![Page 1: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/1.jpg)
A Comparison of the Hydraulic Properties of Tubular and Geonet Drainage Geocomposites Considering Landfill Leachate Conditions
Eric Steinhauser, Sanborn, Head & Associates Inc., Concord, NH, USA Stephan Fourmont, Afitex-Texel Geosynthetics, Ste Marie, QC, Canada
The Sagamore, Bolton Landing, New York, May 17, 2016
![Page 2: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/2.jpg)
Outline
Leachate collection system (LCS) refresher
Hydraulic considerations for LCS design Commonly used construction materials Experience with an alternative drainage
geocomposite Recent comparison testing of drainage
geocomposites Design considerations
2
![Page 3: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/3.jpg)
Leachate Collection
3
![Page 4: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/4.jpg)
Question #1
What is the purpose of the leachate collection and removal system? Answer: Effectively remove leachate from the landfill. Must be designed so that, during typical operations, the head on the primary liner system is no greater than 1 foot.
4
![Page 5: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/5.jpg)
LCS Design
5
Current NYS requirements Part 360-2.13 (g), (l), (m), & (n)
According to GRI White Paper #14, the geomembrane should be protected from the overlying sand.
Drainage Geocomposite Transmissivity = 1 ft × 1×10-2 cm/s
![Page 6: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/6.jpg)
LCS Design
6
Proposed NYS requirements Part 363-6.6 (a) (3); 9; 11; & 12
Slope k (min.) Component
≤ 10% 0.1 cm/s 1.0 cm/s
upper 12 in. lower 12 in.
>10% 0.1 cm/s 24 in.
Geocushion
Protective Soil k values If a drainage geocomposite is used, the hydraulic flow capacity calculations must include a Factor of Safety of at least 10!
Does this include the design reduction factors?
![Page 7: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/7.jpg)
During operation
Rainfall retention / evaporation Leachate from the waste
Quantity of liquid drained by the Leachate Collection System (LCS)
Immediately after construction 100% rain to the LCS No leachate
Leachate generation
After closure
“no” infiltration Leachate from the waste
7
![Page 8: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/8.jpg)
Quantity of liquid drained by the LCS
Leachate generation
18 months
Cover
0 m 25 m Waste Thickness
HELP model example from Thiel R., Narejo D. & Richardson G., GFR, April 2005 8
![Page 9: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/9.jpg)
The drainage geocomposite needs to be operational for at least 18 months
Validation of the required flow capacity of the LCS at each stage: Immediately after construction During operation After geomembrane cover
Just after construction Operation I Operation II Cover
Load
Flow of leachate
9
Leachate generation
![Page 10: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/10.jpg)
Question #2
What are the steps to select a drainage geocomposite for the leachate collection system? Answer: 1. Calculated the estimated amount of leachate to
be generated for each operational scenario. 2. Calculated the design transmissivity for the
leachate generated and the cell configuration. 3. Calculated the required transmissivity based on
reduction factors and an overall factor of safety.
10
![Page 11: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/11.jpg)
Where: θreq or θspec= required or specified drainage geocomposite hydraulic
transmissivity (m2/s); FS = Factor of Safety; П(RF) = product of reduction factors (dimensionless) qh = impingement rate (m/s); L = flow length (m); β = slope (degrees).
Equation from: Giroud, J.P. Zornberg, J.G., Zhao, A., 2000, “Hydraulic Design of Geosynthetic and Granular Liquid Collection Layers,” Geosynthetics International, Special Issue on Liquid Collection Systems, Vol. 7, Nos. 4-6, pp. 285-380.
11
Hydraulic Design Criteria ≥10?
According to GSI WP#4, Π(RF) ranges from 4.73 to 16.
θdesign
![Page 12: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/12.jpg)
Drainage Layer Materials
12
![Page 13: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/13.jpg)
Reduction Factors
For drainage geocomposite design: RFIN: intrusion of the geotextile into the drainage core; RFCR: creep in compression; RFCC: chemical clogging; RFBC: biological clogging.
RFs should be applied to geotextile AND drainage core.
For LCS, RFCC and RFBC for the geotextile are critical.
RFs presented in GSI White Paper #4 (Geosynthetic Institute, 2007)
13
![Page 14: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/14.jpg)
Question #3 Reduction factors? Published values or can the be evaluated in a laboratory setting? Answer: Both will work. Perform tests under design loading conditions with the proposed materials and extended testing time frame (100 hours). Consider specialty materials – those specifically made to combat reduction effects [e.g., biological clogging and creep]).
14
![Page 15: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/15.jpg)
Geonet Geocomposite
Geonet sandwiched between to geotextiles (typically nonwoven)
Geonet and be bi-planar or tri-planar
Design considerations: Geotextile intrusion into geonet Geonet crushing (creep) Biological / chemical impacts
15
![Page 16: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/16.jpg)
Geonet Geocomposites
16 16
![Page 17: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/17.jpg)
Tubular Geocomposite
17
Perforated mini-pipes between to geotextiles (typically nonwoven)
Design considerations: Spacing of mini-pipes Biological / chemical impacts
![Page 18: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/18.jpg)
How it Works
18
![Page 19: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/19.jpg)
Mechanical Behavior No creep & no geotextile intrusion over time and
under load (“Arching effect” when confined)
19
![Page 20: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/20.jpg)
Mechanical Behavior
20
![Page 21: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/21.jpg)
Mechanical Behavior Tubular drainage geocomposites do not loose
drainage capacity due to the weight of waste on it
21
![Page 22: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/22.jpg)
Biological Resistance
22
DRAINTUBETM ACB: includes a non-leachable, silver based biocide treatment
![Page 23: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/23.jpg)
22M sf 1M sf
2M sf
4M sf 0.7M sf
1.3M sf
0.6M sf
0.1M sf
International Experience
Leachate Collection System Projects
23
![Page 24: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/24.jpg)
Question #4
Is there any test data on how tubular drainage geocomposites perform with respect to landfill leachate? Answer: Yes! Testing programs were held in Morocco and France, and one is currently underway in the US (at the Geosynthetic Research Institute).
24
![Page 25: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/25.jpg)
Question #5 What is/are the standard(s) for transmissivity testing of drainage geocomposites? Answer: ASTM D4716 – Standard Test Method for Determining the (In-plane) Flow Rate per Unit Width and Hydraulic Transmissivity of a Geosynthetic Using a Constant Head
GRI Test Method GC15 – Standard Test Method for “Determining the Flow Rate per Unit Width of the High Flow Component of Enhanced Flow Drainage Geocomposites”
25
![Page 26: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/26.jpg)
Testing Appartus
Geocomposite
Outlet
Water Reservoirs
Inlet
26
Geocomposite
Sample Size: width – 300 mm (12 in.); length – 350 mm (14 in.)
![Page 27: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/27.jpg)
ASTM D4716 Method
Works well for geonet drainage geocomposites
Underestimates the flow in tubular drainage geocomposites
27
![Page 28: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/28.jpg)
Modified Testing Apparatus
28
Sample Size: width – 250 mm (10 in.); length – 250 mm (10 in.)
![Page 29: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/29.jpg)
Testing: France & Morocco Behavior of the entire product was monitored
(geotextiles and tubes); Constant normal load of 100 kPa; Anaerobic conditions; cells saturated with fresh
leachate directly pumped from a landfill sump; Temperature maintained above 22°C (72°F); Same amount of leachate injected into each cell
~ 5.5 m3 (~ 1,453 gallons) over 18 months equivalent to a flow rate of 2×10-6 m3/s/m2 (~3×10-3 gpm/ft2); and
Nine simultaneous tests: Three each using two different anti-biological geotextiles; and One of gravel only.
29
![Page 30: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/30.jpg)
Modified Testing Device
30
ACB #1 ACB #2 Gravel
Gravel: washed, 20 to 40 mm aggregate, k ~ 1 cm/s
![Page 31: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/31.jpg)
Test Results
Tubluar drainage geocomposite similar behavior as gravel over the time.
Neither the geotextile filter nor the tube clogged during the 18-month test program.
31
![Page 32: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/32.jpg)
Test Results - ACBs
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
0 100 200 300 400 500 600
Res
idua
l Sys
tem
Per
mea
bilit
y
Elapsed Time (days)
DRAINTUBE ACB (France)
DRAINTUBE ACB (Morocco)
32
![Page 33: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/33.jpg)
Recent Test Program US test program at the GRI is similar to that performed in France & Morocco, but:
Modeling aerobic conditions (cells are allowed to empty [i.e., falling head test]);
150 mm of sand above the products; 2 types of ACB filters tested; and A 7.6-mm [300-mil] thick biaxial geonet drainage
geocomposite was tested.
33
![Page 34: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/34.jpg)
Recent Test Program
34
Sand
Leachate
6 in
.
![Page 35: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/35.jpg)
Test Results: Aerobic vs. Anaerobic
35
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
0 100 200 300 400 500 600 700
Res
idua
l Sys
tem
Per
mea
bilit
y
Elapsed Time (days)
DRAINTUBE ACB (USA)
DRAINTUBE ACB Anaerobic (France, Morocco)
![Page 36: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/36.jpg)
Test Results: Tubular/Geonet
36
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
0 100 200 300 400 500 600 700
Res
idua
l Sys
tem
Per
mea
bilit
y
Elapsed Time (days)
DRAINTUBE ACB (USA)
300mil Geonet geocomposite
![Page 37: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/37.jpg)
Design Example LCS geocomposite design example (see: Thiel R., Narejo D., & Richardson G., GFR, April 2005)
37
Drainage length = 45 m (~148 ft) Base slope = 4% Loading and Impingement Rate:
After Construction 50 kPa (~12 feet of waste) 5×10-7 m/s
During Operation I 250 kPa (~60 feet of waste) 1×10-7 m/s
During Operation II 500 kPa (~120 feet of waste) 3×10-8 m/s
Closure 550 kPa
(~130 feet of waste, plus cover)
1×10-9 m/s
![Page 38: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/38.jpg)
Stage σ θdesign FSD RFIN RFCR RFCC RFBC θspec θ100 θ100/θspec
After construction 50 kPa 100% 5.00E-07 5.63E-04 2 1.0 1.0 1.5 1.0 1.69E-03 2.00E-03 1.2During operation I 250 kPa 20% 1.00E-07 1.13E-04 3 1.0 1.0 6.75E-04 2.00E-03 3.0During operation II 500 kPa 6% 3.00E-08 3.38E-05 3 1.0 1.0 2.03E-04 2.00E-03 9.9Cover 550 kPa 0.2% 1.00E-09 1.13E-06 3 1.0 1.0 1.35E-05 2.00E-03 148.1
Stage σ θdesign FSD RFIN RFCR RFCC RFBC θspec θ100 θ100/θspec
After construction 50 kPa 100% 5.00E-07 5.63E-04 2 1.3 1.1 1.5 1.0 2.41E-03 2.50E-03 1.0During operation I 250 kPa 20% 1.00E-07 1.13E-04 3 1.5 1.4 2.13E-03 2.00E-03 0.9During operation II 500 kPa 6% 3.00E-08 3.38E-05 3 2.0 2.0 1.62E-03 1.30E-03 0.8Cover 550 kPa 0.2% 1.00E-09 1.13E-06 3 2.0 2.0 5.40E-05 1.30E-03 24.1
3.04.04.0
Design with DRAINTUBE ACB1 D25 geocomposite
2.02.04.0
Design with 7.6 mm thick (300 mil) geonet geocompositeqi
qi
Design Example LCS geocomposite design example (see: Thiel R., Narejo D. & Richardson G., GFR, April 2005)
Tubular drainage geocomposite meets the design requirements even with a smaller index transmissivity than the geonet drainage geocomposite.
38
![Page 39: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/39.jpg)
Question #6
How should NYS DEC’s proposed Factor of Safety of 10 be applied to the design of drainage geocomposites, especially considering the material test data and consideration of Reduction Factors? Answer: ?
39
![Page 40: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/40.jpg)
Appropriated for both liquid and gas flow in geonet and tubular geocomposites, and gravel.
Developed at Joseph Fourier University (Grenoble, France).
Validated by Laboratoire Régional des Ponts et Chaussées, Nancy, France)
40
Design with LYMPHEA
![Page 41: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/41.jpg)
Take Aways
Select a LCS drainage geocomposite based on product- and case-specific data.
Reduction factors are product and case specific.
Tubular drainage geocomposite experience: since 2001 in Europe and North Africa for LCS;
and since 2011 in the US and Canada for LFG
collection and cover system drainage.
41
![Page 42: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/42.jpg)
Take Aways
Test data indicates that tubular drainage geocomposites: behave as well as or better than geonet
drainage geocomposites and gravel; and require smaller RFs than their geonet cousins,
especially when the anti-biological geotextile component is used.
A formal report of the GRI test program to be published at Geotechnical Frontiers 2017.
42
![Page 43: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/43.jpg)
Questions?
43
![Page 44: A Comparison of the Hydraulic Properties of Tubular and ...nyfederation.org/wp-content/uploads/2016/pdf2016/63 Steinhauser... · Tubular and Geonet Drainage Geocomposites Considering](https://reader036.fdocuments.in/reader036/viewer/2022082913/605d74f09e4983051d2e719c/html5/thumbnails/44.jpg)
Thank you for your attention.
Eric Steinhauser, Sanborn, Head & Associates Inc., Concord, NH, USA [email protected] Stephan Fourmont, Afitex-Texel Geosynthetics, Ste Marie, QC, Canada [email protected]
The Sagamore, Bolton Landing, New York, May 17, 2016