5. Capacity and Waiting
Dr. Ron LembkeOperations Management
![Page 2: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/2.jpg)
How much do we have? Design capacity: max output designed for
Everything goes right, enough support staff Effective Capacity
Routine maintenanceAffected by resources allocatedWe can only sustain so much effort.Output level process designed forLowest cost per unit
![Page 3: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/3.jpg)
Loss of capacity
![Page 4: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/4.jpg)
Utilization and Efficiency
Capacity utilization = actual output design capacity Efficiency = actual output effective capacity
Efficiency can be > 1.0 but not for long
![Page 5: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/5.jpg)
Scenario 1
Design Capacity 140 tons Effective Capacity 124 tons –
landing gear could fail in bad weather landing With 120 ton load
Utilization: 120/140 = 0.857Efficiency: 120/124 = 0.968
![Page 6: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/6.jpg)
Economies of Scale
Cost per unit cheaper, the more you make Fixed costs spread over more units
![Page 7: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/7.jpg)
Dis-economies of scale
Congestion, confusion, supervision Running at 100 mph means more
maintenance needed Overtime, burnout, mistakes
![Page 8: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/8.jpg)
Marginal Output of Time Value of working n
hrs is Onda As you work more
hours, your productivity per hour goes down
Eventually, it goes negative.
Better to work b instead of e hrs
S.J. Chapman, 1909, “Hours of Labour,” The Economic Journal 19(75) 353-373
![Page 9: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/9.jpg)
Learning Curves
time/unit goes down consistentlyFirst 1 takes 15 min, 2nd takes 5, 3rd takes 3
Down 10% (for example) as output doubles We can use Logarithms to approximate this
cost per unit after 10,000 units? If you ever need this, email me, and we can
talk as much as you want
![Page 10: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/10.jpg)
Break-Even Points
FC = Fixed Cost VC = variable cost
per unit QBE = Break-even
quantity R = revenue per unit
FC+VC*Q
Volume, Q
R*Q
Break-EvenPoint
![Page 11: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/11.jpg)
Cost Volume Analysis
Solve for Break-Even Point For profit of P, QBE = FC R – VCFC = $50,000 VC=$2, R=$10QBE = 50,000 / (10-2) = 6,250 units
![Page 12: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/12.jpg)
747-400 vs 777Monthly Debt Operating$/ton mile
747 $1,367,000 $50,000 $1.45777 $1,517,000 $50,000 $1.38Break-even:747 ($1,367,000+$50,000)/(2-1.45)=
2,576,364 ton/miles per month777 ($1,517,000+$50,000)/(2-1.38)=
2,527,419 ton/miles per month
![Page 13: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/13.jpg)
Capacity Tradeoffs
Can we make combinations in between?
150,000Two-door cars
120,0004-doorcars
![Page 14: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/14.jpg)
Adjust for aircraft size
777 – 124 tons per flight2,576,364/124 = 20,777 full miles/month747 – 104 tons per flight2,527,419/104 = 24,302 full miles/month
![Page 15: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/15.jpg)
# Flights / month
747:20,777 miles/2,869 = 7.24 fully loaded flights= 8 full flights
777:24,302 miles/2,869 = 8.47 fully loaded flights= 9 full flights
![Page 16: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/16.jpg)
Time Horizons
Long-Range: over a year – acquiring, disposing of production resources
Intermediate Range: Monthly or quarterly plans, hiring, firing, layoffs
Short Range – less than a month, daily or weekly scheduling process, overtime, worker scheduling, etc.
![Page 17: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/17.jpg)
Adding Capacity
Expensive to add capacity A few large expansions are cheaper (per
unit) than many small additions Large expansions allow of “clean sheet of
paper” thinking, re-design of processesCarry unused overhead for a long timeMay never be needed
![Page 18: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/18.jpg)
Capacity Planning How much capacity should we add? Conservative Optimistic
Forecast possible demand scenarios (Chapter 11)
Determine capacity needed for likely levels Determine “capacity cushion” desired
![Page 19: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/19.jpg)
Capacity Sources
In addition to expanding facilities:Two or three shiftsOutsourcing non-core activitiesTraining or acquisition of faster equipment
![Page 20: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/20.jpg)
What Would Henry Say? Ford introduced the $5 (per day) wage in 1914 He introduced the 40 hour work week “so people would have more time to buy” It also meant more output: 3*8 > 2*10
“Now we know from our experience in changing from six to five days and back again that we can get at least as great production in five days as we can in six, and we shall probably get a greater, for the pressure will bring better methods.
Crowther, World’s Work, 1926
![Page 21: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/21.jpg)
Toyota Capacity1997: Cars and vans? That’s crazy talkFirst time in North America
292,000 Camrys89,000 Siennas89,000 Avalons
![Page 22: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/22.jpg)
Decision Trees
Consider different possible decisions, and different possible outcomes
Compute expected profits of each decision Choose decision with highest expected
profits, work your way back up the tree.
![Page 23: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/23.jpg)
Draw the decision tree
![Page 24: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/24.jpg)
Everyone is Just Waiting
Everyone is just waiting
![Page 25: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/25.jpg)
Retail Lines
Things you don’t need in easy reach Candy Seasonal, promotional items
People hate waiting in line, get bored easily, reach for magazine or book to look at while in line
Deposit slips Postal Forms
![Page 26: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/26.jpg)
In-Line Entertainment
Set up the story Get more buy-in to ride Plus, keep from boredom
![Page 27: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/27.jpg)
Disney FastPass Wait without standing
around Come back to ride at
assigned time Only hold one pass at a time
Ride other ridesBuy souvenirsDo more rides per day
![Page 28: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/28.jpg)
Benefits of Interactivity
Slow me down before going again Create buzz, harvest email addresses
![Page 29: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/29.jpg)
False HopeDumbo
Peter Pan
![Page 30: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/30.jpg)
Queues
In England, they don’t ‘wait in line,’ they ‘wait on queue.’
So the study of lines is called queueing theory.
![Page 31: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/31.jpg)
Cost-Effectiveness
How much money do we lose from people waiting in line for the copy machine?Would that justify a new machine?
How much money do we lose from bailing out (balking)?
![Page 32: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/32.jpg)
Service Differences Arrival Rate very variable Can’t store the products - yesterday’s
flight? Service times variable Serve me “Right Now!” Rates change quickly Schedule capacity in 10 minute intervals,
not months How much capacity do we need?
![Page 33: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/33.jpg)
We are the problem Customers arrive randomly. Time between arrivals is called the “interarrival
time” Interarrival times often have the “memoryless
property”: On average, interarrival time is 60 sec. the last person came in 30 sec. ago, expected time
until next person: 60 sec. 5 minutes since last person: still 60 sec.
Variability in flow means excess capacity is needed
![Page 34: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/34.jpg)
Memoryless Property
Interarrival time = time between arrivals Memoryless property means it doesn’t matter how long
you’ve been waiting. If average wait is 5 min, and you’ve been there 10 min,
expected time until bus comes = 5 min Exponential Distribution Probability time is t =
tetf )(
![Page 35: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/35.jpg)
Poisson Distribution
Assumes interarrival times are exponential Tells the probability of a given number of
arrivals during some time period T.
![Page 36: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/36.jpg)
Simeon Denis Poisson "Researches on the probability
of criminal and civil verdicts" 1837
looked at the form of the binomial distribution when the number of trials was large.
He derived the cumulative Poisson distribution as the limiting case of the binomial when the chance of success tend to zero.
![Page 37: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/37.jpg)
Larger average, more normal
![Page 38: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/38.jpg)
Queueing Theory Equations
Memoryless Assumptions:Exponential arrival rate = = 10
Avg. interarrival time = 1/ = 1/10 hr or 60* 1/10 = 6 min
Exponential service rate = = 12 Avg service time = 1/ = 1/12
Utilization = = / 10/12 = 5/6 = 0.833
![Page 39: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/39.jpg)
Avg. # of customes
Lq = avg # in queue =
Ls = avg # in system =
2
qL
q
qs
L
LL
![Page 40: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/40.jpg)
Probability of # in System
Probability of no customers in system
Probability of n customers in system
10P
n
n PP
0
![Page 41: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/41.jpg)
Average Time
Wq = avg time in the queue
Ws = avg time in system
q
q
LW
1
qs WW
![Page 42: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/42.jpg)
Example
Customers arrive at your service desk at a rate of 20 per hour, you can help 35 per hr. What % of the time are you busy?How many people are in the line, on average?How many people are there in total, on avg?
![Page 43: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/43.jpg)
Queueing Example
λ=20, μ=35 so Utilization ρ=20/35 = 0.571 Lq = avg # in line =
Ls = avg # in system = Lq + /= 0.762 + 0.571 = 1.332
762.0525400
2035352022
qL
![Page 44: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/44.jpg)
How Long is the Wait?Time waiting for service =
Lq = 0.762, λ=20Wq = 0.762 / 20 = 0.0381 hoursWq = 0.0381 * 60 = 2.29 min
Total time in system = Wq = 0.0381 * 60 = 2.29 min μ=35, service time = 1/35 hrs = 1.714
minWs = 2.29 + 1.71 = 4.0 min
q
q
LW
1
qs WW
![Page 45: 5. Strategic Capacity Planning](https://reader036.fdocuments.in/reader036/viewer/2022081416/56815df9550346895dcc31fc/html5/thumbnails/45.jpg)
What did we learn?
Memoryless property means exponential distribution, Poisson arrivals
Results hold for simple systems: one line, one serverAverage length of time in line, and systemAverage number of people in line and in
systemProbability of n people in the system