Transcript of 7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term...
![Page 1: 7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.](https://reader035.fdocuments.in/reader035/viewer/2022072011/56649e2d5503460f94b1d612/html5/thumbnails/1.jpg)
7th October 2010 energynetworks.org •1
PRESENTED BY Andrew Pace, WSC CHAIR
Workstream C
Long Term Products
Common Methodology Group Work
![Page 2: 7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.](https://reader035.fdocuments.in/reader035/viewer/2022072011/56649e2d5503460f94b1d612/html5/thumbnails/2.jpg)
energynetworks.org 2
WorkStream C – CDCM (1)
• Reviewing User Guide• Agreeing detail on CDCM inputs
• Frequency of update• Time period over which inputs are derived• Some data will be smoothed over 3 years:
• Load Factors• Coincidence Factors• Peaking Probabilities• Split of rate 1 & 2 units by distribution time band
• Notice period for changing timebands• Ensuring DNOs are using common assumptions
• CDCM Methodology that is currently in the user guide will be put into DCUSA and become subject to open governance.
7th October 2010
![Page 3: 7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.](https://reader035.fdocuments.in/reader035/viewer/2022072011/56649e2d5503460f94b1d612/html5/thumbnails/3.jpg)
energynetworks.org 3
WorkStream C – CDCM (2)
• CDCM Annual Review Pack• Produce 5 year of CDCM inputs• DNOs to provide commentary and
assumptions behind the CDCM inputs• To highlight any changes timebands• Suppliers to produce tariffs• To be issued in December 2010
7th October 2010
![Page 4: 7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.](https://reader035.fdocuments.in/reader035/viewer/2022072011/56649e2d5503460f94b1d612/html5/thumbnails/4.jpg)
WorkStream C – EDCM (1)
• EDCM Volatility Analysis produced for September 2010. – on ENA website • Based on LRIC/FCP version used for notional
Sep submission (not expected to change)• Based on Demand Scaling option 25 used for
notional Sep submission (currently on option 30)
47th October 2010
![Page 5: 7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.](https://reader035.fdocuments.in/reader035/viewer/2022072011/56649e2d5503460f94b1d612/html5/thumbnails/5.jpg)
WorkStream C – EDCM (2)
EDCM Volatility Analysis:
• Marginal Charges Volatility• LRIC / FCP Base Case• LRIC / FCP High/ Lo scenarios (+/-3% load data)
• Demand Scaling Volatility• Addition of 3 demand customers of different
sizes• Addition of typical generator
57th October 2010
![Page 6: 7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.](https://reader035.fdocuments.in/reader035/viewer/2022072011/56649e2d5503460f94b1d612/html5/thumbnails/6.jpg)
WorkStream C – EDCM (3)
EDCM Volatility Analysis: • 7 prices produced for each customer• Data summarised by DNO and on a national
basis.• Analysis consisted of:
• average % impact on charges• No. of customers experience price disturbance
with different % bands• Average impact for groups of customers.
67th October 2010
![Page 7: 7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.](https://reader035.fdocuments.in/reader035/viewer/2022072011/56649e2d5503460f94b1d612/html5/thumbnails/7.jpg)
WorkStream C – EDCM (4)
77th October 2010
Average impact – Demand Customers
Base case 0.0%
All loads up 3 per cent 0.4%
All loads down 3 per cent -2.4%
Dummy demand customer 1 - Large user -1.6%
Dummy demand customer 2 - Medium user -0.3%
Dummy demand customer 3 - Small user 0.0%
Dummy generator - Medium size 0.0%
![Page 8: 7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.](https://reader035.fdocuments.in/reader035/viewer/2022072011/56649e2d5503460f94b1d612/html5/thumbnails/8.jpg)
WorkStream C – Next Steps
• EDCM• Continue to undertake further volatility analysis
• CDCM• Finalise annual review pack• Determine DCUSA change mods and submit to
COG subgroup• Update and issue user manual
87th October 2010