14.3.20021.Irradiation Workshop - KarlsruheA. Dierlamm, IEKP 1 Irradiation with Protons - IQC...
-
date post
15-Jan-2016 -
Category
Documents
-
view
215 -
download
0
Transcript of 14.3.20021.Irradiation Workshop - KarlsruheA. Dierlamm, IEKP 1 Irradiation with Protons - IQC...
14.3.2002 1.Irradiation Workshop - Karlsruhe
A. Dierlamm, IEKP 1
Irradiation with Protons -Irradiation with Protons -IQC KarlsruheIQC Karlsruhe
IEKP - Universität Karlsruhe (TH)
14.3.2002 1.Irradiation Workshop - Karlsruhe
A. Dierlamm, IEKP 2
Isochroncyclotron in KarlsruheIsochroncyclotron in Karlsruhe
• 26 MeV protons
• Frequency:
~33MeV
• Accessible
within 2 days
14.3.2002 1.Irradiation Workshop - Karlsruhe
A. Dierlamm, IEKP 3
Irradiation AreaIrradiation Area• Cooling with Nitrogen
gas down to -50°C• Initial positioning by
laser pointer• Scanning with 1mm
row steps (10cm/s)• Used proton current:
2 A• Irrad. of 120x120mm2
up to 1e14 p/cm2
takes 20min
14.3.2002 1.Irradiation Workshop - Karlsruhe
A. Dierlamm, IEKP 4
During Irradiation ...During Irradiation ...
Cold box with proton beam spot on mylar window
Scanning speed up to 250 mm/s !
14.3.2002 1.Irradiation Workshop - Karlsruhe
A. Dierlamm, IEKP 5
Homogeneity of ScanningHomogeneity of Scanning
Scan Area
Area of Interest
Autoradiography picture
14.3.2002 1.Irradiation Workshop - Karlsruhe
A. Dierlamm, IEKP 6
Fluence EstimationFluence Estimation
• Beam current I in p/s
• Calculate ratio of hits inside homogeneous area to total hits
• F = I * * t / Ahomogene
• Get time t for irradiation
• Adjust speed to have integer no. of scans
Teststructure
14.3.2002 1.Irradiation Workshop - Karlsruhe
A. Dierlamm, IEKP 7
Fluence MeasurementFluence Measurement
• Ni foils behind teststructures in homogeneous area• Measure specific activity of 57Ni line with Ge-
Spectrometer• Extrapolation to activity at 3.77 days after irrad.
(T1/2 = 35.6h = 1.483 days = 2.14 days)
• Calibration factor for 26 MeV protons:19.28 kBq cm2 / mg Ah
• 1 Ah = 22.5e15 protons
14.3.2002 1.Irradiation Workshop - Karlsruhe
A. Dierlamm, IEKP 8
ComparisionComparision
1 2 3 40
2
4
6
8
10
12
14F
luen
ce [1
e14
p/cm
2 ] Ni analysis Estimation from BS2 current
14.3.2002 1.Irradiation Workshop - Karlsruhe
A. Dierlamm, IEKP 9
Speed CalculationSpeed Calculation
14.3.2002 1.Irradiation Workshop - Karlsruhe
A. Dierlamm, IEKP 10
Current ControlCurrent Control
• Beam current monitored during irradiation
• Data saved to disk
• On-line integration of current
• Beam and scanning automatically stopped if
current out of limit (e.g. 10%)
• Insert aperture to get more stable low current
14.3.2002 1.Irradiation Workshop - Karlsruhe
A. Dierlamm, IEKP 11
Biasing schemeBiasing scheme• After 10 years LHC we expect a current of upto 1µA per strip at 1M 1V potential at p-implant
• Bias of 1V during irrad. and both AC and biasring on ground gives 1V over diel.
• Used bias voltage for safety reasons (voltage drop in power lines) : 12 V
14.3.2002 1.Irradiation Workshop - Karlsruhe
A. Dierlamm, IEKP 12
Next IrradiationsNext Irradiations
• Hybrid• Optohybrid• Module
• We will provide the hybrids with power,
clock, I2C-pulses and reset.• The module will be under bias.