Building Disaster Resilient Communi3es in Pokhara Sub-‐Metropolitan
Navin Subedi
Partnership Project Manager 13 August 2012
Project Area: All 18 wards within Pokhara Sub-‐Metropolitan Beneficiary: Direct: 20,200 People (3,200 students) Indirect : 200,000 people
Funding Support: DFID Project Management: AcJonAid InternaJonal Nepal PracJcal AcJon In Nepal ImplementaJon: Community Support Group and Siddhartha
Club
Total Project Cost: One Million GBP Project Period : April 2012-‐March 2014
Project Brief
Project Ra3onale
MulJ-‐Hazards In Nepal
• Nepal is situated in one of the high disaster risk area • Disaster Risk Management is one of the prioriJes of the Government of Nepal and Donors
• Pokhara potenJal to mulJ hazard reoccurrence like: – Flood, Avalanche – Land Cave in – Earthquake Prone Area – Need to reinforce Building Code implementaJon – Poor and Vulnerable communiJes
Project Ra3onale
To increase the resilience of poor and vulnerable people, especially women, to mi3gate, prepare for, effec3vely respond to and overcome the impact of mul3ple hazards in Pokhara Sub-‐Metropolitan
Goal
Impact • Poor and vulnerable people in Nepal are less at risk from mulJple hazards • CommuniJes manage and miJgate risks from mulJple hazards • Infrastructure and public buildings are protected
• Capacity of communiJes is enhanced to reduce hazards and impact of disasters through collecJve local acJons.
• NaJonal and local level policy and pracJce are influenced (based on project and past experiences)
• Awareness of the target stakeholders is raised on disaster preparedness at each wards and Sub Metropolitan
• Small scale miJgaJon measures contribute to reducJon of vulnerabiliJes in schools and communiJes
• Resilience of communiJes increased through improved financial (also human, social and physical) assets
Expected Outputs
• An innovaJve approach to best fit insJtuJonal experJse for resilience building.
• ImplementaJon in close coordinaJon and collaboraJon with local government agencies/Sub-‐Metropolitan/NGO/Media/private sectors
• Community based program approach • Program focused on vulnerable women and youths • InsJtuJonalizaJon and human resource development at local
level • DocumentaJon of project learning and experience • CoordinaJon and cooperaJon for policy level works with
concerned stakeholders
Project Strategy
Capacity Building Ini3a3ves • Par3cipatory Vulnerability Analysis • REFLECT centre • DMC Forma3on at Ward, School and Community level (50) • Disaster Risk Management Training at ward/community/school • Task force (TF)and volunteers groups forma3on (20) • Skill based training for volunteers and task force members
Ac3vi3es
• Support ing Disaster preparedness works and community based early warning system set up.
• Disaster Safety Equipment support to DMC, volunteers groups • FormaJon and strengthening of Saving Credit Groups • Skilled based training for livelihood opJon to build disaster
resilience. • Set up of Disaster Emergency Fund at various community level
Ac3vi3es
Disaster Mi3ga3on Physical construc3on • River Embankment construc3on • Culvert and other safe outlet construc3on • School RetrofiZng • RetrofiZng of Hospital and community buildings.
Ac3vi3es
Support for Na3onal Building Code 2060 Implementa3on • Geological/Seismic/GLOF Study on Risk Assessment from
mul3ple hazards in Pokhara • Mason Training on Earthquake Resistant Construc3on of
Buildings (300) • Support to Pokhara Sub Metropolitan on implementa3on of
Na3onal Building Code 2060
Ac3vi3es
Mainstreaming Disaster Risk Reduc3on (DRR) in Development Ini3a3ves
• Orienta3on to local stakeholder on Hyogo Framework for Ac3on, Na3onal Strategy for Disaster Risk Management and Local Disaster Risk Management Planning Guidelines.
• Support Pokhara Sub Metropolitan to mainstream DRR in development works through prepara3on of Municipal Level Disaster Management Plan.
• Inclusion of DRR curricula at local school level
Ac3vi3es
Ac3onAid Interna3onal Nepal
Prac3cal Ac3on In Nepal
Project CoordinaJon Commi^ee
Project Team Pokhara
Community Support Group
Siddhartha Club
Stakeholder Agency
Beneficiary (Community/School/Municipality)
Project Advisory Commi^ee (PAC)
Project Implementa3on Framework
District Project Advisory Commi^ee (DPAC)
Stakeholders Agency
Pokhara Sub Metropolitan District Disaster Response Commi^ee
District Development Commi^ee District EducaJon Office
Western Regional Hospital Department of Mine and Geology
Department of Hydrology and Metrology District Division CooperaJve Office
Urban Development and Building ConstrucJon Office
Centre for Technical and VocaJonal Training
Small Co^age Industry Office Water Induced Disaster MiJgaJon Office
Nepal Red Cross Society Soil ConservaJon Office
ConstrucJon Contractors AssociaJon NaJonal Society of Earthquake Technology
I/NGO’s Other Relevant local Stakeholders