Mining Business Managementfor Cost Reduction () 2551
-
Mining Business Mission
-
(Cost Reduction) VC FC FO DP IC TC Vop or Economic Scale OEE (Income Improvement) price Other Income new product/new services Value Added (Opportunity Search) ( )
-
(Price) (Quality Upgrade) (Recovery) (Zero Waste)
-
Management Systemsconcern Cost Reduction
-
1) 2) 3) 4) 5) Performance Index ( TQM )
-
TPM TQM Why-Why Analysis Cause and Effects Diagram Fact and Data ManagementDOEBalance ScorecardsLoss Tree AnalysisInventory Control
-
Loss Management
-
7 Wastes overproduction: producing more, sooner and faster than required by the next process excess transportation: any transport that adds cost but no value to the product excess inventory: this not only is a waste, but also creates waste excess processing: doing more work than necessary waiting: operator or machine idle time correction: repairs to products motion: walking or wasted motion to pick up or store parts.
-
(Loss Definition) (Loss Tree) (Priority) (Feasibility Study) (Project Setting) (Action Plan) (Review) (Zero Loss)
-
Quarry Loss Reduction
- - - - - - - - () - - - - ? Check - #5 - Dump -
-
- 45 - - - - - - Dump - ? - - Just in time - - - Bio-diesel - - - OT - >>> CR CR >>> - OEE
-
- CD - - Double Handing - - - - - - PDCA -
-
Cost Reduction Principle
-
() =
-
- -
-
()
-
1: 2: 3: 4:
-
= () ()
-
e-commerce
-
- () - 3 Mu Muri= Muda= Mura= 3 Mu = () / () QC Story
-
Good Mining Plan for Cost Reduction
-
Mining Design for Cost Reduction
-
Mining Operation Excellence
-
() Waste Blending for Cost Reduction1. % 2. 25 % 3. Operator % 4. % 35%
-
Crushing Effectiveness
-
/. / . / . / / / / / . / . , ,
-
(/.) Spec. 750/. 543/.207/. - / /. Spec. 750 /. X 100 .= 75,000 543 /. X 138 .= 75,000 38 / (Downtime)
-
() () () Output16:00 .08:00 .
-
PM PM
-
/ .
-
/ / /
-
/. () GAP () /.
-
3
-
Excavation and Transportation
-
- /.- Metal Detector Grinding Path - -
-
- /.- /. - /.- 3 2 1 /.
-
- ( C) /. () /. - ( B) () /.- ( A) /. /.
-
- A B B C /. - C A B /.- /. -
-
- /.- - - - - /.-
-
- - /. -
-
- /.- /.-
-
- /.- /.- - /.
-
- /.- /. ( - ()
-
- /. Impact Plate Peak Load - Impact Plate /. - /.
-
- - Impact Plate /.- Grinding Path /. /. 25 . - GAP /. ()
-
Conveyor Excellence
-
- - /.- - /.- /.
-
- /.- /. - /.
-
Pile Stocking
-
- /. /. -
-
- /. /. /.- - ()
-
Products Delivery
-
/ (Bin and Stock Pile) (Stock and Loader) (Stacker and Reclaimmer)
-
- - - - 25,000 /. /. - /.
-
Maintenance Effectiveness
-
(Mine Machine) (Support Function) (Crushing Plant) (ME, EE, CE) (Miscellneous)
-
- - Downtime - PM
-
- (Condition Base) (Time Base) 5,000 . 50 - - - - - (Standby) - - (Failure Analysis) - - (Service Contract) - -
-
Machine Utilization
-
(% Utility) 50 % Utility
-
- - - - - 1 2 3 3 Pressure Loss
-
Spare Parts Management
-
Just in Time
-
Manpower Management
-
Competency
-
Energy Management
-
NGV Off Peak On Peak Demand Charge Energy Charge Peak Fuel Max Tejohn
-
Overtime Management
-
1. 2. OT 3. (Break Down) 4. ( Multi-skill) 5. 6. 7. 8. 3 9. 10. 7 3 11. 12. OT 13. 14. OT 15. 16. 17. 18. 90 19. OT 20. OT OT 21.
-
1) 2) OT (% OT ) 3) 4) ( MA) 5) (Multi-skill) 6) OT 7) 8) 1 07:00 - 15:00 . 2 16:00-24:00 . 15:00 - 16:00 . 9) OT 10)
-
1) Inpit Crusher Semi Mobile Crusher 2) / 3) 1 3 2 7 6 4) " 45,000 5,000 / 10,000 / () 5) 6) 6-10 1 24 7) 35 / 90 / 90 / 120 / 8)
-
Blasting Cost Reduction
-
Pentolite Emulsion Delay
-
Others Cost Reduction
-
www.budmgt.comBudding Wisdom in Management