9675081 Foley Fullbleed8.5x11B

download 9675081 Foley Fullbleed8.5x11B

of 63

Transcript of 9675081 Foley Fullbleed8.5x11B

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    1/63

    STUDENT WORKGLITCH.................................................................... 4

    PREFAB PLACE...................................................... 30

    ACADIANA OUTREACH CENTER.......................... 34

    CAMERON CAMP HOUSE.................................... 40

    PROFESSIONALYALE COGENERATION FACILITY................ 54presentation materials

    YALE CENTRAL BOILER PLANT............. 58conceptual designs

    860.304.5564 [email protected]

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    2/63

    4

    software malfunction

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    3/63

    GLITCHThis project

    is an exploration into the value of found and

    manufactured accidents in the architec-

    tural design process. These accidents, or

    Glitches,are resolved in an attempt to draw

    beauty from the otherwise awkward and

    overlooked.

    There are 3 types of Glitches that are in-

    vestigated. The rst Glitch is that ofInfra-

    structure Appropriation, the second isVisual

    Artifactand the third isWestern Light. Asan origin for design Glitch phenomenon

    can shape an architectural process without

    preconception.

    Building program takes the form of a dedi-

    cated sound installation space with outdoor

    performance areas.

    appropriated coulee wall adjacent to site

    third oor reading room in west wall

    construction detail at coulee level

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    4/63

    6

    Lafayette, Louisiana

    aerial photo of project site, adjacent coulee system, and closest major intersection

    site boundary

    Lee Avenue coulee

    site includes abandoned structure and adjacent lot

    site

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    5/63

    proximity to urban neighborhoods

    entire Lafayette coulee system

    proximity to exhibition/performance spaceslooking down into adjacent coulee

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    6/63

    8

    infrastructure appropriationThe Lee Avenue coulee runs ad-jacent to the project site. Aside from draining rainwater into the Vermillion river it also acts as a canvas

    for local grafti artists. The coulee base is ten feet below grade and layered in colorful markings creatin

    a surreal and intimate space. An architectural intervention in the coulees proximity has the potential to

    acknowledge and celebrate this presence.

    markings along the Lee ave. coulee

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    7/63

    Lee Avenue coulee

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    8/63

    10

    visual artifact Digital media is capable of true random images in the form of VisualArtifacts. The value of the Visual Artifact is in its lack of composition. Using this form of Glitch in the con

    ceptual design process yields ideas and diagrams that have an origin free of preconception.

    Glitch aquired by forcefully increasing the clock speed of the computers graphics processor

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    9/63

    1

    By imposing the Glitch onto a site diagram previously unseen relationships and program possibilities becom

    part of the thinking process.

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    10/63

    12

    Glitch photographed from malfunctioning digital television

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    11/63

    1

    Resolving Glitches becomes a technique to infer spatial qualities that could otherwise go unconsidered.

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    12/63

    14

    western light The western sky in south Louisiana is unique in its wide range of tonesafter sunset and in its unforgiving heat in the few hours before. Architecture in the region rarely has a

    chance to engage sunset phenomenon due to the thermal cost. In this exploration the sunset phenom-

    enon is treated as a Glitch to be deliberately resolved.

    sun elevation and azimuth diagrams

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    13/63

    1

    western sky geometry and value reduction

    western sky in south Louisiana

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    14/63

    16

    architectural resolution The three Glitch explorations are a creativeorigin that lessens the hold of preconception on the fragile beginning of the design process. While in-

    herently unpredictable the Glitch phenomenon as an origin yields an atmosphere of improvisation and

    discovery that is felt in the architecture.

    west elevation @ 1/32 = 1-0

    north facing facade

    north elevation @ 1/32 = 1-0

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    15/63

    1

    ground level oor plan1/32 = 1 - 0

    A. open air cafe

    B. lobby

    C. enclosed installation space

    D. elevator

    E. mechanical room

    F. primary installation spaceA

    C

    C

    C

    F

    B

    ED

    GLee Avenue coulee

    N

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    16/63

    18

    third oor plan

    second oor plan

    coulee level plan

    N

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    17/63

    1

    view looking west

    performance space at coulee level

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    18/63

    20

    south elevation @ 1/32 = 1-0

    east elevation @ 1/32 = 1-0

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    19/63

    2

    open air cafe

    view of re escape on east wall

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    20/63

    22

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    21/63

    2

    looking south up re escape

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    22/63

    24

    light apertureHeat generated by the western suncauses shape memory alloy actuator wire to constrict withineach light aperture closing thin wooden louvers. Once the

    sun has set the louvers relax again allowing for views of the

    western sky.

    Hot air captured in the apertures is vented into the wall cavity

    and out through the garden roof above.

    west wall

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    23/63

    2

    primary installation space

    west wall directly after sunset

    west wall in direct light

    Flexinol .025mm actuator wire

    has a max force pull of 930g and

    has on average 1 million cyclesin its life span. Constriction is

    5 - 10% total length and activa-

    tion temperature is aproximately

    80c.

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    24/63

    26

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    25/63

    2

    perspective section looking east

    west facade

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    26/63

    28

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    27/63

    2

    interior view of sitting area

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    28/63

    30

    PREFAB PLACEDesigned to bepacked in a standard 8ft x 40ft shipping container,

    this collapsible classroom is intended for young

    victims of the 2004 tsunami in southeast Asia. The

    classroom uses a material and tectonic language

    similar to that found in the native regional architec-

    ture of Thailand. Once primary places of education

    have been rebuilt these structures can remain or be

    repurposed without having the negative visual impact

    of typical prefabricated emergency solutions.

    sequence

    Mani Ayah (hut) of Thailand

    exploded building components

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    29/63

    3

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    30/63

    32

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    31/63

    3

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    32/63

    34

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    33/63

    3

    ACADIANA OUTREACH CENTER

    PERFORMANCE SPACE+SEATINGThe Acadiana Outreach Center ofLafayette, Louisiana is a nonprot organization that provides rehabilitation services, temporary housing,

    and day programs for the residents of Acadiana. Myself and other architecture students from the Uni-

    versity of Louisiana at Lafayette were approached by the AOC to design and construct a small outdoor

    performance space for live music and group therapy in the summer of 2006. Our design goals included

    using salvaged materials, providing consistent shade, having comfortable seating that discouraged over-night sleeping, and implementing local prison inmates on work-release in the construction process.

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    34/63

    36

    salvaged grill plate seating detail

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    35/63

    3

    arbor project completed by previous class

    occupied seating area

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    36/63

    38

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    37/63

    3

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    38/63

    40

    GULF OF MEXICO

    CAMERON, LA

    CAMERON CAMP HOUSECameron was devastated by eighteen foot stormsurges caused by Hurricane Rita in 2005. All homes in Cameron were destroyed as a result of the surge

    The Cameron Camp House is a retrotted prefab steel Quonset Hut elevated eighteen feet above grade

    on a braced piling structure. Originally used as temporary buildings in WWI the Quonset is known for itsresistance to lateral loading and its exibility of interior space. Not used as a permanent residence the

    Cameron Camp House also doubles as an emergency shelter for parish residents.

    view facing southeast

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    39/63

    4

    USGS photo of Cameron underwater after Hurricane Rita typical Quonset Hut warehouses

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    40/63

    42

    ground level plan @ 1/8 = 1-0

    N

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    41/63

    4

    second level plan @ 1/8 = 1-0

    N

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    42/63

    44

    third level plan @ 1/8 = 1-0

    N

    up

    down

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    43/63

    4

    fourth level plan @ 1/8 = 1-0

    N

    down

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    44/63

    46

    north elevation @ 1/8 = 1-0

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    45/63

    4

    south elevation @ 1/8 = 1-0

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    46/63

    48

    section looking north @ 1/8 = 1-0

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    47/63

    4

    section looking east @ 1/8 = 1-0

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    48/63

    50

    west elevation @ 1/8 = 1-0

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    49/63

    5

    wall section A @ 1/4 = 1-0

    stair details

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    50/63

    52

    wall section B @ 1/4=1-0

    exploded axon

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    51/63

    5

    construction detail

    third oor communal area

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    52/63

    54

    1 2

    3 4

    65

    construction sequence presentation for the Yale Cogeneration Facility[work completed for Charney Architects, New Haven, CT]

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    53/63

    5

    7

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    54/63

    56

    presentation images for the Yale Cogeneration Facility[work completed for Charney Architects, New Haven, CT]

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    55/63

    5

    study model for the Yale Cogeneration Facility[work completed for Charney Architects, New Haven, CT]

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    56/63

    58

    design options of the Yale Central Boiler Plant[work completed for Charney Architects, New Haven, CT]

    existing structure

    existing structure

    option A

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    57/63

    5

    option B

    option C

    option D

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    58/63

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    59/63

    860.304.5564 [email protected]

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    60/63

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    61/63

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    62/63

  • 8/13/2019 9675081 Foley Fullbleed8.5x11B

    63/63