Presented by: Dr. Paul J. Tikalsky, P.E. University of Utah Dr. Reid Castrodale, P.E. Stalite Corporation James McMinimee, P.E.UDOT Director,Project Development Louis N. Triandafilou, P.E. FHWA Resource Center

Transcript of 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17...

Page 1: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Presented by: Dr. Paul J. Tikalsky, P.E. ‐ University of UtahDr. Reid Castrodale, P.E. ‐ Stalite Corporation James McMinimee, P.E.‐UDOT Director,Project DevelopmentLouis N. Triandafilou, P.E. ‐ FHWA Resource Center

Page 2: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

What is ABCBenefits of ABCElements of ABCWhy use ABCUDOT ABC HistoryPast ProjectsCurrent ProjectsFuture ProjectsLessons Learned

Page 3: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Innovative methods to decrease bridge construction timeBuild elements offsite/outside of traffic areaTransport to site and install rapidly

Page 4: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Minimized traffic disruptionImproved work zone safetyImproved product qualitySave $$ in regional commerce

Page 5: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Family of Innovative ABC Family of Innovative ABC Elements and MethodsElements and Methods

Precast Concrete Elements

Modular Construction

Structure PlacementMethods

Innovative Accelerated

Bridge Construction

Accelerated Geotech

Work

Fast Track Contracting

Page 6: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Precast Concrete Elements

Abutments

Post-Tensioned

Deck Panels

Post-Tensioned Approach

Slab Panels

Bentcaps (Post-

Tensioned Preferred)

Columns Wingwalls Footings

Page 7: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Family of Innovative ABC Family of Innovative ABC Elements and MethodsElements and Methods

Modular Construction

Precast Concrete Box

Culvert System

Prefabricated Concrete

Arch

Precast Concrete

Segmental Superstructure

Prefabricated Modular Steel

Bridge Systems

Page 8: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Structure PlacementMethods

SlidingSystems

Bridge Launching

Self Propelled Modular Transport (SPMT) and

Other Heavy Lift Systems

Page 9: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Fast Track Contracting

CM/GC or“CM at Risk”

A + B

Design Build

Total Closures

Lane Rental

Page 10: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

• Good business model for agency

• Existing interstate was constructed

• Competition determines the lowest cost

• Contractors select time and method

• Cost of regional impacts ignored

Page 11: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

• Linear relationship

• Cost depends on volume of traffic

• Longer construction duration       increase impacts to users

Page 12: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

• Lowest construction cost        lowest project cost

• Societal costs minimized

• Political capital

• Public praise

Page 13: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

• First implementations cost more

• Potential for new methods to cost less

• Promise of time savings

• Positive cost‐benefit ratios

Page 14: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized
Page 15: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Total Move Time

264

154

122 120 111 100 9281

Highland1st move

Highland2nd move

900 E 700 E 600 E 500 E 300 E 600 ERamp

Includes preparation of site, moving bridge from 1300 East to specific location, skidding, and setting bridge.

Hou

rs

Hours

Page 16: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

UDOT has 17 projects, including 80 bridges total,  completed or under construction that utilized ABC

Self Propelled Modular Transports:   4 projects/13 BridgesHalf Thickness Precast Deck Panels:  2 Projects/47 BridgesFull Depth Precast Deck Panels: 8 Projects/11 BridgesPrecast abutments: 1 Project/2 BridgesPrecast bent caps: 1 Project/2 BridgesPrecast voided slabs:     1 Project/2 BridgesSegmental Bridges:     1 Project/1 BridgeHeavy Lift Cranes: 1 Project/1 Bridge

Page 17: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Deck replacements using precast deck panels

Page 18: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Construction Year:Total Construction Cost: ABC Construction Cost: Facility User Cost Per Day:Estimated Days Saved:User Savings:Cost Benefit Ratio:

* Project cost does not take into account for traffic control cost savings from traditional to ABC

2004$366,073$10,000*$4,00090$360,00036

Page 19: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Full superstructure replacement deck precast on steel girdersLifted into place by cranes

Page 20: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

I‐215 over 3900 SouthDeck replacement with precast deck panels

Page 21: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Construction Year:Total Construction Cost:ABC Construction Cost:Facility User Cost Per Day:Estimated Days Saved:User Savings:Cost Benefit Ratio:

* Project cost does not take into account for traffic control cost savings from traditional to ABC

2004$2,690,965$600,000*$34,00030$1,020,0002

Page 22: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized
Page 23: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

4500 South over I4500 South over I--215215

Deck precast on steel Deck precast on steel girdersgirders

Moved into place with Moved into place with SPMTSPMT

Page 24: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Construction Year: Total Construction Cost: ABC Construction Cost: Facility User Cost Per Day: Estimated Days Saved: User Savings: Cost Benefit Ratio:

* Project cost does not take into account for traffic control cost savings from traditional to ABC

2007$7,700,000$900,000*$35,500120$4,260,0005

Page 25: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

I‐84 Bridge Deck ReplacementsUS‐6 Railroad Crossing I‐80 State Street to 1300 East Bridge ReplacementsI‐80 East and Lambs Canyon Bridge ReplacementI‐215 3300 South Bridge Replacement

Page 26: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Replace deck with precast deck panel on existing steel girdersOverhead power lines limiting crane size and accessReverse curves make fitting panels complexRailroad under structure limits access for workWeber River crossing increases complexity

C-477 C-476

Page 27: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Replacement of six structures along I‐80Moved to location using SPMTsMoved over final location using skid shoesLowered to final location using climbing jacks

Page 28: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

CM/GC Contract for $103 million CM/GC Contract for $103 million (Engineering Estimate +$97M)(Engineering Estimate +$97M)

Page 29: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized
Page 30: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized
Page 31: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized
Page 32: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized
Page 33: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized
Page 34: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

4 Separate Interstate Highway Bridges 

2 Weekends in less than 24 hours

No traffic frontage alternative

Design/Build for $9 million, with $640k incentives  (Engineering Estimate +$7M)

Page 35: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized
Page 36: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized
Page 37: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Design/Build for $4 million, with $500k Design/Build for $4 million, with $500k incentives (Engineering Estimate $6 Million)incentives (Engineering Estimate $6 Million)

Page 38: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Engage the industry

Page 39: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Get Department Leadership CommittedObtain funding for demonstration projectsChange the processStart at concept levelInitiate within central structures design

Use decision support tools for ABC methodsApply synergy of innovative contracting

Page 40: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Identify a program of projectsPerform scanning toursGet involved nationallyImplement standardizationEducate and communicate within the industry

Page 41: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized

Stakeholders' OVERALL Satisfaction With Project Results(1=not satisfied, 7=very satisfied)

5, 2.80%

6, 18.30%

7, 76.10%

1, 0.00%

2, 0.00%

4, 1.40%3, 1.40%

1

2

3

4

5

6

7

Page 42: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized
Page 43: 7B - UDOT ABC Construction - LouTvirginiadot.org/.../7B-UDOT_ABC_Construction-LouT.pdfyUDOT has 17 projects, including 80 bridges total, completed or under construction that utilized