 5.5
PERENNIALS17 AF Agastache foeniculum (Anise Hyssop) #1 12" O.C.14 AR Actaea racemosa (Black Cohosh) #2 24" O.C.12 AH Anemone hupehensis (Japanese Anemone) #2 24" O.C.20 AS Astilbe x rosea 'Peach Blossom' (Early Pink Astilbe) #1 15" O.C.14 AT Asclepias tuberosa (Butterfly Weed) #1 15" O.C.20 AX Astilbe x arendsii (Red Astilbe) #1 15" O.C.24 BC Bergenia cordifolia (Heart-leaved Bergenia) #1 18" O.C.
58 BM Brunnera macrophylla (Brunnera) #SP5 15" O.C. non-variegated leaf
8 CO Coreosis verticillata (Treadleaf Coreopsis) #1 15" O.C.12 CR Coreosis verticillata 'Broad Street' (Red Treadleaf Coreopsis) #1 15" O.C.11 EP Echinacea purpurea (Purple Coneflower) #1 18" O.C.32 ER Epimedium x rubrum (Bishop's Hat) #17 EU Eupatorium purpureum (Sweet Joe Pye Weed) #2 30" O.C.56 GM Geranium macrorrhizum (Bigroot Geranium) #SP5 15" O.C.22 HC Hypericum calycinum (St. John's Wort) #1 18" O.C.5 HH Heliopsis helianthoides (Oxeye Sunflower) #2 30" O.C.15 HX Heuchera x cv. (Heuchera) #1 15" O.C.6 LS Lamprocapnos spectabilis (Bleeding Heart) #2 18" O.C.16 MF Monarda fistulosa (Wild Bergamot) #1 24" O.C.15 PS Polystichum setiferum (Soft Shield Fern) #2 24" O.C. ideal pH 6.515 RF Rudbeckia fulgida (Black-eyed Susan) #1 18" O.C.8 SN Symphyotrichum novae-angliae cv. (Blue New England Aster) #1 18" O.C.
3L3.3
3L3.3
2L3.3
2L3.3
2L3.3
1L3.3
1L3.3
3L3.3
3L3.3
Outdoor Kitchen
Scale: As Noted
L3.0
Glen Hazel HighriseCommunity Room &
945 Roselle Court
Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219
Pittsburgh, PA 15207
Details
Terrace Improvements
Key Plan
PROJECTNORTH
4 November 2014
ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113
Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513
Kitchen Cabinets ElevationScale: 1/2" = 1'-0"3
Kitchen Cabinets / Grills ElevationScale: 1/2" = 1'-0"2
eq eq eq eq
exterior grills to be relocated as shown
board form concrete countertop, typ.
open
9"4"
Cabinet Section A-AScale: 1 1/2" = 1'-0"7
#3 rebar @ 9" each way
4" CMU w/ durowall (or equal) joint reinforcing every other course
3'-0"
cedar slat door
4" block, grout full
1'-8"
2'-3"
5" conc. sidewalk
3" sub-base
#3 rebar @ 2'-8" ctrs.
ext. outlet w/ cover,location tbd
3'-0"
2'-9"
Kitchen Plan : Foundation / CountertopScale: 1/2" = 1'-0"1
2
3X X
A1.1
8"
2'-6
1/2"
5'-6"
2'-6
1/2"
3'-0"
coun
tertop
6'-8" 5'-11"
1'-8" 1'-8"
board-formed concrete countertop, typ
7A1.1
5A1.1
4A1.1
6A1.1
5'-11"
2'-9 1
/4" +
/-
7'-1 5/8" countertop
19'-8 3/8" countertop
align
conc
w/ s
tone v
enee
r
outlet location tbd
outlet location tbd
2'-7"
Kitchen Exterior Elevation BScale: 1/2" = 1'-0"5
Kitchen Exterior Elevation AScale: 1/2" = 1'-0"4
open
Kitchen End ElevationScale: 1/2" = 1'-0"6
3'-0"
2'-9"
2'-9 1/2" +/-
Planting Bed Longitudinal SectionScale: 3" = 1'-0"3
potting soil mixturezinc Flashingwaterproofingroot barrier
3/4" exterior plywood
pressure treated 2x4 turned sideways @ 12" o.c.
drainage composite
cedar 2x12
geotextile fabric
galv. hardware cloth
flashing
continuous slot
Planting Bed PlanScale: 1/4" = 1'-0"1
A
B
C
D4'-0"
4'-0"
4'-0"
2'-11
1/2"
6'-0"
6'-0"
6'-0"
2'-0"
2'-0"
pt 2x4 turned sideways @ 12" o.c., typ.
Raised Planting
Scale: Noted
L3.1
Glen Hazel HighriseCommunity Room &
945 Roselle Court
Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219
Pittsburgh, PA 15207
Bed Details
Terrace Improvements
Key Plan
4 November 2014
ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113
Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513
Planting Bed D ElevationScale: 1/4" = 1'-0"7
22'-0"
2'-3"
5'-0" 12'-0" 5'-0"
Planting Bed C ElevationScale: 1/4" = 1'-0"6
20'-0"
5'-0" 5'-0"10'-0"
2'-3"
Planting Bed B ElevationScale: 1/4" = 1'-0"5
18'-0"
5'-0" 5'-0"8'-0"
2'-3"
Planting Bed A ElevationScale: 1/4" = 1'-0"4
5'-0"
24'-8"
6'-8"5'-0"8'-0"
2'-3"
topsoilzinc flashingwaterproofingroot barrier
3/4" exterior plywood
galv. hangers
2x4 @ 12" o.c.
drainage composite
Planting Bed Cross SectionScale: 3" = 1'-0"2
7 3/4"
Post Connection DetailScale: 3" = 1'-0"6
1/2" dia. expansion anchor bolt, epoxy into concrete using Hilti HY-150 or equal
4x4 cedar postroute btm of post to accept galv. steel T
1/2"
11 1/
4"
5 5/8"
2 7/8"
2 7/8"
2'-3"
3 1/2"
WT 5x6
PlanScale: 3/16" = 1'-0"1
1x2 attached to underside of 2x8 rafters
w14x22
8'-8"
10'-1
0 1/4"
30'-0"8'-0" 8'-0"
13'-2
"
8'-7
3/4"
4'-8 1
/4"2'-
0"
4'-4 1
/2"
Pergola Details
Scale: Noted
L3.2
Glen Hazel HighriseCommunity Room &
945 Roselle Court
Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219
Pittsburgh, PA 15207
Terrace Improvements
Key Plan
PROJECTNORTH
4 November 2014
ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113
Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513
Side ElevationScale: 3/16" = 1'-0"3
12'-1
0"
11'-8
1/2"
2x8 wood rafter attached to underside of W14x22
5.00°
12'-10 1/2"
22'-0 1/2"
w14x22 stl.beam
8'-8"
3'-0"
4"
w5x16 column
spotlight,typ. of 2
2'-8"
btm/be
am
btm/be
am
1"x2"x8'-0" wood
Rear ElevationScale: 3/16" = 1'-0"2
30'-0" 7'-8"
3'-0"
2'-8"
3'-0"
2'-8"
base plate
46'-0"
2x8 wood rafter attached to underside of W14x22 @ 2'-0" o.c.
W14x22 stl. beams
W5x16 stl. column(beyond)
8'-0" 8'-0"
Exploded AxonScale: 3/16" = 1'-0"4
1x2 attached to underside of 2x8 rafters
W14x22
2x8 wooden rafters attached to underside of W14x22 @2'-0" o.c.
top plate
sister 2x8's as shown. glue & screw.
base plate
Base PlateScale: 1 1/2" = 1'-0"8
1 1/2"
1 1/2"
10"
10"
3/4" x 10" x 10" base plate
hole for conduit
Top Plate PlanScale: 1 1/2" = 1'-0"7
5"
5"
1/2"X5"X5" top plate
Top Plate SectionScale: 1 1/2" = 1'-0"6
1/2"x5"x5" top plate
W5x16 stl. column
W14x22 stl. beam
2x8 wood rafter (beyond)
Connection DetailScale: 1 1/2" = 1'-0"5
W14x22 stl. beam
1/4"x2 3/4" lag screws
4"x1 1/2" clips
2x8 wood rafter, bird cut
shim
Site Details
Scale: Noted
L3.3
Glen Hazel HighriseCommunity Room &
945 Roselle Court
Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219
Pittsburgh, PA 15207
Terrace Improvements
Key Plan
4 November 2014
ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113
Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513
TREE PLANTINGScale: 1" = 1'-0"1
DO NOT CUT LEADER
THIN BRANCHES & FOLIAGE BY 1/3 RETAINING NATURAL TREE SHAPE
REMOVE TOP 1/3 OF NATURAL FIBER BURLAP
REMOVE ENTIRELY IF BALLED IN SYNTHETIC, NON-BIODEGRADABLE FABRIC
REMOVE TOP 1/2 IF BALLED IN WIRE BASKET
DO NOT DAMAGE ROOT BALL
TAMP SOIL FIRMLY ADJACENT TO ROOT BALL
PLANT TREE TO PREVIOUS NURSERY GRADE
4" DEPTH OF BARK MULCH
FINISH GRADE
AMENDED TOPSOIL
3" IMPORTED TOPSOIL MIXED W/ TOP 6" OF EXISTING SUBSOIL
(3) WOOD POLES SPACED EVENLY AROUND OUTSIDE OF ROOTBALL
TIE POLES TO TRUNK W/ BURLAP ROPE
FOR MULTI-TRUNK TREES TIE POLES TO THE STRONGEST LEADING OR MIDDLE TRUNK W/ POLES SPACED SO THE ROPES ARE NOT IN CONTACT WITH OTHER TRUNKS
SUBGRADE
2'-0" 2'-0"
MULCHED CIRCLE
3"9"
PLANTING SAUCER WIDTH 8'-10' ACCORDING TO SIZE OF TREE
SMALL TREE OR SHRUB PLANTINGScale: 1" = 1'-0"2
DO NOT CUT LEADER
THIN BRANCHES & FOLIAGE (NOT ALL END TIPS) BY 1/3 RETAINING NATURAL PLANT SHAPE
REMOVE TOP 1/3 OF NATURAL FIBER BURLAP
REMOVE ENTIRELY IF BALLED IN SYNTHETIC, NON-BIODEGRADABLE FABRIC
REMOVE TOP 1/2 IF BALLED IN WIRE BASKET
DO NOT DAMAGE ROOT BALL
TAMP SOIL FIRMLY ADJACENT TO ROOT BALL
PLANT TO PREVIOUS NURSERY GRADE
4" DEPTH OF BARK MULCH
FINISH GRADE
AMENDED TOPSOIL
3" IMPORTED TOPSOIL MIXED W/ TOP 6" OF EXISTING SUBSOIL
SUBGRADE
2'-0" 2'-0"
MULCHED CIRCLE
PLANTING SAUCER WIDTH 4'-6'
HEDGE AND PERENNIAL PLANTINGScale: 1" = 1'-0"3
PLANT TO PREVIOUS NURSERY GRADE
3" DEPTH OF BARK MULCH2" FOR LOW GROUNDCOVERSKEEP MULCH OUT OF CROWNS
FINISH GRADE
AMENDED TOPSOIL
50% STERILIZED TOPSOIL MIXED W/ 50% EXISTING SUBSOILADJUST DEPTH TO PLANT SIZE
SUBGRADE
PLANT SPACING SEE PLANT SCHEDULE
ADJACENT PAVEMENT
4"-8
"3"
BOCCE COURTScale: 1/2" = 1'-0"?
DETAIL FORTHCOMING
NOTES:
PLANTS PROVIDED TO BE OF HIGH QUALITY MEETINGANSI Z60.1-2004 STANDARD OF NURSERY STOCK
AMENDED TOPSOIL: 40% NATIVE TOPSOIL40% STERILIZED TOPSOIL20% SHREDDED LEAVES
ADJUST SOIL PH WHEN NEEDED: USE LIME TO RAISE PHUSE SULPHUR TO LOWER PH
COMPACTED #2 AGGREGATE SUBBASE
4" EXPOSED AGGREGATE CONCRETE PAVEMENTScale: 1" = 1'-0"4
CONTROL JOINT 1" MIN. DEPTH
CONCRETE W/ EXPOSED AGGREGATE FINISH
6 X 6 X 6/6 WELDED WIRE FABRIC
SOLID, UNDISTURBED OR COMPACTED SUBGRADE COMPACT TO 95% STANDARD PROCTOR
1/4" EXPANSION JOINT
GEOTEXTILE FABRIC
EXPANSION JOINT: REMOVE TOP 1/2" OF EXPANSION MATERIAL, CAULK
R 1/8"
HORSESHOE PIT IN LAWNScale: 1/2" = 1'-0"8
COMPACTED #2 AGGREGATE
GEOTEXTILE
UNDISTURBED OR COMPACTED SUBGRADE
2x8 DECK FRAMING
2x8 FRAMING FORPIT COVER
FOLDING HINGED PIT COVER
3"
8" 110 UTILITY SAND
1" COLD ROLLED STEEL STAKE
1'-2
"
S.S. BARREL HINGES.S. BARREL HINGE
S.S. BARREL HINGE
ENLARGED HORSESHOE PIT PLANSScale: 1/2" = 1'-0"5
3'-0
"3'
-4"
3'-0
"
1'-6
"3'
-4"
1'-6
"
10" 4'-4" 1'-10"
4'-0" CLEAR
3'-0
" CLE
AR
4'-0" CLEAR
3'-0
" CLE
AR
1'-10" 4'-4" 10"
8"
1X6
DE
CK
ING
1X6
DE
CK
ING
1X6
DE
CK
ING
1X6
DE
CK
ING
1X6
DE
CK
ING
1X6
DE
CK
ING
HORSESHOE PIT COVER AND FRAMINGScale: 1/2" = 1'-0"7
2x8 FRAMING
2'-2" 2'-2"
3'-4
"
S.S. BARREL HINGES
4'-0"CLEAR
3'-0
"CLE
AR
6"
Community Room - Demo PlanScale: 3/16" = 1'-0"1
remove portion of wall for new door installation
existing vct flooring to remain, prep for new flooring overlay
trench floor for new floor boxes, typ. of 2
remove ex'g carpet and glue shown hatched, levelsurface as req'd for new flooring
Community Room101
Corridor100
ex'g cabinets to remain
Floor Plans &
Scale: 3/16" = 1'-0"
A1.0
Glen Hazel HighriseCommunity Room &
945 Roselle Court
Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219
Pittsburgh, PA 15207
Schedules
Terrace Improvements
Key Plan
PROJECTNORTH
4 November 2014
ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113
Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513
existing wall outlet to daisy chainpower to new floor box
Community Room - New WorkScale: 3/16" = 1'-0"2
level floor at wall scar, install new dot pattern rubber flooring and threshold, color tbd
new fire door and partition, partition to continue to underside of structure above
new inset carpet tile "area rug"
new lvt plank flooring border, threecolors, pattern tbd
new lvt plank field color, tbd
14'-0
"
1'-0"
1'-0"
12'-0
"
4'-0"
5'-11
" +/-
existing wall outlet to daisy chain power to new floor box
6'-2" 1'-0" 8'-0" 1'-0"
3'-7"
5'-1"
1'-6"
Community Room101
Corridor100
1101
1
6A1.1
align
B1
C5
C5
C5
C5
B1
C5
C5
C5
C5
B1
C5
C5
C5
C5
B1
C5
C5
C5
C5
B1
C5
C5
C5
C5
B1
C5
C5
C5
C5
B1
C5
C5
C5
C5
B1
C5
C5
C5
C5
C1
C3
C2
C4
C4
B1
C5
C5
C5
C5
C2
Community Room - New Furniture PlanScale: 3/16" = 1'-0"4
Community Room101
Corridor100
Note: See Interior Furniture Specification for Furniture Schedule
ex'g bookshelves
Drop Leaf Table1,2,3A1.1
ex'g
cabin
ets
Community Room - Existing RCP w/ New WorkScale: 3/16" = 1'-0"3
new ceiling tile in existing grid, typthroughout. salvage several clean tile for
reuse in corridor
ex'g sprinkler head to remain in place
new wall mounted exit sign tomatch existing in room
relocated light fixturenew or modified grid req'd at new door location in corridor, replace tile as shown with salvaged tile from community rm.
paint all gwb bulkheads, typ
existing speaker to be re-mountedon ceiling mounted post
Note: All devices existing unless noted otherwise
clean diffusers, typ of 3
Note: All devices existing unless noted otherwise
Door ScheduleID DOOR SIZE FRAME GLAZING RATEDNo. Width Height Mat'l Mat'l Type Fire Label
1/ 101 3'0" 7'-0" vif wd hm 20 min 20 minRemarks:1. Match glazing and finishes to ex'g community rm/ corridor doors
Finish Schedule
NO. LOCATION FLOOR WALLS BASE CEILINGmat'l mat'l/ finish mat'l/ color mat'l/ finish
100 Corridor rubb dot gwb/pt'd rubb / tbd act / match ex'g101 Community Rm lvt gwb/pt'd rubb / tbd act / linear
Remarks:1. Corridor finishes only at new work area, match ex'g paint color
Exit Sign
Recessed Can Light
Sprinkler Head
Camera
Smoke Detector
LegendNew Floor Box
Existing Duplex
3 5/8" Mtl. Stud Wall PartitionUL # U419 (1 Hr)1
5/8" type X gwb, both sides
3 5/8" mtl. studs @ 16"o.c. - 20 gauge min.
4 7/8"
Drop Leaf Table &
Scale: As Noted
A1.1
Glen Hazel HighriseCommunity Room &
945 Roselle Court
Housing Authority City of Pittsburgh100 Ross StreetPittsburgh, PA 15219
Pittsburgh, PA 15207
Interior Details
Terrace Improvements
Key Plan
PROJECTNORTH
4 November 2014
ConsultantsMulti-Lynx Companies, Inc.241 Fourth AvenuePittsburgh, PA 15222412.798.4113
Watson Engineers100 Jaspen WayMcMurray, PA 15317724.745.7513
4'-0"
2'-9
13/16
"
eq.
eq.
eq.
eq.
7"
30" dia. base
3 1/2" dia.
15" mounting plate
7" leaf
180 deg drop leaf hinges
Drop Leaf Table - Plan and SectionScale: 3/4" = 1'-0"1
2'-6"
180 deg drop leaf hinges
Hinge DetailScale: 3" = 1'-0"3
Table Top Composition DetailScale: Actual Size2
plastic laminate top
2mm pvc edge at drop leaf
plastic laminate top
plastic laminate bottom
1 1/8" hi-density particle bd 2mm pvc edge
hollow metal framesolid core wood fire door (20 min.)
4 7/8"
cont. fire block sealant, both sides, typ.
Door Head/Jamb DetailScale: 1 1/2" = 1'-0"4
hollow metal frame
solid core wood fire door (20 min.)
cont. fire block sealant, bothsides, typ.
5/8" gwb to continue up tounderside of structure above, fire
seal at structure, typ
1
1
Door ElevationScale: 1/2" = 1'-0"5
3'-0"
field
verify
match new door to existing double door entrance to community room
Vinyl to Carpet Transition DetailScale: Actual Size6
new carpet tile flooringnew vinyl tile flooringflash patch apron 2'-0" wide
1/4"
max. offset