A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A...

70
REPORT FEBRUARY 2016 A Changing Tide . British Columbia’s Emerging Liquefied Natural Gas Industry

Transcript of A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A...

Page 1: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

REPORT FEBRUARY 2016

A Changing Tide.British Columbia’s Emerging Liquefied Natural Gas Industry

Page 2: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A Changing Tide: British Columbia’s Emerging Liquefied Natural Gas Industry Allison Robins, Prince Owusu, Dan Munro, and Len Coad

preface

There are currently 21 proposed liquefied natural gas (LNG) facilities vying to be a part of a future LNG industry in British Columbia. The objective of this report is to quantify the economic and labour market impacts associated with a 30 million tonnes per annum (MTPA) LNG industry in the province. An LNG industry in B.C. would create new markets for Canada’s natural gas, generating income and jobs for governments and citizens. The findings in this report, however, are subject to uncertainty, as none of the proposed projects have entered the construction phase, with many still attempting to obtain required government and investor approval.

To cite this report: Robins, Allison, prince Owusu, Dan Munro, and Len Coad. A Changing Tide: British Columbia’s Emerging LNG Industry. Ottawa: The Conference Board of Canada, 2016.

©2016 The Conference Board of Canada* published in Canada | All rights reserved | Agreement No. 40063028 | *Incorporated as AERIC Inc.

An accessible version of this document for the visually impaired is available upon request. Accessibility Officer, The Conference Board of Canada Tel.: 613-526-3280 or 1-866-711-2262 E-mail: [email protected]

®The Conference Board of Canada and the torch logo are registered trademarks of The Conference Board, Inc. Forecasts and research often involve numerous assumptions and data sources, and are subject to inherent risks and uncertainties. This information is not intended as specific investment, accounting, legal, or tax advice. The findings and conclusions of this report do not necessarily reflect the views of the external reviewers, advisors, or investors. Any errors or omissions in fact or interpretation remain the sole responsibility of The Conference Board of Canada.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 3: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

CONTENTS

i EXECUTIVE SUMMARY

Chapter 1 1 LNG Industry Overview 2 The Global Context 3 British Columbia’s Emerging LNG Sector

Chapter 2 6 LNG Industry Investments 8 Liquefaction Terminals 8 LNG Support Activities

Chapter 3 21 Economic Impacts 22 Key Assumptions and Methodology 26 Economic Impact Results 30 Implications of Possible Expansion 32 Economic Impact Summary

Chapter 4 33 Labour Impacts 34 Employment, Unemployment, and Labour Market Participation 36 Lagging Population Growth and Rising Retirements 37 Slow Labour Force Growth and Rising Labour Needs 38 High-Demand Occupations 39 A Challenging Labour Market for LNG Development 43 Opportunities, Challenges, and Strategies

Chapter 5 49 Conclusions

Appendix A 53 Bibliography

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 4: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

AcknowledgementsThe authors of this report would like to gratefully acknowledge Progress Energy Canada Ltd. for the funding that it provided, which made this report possible. We would also like to extend our sincere thanks to the external reviewers, who wish to remain anonymous, for providing insightful feedback on earlier drafts of this report. Notwithstanding these contributions, the analysis and conclusions of this report are those of The Conference Board of Canada. Any errors or omissions that remain are those of the Conference Board.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 5: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Find Conference Board research at www.e-library.ca.

EXECUTIVE SUMMARY

A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry

At a Glance

• This report quantifies the impact of a 30 million tonnes per annum LNG industry in British Columbia.

• Between 2015 and 2045, total annual spending would average $7 billion per year.

• Canada’s economy would grow by an average of $7.4 billion per year, with $5.3 billion in growth taking place in British Columbia.

• An increase in economic activity would increase national employment by an average of 65,000 jobs, with 46,800 occurring in British Columbia.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 6: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. ii

The projects that could form British Columbia’s future liquefied natural gas (LNG) industry are currently at various stages in obtaining required government and investor approval. At this time, there are 21 proposed LNG projects in B.C., which are the largest private sector investments to occur in the province. The objective of this report is to quantify the potential economic and labour market impacts associated with a 30 million tonnes per annum (MTPA) LNG industry in British Columbia.1 The development of this size of industry would result in the production of an additional 5 billion cubic feet per day (bcf/d) of natural gas, approximately doubling 2014 production levels.

For the purposes of this report, BC’s future LNG industry consists of

three hypothetical projects that come into service between 2021 and

2025. These projects consist of two larger-scale projects that include

two liquefaction trains with a capacity of approximately 6 MTpA each

and one smaller-scale project that includes a single train with a capacity

of 5 to 6 MTpA. The capacity of the reference case projects are

representative of currently proposed LNG projects in British Columbia.

As a sensitivity case, the report also considers an additional 23 MTpA

of expansion capacity, which could occur if market and regulatory

conditions were conducive to additional development.

The development of an industry of this size requires a significant level

of investment. (see Table 1.) This report finds that the majority of

investment spending would occur in the upstream sector of the natural

gas value chain, to produce a sufficient quantity of natural gas to supply

liquefaction terminals with feedstock and fuel. Compared with initial

1 One tonne of LNG is approximately equal to 1.38 million cubic metres, or 51.4 petaJoules of natural gas.

The development of an industry of this size requires a significant level of investment.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 7: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Executive summary | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. iii

investment requirements, expansion investment requirements (excluding

upstream investments) are significantly lower. Much of the existing

infrastructure would not need to be replicated; increasing capacity would

involve either adding additional trains to existing liquefaction terminals or

adding compressor stations to natural gas pipelines.

Table 1Investment Totals(2015 C$ millions)

2016–20 2021–25 2026–30 2031–25 2036–40 2041–45 2046–50 2051–55

Upstream

Wells 17,623 21,521 18,669 18,214 18,163 18,156 18,155 18,155

Gathering 8,812 3,228 2,800 2,732 2,724 2,723 2,723 2,723

Initial total 26,435 24,749 21,469 20,946 20,887 20,879 20,878 20,878

Wells – 10,374 17,245 15,153 14,225 14,674 14,667 14,667

Gathering – 5,187 8,623 7,576 7,363 7,337 7,334 7,333

Expansion total – 15,561 25,868 22,729 21,588 22,011 22,001 22,000

Midstream

Initial total 3,602 2,201 – – – – – –

Expansion total – 2,400 2,200 – – – – –

Transmission

Onshore pipelines 6,094 1,607 – – – – – –

Offshore pipelines 937 – – – – – – –

Compressor stations 541 269 – – – – – –

Initial total 7,572 1,876 – – – – – –

Expansion total – 1,488 539 – – – – –

Liquefaction terminals

Initial total 27,559 5,668 – – – – – –

Expansion total – 9,761 8,014 – – – – –

Grand total (excluding expansions) 65,168 34,494 21,469 20,946 20,887 20,879 20,878 20,878

Expansion total (including expansions) 65,168 63,704 58,090 43,675 42,475 42,890 42,879 42,878

Source: The Conference Board of Canada.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 8: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. iv

These expenditures will have a multiplier effect on B.C. and Canada’s

economies. (see Table 2.) This report expects that total annual spending

across the upstream, midstream, and downstream sectors will average

$7 billion. Over the next 30 years, these investments would increase

real Canadian GDp by an average of $7.4 billion per year, of which

$5.3 billion would occur in British Columbia.

This increase in economic activity would also have significant

employment impacts; on a national level, employment would increase

by an average of 65,000 jobs, 46,800 of which would occur in British

Columbia. (see Table 2.) The bulk of these jobs would materialize in the

construction, manufacturing, and resource sectors. Induced economic

impacts, such as increased household spending, would also create

employment opportunities in the wholesale and retail trade industry. The

employment opportunities resulting from an LNG industry in B.C. would

decrease the province’s unemployment rate by 0.5 percentage points.

In terms of the fiscal impacts of a B.C. LNG industry, an increase in

labour income and corporate profits would result in additional provincial

and federal personal and corporate income tax revenues. Indirect taxes

would contribute $808 million and $577 million in revenue annually to the

B.C. provincial government and federal government, respectively. Finally,

Table 2Annual Economic Impact of a 30 MTPA LNG Industry

Upstream Transmission Midstream LNG terminal Total

Canada

GDp at market prices (2015 C$ millions) 4,663 335 551 1,751 7,385

Employment (000s) 43 3 5 14 65

B.C.

GDp at market prices (2015 C$ millions) 3,720 232 285 1,080 5,281

Employment (000s) 34 2 3 9 47

Source: The Conference Board of Canada.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 9: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Executive summary | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. v

B.C.’s LNG tax would result in an additional $208 million in revenue

and increased drilling activity would result in an additional $686 million

in royalty payments to B.C.’s provincial government over the lifetime

of the projects.2 In total, between 2016 and 2045, a B.C. LNG industry

would boost average annual revenues for the provincial and federal

governments by $3 and $3.2 billion, respectively. (see Table 3.)

In developing an LNG industry, in addition to significant benefits, there

are challenges with which stakeholders will need to contend. proposed

LNG projects are located in small, isolated communities, whose working

populations are often not sufficient to fully staff a project or which may

lack necessary skill sets. Aboriginal residents, a population that often

exhibits lower labour market participation than non-Aboriginal residents,

could fill these jobs. To effectively engage with these communities,

however, governments and firms will need to develop strategies to

mobilize and train these individuals. Governments and firms will

2 Assuming that the feedstock for these LNG facilities is sourced in British Columbia.

Table 3Annual Fiscal Impact of a 30 MTPA LNG Industry(millions of current $)

Upstream Transmission Midstream LNG terminal Total

B.C. corporate income tax 113 9 13 77 211

Federal corporate income tax 289 22 33 197 537

B.C. personal income tax 786 47 65 206 1,096

Federal personal income tax 1,478 89 123 386 2,060

B.C. indirect taxes 595 45 77 100 808

Federal indirect taxes 425 32 55 72 577

B.C. royalty revenue 686 – – – 686

B.C. LNG tax revenue – – – 208 208

Source: The Conference Board of Canada.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 10: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. vi

also need to dedicate time and attention toward supporting intra and

interprovincial migration, and ensuring that workers are set up for

success in post-LNG employment opportunities.

The findings in this report are subject to a great degree of uncertainty,

given that none of the proposed projects have progressed to the

construction stage. What is certain, however, is that in recent years,

Canada’s net natural gas export volumes to the United states has

declined and the North American market remains constrained on

demand. A future LNG industry would create new markets for Canada’s

natural gas, which would generate revenues and employment

opportunities that would not otherwise exist.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 11: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Find Conference Board research at www.e-library.ca.

CHAPTER 1

LNG Industry Overview

Chapter summary

• Global liquefied natural gas (LNG) trade has continued to grow, reaching record volumes in 2014.

• Approximately 80 per cent of additional planned capacity is located in North America, driven by the rapid development of shale gas plays.

• Natural gas supplies in B.C. currently exceed demand in available pipeline markets.

• There are currently 21 proposed LNG facilities in B.C. that are at various stages in obtaining required government and investment approval.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 12: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 2

The Global Context

Natural gas liquefaction technology has been in use globally for more than 50 years. As natural gas changes from gas to liquid, it shrinks volumetrically by a factor of almost 600, making it economical to ship large volumes over great distances. This allows for the development of “stranded” natural gas resources that otherwise would not have market, providing a source of income and employment to the producing jurisdiction.

In 2014, the global LNG supply chain handled near-record volumes.1

Global LNG trade reached 241.1 million tonnes per annum (MTpA) in

2014, with import prices in Japan averaging $15.6 million British Thermal

Units (MMBtu).2 Of the total, 64.7 MTpA (27 per cent) were delivered

under spot contracts and the remainder under long-term contracts.

Liquefaction capacity has been growing modestly since 2011, reaching

301 MTpA in 2014. Regasification capacity totalled 724 MTpA in 2014,

indicating substantial flexibility in the overall supply chain. Current

plans include a total of 750 MTpA of additional liquefaction capacity, of

which 80 per cent would be located in North America. Although not all

of this capacity will be constructed, the expectation is that the industry

will continue to expand. Much of the projected growth in LNG capacity

has resulted from development of Australia’s natural gas resources, the

prolific growth of shale gas in North America, and potential development

of deepwater natural gas offshore of Africa.

1 All data for global LNG are taken from International Gas Union, World LNG Report—2015 Edition.

2 The average spot price of LNG imported to Japan averaged $7.5/MMBtu in November 2015.

In 2014, the global LNG supply chain handled near-record volumes.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 13: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 1 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 3

Although the current global crude oil price downturn has cast a shadow

over LNG markets (with LNG typically priced relative to crude oil), the

outlook remains positive. Continued growth of energy demand in Asia,

particularly mainland China, has generated a competitive race to market,

based on long-term fundamentals; by 2035, Asian import requirements

are expected to increase by approximately 33 billion cubic feet per day

(bcf/d), with over half of this growth occurring in China.3

British Columbia’s Emerging LNG Sector

B.C. has been an active participant in the development of North

America’s unconventional gas industry.4 At the end of 2013, remaining

natural gas reserves stood at 1,197.2 billion cubic metres (bcm), or

42.3 trillion cubic feet (tcf).5,6 Growing reserves in the Montney formation

have been the main driver of reserve increases for several years.

Further, the ratio of reserves to production in B.C. has increased from

20 years in 2008 to 27 in 2013. Although B.C. has access to North

American markets by pipeline via the spectra Gas Transmission

system, Nova Gas Transmission, and their interconnections, shale gas

development has created supplies that exceed demand in available

pipeline markets.

There have been numerous LNG projects proposed to carry B.C. natural

gas to offshore markets. A current list of those projects is presented in

Table 4.7

3 The Conference Board of Canada, Canadian Outlook, 51.

4 According to Natural Resources Canada, the term “unconventional gas” encompasses tight gas sands, coalbed methane, shale gas, and gas hydrates.

5 Remaining reserves refer to natural gas that is recoverable under current economic and technical conditions, including undeveloped reserves that have a reasonable probability of existing, less cumulative production.

6 BC Oil and Gas Commission, Hydrocarbon and By-Product Reserves.

7 Compiled from Government of British Columbia, LNG in BC.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 14: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 4

The information in the table illustrates the high level of interest in LNG

projects in the province, but should not be considered indicative of the

number of projects that might proceed or their potential timing. some

of the smaller projects will serve local markets along the B.C. coastline,

with the larger projects targeting export markets. Given that no project

has yet begun its construction phase, which will take a minimum of

four years to complete, the projects identified before 2020 will likely

Table 4Proposed B.C. LNG ProjectsLocation Project Sponsors Capacity (MTPA) In-service

Campbell River Discovery LNG Quicksilver Resources 20 2021

Delta Wespac Westport Midstream 3 2016

Kitimat Cedar LNG Cedar LNG Export Development Ltd. 14.5 2020

Kitimat Douglas Channel LNG Altagas Ltd. and partners 0.55 2018

Kitimat Kitimat LNG Woodside Energy and Chevron Canada 10 TBD

Kitimat LNG Canada shell Canada and partners 24 TBD

Kitsault Kitsault Energy project Kitsault Energy Ltd. 20 2018

Nasoga Gulf Nisga’a LNG Nisga’a Nation TBD TBD

prince Rupert pacific Northwest LNG petronas and partners 18 2018

prince Rupert prince Rupert LNG BG Group 21 2019

prince Rupert Aurora LNG Nexen and partners 24 TBD

prince Rupert Grassy point LNG Woodside Energy 20 2021

prince Rupert New Times Energy Ltd. New Times Energy Ltd. 12 2019

prince Rupert Orca LNG Orca LNG Ltd. 24 2019

prince Rupert Watson Island LNG Watson Island LNG Corporation TBD TBD

prince Rupert WCC LNG Ltd. Imperial Oil/ ExxonMobil Canada 30 2024

squamish Woodfibre LNG project Woodfibre LNG project 2.1 2017

stewart Canada stewart Energy project stewart Energy B.C. 30 2018

TBD Triton LNG Altagas and partners 2.3 2019

TBD = to be determined Source: The Conference Board of Canada.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 15: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 1 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 5

see their timing adjusted. Further, the projects are at various stages of

evaluation and not all have even applied for the necessary project and

environmental approvals. however, the potential for a strong, vibrant

LNG industry continues to be explored by the companies involved.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 16: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Find Conference Board research at www.e-library.ca.

CHAPTER 2

LNG Industry Investments

Chapter summary

• supporting a 30 MTpA LNG industry would require a 5 bcf/d increase in B.C.’s natural gas production, more than doubling 2014 production levels.

• This natural gas would be sourced from the Montney tight gas region and the horn River shale gas region, whose gas is sweet and requires minimal processing.

• A dedicated natural gas transmission pipeline would supply each of the LNG facilities.

• Investment expenditure patterns and timing differ across the upstream/ midstream/downstream value chain segments.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 17: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 2 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 7

B.C.’s emerging LNG industry is at a critical stage in its development, as decisions to move forward with projects are being taken or considered in a global context of uncertain energy pricing and a local context of cost uncertainty. The B.C. government carried out initial impact studies based on a range of liquefaction capacities of from 80 to 120 MTPA of LNG.1 This analysis is substantially more conservative, and considers the potential collective impacts of the initial phases of three projects totalling approximately 30 MTPA of LNG capacity.

There are several projects that propose an initial configuration of two

trains of 6 to 7 MTpA each, and other projects that propose one initial

train at 5 to 6 MTpA. Two large projects and one small project could

easily be configured to produce 30 MTpA of LNG, which would require

approximately 5 bcf/d of natural gas for feedstock and fuel. An upside

sensitivity case considers an additional 23 MTpA of expansion capacity.

This expansion is less costly to develop than the initial capacity because

it involves adding new trains to existing LNG terminals and adding

compression stations to pipelines, both of which are less expensive than

the original projects.

This report examines the level of investment, GDp, and employment

for B.C. and Canada that would result from a 30 MTpA industry, with

the projects coming into production between 2021 and 2025. Each

LNG project will require significant investments to build the liquefaction

plants, investments in new transmission pipeline projects, and upstream

investments to drill wells, install gathering systems, and build natural

gas processing plants. This chapter summarizes these investments. The

following chapter traces the economic impact of those investments.

1 see Ernst & Young, Potential Revenues; Grant Thornton, Employment Impact Review; Grant Thornton, Potential LNG Revenue.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 18: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 8

Liquefaction Terminals

LNG Terminal Investment RequirementsThe timing of the investments shown in Table 5 is uncertain. Favourable

regulatory decisions and investor decisions will be required in order for

the projects to proceed as shown. To date, only one project has received

a conditional final investment decision. several others have received

natural gas export approvals, and await other regulatory decisions

that would be expected to lead toward financial commitments by

project proponents.

LNG Support Activities

UpstreamIn order to supply 30 MTpA of liquefaction capacity with sufficient

natural gas to meet natural gas feedstock and fuel requirements, B.C.’s

natural gas production must be increased by approximately 5 bcf/d. This

compares with 2014 raw gas production of 4.6 bcf/d.2

2 Raw natural gas production refers to the volume of natural gas as measured at the point of production. Marketable natural gas available reflects losses from natural gas processing (to remove impurities and by-products) as well as receipts from Alberta, Yukon, and the Northwest Territories. All numbers are from Government of British Columbia, B.C.’s Natural Gas & Oil Statistics.

Table 5Downstream Investments During Construction and Operations Phases(2015 C$ millions)

2016–20 2021–25 2026–30

Initial phase 27,559 5,668

Expansion phase 9,761 8,014

Source: The Conference Board of Canada.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 19: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 2 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 9

The LNG projects or their upstream partners for several of the proposed

projects have received National Energy Board approval for the natural

gas export volumes associated with their projects. The export licensing

process requires the applicant to demonstrate that the volumes to be

exported are surplus to foreseeable Canadian requirements, but it does

not require the applicant to demonstrate the source of the natural gas in

any detail or to verify that there is sufficient production capacity to meet

projected needs. For the purposes of this report, we have assumed that

the natural gas supply will come from British Columbian sources, and

that it is incremental to existing supplies rather than a diversion of those

supplies. As a result, the incremental natural gas production associated

with the three projects (initial phase only) would amount to at least a

doubling of provincial natural gas supply.

The upstream investments required to supply 30 MTpA of LNG projects

are shown in Table 6. For the initial 10 years, as the LNG projects are

implemented, annual upstream investments are expected to average just

over $5 billion per year. These investments will put in place the wells,

gathering systems, and field processing facilities to supply 5 bcf/d of

marketable natural gas for delivery to the liquefaction plants, as well as

the pipeline fuel required for the transmission lines (assumed at 2 per

cent of throughput). Additionally, because both Montney and horn River

wells show high initial production rates but very steep initial decline

rates, significant long-term drilling activity will be required to maintain

the targeted production level. The investments shown in the upper half

of Table 6 are for the initial projects only and would increase by the

amounts in the lower half of the table (labelled expansion phase) should

additional liquefaction trains be constructed at those terminals.

There are two major areas in B.C. that are expected to supply natural

gas for the proposed LNG projects: the Montney tight gas region and the

horn River shale gas region.3 The Montney region is close to Dawson

3 This discussion is based on three documents from the BC Oil and Gas Commission that provide further details: Hydrocarbon and By-Product Reserves in British Columbia; Horn River Basin Unconventional Shale Gas Play Atlas; and Montney Formation Play Atlas NEBC.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 20: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 10

Creek, B.C., and includes a range of low permeability formations that

contain a mix of hydrocarbons. A significant portion of the region

produces natural gas with attractive components of propane (C3), butane

(C4), and pentanes plus (C5+), which refers to a raw mix of pentanes

and heavier hydrocarbons. some areas within the Montney produce

oil. Other areas produce natural gas with lower liquids content. The

importance of the natural gas liquids is that they provide a revenue

stream to supplement the natural gas value. They also require more

extensive processing before putting the natural gas into a transmission

pipeline. The raw natural gas in the Montney region contains only

small volumes of sulphur compounds, carbon dioxide (less than 1 per

cent), and water that must be removed before the gas is delivered to a

transmission pipeline.

The horn River shale region is located farther north than the Montney,

in the general region of Fort Nelson, and adjacent to the Liard region

that has been producing natural gas for decades. horn River natural gas

contains very small amounts of C3 through C5+ and has much higher

carbon dioxide content (typically 10 per cent). (see Exhibit 1.)

Table 6Upstream Investments During Construction and Operations Phases(2015 C$ millions)

2016–20 2021–25 2026–30 2031–25 2036–40 2041–45 2046–50 2051–55

Initial phase

Wells 17,623 21,521 18,669 18,214 18,163 18,156 18,155 18,155

Gathering 8,812 3,228 2,800 2,732 2,724 2,723 2,723 2,723

Initial total 26,435 24,749 21,469 20,946 20,887 20,879 20,878 20,878

Expansion phase

Wells 10,374 17,245 15,153 14,225 14,674 14,667 14,667

Gathering 5,187 8,623 7,576 7,363 7,337 7,334 7,333

Expansion total 15,561 25,868 22,729 21,588 22,011 22,001 22,000

Source: The Conference Board of Canada.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 21: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 2 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 11

Exhibit 1Natural Gas Plays in British Columbia

Source: BC Oil & Gas Commission.

Horn River Basin

Liard Basin

CordovaEmbayment

Montney

Fort Nelson

Fort St. John

Dawson Creek

Kelowna

Victoria

The required investments shown in Table 6 were developed based on

a combination of Montney and horn River supplies. Both the pacific

NorthWest (pNW) LNG and LNG Canada projects are expected to rely

heavily on Montney supplies, with Kitimat LNG supplied primarily from

horn River.4

4 Based on the current land holdings and drilling programs of the project partners.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 22: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 12

The investments are based on the total natural gas supply required

from each region, the number of wells that must be drilled annually to

maintain production, and the costs of drilling and completing wells, plus

gathering system expenditures. For each region, the BC Oil and Gas

Commission has published typical well performance data for the initial

rate of production as well as production through time.5 Well drilling and

completion costs are based on the petroleum services Association of

Canada (psAC) well cost studies for 2015.6 The well-level assumptions

are shown in Table 7.

The relatively larger well counts for Montney supplies result from two

factors. First, horn River is assumed to supply only 20 per cent of the

initial liquefaction capacity. second, the higher initial production from

horn River wells more than offsets a steeper initial decline so that

fewer wells are required to establish and maintain a given production

level in the horn River region compared with the Montney region. The

well counts and investment numbers shown in the tables should be

considered conservative because they are based on a limited drilling

5 These type curves are published in BC Oil and Gas Commission, Hydrocarbons and By-Product Reserves in British Columbia. We have adopted the p-50 type curves for this work.

6 petroleum services Association, 2015 Well Cost Study.

Table 7Montney and Horn River Performance Assumptions

Montney tight gas

Horn River shale

Initial production rate (000 cubic metres per day) 75 160

Initial 12-month decline (per cent) 34 44

Average drilling and completion costs (2015 C$ millions) 6.3 12.7

Wells drilled per year during initial LNG preparation phase 520 80

Wells drilled per year during LNG operations phase 450 60

Source: The Conference Board of Canada.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 23: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 2 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 13

history and performance of a well that is typically achieved with a 50 per

cent probability. Increasing that to 90 per cent probability of occurrence

would reduce the initial production assumption and increase the required

well count.

Although the expected drilling levels to support 30 MTpA of liquefaction

capacity are large at 600 wells per year for the initial phase, followed

by 510 wells per year in the longer term, the projected activity levels

are consistent with those seen in the past in British Columbia. Chart 1

illustrates historical drilling levels in the province over the past 25 years.

From 2000 to 2010, there were only three years where fewer than

600 natural gas wells were drilled. More recently, activity has been

somewhat volatile in response to lower natural gas prices, with two of

the four years from 2011 to 2014 reporting above 500 natural gas wells.

The year-to-date performance for 2015 has been strongly and negatively

influenced by low prices. supplying the liquefaction terminals will require

a return to the drilling levels of the 2000–10 decade.

Chart 1Historical Drilling Activity in British Columbia(wells drilled 1990 to 2015 through September)

Sources: BC Oil & Gas Commission; The Conference Board of Canada.

1990 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

0

400

800

1,200

1,600

Gas Oil Cased Service Abandoned

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 24: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 14

Natural Gas Processing FacilitiesThe natural gas production that will support the LNG industry will include

both Montney and horn River. This means that a portion of the gas

(Montney) will be liquids rich with low carbon dioxide content and a

portion (horn River) will have higher carbon dioxide content with limited

liquids. Both sources will require processing to meet the specifications

for inlet to a transmission pipeline. Table 8 shows the expected

investment for natural gas processing to accompany the initial and

expansion phases of the liquefaction plant capacity.

The natural gas processing facilities must be constructed so that they

are able to operate when the natural gas production begins from new

wells. The initial five-year period will include natural gas that will be sold

to other markets while the liquefaction plants are being constructed.

Because natural gas processing plants can operate for decades

with regular maintenance, large-scale investments beyond the initial

construction period will not be required until the liquefaction plants

expand. The investments shown in Table 8 are based on the costs of

recent sweet gas processing facilities built in British Columbia.

The facilities built to process Montney natural gas will include the

capacity to extract at least a raw mix of natural gas liquids, store them

temporarily, and load them into trucks that will carry them to their

destination. This report has not considered how those liquids will be

Table 8Natural Gas Processing Investments During Construction and Operations Phases(2015 C$ millions)

2016–20 2021–25 2026–30

Initial phase 3,602 2,201

Expansion phase 2,400 2,200

Source: The Conference Board of Canada.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 25: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 2 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 15

marketed or the potential economic impact on the liquids industry.

Based on the liquids production reported for 2013 and the marketable

gas requirements of the three LNG projects of 51.7 bcm (1.825 tcf),

the processing facilities treating natural gas before transport to the

liquefaction plants could produce as much as 2.1 million cubic metres

(13 million barrels) of pentanes plus, 0.6 million cubic metres of propane

(95 million barrels), and 0.6 million cubic metres (95 million barrels)

of butane per year. The production of natural gas liquids would likely

decline through time because the most liquids-rich prospects would be

targeted first as the natural gas resource is developed. These volumes

are for total liquids production. however, natural gas processing does not

typically remove all of the liquids in the natural gas stream. The portion

of liquids that is not extracted at the processing plants will be separated

by the refrigeration process at the liquefaction plant, then sold, used at

the liquefaction plant, or re-injected into the LNG according to project

requirements and market opportunities.

PipelinesEach of the LNG plants considered in this report is expecting that it will

be supplied by a dedicated natural gas transmission pipeline. Two of the

three pipeline projects that have been advanced to date will be owned

by TransCanada. The pipelines will be built with a 36-inch or 48-inch

diameter pipe, designed with a capacity to match the initial liquefaction

requirements of the size of liquefaction plant they will supply. Each

pipeline will initially include compressor stations sufficient to move the

required volume of natural gas. Expansions of the pipeline projects to

accommodate additional liquefaction trains will be accomplished by

adding compressor stations and compressor units; no additional pipe is

expected. The investment requirements for the initial pipelines and for

potential expansions are shown in Table 9. These investments represent

the construction phase only. Ongoing maintenance capital over the

operating years is excluded. Further, the investments in compressor

stations provide an indication of the potential future investments should

expansions be required to supply additional liquefaction trains. It is

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 26: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 16

also possible that should additional LNG terminals be built, some of

these proposed pipelines could be expanded to meet the needs of

those terminals.

The remainder of this chapter provides a brief profile of the three major

pipeline projects put forward to date.

Prince Rupert Gas Transmission ProjectThe prince Rupert Gas Transmission (pRGT) project will supply natural

gas to the pNW LNG project. pRGT is a wholly owned subsidiary of

TransCanada, which will own a majority interest in the project and act as

operator. pRGT is structured with TransCanada as the master partner,

which allows for other investors to participate.

pRGT will carry natural gas 900 kilometres from hudson’s hope to

Lelu Island.7 It is the most advanced of the pipeline projects, having

recently received all of the final permits it needs from the BC Oil and

Gas Commission; it also has received a B.C. Environmental Assessment

Certificate.8 (see Exhibit 2.)

7 The project description in this chapter relies on the project’s Application for Environmental Assessment Certificate as filed with the BC Environmental Assessment Agency.

8 TransCanada, Prince Rupert Gas Transmission Project.

Table 9Transmission Pipeline Investments During Construction and Operations Phases(2015 C$ millions)

2016–20 2021–25 2026–30

Initial phase

Onshore pipelines 6,094 1,607

Offshore pipelines 937

Compressor stations 541 269

Initial total 7,572 1,876

Expansion phase

Expansion total 1,488 539

Source: The Conference Board of Canada.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 27: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 2 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 17

The initial pipeline will use a 40-inch diameter pipe for the onshore

portion (780 kilometres) and twin 36-inch lines for offshore segments

(110 kilometres). It will include three compressor stations and provide

2 bcf/d of natural gas delivery capacity. should expansion be required,

Exhibit 2Prince Rupert Gas Transmission

Source: TransCanada.

16

16

37

37

97

16

97

37

Granisle

New HazeltonHazelton

Stewart

Cranberry Junction

Port Edward

Pink Mountain

Wonowon

Hudson’sHope

ALB

ER

TA

BR

ITIS

H C

OLU

MB

IA

ALA

SK

A

Fort St. James

Mackenzie

Taylor

Fort St. John

Dawson Creek

Tumbler Ridge

Prince GeorgeVanderhoofFraser Lake

Burns Lake

SmithersTelkwa

Houston

Terrace

Kitimat

Prince Rupert

Chetwynd

Prince Rupert Gas Transmission (PRGT) Proposed Route Initial Build Compressor StationPotential Future Compressor Station

Proposed Pacific NorthWest LNG Export Facility (3rd party)TransCanada’s NOVA Gas Transmission Ltd. (NGTL) Existing SystemProposed North Montney Mainline ProjectHighwaysCities and Towns

Prince Rupert Gas Transmisson Other

27

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 28: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 18

pRGT will construct five more compressor stations to increase the

capacity to 3.6 bcf/d without installing any additional pipe. It will be

operated at traditional pressure (1,440 pounds per square inch) and will

require the inlet natural gas to be processed to meet a conventional

pipeline specification. This means that liquids-rich natural gas will require

processing to remove most of the liquids before the gas enters the

pRGT system.

The applied-for schedule showed construction beginning in early 2015

and the pipeline coming into service in late 2018, a construction period

of just under four years. This was predicated on all of the necessary

approvals being received before the end of 2014. having received all of

the necessary approvals, the project now awaits a go-forward decision

from the pNW LNG project. That decision will not be final until pNW LNG

receives a positive decision from the federal government pursuant to

the Canadian Environmental Assessment Act.9 The four-year timing for

construction may be adjusted depending on seasonal and other factors

once the pNW LNG decision is finalized and the in-service date for the

liquefaction plant is determined.

Coastal GasLinkThe Coastal GasLink project is also owned by TransCanada and

will supply natural gas to the LNG Canada liquefaction terminal, a

joint venture led by shell.10 This pipeline will receive natural gas at

Groundbirch (just west of Dawson Creek, B.C.) and deliver it to the LNG

Canada facility near Kitimat, B.C., a distance of 650 kilometres. It will be

a 48-inch pipe, with two compressor stations, delivering an initial volume

of 1.7 bcf/d. should expansion be required, up to five more compressor

stations could be built, raising the delivery capacity to 5 bcf/d without

installing any additional pipe. The pipeline inlet will be interconnected

9 Ibid.

10 The information for Coastal GasLink is based on the project description from the Coastal GasLink pipeline project, project Description filed with the BC Environmental Assessment Agency in October 2012, as revised and updated.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 29: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 2 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 19

with TransCanada’s Nova Gas Transmission Limited (NGTL) line at

Groundbirch, providing potential flexibility in natural gas supplies for the

LNG project and in markets for local natural gas production.

The Coastal GasLink project structure is similar to that of pRGT in that

is a wholly owned subsidiary of TransCanada, which will act as general

partner, own at least 50 per cent of the project, and act as operator. It

differs in that the project has been divided (at a point near Vanderhoof,

B.C.) into east and west segments, each with its own partnership

structure. This will enable NGTL to contract with Coastal GasLink for

capacity on the eastern segment of the project.

This project is less advanced than pRGT, but has applied for the

necessary environmental approvals with the BC Environmental

Assessment Agency and for facilities approvals with the BC Oil and Gas

Commission. Coastal GasLink expects a four-year construction period,

with initial natural gas deliveries to coincide with the in-service date of

LNG Canada. (see Exhibit 3.)

Pacific Trails PipelinesThis project would supply the Kitimat LNG facility. It is a 463-kilometre,

42-inch diameter pipeline from summit Lake, B.C., to the Kitimat LNG

site. The project is at application stage, with only a limited number of the

161 required approvals having been issued to date. The original project

application anticipated one compressor station with an initial delivery

capacity of 1 bcf/d. should both trains of the Kitimat LNG project be

constructed, pacific Trail pipelines would add compression. The original

plan was based on a four-year construction period after all approvals

had been granted. The current plan is to maintain the original four-year

construction program and to coordinate the pipeline in-service date with

the start-up of Kitimat LNG.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 30: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 20

Exhibit 3Coastal Gas Link

Source: TransCanada.

16

16

37

37

97

27

16

97

37

Granisle

New HazeltonHazelton

Stewart

Cranberry Junction

Pink Mountain

Wonowon

Hudson’sHope

ALB

ER

TA

BR

ITIS

H C

OLU

MB

IA

ALA

SK

A

Fort St. James

Mackenzie

Taylor

Fort St. John

Dawson Creek

Tumbler Ridge

Prince GeorgeVanderhoofFraser Lake

Burns Lake

SmithersTelkwa

Houston

Terrace

Kitimat

Prince Rupert

Chetwynd

Coastal Gaslink Pipeline ProjectStudy Corridor

Proposed Coastal Gaslink Compression and Metering Facility

Proposed Coastal Gaslink Metering Facility

Proposed Future Coastal Gaslink Compression Facilities

Proposed LNG Canada Facility (3rd party)TransCanada’s NOVA Gas Transmission Ltd. (NGTL) Existing SystemProposed North Montney Mainline ProjectProposed Merrick Mainline ProjectHighwaysCities and Towns

Coastal Gaslink Pipeline Project Other

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 31: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Find Conference Board research at www.e-library.ca.

CHAPTER 3

Economic Impacts

Chapter summary

• Between 2016 and 2045, the average annual investment required to support a 30 MTpA LNG industry in B.C., across all value-chain segments would average $7 billion per year, adjusted for inflation.

• These investments will increase Canadian GDp by $7.4 billion annually over the course of 30 years, with $5.3 billion of this growth occurring in British Columbia.

• Increased economic activity will lead to growth in employment; on a national level, employment will increase by 65,000 jobs, with 46,800 occurring in British Columbia.

• Annual government revenues, including corporate, personal, and indirect taxes and royalty revenues, would increase by approximately $6 billion annually, of which $3 billion would accrue to the provincial government.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 32: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 22

Key Assumptions and Methodology

This chapter quantifies the economic impacts of developing a 30 MTPA LNG industry in British Columbia. As discussed previously, this report uses an estimated detailed breakdown of investment spending across upstream, midstream, and downstream sectors. Between 2016 and 2045, the total investment required to produce a sufficient quantity of natural gas and to construct and operate the necessary infrastructure and facilities will average $7 billion per year, adjusted for inflation. (See Table 10.)

This report relies on macroeconomic models of B.C.’s economy to

produce the economic impact analysis. statistics Canada’s inter-regional

input-output model of Canada’s economy is used to produce detailed

industry and employment impacts for B.C., as well as to produce

supply chain impacts across other provinces. These results are then

used as input into the Conference Board’s own econometric model

of the B.C. economy. While the Conference Board model contains a

Table 10Average Annual Spending for 30 MTPA LNG Capacity (2015 C$ millions)

Time Amount

Upstream 2016–45 4,509

Transmission 2017–45 354

Midstream 2019–45 527

LNG terminal 2016–45 1,647

Total spending 2016–45 6,971

Source: The Conference Board of Canada.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 33: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 3 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 23

more aggregated industrial sector, it has the benefit of assessing the

impact of additional income, generated through changes in wages and

profits, on the economy. In addition, the Conference Board’s model can

produce impacts on a broad range of economic indicators on a year-by-

year basis.

The Conference Board’s provincial forecasting model captures the sum

of the direct, indirect, and induced impacts on B.C.’s economy, based

on its estimated historical relationships. The model also incorporates a

detailed modelling of prices, households, and businesses, and provides

economic impact results for a wide range of economic indicators. In

addition, it contains a detailed accounting of government revenues. (see

“What Is the Difference Between Direct, Indirect, and Induced Impacts?”)

What Is the Difference Between Direct, Indirect, and Induced Impacts?

Direct impact measures the value added to the economy from the increased

infrastructure spending from those firms employed to either build structures or

manufacture equipment. Because much of the equipment is expected to be

imported, the direct effect on B.C.’s economy from machinery and equipment

investment is muted.

Indirect impact measures the value added from supply chain effects—as

demand for intermediate inputs or other support services is lifted. Increased

demand for construction and machinery will bolster activity in transportation,

financial, insurance, and other services. Moreover, imported materials and

machinery will bolster activity in transportation and warehousing.

Induced impacts are derived when employees of the aforementioned industries

spend their earnings and owners spend their profits. These purchases lead to

more employment, wages, income, and tax revenues, and can be felt across a

wide range of industries.

Source: The Conference Board of Canada.

The Conference Board’s provincial forecasting model captures the sum of the direct, indirect, and induced impacts on B.C.’s economy.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 34: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 24

Consequently, increased production from specific industries will not

only have direct impacts on the economy, but will also spread through

the economy via a series of multiplier effects. Indirect effects—in the

form of increased demand—are first felt by industries that are direct

suppliers. second-round induced effects produce a widespread impact

(albeit usually smaller) on all sectors of the economy, largely through a

general increase in consumer spending. The overall economic multiplier

is calculated as the sum of all value-added impacts (direct, indirect, and

induced) divided by the initial constant dollar spending generated by

the investment.

It is important to note that the constant dollar value of the investment

does not necessarily result in a one-to-one increase in real GDp on

B.C.’s economy. This is because a good portion of the investment is

assumed to go toward the purchase of machinery and equipment, which

is imported either from other provinces and territories or overseas. For

Canada, the overall multiplier is greater than 1 because of the positive

supply chain impact on other provinces and territories. (see Table 11.)

For B.C. alone, the multiplier is less than 1 due to the leakages through

imports from overseas and from other provinces and territories. (see

Table 12.)

Table 11Average Economic Impact of 30 MTPA LNG Capacity on Canada’s Economy

Upstream Transmission Midstream LNG terminal Total

Economic multipliers 1.03 0.95 1.05 1.06 1.06

GDp at market prices (2015 $ millions) 4,663 335 551 1,751 7,385

Employment (000s) 43 3 5 14 65

Source: The Conference Board of Canada.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 35: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 3 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 25

In particular, the midstream production trains and the LNG terminals

represent new lines of industry to the Canadian economy—hence,

part of the investment will be spent overseas to import the required

machinery and equipment and specialized labour to develop and

operate such projects. Additionally, the upstream and pipeline sectors

could import components from other Canadian oil and gas jurisdictions,

such as Alberta and Newfoundland and Labrador. Moreover, even as

demand for machinery and equipment produced in B.C. is lifted, the

Table 12Average Annual Impacts in British Columbia for 30 MTPA LNG Capacity

Upstream Transmission Midstream LNG terminal Total

Total investment (2015 $millions) 4,509 354 527 1,647 6,971

GDp at market prices (2015 $ millions) 3,720 232 285 1,080 5,281

GDp deflator (percentage difference) 0.07 0.06 0.08 0.09 0.29

Consumer price index (percentage difference) 0.06 0.05 0.07 0.07 0.24

Average weekly wages industrial composite (percentage difference)

0.13 0.09 0.12 0.13 0.46

personal income (current $ millions) 3,810 194 472 1,173 5,595

household disposable income (current $ millions)

3,219 157 384 1,043 4,759

population of labour force age (000s) 23 2 3 7 34

Labour force (000s) 25 2 2 6 35

Employment (000s) 34 2 3 9 47

Unemployment rate (level difference in rate) –0.37 –0.02 –0.03 –0.09 –0.5

Retail sales (current $ millions) 1,356 89 136 396 1,961

housing starts (000s) 0.5 0.02 0.05 0.14 0.7

Net operating surplus: corporation (current $ millions)

1,031 79 119 704 1,918

personal income taxes (current $ millions) 786 47 65 206 1,096

Indirect taxes (current $ millions) 595 45 77 100 808

Economic multipliers 0.83 0.66 0.54 0.66 0.76

Note: Level difference shock minus control except where otherwise indicated.Source: The Conference Board of Canada.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 36: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 26

increased demand for manufactured goods will require intermediate

inputs purchased from suppliers that may be outside the provincial

boundaries. This supply chain effect on imported components and labour

will have a dampening effect on the impact of the overall multiplier on

B.C.’s economy.

Economic Impact Results

Overall Economic Impact of 30 MTPA LNG CapacityThis report expects that the total average annual investment of roughly

$7 billion and will permanently lift Canadian real GDp by $7.4 billion

a year over the next 30 years. (see Table 11). As shown in Table

12, $5.3 billion of the $7.4 billion permanent annual increase in real

economic activity will occur in British Columbia. Beginning in 2016,

British Columbia’s real GDp will rise from $4.6 and will reach a peak of

$10.4 billion by 2020 before slowing down to around $4.7 billion by 2045.

(see Chart 2.)

Chart 2Real GDP Impact of 30 MTPA LNG Capacity on B.C.’s Economy Over Time (2015 $ millions)

Source: The Conference Board of Canada.

0

2,000

4,000

6,000

8,000

10,000

12,000

Upstream LNG terminal Transmission Midstream

2016 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 37: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 3 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 27

Growth in B.C.’s economic activity will increase demand for materials

and services outside the province—leaving approximately $2.1 billion in

real GDp growth that occurs in other provinces and territories. Overall,

combining direct, indirect, and induced effects for every real dollar spent

increases Canada’s real GDp by $1.06, of which $0.76 will accrue to

British Columbia.

The sizable boost to economic activity will be met with increased

employment. Nationally, employment is bolstered by roughly 65,000—

with 46,800 of those jobs occurring in British Columbia. (see Table 13.)

Overall, upstream activity generates the majority of new employment

within the province (as shown in Chart 3), while transmission, midstream,

and terminal activity contribute just over 27 per cent of jobs. peak

employment in B.C. will reach 93,0001 person-years in 2020.

supply chain impacts boost employment across a wide range of services

sector industries, which include transportation and warehousing, finance,

insurance, and real estate, and other commercial services. Wholesale

and retail trade employment is largely boosted by induced economic

impacts—specifically, that of households spending their increased

income. The increases to population, employment, and wages will lift

(nominal) personal household income by $5.6 billion a year over the

2016–45 period. This results in an annual boost to household spending,

including retail sales ($2 billion) and housing starts (700 units). (see

Table 12.)

The Conference Board’s economic model of B.C.’s economy captures

the effects of a regionally mobile workforce. As such, an increase in

employment is not reflected, one-for-one, in a decrease in the number

of those unemployed. For example, as job prospects improve in B.C.

relative to other provinces, net interprovincial migration flows into the

province will also increase. Moreover, as more people naturally enter

the workforce, the impact on the unemployment rate is mitigated.

1 A person-year of employment is a job held for a period of one year. A single job created by a project can last for several years, thereby creating more than one person-year of employment. For instance, a project that creates two jobs that last for 10 years is said to have created 20 person-years of employment.

The sizable boost to economic activity will be met with increased employment.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 38: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 28

Chart 3Employment Impact of 30 MTPA LNG Capacity on B.C.’s Economy Over Time

Source: The Conference Board of Canada.

0

20,000

40,000

60,000

80,000

100,000

Upstream LNG terminal Transmission Midstream

2016 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

Table 13Average Annual Labour Impact of 30 MTPA LNG Capacity on BC’s Economy

Upstream Transmission Midstream LNG terminal Total

Total employment 34,006 1,932 2,625 8,574 46,810

Agriculture 203 22 18 100 340

Other primary sector 6,217 34 49 216 6,510

Utilities 128 13 11 49 199

Manufacturing 3,337 145 128 647 4,239

Construction 9,797 489 1,333 1,848 13,317

Wholesale and retail trade 4,554 414 235 1,584 6,750

Transportation and warehousing 858 98 20 1,235 2,206

Finance, insurance, real estate 268 107 37 406 810

Other commercial services 6,416 464 461 2,021 9,301

public sector (Including education, health, public administration)

2,228 147 333 481 3,151

Unemployment –8,606 –367 –698 –2,162 –11,751

Note: A negative unemployment value refers to a reduction in the number of people who are unemployed, due to the projects. On average, the number of people unemployed is reduced by 11,700 per year.Source: The Conference Board of Canada.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 39: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 3 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 29

Given the sizable addition to employment from the development and

operations of the LNG industry, the labour force is lifted permanently,

by roughly 35,000 persons. Despite this offsetting boost to the supply

of labour, the province’s unemployment rate is expected to permanently

drop by 0.5 percentage points. (see Table 12.) This represents a drop

of 11,751 people per annum in the number of people unemployed in

British Columbia. (see Table 13.)

Fiscal Impact of 30 MTPA LNG CapacityIn addition to the economic impacts, both federal and provincial

governments stand to reap significant fiscal dividends from the

development of 30 MTpA LNG capacity in the province. Table 14

highlights the various sources of income for both governments. higher

labour income and corporate profits result in a boost to both federal and

provincial government revenues in each year over the 30-year period. In

current dollar terms, the federal government would see corporate income

tax revenues up by nearly $537 million while B.C. would benefit from

an additional $211 million in corporate income tax. In addition, personal

income taxes will add another $2 billion to the federal government and

$1.1 billion to the B.C. government coffers. Indirect taxes, including sales

taxes and other taxes on products, will provide an additional $808 million

and $577 million a year, respectively, to provincial and federal coffers.

Natural gas royalty revenues accruing to the B.C. government are also

sizable—30 MTpA of production is expected to generate $686 million

per year, completely eclipsing the $220 million the B.C. government is

expecting to collect for the 2015–16 fiscal year, as contained in the first

quarter fiscal update released in september 2015.2

In addition to royalties and other taxes mentioned above, B.C. stands

to benefit from LNG tax revenue. British Columbia’s government has

introduced a two-tier tax on net income of LNG producers. The Tier 1

tax rate of 1.5 per cent applies to an operator’s net operating income

after commercial production begins. The Tier 2 tax is levied at 3.5 per

2 Government of British Columbia, First Quarterly Report: September 2015, 20.

Federal and provincial governments stand to reap significant fiscal dividends.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 40: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 30

cent (rising to 5 per cent in 2037) on net income less capital investment

deductions for the tax year until the capital costs associated with

constructing the LNG facility have been fully deducted. Our estimate

indicates that LNG tax revenues could boost B.C.’s government coffers

by an average of $208 million a year over 2021–45.

The federal government also benefits from reduced employment

insurance payments and an increase in employment insurance revenues

due to the lift to employment and reduction in the number of those who

are unemployed.

Implications of Possible Expansion

Given the vast natural gas resources in Northern B.C., the initial

30 MTpA LNG capacity could be expanded to harness more LNG for the

market, if market and regulatory conditions were favourable. This report

analyzes the economic and fiscal impact of a 40 per cent increase to the

initial development and operational investment. (see Chart 4.)

Table 14Annual Fiscal Impact of a 30 MTPA LNG Industry(millions of current $)

Upstream Transmission Midstream LNG terminal Total

B.C. corporate income tax 113 9 13 77 211

Federal corporate income tax 289 22 33 197 537

B.C. personal income tax 786 47 65 206 1,096

Federal personal income tax 1,478 89 123 386 2,060

B.C. indirect taxes 595 45 77 100 808

Federal indirect taxes 425 32 55 72 577

B.C. royalty revenue 686 – – – 686

B.C. LNG tax revenue – – – 208 208

Source: The Conference Board of Canada.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 41: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 3 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 31

Expanding the infrastructure and boosting drilling and production

of natural gas production could add another $5.1 billion per year to

Canada’s real GDp, $2.3 billion will accrue to B.C., and the remaining

$2.8 billion will spread across the rest of the provinces and territories.

The expansion phase will generate additional 49,000 jobs across

Canada, with 28,000 occurring in British Columbia. (see Chart 5.)

Chart 4Real GDP Impact of a 40 Per Cent Expansion($ millions)

Source: The Conference Board of Canada.

0

4,000

8,000

12,000

Initial impact With expansion

2016 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

Chart 5Employment Impact of a 40 Per Cent Expansion

Source: The Conference Board of Canada.

0

20,000

40,000

60,000

80,000

100,000

120,000

Initial impact With expansion

2016 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 42: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 32

Economic Impact Summary

In summary, the simulation results suggest that for each (inflation-

adjusted) dollar of direct investment in developing and operating a

30 MpTA increase in LNG capacity, real GDp will rise by $1.06 in

Canada, of which $0.76 will occur in British Columbia. Over the 2016–45

period, development and operations will permanently lift real GDp in

Canada by roughly $7.4 billion and support 65,000 jobs on an ongoing

basis. The lion’s share of the impacts will occur in B.C., with real GDp

lifted by $5.3 billion and employment up by 47,000 on an ongoing

basis—enough to lower the province’s unemployment rate by 0.5 per

cent permanently. The fiscal impact is equally significant. A 30 MTpA

increase in LNG capacity would boost revenues for the federal and B.C.

governments by an average of $3.2 billion and $3 billion, respectively,

over 2016–45.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 43: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Find Conference Board research at www.e-library.ca.

CHAPTER 4

Labour Impacts

Chapter summary

• B.C. is not currently experiencing a labour shortage, which indicates that it may have a labour force large enough to meet the needs of an LNG industry. This assumes that it can mobilize and develop the skill sets of individuals who are unemployed or out of the workforce.

• pressures that include slow population and labour force growth and rising retirements and labour needs are trends that will strain B.C.’s labour market.

• When attempting to mobilize and train labour to support an LNG industry, governments and LNG employers will encounter challenges that include competition for labour in the remote communities where LNG projects are located and engaging potential Aboriginal workers.

• Governments will also need to consider how to support inter and intraprovincial migration, education, and training, and prepare workers for post-LNG employment.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 44: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 34

The labour and skills needs associated with LNG developments in B.C. will have a noticeable impact on the province’s labour market. Targeted labour and skills strategies will be needed to ensure not only that LNG-related employers are able to attract and retain the skilled labour they need, but also to minimize negative impacts on other employers, while providing good employment options for local workers, and especially Aboriginal communities.

Employment, Unemployment, and Labour Market Participation

LNG development will occur in a labour market showing mixed signals

about labour and skills supply and demand. At 6.3 per cent, B.C.’s

unemployment rate (for those aged 15 and older) does not indicate

serious labour shortages at first glance. While it is below the overall

Canadian unemployment rate (7.1 per cent) and has fallen by more than

a percentage point over the past five years, it has not yet approached

levels associated with the tight labour markets seen in 2014 in

saskatchewan (3.5 per cent unemployment) and pre-recession Alberta

(3.4 to 3.6 per cent). Nor has B.C.’s unemployment rate returned to its

pre-recession levels of below 5 per cent. (see Chart 6.)

Additionally, B.C. has a labour force participation rate (63.7 per cent)

that is slightly lower than the Canadian average (65.9 per cent), and well

below that of provinces that have experienced tight labour markets—

namely, Alberta (73.5 per cent) and saskatchewan (70.3 per cent).1

B.C.’s participation rate has remained relatively stable, albeit dipping

a bit in recent years. The key point is that the gap between B.C. and

provinces that have experienced labour and skills pressures is sizable,

1 statistics Canada, CANsIM table 282-0087; stuckey and Munro, Skills for Success, 15.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 45: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 4 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 35

suggesting that B.C. is not currently facing a labour shortage in the

aggregate, and has opportunities to mobilize additional labour should

LNG developments and other projects begin to strain the labour market.

however, whether the potential labour has the required skills is a

separate challenge. (see Chart 7.)

Chart 6Unemployment Rate, Canada and Selected Provinces (per cent unemployed, aged 15 and over)

Sources: Statistics Canada; The Conference Board of Canada.

Sep 2006 Sep 2007 Sep 2008 Sep 2009 Sep 2010 Sep 2011 Sep 2012 Sep 2013 Sep 2014 Sep 2015

3

4

5

6

7

8

9

Canada British Columbia Alberta Saskatchewan

Chart 7Labour Force Participation, Canada and Selected Provinces (per cent participation, aged 15 and older)

Sources: Statistics Canada; The Conference Board of Canada.

Sep 2006 Sep 2007 Sep 2008 Sep 2009 Sep 2010 Sep 2011 Sep 2012 Sep 2013 Sep 2014 Sep 2015

62

66

70

74

78

Canada British Columbia Alberta Saskatchewan

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 46: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 36

In short, the unemployment and labour participation rates in B.C. suggest

that the province may have sufficient labour and skills to meet its needs

provided it can mobilize and train segments of the population who are

either unemployed or currently out of the workforce. however, other

indicators point toward increasing labour and skills pressures.

Lagging Population Growth and Rising Retirements

Once under way, LNG development will strain B.C.’s labour market

and will occur just as other trends create additional challenges. B.C.’s

population growth rate will average only 1.1 per cent between 2013 and

2035, making it “the slowest-growing province west of Quebec over

the long term.”2 According to Conference Board projections, migration

(primarily international, but also interprovincial) will be the most important

source of population growth in the province.3 Managing migration and

ensuring that newcomers are well integrated into the labour market will

be key challenges for governments and employers.

At the same time, the province’s population is aging and skilled workers

are retiring in large numbers. By 2035, people aged 65 and older will

make up nearly 26 per cent of the population, as opposed to 16.4 per

cent in 2013.4 The Conference Board’s B.C. Employer skills survey

reveals that many employers are worried about retirements of workers

with specialized skills. Overall, 57 per cent of employers say they are

“concerned” (35 per cent) or “very concerned” (22 per cent) about

imminent retirements. Concern is especially high among the province’s

largest firms, with 78 per cent of firms with 500 or more employers

saying they are “concerned” (46 per cent) or “very concerned” (32 per

cent) about retirements.5 (see Chart 8.)

2 The Conference Board of Canada, Provincial Outlook, 116.

3 Ibid., 114–16.

4 Ibid., 114.

5 stuckey and Munro, Skills for Success, 17–18.

Migration will be the most important source of population growth in the province.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 47: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 4 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 37

Slow Labour Force Growth and Rising Labour Needs

Given lagging population growth and rising retirements for the

foreseeable future, B.C. faces two or more decades of slow growth in

its labour force as a whole. Although migration will help, the Conference

Board nevertheless projects that annual labour force growth in B.C. will

be 1 per cent until 2020, falling to just 0.7 per cent by 2035.6 Meanwhile,

new economic developments—including LNG development—are

expected to put further strain on labour and skill markets during this

period. Overall, labour force growth may fall short of job openings in

B.C. until 2020 and beyond. The B.C. labour market outlook estimates a

deficit of 61,500 workers across the province by 2020—or approximately

2 per cent of the labour force (assuming a total labour force in the

province of about 2,750,000 in 2020).7

6 The Conference Board of Canada, Provincial Outlook, 117.

7 WorkBC, B.C. Skills for Jobs Blueprint, 2.

Chart 8B.C. Employers’ Concerns About Retirements in the Next 5 to 10 Years, by Firm Size(percentage of respondents, n = 854)

Sources: B.C. Employers Skills Survey 2014; The Conference Board of Canada.

Not at allconcerned

Only slightlyconcerned

Concerned Very concerned

0

10

20

30

40

50

1–19 100–49920–99 500+

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 48: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 38

The challenges may be especially acute in particular regions. Although

roughly 90 per cent of all new job openings (all sectors) will be located

in B.C.’s three largest regions (Mainland-southwest, Vancouver Island/

Coast, and Thompson-Okanagan), growth in demand for workers is likely

to be highest in the Northeast and Mainland-southwest regions primarily

due to infrastructure projects.8 This will complicate efforts to recruit and

retain skilled labour for LNG construction in certain regions throughout

the province.

High-Demand Occupations

The occupational needs specific to LNG construction and operation will

be discussed in the next section. As context, however, a brief overview

of which occupations B.C. employers across the province expect to have

difficulty filling is useful. In the Conference Board’s B.C. Employer skills

survey, employers expressed concern about their ability to attract and

retain skilled workers to fill a wide range of occupations, many linked to

LNG development. More than a third (35 per cent) of the 854 employers

surveyed across all sectors of the economy expect to have difficulty

filling positions in business, finance, and administration. Nearly as many

expect difficulty finding qualified people to work in trades, transport, and

equipment operator occupations (30 per cent). And more than a fifth

of employers expect difficult hiring in sales and services occupations

(23 per cent) and natural and applied sciences occupations (22 per

cent)—many of which are relevant occupations for LNG construction and

operation.9 (see Chart 9.)

The responses differ by region, with employers in B.C.’s North and

Central Interior much more likely (45 per cent) than employers in

other regions (28 per cent) to express concern about hiring for trades,

transport, and equipment operator occupations. Concern about hiring

8 Ibid., 3.

9 stuckey and Munro, Skills for Success, 43–44. Note that percentages sum to more than 100 as employers were asked to indicate all categories in which they expect to have difficulty hiring people.

Employers expressed concern about their ability to attract and retain skilled workers to fill a wide range of occupations.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 49: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 4 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 39

difficulties in certain other occupational categories (i.e., occupations

unique to primary industry, processing, manufacturing, and utilities) is

also higher among B.C.’s North and Central Interior employers than

employers in other regions. This is likely a function not only of increasing

demand for these skills, but also a limited supply of such skills in

these communities.

A Challenging Labour Market for LNG Development

Key indicators of the B.C. economy—such as moderate unemployment

and low labour force participation—suggest that labour and skills

pressures have not quite taken hold. however, other signs—such as

slow labour force growth, rising retirements, and expectations of difficulty

in hiring for certain occupations—point toward emerging and growing

Chart 9B.C. Employers’ Concerns About Occupational Needs, by Region(percentage of regional responses, n = 854)

Sources: B.C. Employers Skills Survey 2014; The Conference Board of Canada.

Lower Mainland North and Central Interior Okanagan Boundary, Kootenay, and Southern Interior

Vancouver Islandand Central Coast

0

10

20

30

40

50

Business, finance, and administration

Trades, transport, and equipment operators

Sales and service

Natural and applied sciences

Social science, education, government service, and religion

Occupations unique to primary industry

Art, culture, recreation, and sport

Occupations unique to processing, manufacturing, and utilities

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 50: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 40

challenges. As the LNG sector begins and accelerates its construction

and operation activities, employers are likely to face greater difficulty

attracting and retaining the labour and skills they need. how will LNG

activities change the situation, and what will LNG-related employers

need in particular?

Labour, Skills, and Occupational Needs of LNG Construction and OperationThe labour, skills, and occupations needed to develop B.C.’s LNG

potential are significant, though quantifying the exact size and nature of

those needs is difficult. Uncertainty remains about how many and what

kinds of LNG development projects will be pursued, when construction

will begin and end, and when operations will commence. Until industry

and regulators make decisions, these uncertainties will complicate

labour projections.

Additionally, labour and skills needs will vary by phase of development

(construction vs. operation); pace and timing of specific activities; role

in the supply chain (upstream, midstream, downstream, or indirect

activities); geographic location of activities; and local and provincial

labour market conditions. Despite the uncertainty, a general picture of

the labour, skills, and occupations needed to support 30 MTpA of LNG

capacity can be drawn.

Specific Occupational Needs LNG development requires workers with a range of skills to fill many

occupational types. The Conference Board’s analysis of employment

needs for the current scenario includes a breakdown by occupational

category for all direct, indirect, and induced employment needs, but not

by more specific occupational type, nor by direct, indirect, and induced

employment. For estimates of specific direct occupational needs, we turn

to observable patterns in the secondary literature and apply those to the

current scenario.

The labour, skills, and occupations needed to develop B.C.’s LNG potential are significant.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 51: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 4 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 41

Analyses produced by KpMG and the B.C. Natural Gas Workforce

strategy Committee (B.C. NGWsC) show that the direct occupational

needs for construction lean heavily toward the trades and construction

trades helpers and labourers. The B.C. NGWsC analyses expect that

57 per cent of direct construction needs will be in trades and 25 per cent

for construction trades helpers and labourers.10 (see Chart 10.)

Looking at just the trades slice, the specific kinds of trades required are

varied, though steamfitters, pipefitters, and gasfitters will be needed

most (47 per cent), followed by welders (21 per cent). (see Chart 11.)

In terms of operations, occupational needs will be primarily for process

operators (50 per cent), followed by a variety of tradespeople (25 per

cent) and others. (see Chart 12.) In particular, the B.C. NGWsC expects

10 Note that the overall employment numbers presented above include direct, indirect, and induced employment while the specific occupational needs numbers refer only to direct employment. Consequently, the proportions shown in charts 8 to 10 cannot be applied to the total number of jobs.

Chart 10LNG Construction—Occupational Needs(per cent at peak construction)

Sources: B.C. Natural Gas Workforce Strategy Committee; The Conference Board of Canada.

5725

3211

11Trades

Construction trades helpers and labourers

Heavy equipment operators

Truck drivers and operators

Engineers

Managers, supervisors, and foremen

Other

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 52: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 42

greatest need for oil and gas field workers, labourers, and operators;

supervisors in oil and gas drilling services; operators including plant,

process, and pipeline; truck drivers; and millwrights and machinists.11

11 petroleum human Resources Council of Canada, B.C. Natural Gas Workforce Strategy and Action, 8.

Chart 11Trades Workforce Required at Peak Construction(percentage of trades workers)

Sources: B.C. Natural Gas Workforce Strategy Committee; The Conference Board of Canada.

47

21

7

7

6

64 1 1

Steamfitters, pipefitters, and gasfitters

Welders

Carpenters, including scaffolders

Iron and sheet metal workers

Concrete finishers

Crane operators

Electrical and instrumentation

Insulators

Heavy-duty equipment mechanics

Chart 12LNG Operations—Occupation Needs(percentage of trades workers)

Sources: B.C. Natural Gas Workforce Strategy Committee; The Conference Board of Canada.

50

25

10

105

Process operators

Trades

Operations and maintenance management

Admininstration and other

Engineers

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 53: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 4 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 43

Opportunities, Challenges, and Strategies

LNG employers may be hard-pressed to find all the workers with the

skills they need, at the right times, in the right places, and without

disrupting the labour market for other economic opportunities. Although

there appears to be enough slack in the B.C. labour market overall at

present (as indicated by moderate unemployment and relatively low

participation rates), those conditions are changing and strategies to

effectively mobilize non-participant populations and to recruit, train, and

retain employees will be needed. A number of key issues and conditions

present both opportunities and challenges for governments and LNG

employers, including the nature of regional labour markets; engaging

Aboriginal workers; worker migration and mobility; and issues related to

workforce transitions and career pathways for workers after peak LNG

construction activities have been completed.

Regional Issues In the province as a whole, although there is some labour market

slack, pressures will emerge in coming years. But LNG developments

must grapple also with the fact that many projects will occur in smaller,

Northern, and remote communities with unique regional labour market

challenges, including lower levels of labour market participation and

fewer workers overall. Even in cases where LNG projects are able

to recruit labour and skills in Northern and remote communities,

competition is likely to be “fierce” and could negatively affect other

businesses’ efforts to retain workers.12

For example, an environmental assessment for the pNW LNG project

notes that “the labour requirements for project construction would vastly

exceed the labour supply in the RAA [Regional Assessment Area].”13 The

project is expected to require 4,000 workers during peak construction,

but the RAA has a labour force of only 6,980—only 1,045 of whom were

12 Ibid.

13 Government of British Columbia—Environmental Assessment Office, Pacific Northwest LNG Project, 103.

A number of key issues and conditions present both opportunities and challenges for governments and LNG employers.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 54: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 44

unemployed and available for work (according to 2011 Census data).

In fact, the assessment estimates that only 200 workers will be drawn

from the RAA for the project. The remainder—indeed the overwhelming

majority—would have to be recruited from elsewhere in the province,

from other provinces, or from abroad.14 Other projects across Northern

and remote areas of B.C. will be in the same position.

Employing Aboriginal WorkersAt least part of the value proposition for LNG development is that it

has the potential to provide well-paying jobs for Aboriginal residents of

B.C.—particularly in Northern communities. Yet, historically, the labour

market participation of the Aboriginal population lags that of the non-

Aboriginal population. According to the 2011 National household survey,

among those aged 15 or older in B.C., Aboriginal people had a labour

force participation rate of 72.4 per cent, while that of non-Aboriginals was

79.7 per cent.15 (Unemployment for B.C. Aboriginals aged 25 to 64 was

14.7 per cent versus 6.1 per cent for non-Aboriginals).16 If Aboriginal

residents in B.C. participated in the labour market at the same rate as

non-Aboriginal residents (79.7 per cent), nearly 9,000 more workers

would be available.17

While this means that there is previously untapped labour available for

LNG development, it also means that strategies to mobilize, train, and

effectively engage with Aboriginal employees will be needed. previous

work by the Conference Board has identified some of the challenges

associated with engaging Aboriginal workers, including:

• difficulties in finding and reaching out to potential Aboriginal workers with

previously low labour market participation;

14 Ibid., 102.

15 statistics Canada, National Household Survey (NHS), 2011.

16 Ibid.

17 Calculations by the Conference Board, based on statistics Canada, National Household Survey (NHS), 2011.

LNG development has the potential to provide well-paying jobs for Aboriginal residents of B.C.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 55: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 4 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 45

• lagging educational and skills attainment relative to the

non-Aboriginal population;18

• reluctance of potential workers to move away from their communities;

• negative perceptions on the part of many employers and non-

Aboriginal colleagues about the skills, attitudes, and performance of

Aboriginal workers.19

While the precise strategies needed to engage with, recruit, train, and

support Aboriginal workers in LNG development will depend on local

conditions and discussions, some general principles can be identified:20

• Appropriate consultations among Aboriginal communities, governments,

and employers are a critical first step toward developing trust and

identifying how to achieve mutual benefits.

• Governments and communities can make efforts to increase both the

secondary and post-secondary educational attainment among the

Aboriginal populations, while employers can provide training that benefits

workers not only in their current roles, but helps to prepare them for

future roles.

• Existing Aboriginal employment organizations (e.g., Aboriginal skills and

Employment Training strategy [AsETs] Agreement holders) can share

best practices related to mobilizing and supporting Aboriginal workers

with each other and with employers to help engage Aboriginal workers

and provide mutual benefits.

• Cultural awareness programs can be developed and implemented to help

overcome racism and misunderstandings in the workplace that act as

barriers to valuing and benefiting from Aboriginal workers’ contributions.

18 see also Munro, MacLaine, and stuckey, Skills, 21–22.

19 howard, Edge, and Watt, Understanding the Value, Challenges, and Opportunities, ii.

20 Ibid.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 56: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 46

Worker Migration and MobilityRecruiting local and Aboriginal workers alone will not address the labour

needs of LNG construction and operation. Employers will need to look

beyond local and regional labour markets to recruit the labour and skills

they need. As the analysis above reveals, there is some slack in the

provincial labour market as a whole which can help, though pressure

should be expected during peak construction, creating a need to identify

and recruit labour from outside the province, and perhaps outside the

country as well.

Intra and interprovincial migration will require attraction and support

strategies. The experience of employers in the Alberta oils sands may

provide lessons for LNG employers in British Columbia. In the case of

Alberta’s oil sands, offering higher wages than found in opportunities

elsewhere in the province and country were a key part of successfully

attracting sufficient labour.21 Travel support and flexible shift scheduling

also eased the challenges for workers outside the region.

Where labour from elsewhere in B.C. and Canada is insufficient—

or where specialized skills are needed—there are opportunities for

employers to pursue immigrant workers or temporary foreign workers.

Given the short duration of the peak construction period in a medium

development scenario, recruiting temporary foreign workers may prove to

be a useful strategy. previous Conference Board research on the use of

temporary foreign workers in Alberta provides a number of insights and

strategies for B.C.’s LNG employers.22 In particular, it recommends that

employers and governments:

• Look close to home for skilled labour.

• But know that domestic sources are rarely enough to meet demand.

• Competition for foreign skilled labour may heat up.

• Employers, unions, and regulators must work together to eliminate

unnecessary barriers to worker certification.

21 Lewis, Alberta Oil Patch’s High Wages Attract U.S. Workers.

22 Dawson, Skills in Motion.

Intra and interprovincial migration will require attraction and support strategies.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 57: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 4 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 47

• It is not enough to allow temporary workers in—governments,

businesses, and unions need to work together to recognize

their credentials.23

Education and TrainingMany reports on LNG labour and skills have noted that there is a need

for investment in education and training to prepare potential workers for

employment. Key education and training needs will include expanding

and tailoring the apprenticeship system to accommodate not only

more apprentices in the trades—a key occupational category for LNG

development—but also the learning needs of remote and Aboriginal

workers. Additionally, because LNG development will require substantial

numbers of low-skilled construction workers, pathways from high school

to LNG employment should be clarified, and employers should be

prepared to provide significant skills, as well as occupational health and

safety training, to these employees.

The province’s B.C. Skills for Jobs Blueprint, the Natural Gas Workforce

Strategy and Action Plan, and the Conference Board’s work on skills

in B.C.—Skills for Success—provide a strong set of recommendations

and options to address education and training needs related to LNG

development.24

Workforce Transitions and LegacyOne final issue with which LNG employers and governments should be

concerned is the potential for employment in LNG construction to be

disruptive to the longer-term career success of some workers. some of

the environmental assessments for various LNG projects note that there

is the potential for low-skilled, well-paying construction employment to

draw some students out of school before they complete Grade 12 or

23 Ibid., 13–14.

24 WorkBC, B.C. Skills for Jobs Blueprint; petroleum human Resources Council of Canada, B.C. Natural Gas Workforce Strategy and Action Plan; stuckey and Munro, Skills for Success.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 58: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 48

some other educational credential. Because LNG construction is only

temporary, upon completion, those workers may find that their lack

of educational credentials impairs future employment prospects. One

promising strategy to avoid this is for employers to require job candidates

below a certain age (e.g., 19) to complete Grade 12 or its equivalent

before being hired. That would ensure that workers would be in a much

better position for future, post-LNG employment opportunities.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 59: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Find Conference Board research at www.e-library.ca.

CHAPTER 5

Conclusions

Chapter summary

• This report’s results are subject to uncertainty, as none of the LNG projects that were examined has progressed to the construction stage.

• While the final level of investment, capacity, and timing of projects is uncertain, what is certain is that the development of an LNG industry in B.C. would result in significant benefits for Canadians and their governments.

• The majority of economic development, employment opportunities, and government revenues would occur in British Columbia.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 60: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 50

This report examined the potential economic, fiscal, and employment impacts that might arise from B.C.’s emergent LNG industry. The results are subject to considerable uncertainty, primarily because the projects examined have not yet moved to the construction stage. This raises questions about how many projects might go forward, as well as the eventual liquefaction capacity. It also raises questions about the actual investments that would be made for any given level of capacity, primarily because the engineering-procurement-construction contracts have not yet been finalized. As a result, the findings of this report are based on the best available public information.

The findings presented herein assume an initial liquefaction capacity

of 30 MTpA, divided among three projects. There are several projects

currently identified that intend to start operations with two liquefaction

trains of approximately 6 MTpA each. There are also projects that

intend to start operations on a smaller scale, with only one initial train of

5 to 6 MTpA. Our reference case results are based on two large initial

projects, each with two trains of 6 MTpA and one smaller project with a

single train of 5 to 6 MTpA. potential expansions to these projects could

add another 24 MTpA of capacity should market development permit.

The investment profiles and economic impacts are shown by value chain

segment: liquefaction, transmission pipelines, natural gas processing,

and upstream activities required to ensure that natural gas production

is available. Each segment has its own expenditure patterns and timing.

For example, the liquefaction plants will expend large amounts of capital

before beginning operations, with their greatest impacts on services

industries, construction, utilities, and manufacturing. Once the terminals

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 61: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Chapter 5 | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 51

begin operations, the impacts on services industries remain strong, while

the other industries see reduced ongoing benefits. A similar pattern

occurs for natural gas transmission pipelines.

The impacts on the upstream sector (natural gas exploration and

production) are very different. The level of ongoing investment required

to maintain the natural gas supply to the liquefaction terminals is very

similar to the investments made in preparation for the first cargo of

LNG sent out. The upstream segment also shows a larger share of

investment and GDp generated in construction, manufacturing, and

utilities compared with services. This is true both initially and on an

ongoing basis.

The question of who benefits from the investments also provides

interesting answers. Each dollar of investment in the industry as a

whole generates approximately $0.76 in GDp for B.C. and $1.06 for

Canada. This smaller impact on B.C. is because not all of the

components are sourced within the province, or even within Canada.

This kind of import leakage is common for an open economy such as

Canada’s. The investments provide a significant boost to households’

disposable income, the single largest beneficiaries of the projects.

however, corporate incomes, personal income taxes, and indirect taxes

combined rise by approximately half of the total amount invested by the

industry. This is in addition to the resource royalties and LNG taxes that

are generated.

On the employment front, during the construction phase, the industry

would boost B.C.’s economy by adding between 55,000 and 93,000 jobs

in each year. Longer term, the industry will create approximately

33,000 permanent jobs. Over the total period examined, more than

1 million person-years of employment are created by the industry.

Governments would also benefit from LNG development. The total

impact on government revenues is estimated at $6.2 billion per year, of

which $3 billion (47 per cent) would accrue to B.C. and the remainder to

Canada. The fiscal impacts on other provincial governments or to other

levels of government are not included.

On the employment front, the industry will create approximately 33,000 permanent jobs.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 62: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 52

Although there is a great deal of uncertainty surrounding the number,

size, and timing of the projects that might proceed as the industry

continues to develop, there is certainty around the employment and

economic benefits that will occur. Our analysis of a 30 MTpA industry

demonstrates the following benefits:

• $7 billion average annual investment;

• $4.5 billion annual investment in natural gas production and processing

facilities that will remain near that level throughout the operations phase;

• $6.2 billion annual government revenues (on average), of which 47 per

cent accrues to British Columbia;

• $4.8 billion average annual boost to household disposable income in

British Columbia;

• a total long-term reduction of 0.5 per cent in B.C.’s unemployment rate

• creation of approximately 1 million person-years of employment in total

until 2045.

The industry would also require net migration into B.C., require labour

market adjustments to ensure an adequate supply of appropriately

trained and skilled workers, and boost inflation by almost a quarter of

a percentage point.

The regional impact of this industry is also important. Although the

terminals themselves will result in significant spending and employment

in the Kitimat/prince Rupert area, the majority of the spending will occur

in the upstream segment of the industry. The resulting impacts will be

long term, and will occur primarily in Northeast British Columbia.

Tell us how we’re doing—rate this publication.

www.conferenceboard.ca/e-Library/abstract.aspx?did=7726

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 63: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Appendix A | The Conference Board of Canada

Find Conference Board research at www.e-library.ca. 53

APPENDIX A

Bibliography

BC Air Quality. How Air Quality Affects Health. www.bcairquality.ca/

health/air-quality-and-health.html (accessed November 11, 2015).

BC Oil and Gas Commission. About Us. www.bcogc.ca/about-us

(accessed October 29, 2015).

—. Coastal Gas Link. www.bcogc.ca/public-zone/major-projects-centre/

coastal-gas-link (accessed January 4, 2016).

—. Horn River Basin Unconventional Shale Gas Play Atlas. 2014.

www.bcogc.ca/node/11238/download (accessed January 23, 2016).

—. Hydrocarbon and By-Product Reserves in British Columbia. 2013.

www.bcogc.ca/node/12346/download (accessed January 23, 2016).

—. Legislation. www.bcogc.ca/Legislation (accessed

November 11, 2015).

—. Montney Formation Play Atlas NEBC. 2012. www.bcogc.ca/

node/8131/download (accessed January 23, 2016).

—. Pacific Trails Pipeline. www.bcogc.ca/public-zone/major-projects-

centre/pacific-trails-pipeline (accessed January 4, 2015).

—. Prince Rupert Gas Transmission. www.bcogc.ca/public-zone/

major-projects-centre/prince-rupert-gas-transmission (accessed

January 4, 2016).

Canadian Environmental Assessment Agency. Basics of

Environmental Assessment. 2015. www.ceaa-acee.gc.ca/default.

asp?lang=en&n=B053F859-1#agency01 (accessed November 18, 2015).

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 64: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 54

Chislock, F.M., E. Doster, A.R. Zitomer, and A.E. Wilson. Eutrophication:

Causes, Consequences, and Controls in Aquatic Ecosystems.

2013. www.nature.com/scitable/knowledge/library/eutrophication-

causes-consequences-and-controls-in-aquatic-102364466

(accessed November 11, 2015).

Dawson, L. Skills in Motion: U.S. Workers May Hold the Key to Canada’s

Skills Shortage. Ottawa: The Conference Board of Canada, 2013.

Environment Canada. Acid Rain. 2013. https://ec.gc.ca/Air/default.

asp?lang=En&n=AA1521C2-1 (accessed November 16, 2015).

Ernst & Young. Potential Revenues to BC Government From Potential

Liquefied Natural Gas Development in BC. 2013. www.empr.gov.

bc.ca/OG/Documents/Ernst_and_Young_LNG_Revenue.pdf (accessed

January 23, 2016).

Government of British Columbia. B.C.’s Natural Gas & Oil Statistics.

www2.gov.bc.ca/gov/content/industry/natural-gas-oil/statistics (accessed

November 13, 2015).

—. First Quarterly Report: September 2015. www2.gov.bc.ca/

assets/gov/british-columbians-and-our-governments/about-the-bc-

government/bc-budget/quarterly-reports/2015-q1-report.pdf (accessed

December 21, 2015).

—. LNG in BC. http://engage.gov.bc.ca/lnginbc/lng-projects/ (accessed

November 13, 2015).

Government of British Columbia—Environmental Assessment Office.

Frequently Asked Questions. www.eao.gov.bc.ca/FAQ.html#005

(accessed November 18, 2015).

—. Pacific Northwest LNG Project: Assessment Report. Victoria:

Government of British Columbia, 2014.

Grant Thornton. Employment Impact Review. 2013. www.empr.gov.

bc.ca/OG/Documents/Grant_Thornton_LNG_Employment_Impacts.pdf

(accessed January 23, 2016).

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 65: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Find Conference Board research at www.e-library.ca. 55

Appendix A | The Conference Board of Canada

—. Potential LNG Revenue to the BC Government. 2013. www.empr.

gov.bc.ca/og/documents/grant_thornton_lng_revenue.pdf (accessed

January 23, 2015).

howard, A., J. Edge, and D. Watt. Understanding the Value, Challenges,

and Opportunities of Engaging Métis, Inuit, and First Nations Workers.

Ottawa: The Conference Board of Canada, 2012.

International Gas Union. World LNG Report—2015 Edition.

www.igu.org/sites/default/files/node-page-field_file/IGU-World%20

LNG%20Report-2015%20Edition.pdf (accessed January 23, 2016).

KpMG. British Columbia LNG Workforce Occupation Forecast. May 21,

2014. www.workbc.ca/WorkBC/media/WorkBC/Documents/Docs/KpMG-

LNG-Forecast.pdf (accessed November 11, 2015).

Kulkarni, p. Gas-Driven Hydraulic Fracturing and Drilling Cut Costs,

Reduce Environmental Impact. 2013. www.gasprocessingnews.com/

features/201307/gas-driven-hydraulic-fracturing-and-drilling-cut-costs,-

reduce-environmental-impact.aspx (accessed October 29, 2015).

Lewis, J. Alberta Oil Patch’s High Wages Attract U.S. Workers.

January 7, 2013. http://business.financialpost.com/news/energy/

alberta-oil-patchs-high-wages-attract-u-s-workers (accessed

November 17, 2015).

Munro, D., C. MacLaine, and J. stuckey. Skills—Where Are We Today?

The State of Skills and PSE in Canada. Ottawa: The Conference Board

of Canada, 2014.

National Energy Board. A Primer for Understanding Canadian Shale

Gas. Calgary: National Energy Board, 2009.

Natural Resources Canada. Canadian LNG Projects. 2014. www.nrcan.

gc.ca/energy/natural-gas/5683 (accessed November 9, 2015).

pacific North Coast Integrated Management Area Initiative. Atlas of the

Pacific North Coast Integrated Management Area. 2011. www.pncima.

org/site/atlas.html (accessed January 23, 2016).

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 66: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

A ChANGING TIDEBritish Columbia’s Emerging Liquefied Natural Gas Industry

Find Conference Board research at www.e-library.ca. 56

petroleum human Resources Council of Canada. B.C.Natural Gas

Workforce Strategy and Action Plan. www.iuoe115.ca/wp-content/

uploads/2013/09/BC-Natural-Gas-Workforce-strategy-and-Action-plan-

July-2013.pdf (accessed January 23, 2016).

petroleum services Association. 2015 Well Cost Study. 2015. www.psac.

ca/resources/well-cost-study-overview/ (accessed January 21, 2016).

Reuss, J.O., and D.W. Johnson. Acid Deposition and the Acidification of

Soils and Waters. New York: springer science+Business Media, 1986.

stantec Consulting. Appendix J. Technical Assessment Report—

Freshwater Acidification and Eutrophication. 2014. https://a100.gov.

bc.ca/appsdata/epic/documents/p396/d37423/1395766902924_4c3e62c

6c9b21ab36431891ca349aaa232612bd636fdc3a890dfb7d030c90064.pdf

(accessed January 23, 2016).

statistics Canada. National Household Survey (NHS), 2011: The

Educational Attainment of Aboriginal Peoples in Canada. Catalogue no.

99-012-Z2011039. www12.statcan.gc.ca/nhs-enm/2011/as-sa/99-012-

x/99-012-x2011003_3-eng.pdf (accessed January 23, 2016).

—. CANsIM table 282-0087. Labour Force Survey Estimates (LFS), by

Sex and Age Group, Seasonally Adjusted and Unadjusted, Monthly

(Persons Unless Otherwise Noted). www5.statcan.gc.ca/cansim/a26?lan

g=eng&retrLang=eng&id=2820087&&pattern=&stByVal=1&p1=1&p2=37&t

abMode=dataTable&csid= (accessed November 17, 2015).

stuckey, J., and D. Munro. Skills for Success: Developing Skills for a

Prosperous B.C. Ottawa: The Conference Board of Canada, 2014.

sutton, M.A., K.E. Mason, L.J. sheppard, h. sverdrup, R. haeuber, and

K.W. hicks. Nitrogen Deposition, Critical Loads and Biodiversity. New

York: springer science+Business Media, 2014.

switzer, p.V. “site Fidelity in predictable and Unpredictable habitats.”

Evolutionary Ecology 7, no. 6 (1993): 533–55.

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 67: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

Find Conference Board research at www.e-library.ca. 57

Appendix A | The Conference Board of Canada

The Conference Board of Canada. Canadian Outlook Long-Term

Economic Forecast: 2016. Ottawa: The Conference Board of

Canada, 2015.

—. Provincial Outlook Long-Term Economic Forecast for British

Columbia. Ottawa: The Conference Board of Canada, 2014.

TransCanada. Prince Rupert Gas Tranmission Project Receives Oil and

Gas Commission Approvals. Vancouver: TransCanada, 2015.

U.s. Energy Information Administration. How Much Carbon Dioxide Is

Produced When Different Fuels Are Burned? 2015. www.eia.gov/tools/

faqs/faq.cfm?id=73&t=11 (accessed October 29, 2015).

United states Environmental protection Agency. Effects of Acid Rain—

Surface Waters and Aquatic Animals. 2012. www3.epa.gov/acidrain/

effects/surface_water.html (accessed November 16, 2015).

WorkBC. B.C. Skills for Jobs Blueprint. Victoria: Government of British

Columbia, 2014.

—. British Columbia Labour Market Outlook 2010–2020. Victoria:

Government of British Columbia, 2013.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 68: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

For the exclusive use of Caley Hurley, [email protected], WorkIt.

Page 69: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

About The Conference Board of Canada

We are:

• The foremost independent, not-for-profit, applied research organization in Canada.

• Objective and non-partisan. We do not lobby for specific interests.• Funded exclusively through the fees we charge for services to the

private and public sectors.• Experts in running conferences but also at conducting, publishing,

and disseminating research; helping people network; developing individual leadership skills; and building organizational capacity.

• Specialists in economic trends, as well as organizational performance and public policy issues.

• Not a government department or agency, although we are often hired to provide services for all levels of government.

• Independent from, but affiliated with, The Conference Board, Inc. of New York, which serves nearly 2,000 companies in 60 nations and has offices in Brussels and Hong Kong.

© The Conference Board of Canada. All rights reserved. Please contact cboc.ca/ip with questions or concerns about the use of this material.

Page 70: A Changing Tide Changing Tide.pdf · Find Conference Board research at . EXECUTIVE SUMMARY A Changing Tide: Canada’s Emerging Liquefied Natural Gas Industry At a Glance • This

255 smyth Road, Ottawa ON

K1h 8M7 Canada

Tel. 613-526-3280

Fax 613-526-4857

Inquiries 1-866-711-2262

conferenceboard.ca

Insights. Understanding. Impact.

pUBLICATION 7726 | 7727

pRICE: Complimentary

For the exclusive use of Caley Hurley, [email protected], WorkIt.