625 Liberty Avenue, Suite 1700 | Pittsburgh, PA 15222 844-MVP-TALK | [email protected] www.mountainvalleypipeline.info May 8, 2018 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street NE Washington, DC 20426 Re: Mountain Valley Pipeline, LLC Docket No. CP16-10-000 Request for Notice to Proceed No. 23 Dear Ms. Bose: On October 13, 2017, the Federal Energy Regulatory Commission issued an order granting a Certificate of Public Convenience and Necessity to Mountain Valley Pipeline, LLC for the Mountain Valley Pipeline Project in this docket. Mountain Valley submitted and supplemented its Implementation Plan for the Project on various dates. Mountain Valley requests that the Director of the Office of Energy Projects issue a Notice to Proceed with (i) all construction activities for the facilities listed in Attachment A and (ii) hand- felling of trees for the facilities listed in Attachment B. Attachment C includes a cultural concurrence referenced in Attachment A. Mountain Valley respectfully requests that this Notice to Proceed be issued by May 9, 2018. If you have any questions, please do not hesitate to contact me at (412) 553-5786 or [email protected]. Thank you. Respectfully submitted, MOUNTAIN VALLEY PIPELINE, LLC by and through its operator, EQM Gathering Opco, LLC By: Matthew Eggerding Senior Counsel, Midstream Attachments cc: All Parties Paul Friedman, FERC Lavinia DiSanto, Cardno, Inc. Doug Mooneyhan, Cardno, Inc.

Transcript of 625 Liberty Avenue, Suite 1700 | Pittsburgh, PA 15222 844 ...€¦ · Phase I Cultural Resource...

Page 1: 625 Liberty Avenue, Suite 1700 | Pittsburgh, PA 15222 844 ...€¦ · Phase I Cultural Resource Survey, Negative Findings 3/29/18 4/23/2018 4/26/2018 CLEARED - NO identified RTE impacts

625 Liberty Avenue, Suite 1700 | Pittsburgh, PA 15222 844-MVP-TALK | [email protected] www.mountainvalleypipeline.info

May 8, 2018

Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street NE Washington, DC 20426

Re: Mountain Valley Pipeline, LLC Docket No. CP16-10-000 Request for Notice to Proceed No. 23

Dear Ms. Bose:

On October 13, 2017, the Federal Energy Regulatory Commission issued an order granting a Certificate of Public Convenience and Necessity to Mountain Valley Pipeline, LLC for the Mountain Valley Pipeline Project in this docket. Mountain Valley submitted and supplemented its Implementation Plan for the Project on various dates.

Mountain Valley requests that the Director of the Office of Energy Projects issue a Notice to Proceed with (i) all construction activities for the facilities listed in Attachment A and (ii) hand-felling of trees for the facilities listed in Attachment B. Attachment C includes a cultural concurrence referenced in Attachment A.

Mountain Valley respectfully requests that this Notice to Proceed be issued by May 9, 2018. If you have any questions, please do not hesitate to contact me at (412) 553-5786 or [email protected]. Thank you.

Respectfully submitted,

MOUNTAIN VALLEY PIPELINE, LLC by and through its operator, EQM Gathering Opco, LLC

By:

Matthew Eggerding Senior Counsel, Midstream

Attachments

cc: All Parties Paul Friedman, FERC Lavinia DiSanto, Cardno, Inc. Doug Mooneyhan, Cardno, Inc.

Page 2: 625 Liberty Avenue, Suite 1700 | Pittsburgh, PA 15222 844 ...€¦ · Phase I Cultural Resource Survey, Negative Findings 3/29/18 4/23/2018 4/26/2018 CLEARED - NO identified RTE impacts

Ms. Kimberly D. Bose May 8, 2018

Attachment A

Page 3: 625 Liberty Avenue, Suite 1700 | Pittsburgh, PA 15222 844 ...€¦ · Phase I Cultural Resource Survey, Negative Findings 3/29/18 4/23/2018 4/26/2018 CLEARED - NO identified RTE impacts

Facility Name County State

MP Start (based on IFC

Route filed with FERC on 12-20-2017)

MP End (based on IFC

Route filed with FERC on 12-20-2017)

Parcel Number Wetland Survey Status

Cultural Survey Status

RTE Survey Status

Cultural Resources Identified Y/N Report Title (Date) Date Report Filed with

FERC SHPO Clearance Date Date SHPO Letter Filed with FERC RTE Status Nationwide 12 Permit Status

Pipeline Summers West Virginia 159.7 160.1WV-SU-008 (Partial

Parcel due to Treatment Plan)

Complete Complete Complete46SU752 (Eligible);

46SU760 (Not Eligible); 46SU761 (Not Eligible)

Mountain Valley Pipeline Project, Cultural Resources Report, Addendum 8 to Volume IV, Summers and Monroe Counties, West Virginia (Espino et. al.

2018); Mountain Valley Pipeline Project, Addendum 10 to Volume IV, Phase II Archaeological Investigations and Treatment Plan, Sites 46SU752, 46SU754,

46SU755, 46SU756, 46SU757, Tracts WV-SU-008 and WV-SU-009, Summers County, West Virginia (Barse et al. March 2018)

2/23/2018; 3/28/2018 Concurrence assumed per Programmatic Agreement - 3/28/2018; 4/26/2018

Concurrence assumed per Programmatic Agreement - 3/28/2018; 5/3/2018

CLEARED - NO identified RTE impacts Included in NWP

Pipeline Summers West Virginia 160.6 160.8WV-SU-009 (Partial

Parcel due to Treatment Plan)

Complete Complete Complete

46SU752 (Eligible); 46SU754 (Eligible); 46SU755 (Eligible); 46SU756 (Eligible); 46SU757 (Eligible)

Mountain Valley Pipeline Project, Cultural Resources Report, Addendum 8 to Volume IV, Summers and Monroe Counties, West Virginia (Espino et. al.

2018); Mountain Valley Pipeline Project, Addendum 10 to Volume IV, Phase II Archaeological Investigations and Treatment Plan, Sites 46SU752, 46SU754,

46SU755, 46SU756, 46SU757, Tracts WV-SU-008 and WV-SU-009, Summers County, West Virginia (Barse et al. March 2018)

2/23/2018; 3/28/2018 Concurrence assumed per Programmatic Agreement - 3/28/2018; 4/26/2018

Concurrence assumed per Programmatic Agreement - 3/28/2018; 4/26/2018

CLEARED - NO identified RTE impacts Included in NWP

Pipeline Summers West Virginia 171.3 171.4 WV-SU-046 Complete Complete Complete

46SU766 (Eligible/Eligible portion Avoided);

46SU767 (Eligible); 46SU768 (Not Eligible)

Mountain Valley Pipeline Project, Adendum 11 to Volume IV, Cultural Resources Survey, Combined Ohase I and II Investigation, Tracts WV-SU-046 and WV-SU-046.01, Summers County, West Virginia (Marine and Barse April

2018)

4/13/2018 5/2/2018 5/8/2018 CLEARED - NO identified RTE impacts Included in NWP

Pipeline Summers West Virginia 171.3 171.4 WV-SU-046.01 Complete Complete Complete No

Mountain Valley Pipeline Project, Adendum 11 to Volume IV, Cultural Resources Survey, Combined Ohase I and II Investigation, Tracts WV-SU-046 and WV-SU-046.01, Summers County, West Virginia (Marine and Barse April

2018)

4/13/2018 5/2/2018 5/8/2018 CLEARED - NO identified RTE impacts Included in NWP

Pipeline Montgomery Virginia 219.4 219.7 VA-MO-200.056 Complete Complete Complete NoMountain Valley Pipeline Project, Phase I Archaeological Investigation in Jefferson National Forest, Monroe County, West Virginia, and Giles and

Montgomery Counties, Virginia5/24/2016 4/26/2017 9/5/2017 CLEARED - NO

identified RTE impacts Included in NWP

Pipeline Montgomery Virginia 220.8 221.1 VA-MO-3369 Complete Complete Complete NoMountain Valley Pipeline Project, Phase I Archaeological Investigation in Jefferson National Forest, Monroe County, West Virginia, and Giles and

Montgomery Counties, Virginia5/24/2016 4/26/2017 9/5/2017 CLEARED - NO

identified RTE impacts Included in NWP

Pipeline Franklin Virginia 248.4 248.8VA-FR-010 (Partial

Parcel due to Treatment Plan)

Complete Complete Complete 44FR0370 (Eligible) Mountain Valley Pipeline Project, Phase I Archaeological Survey, and Phase II Archaeological Evaluation Site 44FR0370, Franklin County, Virginia 6/30/2017 10/27/2017 11/1/2017 CLEARED - NO

identified RTE impacts Included in NWP

Pipeline Roanoke Virginia 245.9 246 VA-RO-068 Complete Complete Complete NoMountain Valley Pipeline Project, Phase I Archaeological Investigation, MVP Alternative 3, In National Park Service - Blue Ridge Parkway, Roanoke and

Franklin Counties, Virginia1/19/2017 August 2017 August 2017 CLEARED - NO

identified RTE impacts Included in NWP

Facility Name County State

MP Start (based on IFC

Route filed with FERC on 12-20-2017)

MP End (based on IFC

Route filed with FERC on 12-20-2017)

Facility Type Wetland Survey Status

Cultural Survey Status

RTE Survey Status

Cultural Resources Identified Y/N Report Title (Date) Date Report Filed with

FERC SHPO Clearance Date Date SHPO Letter Filed with FERC RTE Status Nationwide 12 Permit Status

MVP-ATWS-1482 Franklin Virginia 249.7 - ATWS Complete Complete Complete 44FR0370 (Eligible) Mountain Valley Pipeline Project, Phase I Archaeological Survey, and Phase II Archaeological Evaluation Site 44FR0370, Franklin County, Virginia 6/30/2017 10/27/2017 11/1/2017 CLEARED - NO

identified RTE impacts Included in NWP

MVP-ATWS-1483 Franklin Virginia 249.7 - ATWS Complete Complete Complete 44FR0370 (Eligible) Mountain Valley Pipeline Project, Phase I Archaeological Survey, and Phase II Archaeological Evaluation Site 44FR0370, Franklin County, Virginia 6/30/2017 10/27/2017 11/1/2017 CLEARED - NO

identified RTE impacts Included in NWP

MVP-ATWS-221 Nicholas West Virginia 119.4 - ATWS Complete Complete Complete No

Mountain Valley Pipeline Project, Letter Report for the Proposed MVP-NI-152 Access Road, MVP-ATWS-221 Temporary Workspace, and MVP-ATWS-221A

Temporary Workspace, Tract WV-NI-4042, Nicholas County, West Virginia, Phase I Cultural Resource Survey, Negative Findings

3/29/18 4/23/2018 4/26/2018 CLEARED - NO identified RTE impacts Included in NWP

MVP-ATWS-221A Nicholas West Virginia 119.5 - ATWS Complete Complete Complete No

Mountain Valley Pipeline Project, Letter Report for the Proposed MVP-NI-152 Access Road, MVP-ATWS-221 Temporary Workspace, and MVP-ATWS-221A

Temporary Workspace, Tract WV-NI-4042, Nicholas County, West Virginia, Phase I Cultural Resource Survey, Negative Findings

3/29/18 4/23/2018 4/26/2108 CLEARED - NO identified RTE impacts Included in NWP

MVP-FR-292.01 Franklin Virginia 249.5 - Access Road Complete Complete Complete 44FR0370 (Eligible) Mountain Valley Pipeline Project, Phase I Archaeological Survey, and Phase II Archaeological Evaluation Site 44FR0370, Franklin County, Virginia 6/30/2017 10/27/2017 11/1/2017 CLEARED - NO

identified RTE impacts Included in NWP

MVP-FR-292 Franklin Virginia 248.7 - Access Road Complete Complete Complete NoMountain Valley Pipeline Project, Phase IB Archaeological Survey Report,

Addendum I, Franklin County, Virginia, Mountain Valley Pipeline Project, Phase IB Archaeological Survey Report, Franklin County, Virginia

12/22/2016, 10/21/2015 4/26/2017, 12/30/2015 6/30/2017, 1/15/2016 CLEARED - NO identified RTE impacts Included in NWP

MVP-MLV-AR-29 Franklin Virginia 249.7 - Access Road Complete Complete Complete 44FR0370 (Eligible), 44FR0370 (Eligible)

Mountain Valley Pipeline Project, Phase I Archaeological Survey, and Phase II Archaeological Evaluation Site 44FR0370, Franklin County, Virginia, Mountain

Valley Pipeline Project, Phase I Archaeological Survey, and Phase II Archaeological Evaluation Site 44FR0370, Franklin County, Virginia

6/30/2017, 6/30/2017 10/27/2017, 10/27/2017 11/1/2017, 11/1/2017 CLEARED - NO identified RTE impacts Included in NWP

Pipeline

Facilities

Page 4: 625 Liberty Avenue, Suite 1700 | Pittsburgh, PA 15222 844 ...€¦ · Phase I Cultural Resource Survey, Negative Findings 3/29/18 4/23/2018 4/26/2018 CLEARED - NO identified RTE impacts

Ms. Kimberly D. Bose May 8, 2018

Attachment B

Page 5: 625 Liberty Avenue, Suite 1700 | Pittsburgh, PA 15222 844 ...€¦ · Phase I Cultural Resource Survey, Negative Findings 3/29/18 4/23/2018 4/26/2018 CLEARED - NO identified RTE impacts

Facility Name County State

MP Start (based on IFC

Route filed with FERC on 12-20-2017)

MP End (based on IFC

Route filed with FERC on 12-20-2017)

Parcel Number Wetland Survey Status

Cultural Survey Status

RTE Survey Status

Cultural Resources Identified Y/N Report Title (Date) Date Report Filed with

FERC SHPO Clearance Date Date SHPO Letter Filed with FERC RTE Status Nationwide 12 Permit Status

Pipeline Harrison West Virginia 32.8 33.2 WV-HA-144 Complete Complete Complete NoMountain Valley Pipeline Project, Cultural Resources Survey, Combined County Report 1, Wetzel, Harrison, Braxton, Nicholas, and Greenbrier

Counties, West Virginia, Espino et al. February 20182/19/2018 3/7/2018 SHPO Submitted comments to FERC in

3/7/2018 letterCLEARED - NO

identified RTE impactsAwaiting NWP Permit

Modificaiton

Pipeline - Hand Felling Only

Page 6: 625 Liberty Avenue, Suite 1700 | Pittsburgh, PA 15222 844 ...€¦ · Phase I Cultural Resource Survey, Negative Findings 3/29/18 4/23/2018 4/26/2018 CLEARED - NO identified RTE impacts

Ms. Kimberly D. Bose May 8, 2018

Attachment C

Page 7: 625 Liberty Avenue, Suite 1700 | Pittsburgh, PA 15222 844 ...€¦ · Phase I Cultural Resource Survey, Negative Findings 3/29/18 4/23/2018 4/26/2018 CLEARED - NO identified RTE impacts
Page 8: 625 Liberty Avenue, Suite 1700 | Pittsburgh, PA 15222 844 ...€¦ · Phase I Cultural Resource Survey, Negative Findings 3/29/18 4/23/2018 4/26/2018 CLEARED - NO identified RTE impacts