Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
PowerPoint
presentation
Direct bond walls with windows and piers
Unit 222: Fix dry lining and plasterboards to
interiors
![Page 2: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/2.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Assessment criteria
2.2 comply with specifications and schedules
5.1 describe the process of planning work
5.3 describe the purpose of maintaining in-line level and
plumb
6.1 apply dry lining using adhesive compounds to vertical
backgrounds
![Page 3: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/3.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Did you know?
• The sides of the window are called reveals.
• The top underneath part is called the head or
soffit.
• The bottom ledge is called the sill.
![Page 4: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/4.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Fixing plasterboards
![Page 5: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/5.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Windows and pillars
At some point it is inevitable that you will need to fix to
walls with windows or returns.
![Page 6: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/6.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Attached piers
Piers built into the middle of a wall must be made to run
parallel to the back walls and the returns should be made
square.
This can be done by using a tape measure and square
when marking out the chalk line to the back wall.
Marking out can be done on the floor and ceiling, and to
fixed boards on the back wall once they are in place.
![Page 7: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/7.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Attached piers
Floor plan showing setting out to ensure
that the boards will be square and parallel
![Page 8: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/8.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Attached piers
When fixing, the boards to the back wall should be fixed
first.
The square can be used against the back wall once those
boards are in place.
![Page 9: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/9.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Attached piers
By fixing to lines, both side of the pier
will be in line with each other
![Page 10: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/10.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Internal angles
By using a square, the reveal
can be set from the plumb
board. This will ensure a
prefect right angle.
![Page 11: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/11.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
External angles
Squares can also be used
on the external angles
![Page 12: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/12.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Windows
When setting out a window wall, you should set the boards
from the reveals.
Allow some extra for an overhang when measuring to allow
for a neat external angle joint.
![Page 13: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/13.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
External angles
It is recommended that you have two tapered edges on the
external angle in order to form a neater finish.
If not possible, a tapered/good edge should be placed over
the square/cut edge.
![Page 14: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/14.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Windows
Plasterboard fixed
correctly with
overhang
![Page 15: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/15.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Windows
Plasterboard fitted
with no overhang
![Page 16: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/16.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Window reveals
![Page 17: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/17.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Windows
If you have to cut a board for under or above the window, ensure that you keep one tapered edge for joining.
The reveal boards should be placed with the taper edge to the external angle and the cut to the window frame.
Once all of the boards have been cut, you can fix them just the
same as you would a straight wall.
A continuous band of adhesive must be placed around the
opening in order to prevent fire and air from getting behind.
![Page 18: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/18.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Fixing plasterboards
![Page 19: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/19.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Fixing plasterboards
![Page 20: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/20.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Fixing plasterboards
![Page 21: 6708 l2 222_presentation_5](https://reader031.fdocuments.in/reader031/viewer/2022030315/58828bef1a28abca6d8b55cf/html5/thumbnails/21.jpg)
Level 2 Diploma in Plastering
© 2013 City and Guilds of London Institute. All rights reserved.
Any questions?