A STUDY ON THE CAUSES OF TRAFFIC CONGESTION IN …
Transcript of A STUDY ON THE CAUSES OF TRAFFIC CONGESTION IN …
A STUDY ON THE CAUSES OF TRAFFIC CONGESTION IN
CHITTAGONG CITY: GATE NO.2, GEC AND NEW MARKET
INTERSECTIONS IN THE PERSPECTIVE
Sazia Ferdous Nitu1* ,M. Mahsin1*,
1 Undergraduate Student, Department of Civil Engineering, Southern University Bangladesh,
Chittagong, <[email protected]> 2 Lecturer, Department of Civil Engineering, Southern University Bangladesh, Chittagong,
*Corresponding Author
ABSTRACT
One of the most challenging and complicated issues in city management in the present decade for
Bangladesh is the traffic problem. It is a very common phenomenon in almost all the cities of
Bangladesh. Presently, traffic congestion problem in Bangladesh are increasing at an alarming rate. The
traffic problem has become to a very dangerous aspect and has already implicit agonizing extent in the
cities of Bangladesh. Traffic management in Chittagong is not well organized as Dhaka so that the
problem is becoming more complicated as the number of people in Chittagong is increasing and it is
getting the priority after Dhaka. This article is dedicated to determine the current condition of traffic
management in Chittagong City. This study explores the causes involved in traffic congestion including
heavy concentration of vehicles, inadequate road infrastructure, faulty signaling equipment and poor
enforcement of traffic with respect to the three intersections (Gate No. 2, New Market and GEC
intersections). At the end of the paper the researchers tried to identify the solution of traffic jam in
Chittagong Metropolitan City.
Keywords: Traffic Congestion, Rotary intersection, PCU, Traffic Volume, Heavy vehicle.
INTRODUCTION
Traffic congestion is a common phenomenon in almost all the cities of Bangladesh. The situation has
got to a critical stage and has already encountered unbearable proportions in the cities of Bangladesh.
(K.D.A. 2001)[1]. Thus it is important in understanding the underlying issues in regarding the urban
problems like traffic jams which has become an area of interest by both academicians and practitioners.
As such, the current study is an attempt to explore the causes and solution of traffic jam in Chittagong,
the commercial capital of Bangladesh [2]. Therefore, it is a commensurations step for us to conduct this
study which would help us to identify problems and solutions for traffic congestion for busy
intersections that symbolizes the overall scenario of the port city.
METHODOLOGY
To meet the motive of this study, various methodologies were used which are discussed briefly.
Traffic jam study is the collection and analysis of measurable factual data relating to traffic. Traffic
volume counts can be carried out manually or by automatic counters, by moving observer method
(Highway Engineering, Gusto & Khanna). Geometric survey is done by Total Station Instrument.
Traffic volume study: Traffic volume is defined as the number of vehicles that passes a point along a
road way or traffic lane per unit time. A measure of traffic flow, volume is commonly measured in units
of vehicle per day, vehicle per hour, vehicles per minute, and so on. By using Passenger Car Unit (PCU)
method we get the following equation[4]:
1st International Conference on Research and Innovation in Civil Engineering (ICRICE 2018), 12 –13 January, 2018, Southern University Bangladesh (SUB), Chittagong, Bangladesh ISBN: 978-984-34-3576-7
Qp = 280w (1+e/w) (1-p/3)
(1+w/l)
Qp= Passenger car unit, PCU per hour
w= Width in weaving section in meter (6-18)m
eav= Average entry width in meter. eav = (e1+e2)/2
l= Length of weaving section between the end of island in meter.
p= Proportion of weaving traffic, p = b+c
a+b+c+d
a= Left turning traffic moving along left extreme lane
d= Right turning traffic moving along right extreme lane
b= Crossing/weaving traffic turning towards right while entering the rotary
c= Crossing/weaving traffic turning towards left while entering the rotary
Fig- 1: Rotary Intersection & showing the study area which includes the three intersections highlighted
in blue
INVESTIGATION RESULT AND CALCULATION: PCU CALCULATION for 2 No. Gate (Morning). 1hr
Table-1 Fig: 1- Traffic Flow for 2 No. Gate
(Morning)
Approach Left Turning Straight Ahead Right Turning
North 655 932 1477
South 760 661 206
East 834 2266 412
West 2314 2242 455
Traffic flow at 2No. Gate Intersection
1st International Conference on Research and Innovation in Civil Engineering (ICRICE 2018), 12 –13 January, 2018, Southern University Bangladesh (SUB), Chittagong, Bangladesh ISBN: 978-984-34-3576-7
PCU CALCULATION
GEC Intersection; Time: 1hr
Table-2 Fig: 2-Traffic flow in GEC Intersection
PCU CALCULATION
New Market Intersection- Morning/Evening Time: 1hr
Table -3 Fig;3- Traffic flow for New Market Intersection
Investigation Result
2 No. Gate Intersection Peak Traffic Flow Morning Time Maximum Traffic Flow West direction (9511 PCU/hr) Maximum Flow in one direction 5011 PCU/hr
Weaving width at the rotary. W w=31m (not appropriate according to the
condition and should be revised) e/w 0.83
w/l 0.53 (not appropriate according to the
condition and should be revised) P 0.6 Qp (Theoretical Capacity) 6273 PCU/hr Remarks Intersection Needs to be revised.
Table:4- Illustration of Present Traffic in 2 No. Gate Intersection
GEC Intersection Peak Traffic Flow Evening Time
Maximum Traffic Flow South (6621 PCU/hr)
Maximum Flow in one direction 3646 PCU/hr
Weaving width at the rotary. W w=15.85m
e/w 0.557
w/l 0.247
P 0.73
Qp 4190 PCU/hr
Approach Left Turning Straight Ahead Right Turning
North 991 1859 0
South 0 2382 599
East 4566 0 337
West 927 406 1215
Traffic flow at GEC Intersection
Approach Left Turning Straight Ahead Right Turning
North 1756 521 1577
South 892 1472 363
East 484 656 375
West 2368 453 944
Traffic flow at New Market Intersection
1st International Conference on Research and Innovation in Civil Engineering (ICRICE 2018), 12 –13 January, 2018, Southern University Bangladesh (SUB), Chittagong, Bangladesh ISBN: 978-984-34-3576-7
Remarks Intersection Needs to be revised.
Table 5: Illustration of Present Traffic in GEC Intersection
New Market Intersection
Peak Traffic Flow Evening Time
Maximum Traffic Flow North (8069 PCU/hr)
Maximum Flow in one direction 4215 PCU/hr
Weaving width at the rotary. W w=15.85m
e/w 0.7
w/l 0.384
p 0.55
Qp 4470 PCU/hr
Remarks Intersection Needs to be revised.
Table 6: Illustration of Present Traffic in New Market Intersection
An independent survey was done to find out the causes of traffic congestions in the three intersection
Fig 4: Survey results for the analysis of causes of Traffic Congestion in 2No. Gate Intersection.
The main causes of traffic congestion in 2No. Gate Intersection were found to be behavioral problem
of drivers, behavioral problem of the pedestrians, no zebra crossings, road design, no speed brakers,
central island diameter and presence of no over bridge as well. The vehicle which was voted for the
root cause of accident was Trucks.
Fig 5: Survey results for the analysis of causes of Traffic Congestion in GEC Intersection.
The main causes of traffic congestion in GEC Intersection were found to be behavioral problem of
drivers as well as behavioral problem of the pedestrians and no zebra crossings. The vehicle which was
voted for the root cause of accident was Private cars.
0%20%40%60%80%
100%120%
Drivers
Pedestrians
Passengers
TrafficPolice
0%20%40%60%80%
100%120%
Drivers
Pedestrians
Passengers
Traffic Police
1st International Conference on Research and Innovation in Civil Engineering (ICRICE 2018), 12 –13 January, 2018, Southern University Bangladesh (SUB), Chittagong, Bangladesh ISBN: 978-984-34-3576-7
Fig 6 : Survey results for the analysis of causes of Traffic Congestion in New Market Intersection.
The main causes of traffic congestion in New Market Intersection were found to be behavioral problem
of drivers as well absence of zebra crossings [5]. The vehicle which was voted for the root cause of
accident was City Service Buses.
Comparison between morning and evening sessions in terms of Traffic volume and Traffic
Capacities for 2 No. Gate Intersection.
Fig -7: Bar chart showing comparison between theoretical traffic volume and practical traffic
volume in terms of morning session for 2 no. gate intersection
Fig -8: Bar chart showing comparison between theoretical traffic volume and practical traffic volume
in terms of evening session for 2 no. gate intersection.
0%20%40%60%80%
100%120%
Drivers
Pedestrians
Passengers
Traffic Police
0
2000
4000
6000
8000
South West West North North East East West
Traf
fic
Vo
lum
e in
PC
U
Direction
Theoretical Traffic Volume inPCU
Practical Traffic Volume in PCU
0
2000
4000
6000
8000
10000
12000
South-West West-North North-East East-South
Axi
s Ti
tle
Direction
Theoretical traffic volumecapacity
Practical traffic volume
1st International Conference on Research and Innovation in Civil Engineering (ICRICE 2018), 12 –13 January, 2018, Southern University Bangladesh (SUB), Chittagong, Bangladesh ISBN: 978-984-34-3576-7
Fig -9 : Bar chart showing comparison between theoretical traffic volume and practical traffic volume
in terms of morning session for NEW MARKET intersection.
CONCLUSIONS
Traffic volume at evening times has the upper hand in two of three intersections.(GEC and New Market
Intersections).Traffic volume was insufficient in all the directions (Practical traffic volume was way
more than that of Theoretical Traffic Volume).From all the three intersections, it was found that
behavioral problem of drivers was the root cause of traffic congestion.
REFERENCES
1. Asian Business Review, Volume 2, Number 1/2013 (Issue 3) ISSN 2304-2613 (Print): ISSN
2305-8730 (Online)
2. Bangladesh Research Publications Journal (BRP), ISSN: 1998-2003, Volume: 4, Issue: 2, Page
185-197, July August 2010.
3. International Journal of Development and Sustainability Online ISSN: 2168-8662- Volume 1
Number 2 (2012): Pages 476-489 ISDS Article ID: IJDS 1210502
4. S.K. Khanna, Highway Engineering (6th Edition).
5. http://www.distancesfrom.com/bd/directions-from-2-No.-Gate-Bus-Stop-to-Chittagong-New-
Market-Station-Road-via-GEC-Chittagong/DirectionHistory/27123311.aspx
0
2000
4000
6000
8000
10000
South-West West-North North-East East-South
Traf
fic
Vo
lum
e in
PC
U
Direction
Theoretical traffic volume
Practical traffic volume