ABU DHABI GAS INDUSTRIES LTD. (GASCO)
EPC Contractor
EPC for Supply of Sales Gas to TAKREER NORM Project at BeAAT Ruwais Plant
Document Number Document Title Page 1 of 9
0600466-RT-588-01-002 SITE VISIT REPORTRev 0
Date 19-01-2014
/tt/file_convert/55cf8cd75503462b13900f99/document.docx
PROJECTEPC for Supply of Sales Gas to TAKREER NORM Project at BeAAT Ruwais Plant
COMPANY Abu Dhabi Gas Industries Ltd. (GASCO)
EPC CONTRACTOR TECTON Engineering and Construction LLC
ENG. SUBCONTRACTOR Tebodin Middle East Ltd.
DOCUMENT NO. 0600466-RT-588-01-002
DOCUMENT REVISION STATUS Rev- 0
DOCUMENT CLASS Class-3
Revision and Authorization Record:
0 19-01-2014 Issued for Construction (IFC) SHE STN PP
A 18-11-2013 Issued for Client Review (ICR) PML STN PP
REV DATE DESCRIPTIONPRPD CHKD APPD EM PM
ENGG. SUBCONTRACTOR CONTRACTOR
ABU DHABI GAS INDUSTRIES LTD. (GASCO)
EPC Contractor
EPC for Supply of Sales Gas to TAKREER NORM Project at BeAAT Ruwais Plant
Document Number Document Title Page 2 of 9
0600466-RT-588-01-002 SITE VISIT REPORTRev 0
Date 19-01-2014
I N D E X
1. PROJECT DESCRIPTION...........................................................................................................................3
1.1 Introduction................................................................................................................................................................................3
1.2 Project Objective........................................................................................................................................................................3
2. SCOPE OF THIS DOCUMENT....................................................................................................................3
3. DEFINITIONS AND ABBREVIATIONS.........................................................................................................4
3.1 Definitions..................................................................................................................................................................................4
3.2 Abbreviations.............................................................................................................................................................................5
4. REFERENCE DOCUMENTS........................................................................................................................5
4.1 FEED Drawings..........................................................................................................................................................................5
5. PURPOSE OF THE VISIT...........................................................................................................................5
6. PARTICIPANTS.......................................................................................................................................6
7. AREAS VISITED......................................................................................................................................6
8. SITE SURVEY FINDINGS..........................................................................................................................7
8.1 Piping/Pipelines..........................................................................................................................................................................7
8.2 Process......................................................................................................................................................................................8
9. CONCLUSION AND RECOMMENDATIONS..................................................................................................8
/tt/file_convert/55cf8cd75503462b13900f99/document.docx
ABU DHABI GAS INDUSTRIES LTD. (GASCO)
EPC Contractor
EPC for Supply of Sales Gas to TAKREER NORM Project at BeAAT Ruwais Plant
Document Number Document Title Page 3 of 9
0600466-RT-588-01-002 SITE VISIT REPORTRev 0
Date 19-01-2014
1. PROJECT DESCRIPTION
1.1 Introduction
Abu Dhabi Gas Industries Limited (GASCO, hereinafter referred to as “COMPANY”) has been
appointed by ADNOC to manage the implementation of a new project to supply Sales Gas to
Takreer Norm Project at their BeAAT Plant in Ruwais including:
Tie-in Connection from 52” HRS Pipeline Under Construction;
New scraper launching station close to the Tie-in Point;
New 4” x 2.0 km(Approx) Carbon Steel Sales Gas Pipeline from Tie-in Point to Takreer
Norm Plant;
New Consumer Receipt Station (CRS) close to Takreer Norm Plant including scraper
receiver, gas filters, custody transfer meter and pressure reduction station.
GASCO has awarded TECTON Engineering and Construction LLC the Contract for EPC
works. TECTON Engineering and Construction LLC appointed Tebodin Middle East as
Engineering Sub-Contractor for this project.
1.2 Project Objective
The objective of this project is to provide sales gas to the Takreer Norm Project at ADNOC’s
BeAAT Plant
2. SCOPE OF THIS DOCUMENT
The purpose of this document is to report information gathered during the site visit performed
on 29th October 2013 which shall be used as the basic information for developing the project
drawings for construction.
/tt/file_convert/55cf8cd75503462b13900f99/document.docx
ABU DHABI GAS INDUSTRIES LTD. (GASCO)
EPC Contractor
EPC for Supply of Sales Gas to TAKREER NORM Project at BeAAT Ruwais Plant
Document Number Document Title Page 4 of 9
0600466-RT-588-01-002 SITE VISIT REPORTRev 0
Date 19-01-2014
3. DEFINITIONS AND ABBREVIATIONS
3.1 Definitions
COMPANY Abu Dhabi Gas Industries Ltd (GASCO)
CONTRACTOR TECTON Engineering and Construction LLC which carries out the
design, engineering, procurement, construction, commissioning or
management of the PROJECT. CONTRACTOR includes its approved
MANUFACTURER(s), VENDOR(s), SUPPLlER(s), and
SUBCONTRACTOR(s). Requirements of this specification shall be
enforced at all levels of the CONTRACTOR's procurement process.
The COMPANY shall have access to all CONTRACTOR SUPPLlER(s)
to the same extent as required of CONTRACTOR".
PROJECT EPC FOR SUPPLY OF SALES GAS TO TAKREER NORM PROJECT
AT BeAAT RUWAIS PLANT
CONTRACT The contract between TECTON Engineering and Construction LLC
Tebodin Middle East for PROJECT “EPC FOR SUPPLY OF SALES
GAS TO TAKREER NORM PROJECT AT BeAAT RUWAIS PLANT”
PMTC COMBINED PROJECT MANAGEMENT TEAM (PMTC) – The
COMPANY – authorized party responsible for overall day-to-day
execution of the PROJECT, consisting of COMPANY and Project
Management Consultancy (PMC) personnel. PMTC is to serve as
liaison between COMPANY and the CONTRACTOR(s) on the
PROJECT
SUBCONTRACTOR includes suppliers and VENDORS and means any and all persons,
firms, partnerships, companies or a combination thereof (not being
employees of CONTRACTOR) of any tier to whom any part of the
WORK has been subcontracted by CONTRACTOR or
SUBCONTRACTORS (including any contracts novated or assigned by
COMPANY to CONTRACTOR) and the successors and assigns of
such persons, firms, partnerships, companies or a combination thereof
TEBODIN Tebodin Middle East Ltd. (Engineering SUBCONTRACTOR appointed
by CONTRACTOR)
/tt/file_convert/55cf8cd75503462b13900f99/document.docx
ABU DHABI GAS INDUSTRIES LTD. (GASCO)
EPC Contractor
EPC for Supply of Sales Gas to TAKREER NORM Project at BeAAT Ruwais Plant
Document Number Document Title Page 5 of 9
0600466-RT-588-01-002 SITE VISIT REPORTRev 0
Date 19-01-2014
3.2 Abbreviations
ADNOC Abu Dhabi National Oil Company
FEED Front End Engineering Design
HRS Habshan-Ruwais-Shuweihat
CRS Consumer Receipt Station
ROW Right Of Way
4. REFERENCE DOCUMENTS
4.1 FEED Drawings
Drawing No. Title
600466-588-A1-5-001 : Overall Pipeline Route Map
600466-588-A1-5-102 : Plot Plan 4” Scraper Area
600466-588-A1-5-005 : Pipeline Corridor Crossing Detail
600466-588-A1-0-001 : Process Flow Diagram
600466-588-A1-0-012 : Piping and Instrumentation Diagram
5. PURPOSE OF THE VISIT
The following are the purpose of this site visit:
To identify and locate the tie in facility constructed by other contractor
To check the plot location of new Pig Launcher and Receiver Station according to FEED
Drawings
To check various crossings according to the preliminary information provided in FEED
drawings along the proposed pipeline route
/tt/file_convert/55cf8cd75503462b13900f99/document.docx
ABU DHABI GAS INDUSTRIES LTD. (GASCO)
EPC Contractor
EPC for Supply of Sales Gas to TAKREER NORM Project at BeAAT Ruwais Plant
Document Number Document Title Page 6 of 9
0600466-RT-588-01-002 SITE VISIT REPORTRev 0
Date 19-01-2014
6. PARTICIPANTS
Sr. No. COMPANY Discipline Name
1 EIL-PMTC E & I Satyajit Mohapatra
2 Veloci-PMTC Civil Manzoor
3
Tecton
Process Swaminathan
4 Piping/Pipeline Satish
5 Instrumentation Devanand
6 Electrical Sheikh Hassan
7 Tebodin Piping/Pipeline Stanly Thomas
8 Process Sunil Singh
7. AREAS VISITED
Sl. No. Site
1 Tie in location of 4” pipeline on 52” HRS Pipeline
2 Plot Location of Pipeline Launcher
3 Pipeline Crossings
/tt/file_convert/55cf8cd75503462b13900f99/document.docx
ABU DHABI GAS INDUSTRIES LTD. (GASCO)
EPC Contractor
EPC for Supply of Sales Gas to TAKREER NORM Project at BeAAT Ruwais Plant
Document Number Document Title Page 7 of 9
0600466-RT-588-01-002 SITE VISIT REPORTRev 0
Date 19-01-2014
8. SITE SURVEY FINDINGS
8.1 Piping/Pipelines
Tie In Location
The tie in location of 4” Pipeline is located at approximate chainage of 96+668 m on HRS
Pipeline. The location has been fenced by the EPC contractor of HRS Pipeline. Visual
inspection of the tie in location has been carried out and compared with the FEED drawings
referred in section 4.1. It was observed that the different piping arrangement has been
constructed by the HRS Pipeline contractor at tie in location.
According to the FEED drawings, 4” pipe shall be vertically tied in and double block valve
arrangement shall be provided along the axis (East Direction) of HRS pipeline. But as per site
condition, vertical tie in is provided with 4” off take but the complete double block arrangement
is provided in the true south direction resulting in consumtion of more space up to the fenced
limit of tie in.
The above scenario is entirely different from the FEED drawings. With the above site
condition, the constructability of crossing is to be studied. To visualise the site scenario, a free
hand sketch of existing site condition at tie in point is attached as SKETCH-1.
Also, as per the FEED drawing “ Pipeline Corridor Crossing Detail” (Drawing No. 600466-588-
A1-5-005) shows the track in between Existing 42” Gas Pipeline and 52” HRS Pipeline, but as
per site observations there is no motorable track between these two pipelines
Scraper Launcher Plot Location
The tentative location of Scraper Launcher Station has been visually inspected with reference
to the tie in point. It was observed that the launcher station falls in sabkha area. The pipeline
approach area has been physically verified and observed as clear of any obstructions.
Pipeline Route
According to the FEED Alignment Sheet drawing number 600466-588-A1-5-002, the initial
part of the pipeline route has been verified and looks clear of any obstruction including station
approach. In between IP-02 to IP-03, two track crossings have been identified as indicated in
the Alignment Sheet. There are no pipeline markers or cable markers available in order to
visually locate the water pipeline and Etisalat buried telephone cable. Detailed topo survey is
required, in order to identify these existing underground facilities.
The fence after IP-03 parallel to which the new 4” Pipeline will be routed has been identified.
Since, there was no ROW along the existing fence; hence the complete route survey up to
Receiver Station was not possible.
/tt/file_convert/55cf8cd75503462b13900f99/document.docx
ABU DHABI GAS INDUSTRIES LTD. (GASCO)
EPC Contractor
EPC for Supply of Sales Gas to TAKREER NORM Project at BeAAT Ruwais Plant
Document Number Document Title Page 8 of 9
0600466-RT-588-01-002 SITE VISIT REPORTRev 0
Date 19-01-2014
Scraper Receiver Plot Location
As explained above, the physical approachability of Scraper Receiver Station was not
possible due to the unavailability of any existing ROW. Tentative location of the Scraper
Receiver Location has been visualised compared to the FEED drawings.
8.2 Process
The tie-in point at 52” (HRS) gas pipeline was verified with the FEED P&ID (600466-588-A1-
0-012). The P&ID shows existing 4” tapping with double block & bleed arrangement for taking
a tie-in.
At site, 4” tapping was provided on the 52” line with two blocks isolation valves with drain in
between the isolation valves which is in line with the P&ID (except the drain v/s bleed).
The isolation valves are horizontally placed & the drain line was extended near to the grade
level.
The PID indicates both the existing isolation valve as LOCKED OPEN (LO) however the
project execution was still in progress and the valves handles were not in position, so this
requirement could not be ascertained.
Also considering the gas pipe, the provision of drain valve instead bleed valve is not clearly
understood.
9. CONCLUSION AND RECOMMENDATIONS
With the initial site survey, following are the conclusions and recommendations for the project
The tie in piping with 52 Inch HRS pipeline needs modification for the constructability of
4” Sales Gas Pipeline. A tentative proposal shall be worked out.
The existing piping arrangement at tie in is provided with drain arrangement without a 2”
valve as the construction was in progress.
The fenced tie in location needs modification. The access gate is provided in between
the berm of two pipelines .i.e. between the 42 inch Gas Pipeline and 52 inch HRS
Pipeline. Hence, the access gate of the tie in fenced area is recommended to be
relocated to the North side in order to provide direct access from the existing track.
The initial crossing of the pipeline is a challenging task. The construction methodology to
be followed for the crossing of these existing pipelines after tie in point in Sabkha area
shall be studied.
/tt/file_convert/55cf8cd75503462b13900f99/document.docx
ABU DHABI GAS INDUSTRIES LTD. (GASCO)
EPC Contractor
EPC for Supply of Sales Gas to TAKREER NORM Project at BeAAT Ruwais Plant
Document Number Document Title Page 9 of 9
0600466-RT-588-01-002 SITE VISIT REPORTRev 0
Date 19-01-2014
It was observed that temporary wooden support arrangement was in place for the tie in
piping. Cast for pedestal of permanent support was observed at site.