5.04 Shortcomings and proposed improvements to the asset … · 2017. 11. 23. · – Software:...

21
Electricity Supply to Africa and Developing Economies: Challenges and Opportunities Sharon Mushabe Eskom Holdings SOC Ltd Paper Number 5.04 Session Number 5 15 November 2017 Shortcomings And Proposed Improvements To The Current Practice Used By Eskom Transmission To Determine Asset Health Index Of Overhead Transmission Lines

Transcript of 5.04 Shortcomings and proposed improvements to the asset … · 2017. 11. 23. · – Software:...

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    Sharon MushabeEskom Holdings SOC Ltd

    Paper Number 5.04

    Session Number 5

    15 November 2017

    Shortcomings And Proposed

    Improvements To The Current Practice

    Used By Eskom Transmission To

    Determine Asset Health Index Of

    Overhead Transmission Lines

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    Content

    • Overview of the Asset Profile• Description of the Transmission Line Health Index• Challenges and Shortcomings• Recommendations

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities3

    • 358 overhead transmission lines in 10 grids• 85000+ towers• 32 500+ km (route length)• 275 000+ km of conductor (excl. Earthwire and

    OPGW)

    Transmission Line Asset Profile 1

    1 Profile at the end of the 2016/2017 financial year

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities4

    Free State has the most

    kilometers of Overhead

    transmission line to cover

    East Grid has the most

    number of lines

    Transmission Line Asset Profile

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    Eskom Transmission Line Teams

    • Design Team– Full detail designs for HVAC up to 765 kV and HVDC up to 800

    kV

    – Team of over 70 engineers, technologists and technicians – Facilities include tower test station and corona cage test – Software: PLSCADD, SolidWorks, FALLS, ATP

    • Maintenance Team– Maintenance teams in 10 grids/operating units– Live line teams

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    Eskom Maintenance Strategy

    • Currently, the strategy is a time based inspection and assessment approach

    • Eskom Transmission is moving towards adopting a condition based approach

    • The condition based approach includes determining the asset health of the overhead line

    • Part of this approach required a health index to be defined

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    Transmission Line Health Index (ideal)

    • Two asset classes for Overhead Transmission lines are defined,

    namely: Steel Structures and

    Overhead Conductor systems.

    • Failure mode and effects analysis (FMEA) is compiled.

    • Condition monitoring task and activity schedule is created

    based on results.

    • End-of-life criteria are developed for various

    components of the asset class.

    7

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities8

    Abbreviated Transmission Line Health Index

    The following abbreviated Health Measures were applied

    when conducting this survey:

    – A line will be rated as a whole and not per individual structure, span etc.

    – Overall ratings of components based on visual inspection reports.

    – Fibre Optic systems will be excluded from the line ratings.– The age of the line is based on the earliest recorded date on

    TxSiS.

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    Health Index rating

    Health index

    Condition Description Requirements

    85 - 100Very Good

    (A)

    Some ageing or minor deterioration of a limited number of components

    Normal maintenance

    70 - 85Good

    (B)Significant deterioration of some components

    Normal maintenance

    50 - 70Fair

    (C)

    Widespread significant deterioration or serious deterioration of specific components

    Increase diagnostic testing, possible remedial work or replacement needed depending on criticality

    30 - 50Poor

    (D)Widespread serious deterioration

    Start planning process to replace or rebuild considering risk and consequences of failure

    0 - 30Very Poor

    (E)Extensive serious deterioration

    At end-of-life, immediately assess risk; replace or rebuild based on assessment

    9

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    Transmission Line Health Index

    10

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    Challenges and Shortcomings

    • Type and Frequency of Inspections

    • Data Capturing

    • Data Storage

    • Sampling and Testing

    • Resources

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    Type and Frequency of Inspections

    • Fast aerial inspection at least once year on each line– Purpose to the pick up serious defects that could result in

    failure in

    • Detailed aerial inspection every four years on each line.– Visual inspection with multi-spectural camera of line

    hardware, conductors, spacers, insulators with the use of

    helicopter

    • Both inspections neglect the foundations as well as sections of tower that are not visible from the air

    • Pole top inspection – Similar to detail aerial inspection but with inspectors physically

    on the tower

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    Data Capturing

    • Detailed aerial inspections captures the defects at each tower.– Defects are supported with photos and videos. – No assignment of a condition rating for each component.– No information is given for towers that have no defects. – Reports vary from operator to operator.

    • No measurements, tests or samples are performed to determine remaining life of the assets.

    • Inspection checksheet or report is ambiguous and leads to various interpretations.

    • Operators are not clear on what to look for during a visual inspection nor how to identify all signs of deterioration on

    transmission lines.

    • Budget constraints limiting number of hours flown by helicopter.

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    Data Storage

    • Accurate records of as-built infrastructure is needed. • Records of all the major components/assemblies including

    material, type, size, manufacturer and installation year must be

    stored.

    • Data must be updated after each inspection cycle and following changes due to maintenance and construction activities.

    • No central storage facility of inspection photos, reports and/or investigations.

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    Sampling and Testing

    • Samples are required to be taken for various tests. – Conductor and Earthwire samples are required for tensile

    tests, tensile ductility tests, wrapping tests, zinc coating

    measurements and torsional ductility tests.

    – Hardware samples are required for corrosion examinations. – Insulator strings are required for pollution conductivity

    testing.

    • Some cases network constraints prevent outages for significant periods to allow teams to acquire the samples.

    • Some lines more than one conductor sample is required to give a suitable representation of the line.

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    Tests or Inspections

    • Conductor clearance measurements• Corrosion and wear on tower

    members and hardware

    • IR and UV scanning • Tower footing resistance

    measurements

    • Line impedance measurements

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    Resources

    • Field operators are responsible for collecting the data while analysis of the data is performed by the relevant engineering

    department.

    • Movement of staff from grid to grid means that local knowledge of lines diminishes as new staff move in and out.

    • Testing facilities, labs, equipment and tools are required to run tests on samples.

    Advancements in technology

    • The maintenance strategy includes the use of multi-spectral cameras and hand-held tough books that are linked to the plant

    management system.

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    UAV’s and Line Robots

    • The use of unmanned aerial vehicles and line robots for overhead line inspections is still being reviewed.

    • Integrating vibration sensors on towers are still being investigated. • These interventions all require trained and skilled personnel to

    operate and produce quality reports.

    Power Line Robot: Developed by Eskom and UKZN (image from: www.powerlinerobot.com)

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    Recommendations

    • Detailed and complete asset registry is required – (including manufacturer, material type, installation year, etc)

    • Revision of the inspection check sheet such that the data can be captured accurately without ambiguity.

    • Review of the frequency of inspections to complete an audit that can be used to compile a complete health index.

    • System is under development that allows operators to capture data in the field, integrate seamlessly with the current plant

    management systems and be available online for all the relevant

    stakeholders.

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    Recommendations

    • Develop a training program for line audits so that the operators are:

    – Fully knowledgeable of the components on the transmission lines

    – Can identify defects and accurately comment on the condition of the transmission line

    – Equipped and trained to use and interpret the results

  • Electricity Supply to Africa and Developing Economies: Challenges and Opportunities

    Acknowledgements

    • Team within the following Eskom departments:– Transmission Grid Supervisors, Operators and

    Engineers

    – Research, Testing and Development– Line Engineering Services – Asset Investment Planning, and– Asset Management Execution