6s Quality Background and Overview
-
Upload
sixsigmacentral -
Category
Documents
-
view
1.600 -
download
1
description
Transcript of 6s Quality Background and Overview
6Quality
Background and OverviewQuality and Productivity Improvement
Control 6.0 - Page 2
6.0 Control
6Quality
MEASURE THE CURRENT PERFORMANCE
DEFINE THE OPPORTUNITY
IMPROVE PROCESS EFFICIENCY
ANALYZE THE CURRENT PROCESSES
CONTROL AND ADJUST NEW PROCESSES
IMPLEMENT IMPROVEMENTS
• Determine breakthroughs, design future state: new process, new “Sigma” level
• Create dashboards, scorecards and plans
• Perform cause-effect analysis to determine reasons for gaps in performance
• Map the process, gather initial performance data and determine current “Sigma” level
• Obtain client input, factors Critical to Quality (CTQ)
• Improve on what matters most to the client
• Significantly impact the bottom line
• Measure improvements and breakthroughs
• Report dashboard, scorecard data and client feedback
• Execute plans, overcome barriers
• Transition to the new process
Client Driven, Consistent,
Metrics Focused, Results Oriented
A DMAIIC Overview
Control 6.0 - Page 3
6.0 Control
6Quality
Key Tools:
Define Analyze Improve Implement ControlMeasure• Launch the project
using “One DayLaunch Process”
• Define project objectives/ outcomes
• Identify sponsor/ key stakeholders
• Select team, define responsibilities and launch
• Create high-level project plan
• Define decision makingapproach
• Determine “thin cut” and iterative approach
• Create high-level process map• Obtain client input,
priorities and CTQ’s• Gather initial metrics
– Historical Performance
– Current performance
– Existing ABC data• Determine process
current “Sigma” level
• Develop initial value proposition: opportunities & targets; Make Go/No Go Decision
• Analyze current processes, associated metrics
• Collect /interpret data ;
benchmarking information
• Complete people and technology analysis for critical processes
• Identify improvement breakthroughs
• Identify high gain alternatives, select preferred
approach• Design future state
– Process– Organization– Technology– Metrics/ Set Targets
• Determine new “Sigma” target• Perform C/B analysis• Review and update CSA• Design dashboards and
scorecards• Create high-level
implementation approach
• Complete risk analysis
• Train• Communicate• Execute• Test/Measure
Results• Develop Control
Methods• Manage change
• Report dashboard and scorecard data
• Create feedback loop for areas of focus
• Adjust process• Identify Replication Opportunities
• Develop Future Plans
• Project Charter• Stakeholder Analysis
Template• Communication
Strategy and Action Plan
• Process Maps• Customer Interviews,
Focus Groups, Surveys
• CTQ Specification• Pareto• Histogram• Control Chart• Run Chart• Sigma Calculation
• Cause-Effect Diagram
• Scatter Diagrams• Benchmarking’• Value/ Throughput
Analyses
• Brainstorming• Storyboarding• Cost/Benefit• Sigma Calculation
• Pilot Testing• Pareto Chart• Control Chart• Histogram• Process Management
Chart
• Control Chart• Histogram• Storyboard• Sigma Calculation
1 Week 2 Weeks 4 - 5 Weeks TBD Ongoing
A Closer Look at DMAIIC as a Process Improvement Method
Control 6.0 - Page 4
6.0 Control
6Quality
When Do You Use DMAIIC?
Incremental Improvement of Existing Product/Service/Process: Root Cause Analysis “Local” Process Improvement
Redesign of Existing Product/Service/Process: End-to-End Process Projects
New Product/Service/Process Design
Instituting Process Management
DMAIIC Tip: Tailor Application to Your Specific Project, Don’t Use It As a “Cookbook”
Control 6.0 - Page 5
6.0 Control
6Quality
What Does It Take to “DO DMAIIC?” What Do I Need
Six Sigma Tools—Process Analysis
Process Depiction
Process Diagnosis—Statistical Methods
Diagnostic
Predictive
Control/Management “People” Tools
—Team Facilitation—Change Facilitation
Project Management Tools—Cost, Schedule, Resources, Risk
Who’s Involved?� Teams (Generally)� Appropriate Representation� Appropriate Skill Sets
How Long Does It Take?� Depends on Scope,
Commitment� GE’s Target - 4 - 6 months
DEFINE
MEASURE
ANALYZE
IMPROVE
IMPLEMENT
CONTROL
Control 6.0 - Page 6
6.0 Control
6Quality
Market Deal Execute DealComplete
Transaction
Defect = When output does not meet client requirements
Input Output
Workflow
Six Sigma Will be a Key Part of Our Toolkit
Six Sigma is a business management approach
The goal is to fully align workflows with client requirements
This leads to higher client satisfaction, increased revenues, lower costs and decreased error rates
The focus is to reduce defects
Control 6.0 - Page 7
6.0 Control
6Quality
Defects Per MillionSigmaLevel Translation
66,803 3 1.5 misspelled words per page6,200 4 1 misspelled word per chapter233 5 1 misspelled word in a set of encyclopedias3.4 6 1 misspelled word in all the books that fit in a small library
Six Sigma Enables Businesses to Measure the Efficiency of Their Processes
A Sigma is a statistical measure of defects generated by a business process
Sigmas range in value, the higher the sigma the fewer the defects
A 3 Sigma process meets client requirements 93.3% of the time.
A 6 Sigma process meets client requirements 99.9997% of the time.
Consider this example…. If you published books….
6Quality
Define - 1.0Quality and Productivity Improvement
Control 6.0 - Page 9
6.0 Control
6Quality
Key Tools:
Define Analyze Improve Implement ControlMeasure• Launch the project
using “One DayLaunch Process”
• Define project objectives/ outcomes
• Identify sponsor/ key stakeholders
• Select team, define responsibilities and launch
• Create high-level project plan
• Define decision makingapproach
• Determine “thin cut” and iterative approach
• Create high-level process map• Obtain client input,
priorities and CTQ’s• Gather initial metrics
– Historical Performance
– Current performance
– Existing ABC data• Determine process
current “Sigma” level
• Develop initial value proposition: opportunities & targets; Make Go/No Go Decision
• Analyze current processes, associated metrics
• Collect /interpret data ;
benchmarking information
• Complete people and technology analysis for critical processes
• Identify improvement breakthroughs
• Identify high gain alternatives, select preferred
approach• Design future state
– Process– Organization– Technology– Metrics/ Set Targets
• Determine new “Sigma” target• Perform C/B analysis• Review and update CSA• Design dashboards and
scorecards• Create high-level
implementation approach
• Complete risk analysis
• Train• Communicate• Execute• Test/Measure
Results• Develop Control
Methods• Manage change
• Report dashboard and scorecard data
• Create feedback loop for areas of focus
• Adjust process• Identify Replication Opportunities
• Develop Future Plans
• Project Charter• Stakeholder Analysis
Template• Communication
Strategy and Action Plan
• Process Maps• Customer Interviews,
Focus Groups, Surveys
• CTQ Specification• Pareto• Histogram• Control Chart• Run Chart• Sigma Calculation
• Cause-Effect Diagram
• Scatter Diagrams• Benchmarking’• Value/ Throughput
Analyses
• Brainstorming• Storyboarding• Cost/Benefit• Sigma Calculation
• Pilot Testing• Pareto Chart• Control Chart• Histogram• Process Management
Chart
• Control Chart• Histogram• Storyboard• Sigma Calculation
1 Week 2 Weeks 4 - 5 Weeks TBD Ongoing
The DMAIIC Process Improvement Method
Control 6.0 - Page 10
6.0 Control
6Quality
1.0 Define
Objective
Launch an improvement project, define project objectives/outcomes, select team, define responsibilities, create high-level project plan, identify sponsors/ key stakeholders, prepare a communication plan.
Key Topics
1.1 Launch the Project
1.2 Define Project Objectives and Outcomes
1.3 Identify Sponsors/ Key Stakeholders
1.4 Prepare a Communication Plan
1.5 Characteristics of Effective Teams
1.6 Define Toll Gates
Control 6.0 - Page 11
6.0 Control
6Quality
Follow-up(2 Hours)
(1 Week after Launch Meeting)
Initiative Selection
Pre-Launch Meetings/Activities
Launch Meeting(1 Day) Ongoing
•Business Manager, Sponsor, Coach determine what business level improvements will yield bottom line results
•Select End-To-End process as reengineering candidate
• Sponsor/Coach Meet: Solidify business case and objectives; determine initial scope, outcomes; skills needed
• Sponsor Selects Team Leader
• Team Leader/ Sponsor/ Coach Select Team
• Sponsor/ Team Leader/ Coach Meet: Plan Launch Meeting agenda
• Sponsor/ Team/ Team Leader Meet: Sponsor charges team with its responsibility
• Team attends to do most of the upfront project planning. Team works with the coach to focus on client requirements and review key process mapping tools, metrics concepts to produce:
• Project scope statement– Targeted outcomes\
success criteria– Stakeholder
analysis– High-level project
plans– Data collection plan
(including client data)
– Initial metrics– Decision /
Responsibility Matrix
– Initial current state process map
– Likely process improvements
• Coach works with team to facilitate project, monitor deliverables, overcome implementation barriers, evaluate progress relative to goals.
• Team reviews and agrees on the remaining elements of the project plan. May include:
– Metrics – Client
engagement – Communication
strategy– Milestones and
timetables
1.1 Launch the Project
Control 6.0 - Page 12
6.0 Control
6Quality
1.2 Define Project Objectives and Outcomes Objective
Fully define the objectives/ outcomes of the project and ensure that the project is aligned to the business strategy.
Key Topics Linking the Project to a Business Need Creating a Team Charter
Control 6.0 - Page 13
6.0 Control
6Quality
Creating a Team Charter
The elements of a team charter are:
Business Case: Purpose and Impact
Objectives: Project Goal Project Scope: Boundaries Project Plan: Activities Team Selection: Who and
What Solution Evaluation
Criteria: Weight and Rating
months rating $ rating months rating
Solution Evaluation Criteria
Implementation Time Scale Cost Benefit Scale Payback Period Scale
Business Case•Why should we do this?•What pain are we experiencing?Objectives•What are our improvement goals and targets?Project Scope•What authority do we have?•What processes do we need to address?•What is not within scope?Project Plan•How will we get this done?•When will we complete this work?Team Selection•Who are the team members?•What responsibilities will they have?
Control 6.0 - Page 14
6.0 Control
6Quality
Business Case
Purpose
Describes the benefit for undertaking a project and addresses the following questions:
Does this project align with other business initiatives? How will this project affect other business units and individuals? What is wrong or not working? When and where do the problems occur? How extensive is the problem? What is the impact/ “pain” on our clients? Our Business? Our People? Does it make strategic sense to address this problem? What benefits will be derived from this project? Has the value of the benefits been quantified?
Control 6.0 - Page 15
6.0 Control
6Quality
Objectives
PurposeStates project outcomes as SMART goals: specific, measurable, attainable, relevant and timebound.
What is the improvement team seeking to accomplish? What does the desired state look like? What specific parameters will be measured? What are the tangible, “hard” deliverables/results (e.g., reduce cost, cycle time, etc.)? What are the intangible, “soft” deliverables/results? What is the timetable for delivery of results?
Control 6.0 - Page 16
6.0 Control
6Quality
Project ScopePurpose
Defines the boundaries of the project.
Project Scope What are the boundaries, the starting and ending steps of the process? What parts of the business are included? What parts of the business are not included? What, if anything, is outside the team’s boundaries?
Compensation Cross-BusinessActivities
TransactionAccounting
Execute Transaction
Y2KProgramsMarket
Deal
ManagePosition
In-Frame/Out-of-Frame Tool:
Control 6.0 - Page 17
6.0 Control
6Quality
Project Plan
PurposeIdentifies the activities necessary to complete the project and contains the overall schedule.
Milestones What are the key activities (high level, 5–7 steps) that must be taken to complete the initiative? What are the key milestones in the project plan (e.g., team kickoffs, major step completion dates, presentation dates, etc.)?
Resource Requirements What resources (people, materials, space, dollars, etc.) will be needed to complete the initiative?
Control 6.0 - Page 18
6.0 Control
6Quality
1.4 Communication PlanMajor Communication Channels
• Most permanent (most binding, hardest to move away from)• Least expensive• Most efficient, communicates to many people quickly• Provides consistency of message• Useful to direct, instruct, inform
• Dramatic, visible• Provides shared experience; “bonding”; builds identity• Facilitates involvement• Useful to signal a new direction, to begin to get buy-in• Good symbolism, e.g., town meetings, plant shutdowns, eradication of reserved parking• Demonstrates values-behavior consistency, commitment
• Effective for persuasion• Carefully attended to by the receiver(s)• Labor intensive; often expensive, time-consuming• Useful to assess perceptions, beliefs, degree of resistance• Builds credibility• Demonstrates commitment, interest, support
Written
Events/Symbols
Face-to-face (one-on-one; one-on-many)
6Quality
Measure – 2.0Quality and Productivity Improvement
Control 6.0 - Page 20
6.0 Control
6Quality
Key Tools:
Define Analyze Improve Implement ControlMeasure• Launch the project
using “One DayLaunch Process”
• Define project objectives/ outcomes
• Identify sponsor/ key stakeholders
• Select team, define responsibilities and launch
• Create high-level project plan
• Define decision makingapproach
• Determine “thin cut” and iterative approach
• Create high-level process map• Obtain client input,
priorities and CTQ’s• Gather initial metrics
– Historical Performance
– Current performance
– Existing ABC data• Determine process
current “Sigma” level
• Develop initial value proposition: opportunities & targets; Make Go/No Go Decision
• Analyze current processes, associated metrics
• Collect /interpret data ;
benchmarking information
• Complete people and technology analysis for critical processes
• Identify improvement breakthroughs
• Identify high gain alternatives, select preferred
approach• Design future state
– Process– Organization– Technology– Metrics/ Set Targets
• Determine new “Sigma” target• Perform C/B analysis• Review and update CSA• Design dashboards and
scorecards• Create high-level
implementation approach
• Complete risk analysis
• Train• Communicate• Execute• Test/Measure
Results• Develop Control
Methods• Manage change
• Report dashboard and scorecard data
• Create feedback loop for areas of focus
• Adjust process• Identify Replication Opportunities
• Develop Future Plans
• Project Charter• Stakeholder Analysis
Template• Communication
Strategy and Action Plan
• Process Maps• Customer Interviews,
Focus Groups, Surveys
• CTQ Specification• Pareto• Histogram• Control Chart• Run Chart• Sigma Calculation
• Cause-Effect Diagram
• Scatter Diagrams• Benchmarking’• Value/ Throughput
Analyses
• Brainstorming• Storyboarding• Cost/Benefit• Sigma Calculation
• Pilot Testing• Pareto Chart• Control Chart• Histogram• Process Management
Chart
• Control Chart• Histogram• Storyboard• Sigma Calculation
1 Week 2 Weeks 4 - 5 Weeks TBD Ongoing
The DMAIIC Process Improvement Method
Control 6.0 - Page 21
6.0 Control
6Quality
2.0 Measure Objective
Create high level process map, obtain client input, priorities and CTQ’s, gather initial data/ metrics, determine current process Sigma level, develop initial value proposition, make Go/No Go decision.
Key Topics
2.1 Measure Step Guide Lines
2.2 Core and Enabling Processes
2.3 Process Mapping
2.4 Defining Client Requirements
2.5 Performance Measures
2.6 Data Collection
2.7 Variation
2.8 Six Sigma
2.9 Go/No Go Decision Making
2.10 Team Dynamics
2.11 Toll Gates
Control 6.0 - Page 22
6.0 Control
6Quality
2.1 Measure Step Guidelines Form a “holistic” understanding of the process
What are the activities? What are the critical metrics? What systems are involved? What people are involved? What data and information is critical? What is the voice of the customer? What is the voice of the process?
Identify current performance levels How does the process perform relative to “critical to quality” requirements?
Determine how data you gather affects the project objectives Given information that you gather, do you need to reset/refine the project
objectives?
Control 6.0 - Page 23
6.0 Control
6Quality
A
PROCESS MAPPING SYMBOLS
Activity
Actor
Activity; indicates actions performed as part of the process. The statement inside thesymbol should begin with a verb.
Actor; role which performs the activity, ie. trader, mid-office manager, client, etc.
Outcome; indicates endpoint of a process.
Connector; indicates connection to another section of the process.
Trigger; indicates what initiates an instance of the process.
Decision; indicates evaluation or inspection. There will always be two direction arrows - one for “yes”, one for “no” decisions.
Control Point; indicates point at which a control is applied.
Process Mapping Symbols
Control 6.0 - Page 24
6.0 Control
6Quality
Factors Critical to Quality (CTQ’s)
What is a CTQ?Important to the client — “client cares about it”
Value proposition
Specifies requirement — “must-have” or “must be” attributes Ultimately satisfy Potentially delight
Can be measured
Establishes a target Client specifications Acceptable range of performance
To be useful, we must ultimately convert the Voice of the Customer data into factors Critical to Quality in the client’s eyes. We can then use these as requirements to assess the performance of our processes. CTQ’s are not defined to the point that a clear target with specifications is established, they are not useful in determining our current defect levels.
Control 6.0 - Page 25
6.0 Control
6Quality
Translating the VOC into CTQ’s: Clients Listen to statements and comments made by clients Determine what factors really drive a client to call Morgan vs. the competition
What product features, service features, attributes, dimensions, characteristics (reliability, availability, etc.) cause a client to call us?
Determine the best way to measure performance relative to these factors / specifications
Determine what targets we would need in order to meet the client’s factors / specifications
Assess current performance relative to these factors / specifications How are we doing today?
Client Need (“CTQ”) Metric Current Performance Target Client: Satisfaction
Control 6.0 - Page 26
6.0 Control
6Quality
Displaying Data
Control 6.0 - Page 27
6.0 Control
6Quality
2.7 Variation
• Variation means that a process does not produce exactly the same result every time the product or service is delivered.
• Variation exists in all processes
• Measuring and understanding variation in our business processes helps identify specifically what the current level of performance is and what needs to change in order to reduce the variability and reduce the defects delivered to customers.
Data Variation
Control 6.0 - Page 28
6.0 Control
6Quality
The Sigma Scale
Note: These Values Include the 1.5 “Sigma Shift”
Z(“Sigma”)
DPMO Defect ReductionFactor
2 308,537 -
3 66,807 4.6
4 6,210 10.8
5 233 26.7
6 3.4 68.5
Control 6.0 - Page 29
6.0 Control
6Quality
2.11 Toll gates Did you view the process holistically: activities, information, people,
systems, etc?
Was the process flowed to the appropriate level?
Were the client (external, internal, stakeholders) needs identified and prioritized?
Were measurable Critical to Quality requirements identified?Do these correlate to the important client needs?
Was the current level of performance determined for the critical metrics?
Were targets established based on client needs?
Did you refine the problem and goal statements?
6Quality
Analyze – 3.0Quality and Productivity Improvement
Control 6.0 - Page 31
6.0 Control
6Quality
Key Tools:
Define Analyze Improve Implement ControlMeasure• Launch the project
using “One DayLaunch Process”
• Define project objectives/ outcomes
• Identify sponsor/ key stakeholders
• Select team, define responsibilities and launch
• Create high-level project plan
• Define decision makingapproach
• Determine “thin cut” and iterative approach
• Create high-level process map• Obtain client input,
priorities and CTQ’s• Gather initial metrics
– Historical Performance
– Current performance
– Existing ABC data• Determine process
current “Sigma” level
• Develop initial value proposition: opportunities & targets; Make Go/No Go Decision
• Analyze current processes, associated metrics
• Collect /interpret data ;
benchmarking information
• Complete people and technology analysis for critical processes
• Identify improvement breakthroughs
• Identify high gain alternatives, select preferred
approach• Design future state
– Process– Organization– Technology– Metrics/ Set Targets
• Determine new “Sigma” target• Perform C/B analysis• Review and update CSA• Design dashboards and
scorecards• Create high-level
implementation approach
• Complete risk analysis
• Train• Communicate• Execute• Test/Measure
Results• Develop Control
Methods• Manage change
• Report dashboard and scorecard data
• Create feedback loop for areas of focus
• Adjust process• Identify Replication Opportunities
• Develop Future Plans
• Project Charter• Stakeholder Analysis
Template• Communication
Strategy and Action Plan
• Process Maps• Customer Interviews,
Focus Groups, Surveys
• CTQ Specification• Pareto• Histogram• Control Chart• Run Chart• Sigma Calculation
• Cause-Effect Diagram
• Scatter Diagrams• Benchmarking’• Value/ Throughput
Analyses
• Brainstorming• Storyboarding• Cost/Benefit• Sigma Calculation
• Pilot Testing• Pareto Chart• Control Chart• Histogram• Process Management
Chart
• Control Chart• Histogram• Storyboard• Sigma Calculation
1 Week 2 Weeks 4 - 5 Weeks TBD Ongoing
The DMAIIC Process Improvement Method
Control 6.0 - Page 32
6.0 Control
6Quality
3.0 Analyze
ObjectiveAnalyze data collected during Measure to determine why the process performs as it does today, identify and quantify cause and effect relationships.
3.1 Process Stratification and Analysis Analyze and interpret data collected during Measure Collect/interpret benchmarking data
3.2 Search for Sources of Variation Further define cause and effect relationships
3.3 Validate Root Causes Validate, quantify and prioritize root causes of current performance
3.4 Toll Gates
Control 6.0 - Page 33
6.0 Control
6Quality
3.1 Process Stratification & AnalysisAnalyze the process in detail to clearly define a specific problem on which the team will concentrate its root cause analysis.
The opportunity will narrow in focus after the initial data is analyzed.
Data can be stratified in many ways: Time Process components (activities, decisions, etc.) Causes Defects Other Factors
— Location— Department— Job Type— Shift— Product or Service Line— Market— Site
Control 6.0 - Page 34
6.0 Control
6Quality
Pareto AnalysisIdentify the “vital few”
Pareto analysis organizes data to show what major factors contribute to the problem being analyzed.
Typically, about 80% of the problems result from 20% of the causes.
Pareto provides focus for root causes Analysis. Defects Found
2
Control 6.0 - Page 35
6.0 Control
6Quality
Ishikawa Diagram
Cause and Effect Diagram
The cause and effect diagram assists in reaching a common understanding of the problem and exposes the potential drivers of the problem.
CAUSES
Control 6.0 - Page 36
6.0 Control
6Quality
3.4 Toll Gates
Was the problem stratified to a manageable size?
Was a cause and effect analysis performed?
Were important process variables/root causes identified?
Were these root causes verified with data?
Are the variables/causes actionable?
6Quality
Improve – 4.0Quality and Productivity Improvement
Control 6.0 - Page 38
6.0 Control
6Quality
Key Tools:
Define Analyze Improve Implement ControlMeasure• Launch the project
using “One DayLaunch Process”
• Define project objectives/ outcomes
• Identify sponsor/ key stakeholders
• Select team, define responsibilities and launch
• Create high-level project plan
• Define decision makingapproach
• Determine “thin cut” and iterative approach
• Create high-level process map• Obtain client input,
priorities and CTQ’s• Gather initial metrics
– Historical Performance
– Current performance
– Existing ABC data• Determine process
current “Sigma” level
• Develop initial value proposition: opportunities & targets; Make Go/No Go Decision
• Analyze current processes, associated metrics
• Collect /interpret data ;
benchmarking information
• Complete people and technology analysis for critical processes
• Identify improvement breakthroughs
• Identify high gain alternatives, select preferred
approach• Design future state
– Process– Organization– Technology– Metrics/ Set Targets
• Determine new “Sigma” target• Perform C/B analysis• Review and update CSA• Design dashboards and
scorecards• Create high-level
implementation approach
• Complete risk analysis
• Train• Communicate• Execute• Test/Measure
Results• Develop Control
Methods• Manage change
• Report dashboard and scorecard data
• Create feedback loop for areas of focus
• Adjust process• Identify Replication Opportunities
• Develop Future Plans
• Project Charter• Stakeholder Analysis
Template• Communication
Strategy and Action Plan
• Process Maps• Customer Interviews,
Focus Groups, Surveys
• CTQ Specification• Pareto• Histogram• Control Chart• Run Chart• Sigma Calculation
• Cause-Effect Diagram
• Scatter Diagrams• Benchmarking’• Value/ Throughput
Analyses
• Brainstorming• Storyboarding• Cost/Benefit• Sigma Calculation
• Pilot Testing• Pareto Chart• Control Chart• Histogram• Process Management
Chart
• Control Chart• Histogram• Storyboard• Sigma Calculation
1 Week 2 Weeks 4 - 5 Weeks TBD Ongoing
The DMAIIC Process Improvement Method
Control 6.0 - Page 39
6.0 Control
6Quality
4.0 ImproveObjective
Identify improvement breakthroughs, identify high gain alternatives, select preferred approach, design the future state, determine the new Sigma level, perform cost/benefit analysis, update CSA, design dashboards/ scorecards, create a preliminary implementation plan.
Key Topics
4.1 Identify Improvement Breakthroughs Apply idea-generating tools and techniques to identify potential solutions that
eliminate root causes
4.2 Identify/Select High Gain Alternatives Develop criteria to evaluate candidate improvement solutions Think systematically and holistically Prioritize and evaluate the candidate solutions against the solution evaluation
criteria Conduct a feasibility assessment for the highest value solutions Develop preliminary solution timelines and cost-benefit analysis to aid in
recommendation presentation and future implementation planning
Control 6.0 - Page 40
6.0 Control
6Quality
Key Topics (Continued)4.3 Design Future State Redraw the process map
4.4 Present Recommendations Refine a stakeholder assessment to support the development of a "winning and
accepted" recommendation Develop the necessary details and documentation needed to effectively
present and articulate the solution and its value to various organization constituencies
Develop the presentation model, materials and action plan for presenting the team's recommended solution(s)
4.4 Implementing Change Become familiar with the elements of effective organization change Assess opportunities to build effective change management considerations into
the recommended solution(s)
4.6 Toll Gates
Control 6.0 - Page 41
6.0 Control
6Quality
4.1 Identify Improvement BreakthroughsObjective
To introduce the team to different tools and techniques that can be used to stimulate collective thought to produce a large number of improvement ideas.
Key Topics Prepare for Idea Generation Traditional Idea Generation Non-Traditional Idea Generation
Control 6.0 - Page 42
6.0 Control
6Quality
Sources of Solutions
Internal Best Internal Best PracticesPractices
Implementation Implementation TeamTeam
Thought LeadersThought Leaders
ExternalExternal
Control 6.0 - Page 43
6.0 Control
6Quality
4.6 Toll Gates
Do the identified solutions address important process variables/root causes?
Can the team actually implement these solutions? Are the solutions cost-beneficial? Will/do the solutions achieve the desired target for
improvement? Do you have an adequate/effective action plan? Did you consider and create “bashing” plans for likely barriers? When are results expected to be seen?
6Quality
Implement – 5.0Quality and Productivity Improvement
Control 6.0 - Page 45
6.0 Control
6Quality
Key Tools:
Define Analyze Improve Implement ControlMeasure• Launch the project
using “One DayLaunch Process”
• Define project objectives/ outcomes
• Identify sponsor/ key stakeholders
• Select team, define responsibilities and launch
• Create high-level project plan
• Define decision makingapproach
• Determine “thin cut” and iterative approach
• Create high-level process map• Obtain client input,
priorities and CTQ’s• Gather initial metrics
– Historical Performance
– Current performance
– Existing ABC data• Determine process
current “Sigma” level
• Develop initial value proposition: opportunities & targets; Make Go/No Go Decision
• Analyze current processes, associated metrics
• Collect /interpret data ;
benchmarking information
• Complete people and technology analysis for critical processes
• Identify improvement breakthroughs
• Identify high gain alternatives, select preferred
approach• Design future state
– Process– Organization– Technology– Metrics/ Set Targets
• Determine new “Sigma” target• Perform C/B analysis• Review and update CSA• Design dashboards and
scorecards• Create high-level
implementation approach
• Complete risk analysis
• Train• Communicate• Execute• Test/Measure
Results• Develop Control
Methods• Manage change
• Report dashboard and scorecard data
• Create feedback loop for areas of focus
• Adjust process• Identify Replication Opportunities
• Develop Future Plans
• Project Charter• Stakeholder Analysis
Template• Communication
Strategy and Action Plan
• Process Maps• Customer Interviews,
Focus Groups, Surveys
• CTQ Specification• Pareto• Histogram• Control Chart• Run Chart• Sigma Calculation
• Cause-Effect Diagram
• Scatter Diagrams• Benchmarking’• Value/ Throughput
Analyses
• Brainstorming• Storyboarding• Cost/Benefit• Sigma Calculation
• Pilot Testing• Pareto Chart• Control Chart• Histogram• Process Management
Chart
• Control Chart• Histogram• Storyboard• Sigma Calculation
1 Week 2 Weeks 4 - 5 Weeks TBD Ongoing
The DMAIIC Process Improvement Method
Control 6.0 - Page 46
6.0 Control
6Quality
5.0 Implement
Objectives Develop a pilot implementation plan, execute the pilot, interpret and
learn from the results, create a full implementation plan, execute the full solution, measure the results, develop control methods, manage the change
5.1 Develop the Pilot Plan What, Why and When to Pilot: Define the objectives and evaluation
criteria for a pilot solution Elements of a pilot plan How to pilot
5.2 Execute Pilot/ Interpret and Learn from the Results Conduct the pilot Measure and verify results Determine next steps: build experience and lessons learned to support
full scope implementation
Control 6.0 - Page 47
6.0 Control
6Quality
5.0 Implement (continued)
5.3 Plan and Implement the Full Solution Expand the pilot and create a plan for a full scope solution Identify potential implementation problems Develop a process control system for holding the improvement gains
5.4 Toll Gates
Control 6.0 - Page 48
6.0 Control
6Quality
5.1 Develop the Pilot Plan
Objective
Develop a plan for testing the solution on a small scale; test the design and prepare for full implementation.
Key Topics What, Why, and When to Pilot Elements of a Pilot Plan How to Pilot
Control 6.0 - Page 49
6.0 Control
6Quality
What, Why, and When to Pilot
What is a pilot?A pilot is the trial implementation of a proposed design on a reduced scale.
Benefits of Conducting a Pilot: A better understanding of the
impacts of the designed solutions Experience with taking a solution
design from paper to real operations “Reality test” of a design’s integrity An opportunity to improve the
design before implementation on a larger scale
Minimizes risks associated with cost and potential problems
Control 6.0 - Page 50
6.0 Control
6Quality
5.4 Toll Gates
Were the process variables/root causes impacted “positively?”
Did the indicator selected in “Define” or “Measure” move in the desired direction?
Was the improvement target achieved?
If not, is there an understanding of why?
Has a means of standardizing the successful changes been identified (procedure, standard, protocol, specification, etc.)?
Has responsibility (and authority) to standardize the changes been delegated?
6Quality
Control – 6.0Quality and Productivity Improvement
Control 6.0 - Page 52
6.0 Control
6Quality
Key Tools:
Define Analyze Improve Implement ControlMeasure• Launch the project
using “One DayLaunch Process”
• Define project objectives/ outcomes
• Identify sponsor/ key stakeholders
• Select team, define responsibilities and launch
• Create high-level project plan
• Define decision makingapproach
• Determine “thin cut” and iterative approach
• Create high-level process map• Obtain client input,
priorities and CTQ’s• Gather initial metrics
– Historical Performance
– Current performance
– Existing ABC data• Determine process
current “Sigma” level
• Develop initial value proposition: opportunities & targets; Make Go/No Go Decision
• Analyze current processes, associated metrics
• Collect /interpret data ;
benchmarking information
• Complete people and technology analysis for critical processes
• Identify improvement breakthroughs
• Identify high gain alternatives, select preferred
approach• Design future state
– Process– Organization– Technology– Metrics/ Set Targets
• Determine new “Sigma” target• Perform C/B analysis• Review and update CSA• Design dashboards and
scorecards• Create high-level
implementation approach
• Complete risk analysis
• Train• Communicate• Execute• Test/Measure
Results• Develop Control
Methods• Manage change
• Report dashboard and scorecard data
• Create feedback loop for areas of focus
• Adjust process• Identify Replication Opportunities
• Develop Future Plans
• Project Charter• Stakeholder Analysis
Template• Communication
Strategy and Action Plan
• Process Maps• Customer Interviews,
Focus Groups, Surveys
• CTQ Specification• Pareto• Histogram• Control Chart• Run Chart• Sigma Calculation
• Cause-Effect Diagram
• Scatter Diagrams• Benchmarking’• Value/ Throughput
Analyses
• Brainstorming• Storyboarding• Cost/Benefit• Sigma Calculation
• Pilot Testing• Pareto Chart• Control Chart• Histogram• Process Management
Chart
• Control Chart• Histogram• Storyboard• Sigma Calculation
1 Week 2 Weeks 4 - 5 Weeks TBD Ongoing
The DMAIIC Process Improvement Method
Control 6.0 - Page 53
6.0 Control
6Quality
6.0 Control
Objective Run the new process, continuously improve the “engine”, report
dashboard and scorecard data, create feedback loop for areas of focus, adjust as needed, identify replication opportunities.
6.1 Verify Solution Results Verify that the process reliably meets client requirements Determine future continuous improvement opportunities
6.2 Identify Replication Opportunities Process replication and solution standardization Process Management as a Continuous Improvement strategy
6.3 Lessons Learned Incorporate lesson learned into the business
6.4 Toll Gates
Control 6.0 - Page 54
6.0 Control
6Quality
6.1 Verify Solution Results
Objective
Validate that the implemented solution is having the desired or intended impact on the performance of the process.
Key Topics Verify that process reliably meets client requirements Determine future continuous improvement opportunities
Control 6.0 - Page 55
6.0 Control
6Quality
6.4 Toll Gates
Is the improved process stable (no assignable causes of variation)?
Is the improved process capable (what is the current sigma level)?
Have opportunities to replicate successful changes been identified?
What remains of the original problem?
What are the plans to address this?
What went well and could have gone better in the project (Project Plus/Deltas)?