EAMOPERATIONALREADINESS
For Capital Projects May 2012
-
7/31/2019 8 EAM Operational Readiness Jeff Bonnell NRX May 31 2012
3/15
Copyright 2012 NRX Global Inc.2
ABOUT NRX
Improve Maintenance Productivity
Reduce Maintenance and MRO Costs
Reduce Safety and Compliance Risk
Accelerate Maintenance Knowledge Growth and Sharing
The only commercial solution for building, standardizing, and sustaining the
maintenance master datafoundation essential for operations and maintenanceexcellence
-
7/31/2019 8 EAM Operational Readiness Jeff Bonnell NRX May 31 2012
4/15
Copyright 2012 NRX Global Inc.3
ABOUT NRX
The only commercial solution for building, standardizing, and sustaining the
maintenance master datafoundation essential for operations and maintenanceexcellence
NEW CAPITAL EXPENDITUREHandover & Maintenance Master Data Readiness to new or
existing CMMS
READINESS
NEW EAM IMPLEMENTATIONMaintenance Master Data Remediation and Preparation for New
EAM/CMMS
BROWNFIELD PRODUCTIVITY, SAFETY, ORCOMPLIANCE ISSUE
Maintenance Master Data Remediation & Validation for existing
EAM
DATA GOVERNANCE & SUSTAINMENTSustain the integrity of Maintenance Master Data in new
or existing EAM/CMMS
SUSTAINMENT
ENTERPRISE REFERENCE LIBRARYCentral repository of approved maintenance practices and data
for Maintenance Master Data readiness and sustainment
IMPROVE MAINTENANCE PRODUCTIVITYRich content such as illustrated parts books and documents
accessible from within EAM/CMMS processes
GET THE DATA RIGHT KEEP THE DATA RIGHT
-
7/31/2019 8 EAM Operational Readiness Jeff Bonnell NRX May 31 2012
5/15
Copyright 2012 NRX Global Inc.4
INDUSTRY LEADING SOLUTION
SITE 1
SITE 3
SITE 2SITE 5
SITE 4
BUILDHierarchy, Plans, Tasks,
Plans, BOMs,
Measuring Points
GOVERNMaintenance Master
Data Change Requests
LEVERAGEBest Practices andMaintenance
Productivity Tools
FEEDDESIGN &
BUILD
COMMISSION &
STARTUPOPERATIONS & MAINTENANCE RETIRE
-
7/31/2019 8 EAM Operational Readiness Jeff Bonnell NRX May 31 2012
6/15
Copyright 2012 NRX Global Inc.5
Page 5
Poor AIM also increases the riskofsafety,health, andenvironmental incidents, whichcan jeopardize an enterprises very survival
Delays in start up of operations
Lower availability of capital assets
Increased maintenance costs
Increased CapEx for Modifications
The Cost of poor AIM for an Asset Intensive
Organization is estimated to be1.5% of grosssales revenue A staggering burden for anycompany today
BUSINESS IMPACT
-
7/31/2019 8 EAM Operational Readiness Jeff Bonnell NRX May 31 2012
7/15
Copyright 2012 NRX Global Inc.6
FEEDDESIGN &
CONSTRUCT
COMMISSION &
STARTUPOPERATIONS & MAINTENANCE RETIRE
PRODUCTION
OPERATIONS
MAINTENANCE MASTER
DATA must be
PREPARED & VALIDATED
every time
Source Data not
Ready for Use in
Maintenance
System
SUPPLIERPRODUCT
DATA
SPARE PARTS
MANUALS
ASBUILT
DESIGNDATA
EAM READINESS FOR NEW CAPITAL PROJECTS
Minimize cost and delay
risk through ramp-up
Optimize asset and
maintenance
performance on-going
GOALS
INFORMATION
MAINTENANCE MASTER
DATA READINESS
REQUIRED
COST & RISK
INCREASE
STANDARDS NOT EASILY FOLLOWED
UNCERTAINTY REGARDING EH&S RISKS
EXPENSIVE REACTIVE MAINTENANCE
SPARE PARTS NOT KNOWN OR AVAILABLE
LOW MAINTENANCE PRODUCTIVITY
DEPENDANCE UPON EXPENSIVE & INCREASINGLY
SCARCE SPECIALIST RESOURCES
HIGHER DATA MANAGEMENT COSTS
OPERATING WITHOUT TRUSTED MAINTENANCE
MASTER DATA ADDS COST & RISK
-
7/31/2019 8 EAM Operational Readiness Jeff Bonnell NRX May 31 2012
8/15
Copyright 2012 NRX Global Inc.7
WHY DO COMPANIES STRUGGLE?
CONFIG
CHANGE
COMPONENT
CHANGE
MOVED
LOCATIONS
Harsh
Environment
Safety
Critical
Process
Remote
Offshore
Location
Country with
Unique
Regulations
Context Specific
Maintenance
Strategies
Maintenance
Tasks & Plans
Regulations
Spare Parts &
BOMs
Integrity and
Assurance
Hierarchy
REGULATORY
CHANGE
SUPPLIER
RECALL
BEST
PRACTICE
CHANGEEPC DATA
SUPPLIER DATA
FEEDDESIGN &
CONSTRUCT
COMMISSION &
STARTUPOPERATIONS & MAINTENANCE RETIRE
ONLY 30% OF DATA
READY FOR
MAINTENANCE
70% MUST BE BUILT & VALIDATED BY MAINTENANCE AND ASSET
EXPERTS BASED ON THE UNIQUE OPERATING CONTEXT
MANAGEMENT OF CHANGE BECOMES
ESPECIALLY CHALLENGING
AQUIRE PREPARE | VALIDATE | DEPLOY SUSTAIN
DATA & TEMPLATE CHANGES MUST BE GOVERNED WITH A FULL AND TRANSPARANT AUDIT TRAIL
-
7/31/2019 8 EAM Operational Readiness Jeff Bonnell NRX May 31 2012
9/15
Copyright 2012 NRX Global Inc.8
PREPARING MAINTENANCE MASTER DATA
InputsResults
Authoring of Maintenance Master Data takes relevant INPUTS to get to high quality RESULTS
It is not achieved by some sort of magical transformation
It requires staff with the right skills
The tools you equip staff with have a direct impact on the RESULT
OR
The RESULT needs to be properly approved before it is used
-
7/31/2019 8 EAM Operational Readiness Jeff Bonnell NRX May 31 2012
10/15
Copyright 2012 NRX Global Inc.9
FEEDDESIGN &
CONSTRUCT
COMMISSION &
STARTUPOPERATIONS & MAINTENANCE RETIRE
TRADITIONAL APPROACHES FALL SHORT
PRODUCTION
INFORMATION
OPERATIONS
MAINTENANCE MASTER
DATA must be
PREPARED & VALIDATED
every time
COST & RISK
INCREASE
MAINTENANCE MASTER
DATA READINESS
REQUIRED
ACTUAL MAINTENANCE MASTER
DATA READINESS
SPREADSHEETS
CUSTOM DEVELOPMENT
SERVICES ONLY
COMPLEXITY AND SCALE HAVE OUTGROWN A SPREADSHEET BASED APPROACH
LEGACY/CUSTOM SOLUTIONS NO LONGER MEET THE NEEDS OF TODAYS DATA BUILDERS AND DATA STEWARDS
SERVICES ONLY APPROACH MAKES IT DIFFICULT TO ESTABLISH A REPEATABLE ENTERPRISE PROCESS
MANAGING CHANGE DURING THE DATA BUILD PROCESS IS VERY DIFFICULT
ROBUST AUDIT TRAIL TO PROVE DATA IS TRULY READY FOR PRODUCTION IS ESSENTIAL
TRADITIONAL MAINTENANCE MASTER DATA READINESS APPROACHES FALL SHORT
-
7/31/2019 8 EAM Operational Readiness Jeff Bonnell NRX May 31 2012
11/15
Copyright 2012 NRX Global Inc.10
EAM READINESS FOR NEW CAPEX
Procurement
ConstructionHandover
Releasef
or
Start-up
100%
75%
50%
25%
Sustain EAM Master Data
Commis. OperationsMechanicalCompletion
EAM/CMMS
FEED Detailed Design
Final
Investment
Decision Phased, progressive handover of
vendor & design documentation
enables timely EAM Master Data
Build and Validation
Build and Standardize EAM Master Data
% DesignProduction Capacity
Benefits Increased reliability
Reduced EH&S Risks
Reduced extended start-up ops costs
Improved Maintenance productivity
Reduced MRO spares costs
-
7/31/2019 8 EAM Operational Readiness Jeff Bonnell NRX May 31 2012
12/15
Copyright 2012 NRX Global Inc.11
BEST PRACTICE PROCESS
Deploy for use in production by people,processes, & systems (SAP ERP)
SUPPLIERS ENGINEER PROCURE
CONSTRUCT
FIELD
AUDITS
LEGACY
DATA
SOURCE DATA Enforce best practices
Enable data governance
Enable complete audit trails
Enable management of change
Enable data ownership Ensure match between Physical
and Informational Plant
Deploy Across Multiple
Domains
PAS55 ISO14224
INDUSTRY STANDARDS
CLASS, CHAR
STRATEGIES
PLANS
TASKS
BOMS
MATERIALS
DOCUMENTS
STANDARDS
BUILD HIERARCHY,
ASSIGN REFERENCE
DATA (PLANS, TASKS,
BOMS, etc.) & Content
to equip/FLOCs
DATA BUILD
ENRICH DATA
Maintenance
Integrity Teams
Safety, Compliance,
& Standards TeamsInformation
Technology Teams
VALIDATE
Continuous
Maintenance
Library
Enrichment
Knowledge Transfer
-
7/31/2019 8 EAM Operational Readiness Jeff Bonnell NRX May 31 2012
13/15
Copyright 2012 NRX Global Inc.12
ENTERPRISE APPROACH DELIVERSMORE VALUE
ENTERPRISE
REFERENCE
LIBRARY
Project 1
COST
Project 3 Project 4
RISK
Project 2
SITE 1
SITE 3
SITE 2SITE 5
SITE 4
KNOWLEDGE
-
7/31/2019 8 EAM Operational Readiness Jeff Bonnell NRX May 31 2012
14/15
Copyright 2012 NRX Global Inc.13
COST
Improve maintenance
productivity 10% to 20%
Reduce Data Management
Costs 30% to 50%
Reduce MRO Supply Chain
Costs 3% to 5%
Reduce Maintenance Training
& Knowledge Management
Costs
RISK
Improve Integrity and
Assurance
Improve Reliability
Lower EH&S Risk
Auditable Management of
Change
KNOWLEDGE
Enterprise reference library
captures & shares critical
maintenance knowledge
Accelerate training & ramp up
for new employees
Quickly establish a
maintenance best practices
foundation in rapid growth
businesses
SUMMARY
ITS A COMPLEX PROBLEM - SPREADSHEETS & CUSTOM DEVELOPMENT ARE NOT THE
ANSWER BUSINESS CASE PAYS FOR ITSELF WITH LASTING BENEFITS
REDUCES DEPENDANCE ON INCREASINGLY SCARE AND EXPENSIVE RESOURCES
-
7/31/2019 8 EAM Operational Readiness Jeff Bonnell NRX May 31 2012
15/15
Copyright 2012 NRX Global Inc.14