Strategic Capacity Planning for Products and Services

Gerlyn BonusAgnes Regala

Roselyn PudaoMary Grace Ibanez

Matex Carillo

BSBA. ManagementProf. Joey Acuῆa

Page 2: Strategic capacity planning for products and services

Capacity Capacity is the upper limit or ceiling on the

load that an operating unit can handle. Capacity also includes:

EquipmentSpaceEmployee skill

• The basic questions in capacity handling are:– What kind of capacity is needed?– How much is needed?– When is it needed?

Page 3: Strategic capacity planning for products and services

Design capacity maximum output rate or service capacity an

operation, process, or facility is designed for.

Effective capacity Design capacity minus allowances such as

personal time, maintenance, and scrap.Actual output

rate of output actually achieved--cannot exceed effective capacity.

Page 4: Strategic capacity planning for products and services

Efficiency and Utilization

Page 5: Strategic capacity planning for products and services

Design capacity = 50 trucks/day

Effective capacity = 40 trucks/day

Actual output = 36 units/day

Actual output = 36 units/day Efficiency = =

90% Effective capacity 40 units/ day

Utilization = Actual output = 36 units/day =

72% Design capacity 50 units/day

Page 6: Strategic capacity planning for products and services

Determinants of Effective Capacity

FACILITIES The design of facilities, including size and provision

for expansion, is key. Locational factors, such as transportation costs,

distance to market, labor supply, energy sources and room for expansion are also important.

Likewise, layout of the work area and environmental factors also play a significant role.

Page 7: Strategic capacity planning for products and services

PRODUCT AND SERVICE FACTORS Product and service design can have a tremendous

influence on capacity. The more uniform the output, the more

opportunities there are for standardization of methods and materials.

PROCESS FACTORS The quantity capability of a process is an obvious

determinant of capacity but subtle determinant is the influence of output quality.

Process improvement that increase quality and productivity can result in increased capacity.

Page 8: Strategic capacity planning for products and services

HUMAN FACTORS The tasks that make up a job, the variety of activities

involved, also the training, skill and experience required to perform a job all have an impact on the potential and actual output.

Employee motivation has a very basic relationship to capacity , as do absenteeism.

POLICY FACTORS Management policy can affect capacity by allowing

or not allowing capacity options such as overtime or second or third shifts.

Page 9: Strategic capacity planning for products and services

OPERATIONAL FACTORS Inventory stocking decisions, late deliveries,

purchasing requirements, acceptability of purchased materials, quality inspection and control procedures also have an impact on effective capacity.

SUPPLY CHAIN FACTORS It must be taken into account in capacity planning if

substantial capacity changes are involved.

EXTERNAL FACTORS Product standards , especially minimum quality and

performance standards, can restrict management’s options for increasing capacity.

Page 10: Strategic capacity planning for products and services

Strategy Formulation• An organization typically its base its capacity

strategy on assumption and predictions about long term demand patterns, technological changes , and the behavior of its competitors.

Key decisions of capacity planning

• The amount of capacity needed• The timing of changes • The need to maintain balance throughout the system• The extent of flexibility of facilities and the workforce.

Page 11: Strategic capacity planning for products and services

• Deciding on the amount capacity involves consideration of expected demand and capacity cost.

• Capacity cushion which is an amount capacity in excess of expected demand when there is some uncertainty about demand.

the greater the degree of demand uncertainty , the greater the amount cushion used.

Page 12: Strategic capacity planning for products and services

Steps in the Capacity Planning Process

• Estimate future capacity requirement • Evaluate existing capacity and facilities and identify

gaps.• Identify alternative for meeting requirements• Conduct financial analyses of each alternative• Assess key qualitative issues for each alternative • Select the alternative to pursue that will be bests in

long term• Implement the selected alternative• Monitor results

Page 13: Strategic capacity planning for products and services

Forecasting Capacity Requirements• Long-term vs. Short-term capacity needs• Long-term relates to overall level of capacity such as

facility size, trends, and cycles.• Short-term relates to variations from seasonal,

random, and irregular fluctuations in demand

Calculating Processing Requirements• A department works one 8-hour shift, 250

days a year , and has these figures for usage of a machine that is currently being considered:

Page 14: Strategic capacity planning for products and services

Working one 8 hour shift 250 days a year provides an annual capacity of 8×250=2000 hours per year.5800 hours/2000 hours/machine=2.90 Machines

Product Annual demand

Standard Processing

time per unit

Processing time needed

1 400 5 20002 300 8 24003 700 2 1400

5800

Page 15: Strategic capacity planning for products and services

The Challenge of Planning Service CapacityThree Important Factors in planning service capacity

The need to be near customers• Convenience for customers is often an important

aspects of services. Generally, a service must be located near customer.

The inability to store service• Speed of the delivery, or customers waiting time

become a major concern in a service capacity planning .

Page 16: Strategic capacity planning for products and services

The degree of volatility• Demand volatility presents problem for capacity

planners. Demand volatility tend to be higher for services than goods, not only in timing of demand, But also in amount of time required to the service individual customers.

Make Or Buy• Once capacity requirements have been determined ,

the organization must decide whether to produce a good or provide a service itself. or outsource (buy) from another organization.

Page 17: Strategic capacity planning for products and services

Factors:Available Capacity • If an organization has available the equipment, necessary skills, and time, if often makes sense to

produce an item of perform a service in-house, The additional cost would be relatively small compared with those required to buy items or subcontract services.

Expertise• If a firm lacks the expertise to do the job satisfactory

buying might be reasonable alternative.

Page 18: Strategic capacity planning for products and services

Quality Considerations• Firm that specialize can usually offer higher quality

than an organization can attain itself. Conversely unique quality requirements or the desire to closely monitor quality may cause an organization to perform a job itself.

The nature of Demand• When demand for an items is high and steady, the

organization is often better off doing the work itself.

Page 19: Strategic capacity planning for products and services

Cost• Any cost savings achieved from buying of making

must weighed against the preceding factors. Cost savings might come from the item itself or from transportation cost savings. If there are fixed cost associated with making an item that cannot be reallocated if the service or product outsourced, that has to recognized in the analysis.

Risk• Outsourcing may involved certain risks. One is loss of

control over operations. Another is the need to disclosed proprietary information.

Page 20: Strategic capacity planning for products and services

Developing Capacity AlternativesDesign Flexibility into system.o Provisions for Future Expansion in the original

design.

Take Stage of life cycle into accounto Capacity requirements are often closely linked to the

stage of the life cycle that a product or service is in.

Page 21: Strategic capacity planning for products and services

Take a “Big Picture” approach to capacity changes

o When developing capacity alternatives, it is important to consider how parts of the system interrelate.

o Bottleneck Operation

BottleneckOperation

Machine #1

Machine #3

Machine #4

10/hr

10/hr

10/hr

10/hr

30/hrMachine #2

Page 22: Strategic capacity planning for products and services

Prepare to deal with capacity “chunks.”o no machine comes in continuous capacities.

Attempt to smooth out capacity requirements.o Unevenness in capacity requirements also can create

certain problems.

Identify the optimal operating level.o Production units typically have an ideal or optimal

level of operation in terms of unit cost of output.Economies of Scaleo If the output rate is less than the optimal level,

increasing the output rate results in decreasing average unit costs.

Page 23: Strategic capacity planning for products and services

Diseconomies of scaleo If the output rate is more than the optimal level,

increasing the output rate results in increasing average unit costs.

Choose a strategy if expansion is involved.o Consider whether incremental expansion or single

step is more appropriate.

Page 24: Strategic capacity planning for products and services

Cost-Volume Analysiso Focuses on relationships between cost, revenue and

volume of output.FC= Fixed CostVC= Total variable costv= variable cost per unitTC= Total CostTR= Total revenueR= Revenue per unitQ= Quantity or Volume of output

QBEP= Break even quantity P=Profit

Page 25: Strategic capacity planning for products and services

•Fixed Costs (FC)– tend to remain constant regardless of output

volume

•Variable Costs (VC)– vary directly with volume of output– VC = Quantity(Q) x variable cost per unit (v)

•Total Cost– TC = Q x v

•Total Revenue (TR)– TR = revenue per unit (R) x Q

Profit (P) = TR – TC = R x Q – (FC +v x Q)

= Q(R – v) – FC

Q=P+FC/R-v ; QBEP=FC/R-V

Page 26: Strategic capacity planning for products and services

Examples:• The owner of Old-Fashioned Berry Pies, Simon Chen, is contemplating adding a new line of pies, which will require leasing new equipment for a monthly payment of $6000. Variable costs would be $ 2.00 per pie, and pies would retail for $7.00.a) How many pies must be sold in order to break-even?b) What would the profit be if 1000 pies are made and sold in a month?c) How many pies must be sold to realize a profit of $4000?d) If 2000 can be sold, and a profit target is $5000, what price should be charged per pie?

Page 27: Strategic capacity planning for products and services

Solution:FC=$6000 VC=$2 per pie REV=$7 per pie

a) QBEP= FC/R-V =$6000/$7-$2 =1200 pies/monthb) For Q=1000; P=Q(R-V)-FC =1000($7-$2)-$6000= $1000c) P=$4000; SOLVE for Q using Q=P+FC/R-VQ=$4000+$6000/$7-$2 = 2000 piesd) Profit=Q(R-V)-FC$5000=$2000(R-$2)-$6000R=$7.50

Page 28: Strategic capacity planning for products and services

• A manager has the option of purchasing one, two, or three machines. Fixed costs and potential volumes are as follows:

VC is $10 per unit and R is $40 per unit.a) Determine the break-even point for each range.b) If projected annual demand is between 580 and 660

units, how many machines should the manager purchase?

Number of Machines

Total annual Fixed Costs

Corresponding range of output

1 $9 600 0-3002 15000 301-6003 20000 601-900

Page 29: Strategic capacity planning for products and services

I. Solution:a) For one machine:

QBEP= $9600/$40 per unit-$10 per unit= 320 units( not in range, so there is no BEP)

b) For two machines:

QBEP= $15000/$40 per unit- $10 per unit=500 unitsc) For three machines:

QBEP= $20000/$40 per unit- $10 per unit=666.67 units

Page 30: Strategic capacity planning for products and services

B. Comparing the projected range of demand to the two ranges for which a break-even point occurs, you can see that the break-even point is 500, which is in the range 301-600. this means that even if demand is at the low end of the range, it would be above the break-even point and thus yield a profit. At the top end of projected demand, the volume would still be less than the break-even point for that range, so there would be no profit.

Page 31: Strategic capacity planning for products and services

Assumptions of Cost-Volume Analysis• One product is involved.• Everything produced can be sold.• The variable cost per unit is the same regardless of

the volume.• Fixed costs do not change with volume changes, or

they are step changes.• The revenue per unit is the same regardless of

volume.• Revenue per unit exceeds variable cost per unit.

Page 32: Strategic capacity planning for products and services

Financial Analysis•Cash flow

– The difference between cash received from sales and other sources, and cash outflow for labor, material, overhead, and taxes

•Present value– The sum, in current value, of all

future cash flow of an investment proposal

Page 33: Strategic capacity planning for products and services

Decision Theory • represents a general approach to decision making

which is suitable for a wide range of operations management decisions, including:

capacity planning

product andservice design

product andservice design

equipment selection

location planning