6/22/2015Tracker Week April 2002IEKP 1 Summary of IQC-workshop IEKP - Universität Karlsruhe (TH)
-
date post
20-Dec-2015 -
Category
Documents
-
view
217 -
download
0
Transcript of 6/22/2015Tracker Week April 2002IEKP 1 Summary of IQC-workshop IEKP - Universität Karlsruhe (TH)
04/18/23 Tracker Week April 2002 IEKP 1
Summary of IQC-workshopSummary of IQC-workshop
IEKP - Universität Karlsruhe (TH)
04/18/23 Tracker Week April 2002 IEKP 6
New facilitiy:New facilitiy:Isochroncyclotron in KarlsruheIsochroncyclotron in Karlsruhe
• 26 MeV protons
• Current 2 µA
(up to
40µA)
•Accessible within
~2 days
WE are the only user of this cyclotron
04/18/23 Tracker Week April 2002 IEKP 7
New INew Irradiation Arearradiation Area• Cooling with Nitrogen
gas down to -50°C• Initial positioning by
laser pointer• Scanning with 1mm
row steps (10cm/s)• Used proton current:
2 A• Irrad. of 120x120mm2
up to 1e14 p/cm2
takes 20min
04/18/23 Tracker Week April 2002 IEKP 8
Ongoing discussions everywhere Ongoing discussions everywhere
04/18/23 Tracker Week April 2002 IEKP 9
Rpoly after irradiationRpoly after irradiation
0V
1V
100V
No dependence on bias conditions !
04/18/23 Tracker Week April 2002 IEKP 10
CC after IrradiationCC after Irradiation0V 100V
1V No dependence on bias conditions !
04/18/23 Tracker Week April 2002 IEKP 11
Strip parameter ST teststructure Strip parameter ST teststructure calibration KA-Louvaincalibration KA-Louvain
0 20 40 60 80 100 120 140100000
1000000
1E7
1E8
1E9
1E10
1E11
1E12
Interstrip Resistance ST teststructure
Inte
rstr
ip R
esis
tan
ce
Stripnumber
0 20 40 60 80 100 120 140
2,0x105
4,0x105
6,0x105
8,0x105
1,0x106
1,2x106
1,4x106
1,6x106
1,8x106
2,0x106
Rpoly Karlsruhe Rpoly Louvain
Rp
oly
(O
hm
)
Stripnumber
20 40 60 80 100 1208,00E-011
1,00E-010
Coupling capacity k595 Karlsruhe Coupling capacity LCR Karlsruhe Coupling capacity LCR Louvain
Co
up
ling
ca
pa
city (
F)
stripdata
Interstrip capacitance: KA 0.64pF (1 neighbour) Louvain 1.05pF (2 neighbours)
0 20 40 60 80 100 120 1404,00E-011
6,00E-011
8,00E-011
1,00E-010
1,20E-010
1,40E-010
1,60E-010
1,80E-010
2,00E-010
2,20E-010
2,40E-010
2,60E-010
2,80E-010
3,00E-010
Leakage current
Le
aka
ge
cu
rre
nt (A
)
Stripnumber
04/18/23 Tracker Week April 2002 IEKP 12
Future calibrationFuture calibration
• Second calibration run
• Calibration with an irradiated teststructure
• Anealing curve each 20 min @ 50°C, agreed with Louvain. IV & CV taken.
04/18/23 Tracker Week April 2002 IEKP 13
FINAL SET FINAL SET • All measurements after 80 min @ 60°C and > 6h in the fridge• All measurements @-10°C
• DIODE:– IV, CV (100kHz with guard on GND; (test also 1MHz))
I_TOT, V_dep, C_TOT, • Minisensor or full sensor
IV, CV (1kHz)
Strip measurements: all on 2 DC pads• Rpoly, Cint, Rint, leakage current
– Before irrad, full stripscan @ 400V– After irrad: 10 strips (later ~5) voltage (IQC) ramp 10V/s [10-500V]
For the beginning: full check for pinholes (Idiel@10V; CC (100Hz) without ramps all @ Vbias= 20V)
All Cap measure with parallel mode!
04/18/23 Tracker Week April 2002 IEKP 14
Preliminary Irrad tables Preliminary Irrad tables already exist in XMLalready exist in XML
• Tables are done and already underwent one iteration between Karlsruhe and Louvain; discussion with Didier done!
• The IQC tables will belong to the sensor ID=same object!!
• We will have 2 new composites with 3 simple tables: – 1. composite: diode minisensor
– 2. composite: sensor
– Tables show the results from:• [Rpoly;Cint;Ileak;Rint (CAC optional)]@Vstandard =400V
• ONE Ramp, values @Vbias=400V
• Delta of values before and after irradiation (
• Environment
04/18/23 Tracker Week April 2002 IEKP 15
Status of IQC-KarlsruheStatus of IQC-Karlsruhe
IEKP - Universität Karlsruhe (TH)
04/18/23 Tracker Week April 2002 IEKP 16
Stability of Beam CurrentStability of Beam Current
0 30 60 90 120 150 180 210 240 270 300 330 360 3900,25
0,30
0,35
0,40
0,45
0,50
0,55
0,60
C
urr
en
t [A
]
Time [s]
04/18/23 Tracker Week April 2002 IEKP 17
Verification of Fluence Verification of Fluence PredictionPrediction
1 2 3 40
1
2
3
4
5
6
7
8
9
Measurement No.
t
F
luen
ce [
1014
p/c
m2 ]
Ni foil dosimetry Prediction
04/18/23 Tracker Week April 2002 IEKP 18
Scan Area
Area of Interest
Autoradiography picture
Area cut for dosimetry
Homogeneity of ScanningHomogeneity of Scanning
04/18/23 Tracker Week April 2002 IEKP 19
Irradiation of HybridIrradiation of Hybrid
• During irradiation: Clock, Trigger (10Hz), Error Buffer Readout (1Hz), Reset
• Irradiation with 2A protons up to 2.7e14 p/cm² (30years LHC) at RT
• First qualification at cyclotron with 5m cables and provisional readout
• Hybrid is still activated (2µSv)• Result: Hybrid still alive
04/18/23 Tracker Week April 2002 IEKP 20
Picture of Hybrid on Ni foilPicture of Hybrid on Ni foil
Area cut for dosimetry
Hybrid
04/18/23 Tracker Week April 2002 IEKP 21
ST teststructures for irradiationST teststructures for irradiation
• #teststructures 5(+1), 4, 5 = 14• All 14 ST teststructures measured for VFlatBand • 6 ts measured for irradiation: IV, CV
all strips Rpoly, Cint, Idiel, Il, CC, Rint
• Finalizing of measurements: this week (incl. full sensor)
• Irradiation planned for next week
04/18/23 Tracker Week April 2002 IEKP 22
ST teststructure ParametersST teststructure Parameters
0 50 100 150 2001,2
1,4
Rpoly
Rp
oly
[M]
strip number
0 100 200 300 400 500 600-5,00E-009
0,00E+000
5,00E-009
1,00E-008
1,50E-008
2,00E-008
2,50E-008
3,00E-008
IV
To
tal C
urr
en
t [A
]
Voltage [V]0 50 100 150 200 250 300
0,00E+000
2,00E-009
4,00E-009
6,00E-009
CV
To
tal C
ap
aci
tan
ce [F
]
Voltage [V]
0 50 100 150 200
0,6
0,8
Interstrip capacitance (1 neighbour on DC pad)
Inte
rstr
ip C
apac
itanc
e [p
F]
Strip number
04/18/23 Tracker Week April 2002 IEKP 23
ST teststructure Parameters IIST teststructure Parameters II
0 50 100 150 20063,4
63,5
63,6
63,7
63,8
63,9
64,0
64,1
64,2
64,3
Coupling capacitance (LCR 100Hz)
Cou
plin
g ca
paci
tanc
e [p
F]
Strip number
Interstrip resistance >> 1G
0 50 100 150 2000,2
0,3
0,4
0,5
0,6
0,7
0,8
0,9
1,0
1,1
1,2
1,3
1,4
1,5
1,6
1,7
1,8
1,9
2,0
Leakage current
Leak
age
curr
ent [
nA]
strip number
0 50 100 150 2000,0000,0050,0100,0150,0200,0250,0300,0350,0400,0450,0500,0550,0600,0650,0700,0750,0800,0850,0900,0950,100
Current over dielectric @ 10V (pinholes)
Idie
l [nA
]
strip number
On 6 teststructures (1176 strips) we found only 2 lower CC (no pinholes)
04/18/23 Tracker Week April 2002 IEKP 24
Flatband voltagesFlatband voltages
Plus several from Wien, Florence and Strasburg with VFB of 5V, 35V, etc.
In addition we will measure the Cint for these structures!!
Flatbandvoltage
0,00E+00
1,00E-10
2,00E-10
3,00E-10
4,00E-10
5,00E-10
6,00E-10
7,00E-10
0 5 10 15 20 25 30
Capacitance [F]
Vo
lta
ge
[V
]
3021-0414308319
3021-0414735711
3021-0414735714
3021-0414735715
3021-0414735910
3021-0414739808
3021-0414842424
3021-0414842606
3021-0415060301
3021-0415060317
3021-0420275822